Gas Authority Of India Limited - Uttar Pradesh

36481004 tender for amrc for pipeline work for construction / maintenance activities for repair / modification / upgradation for gail gas ( o&m ) in ttz region for a period of 2 years. 2 emergency response team 3 for steel pipe line 4 emergency mobilization of fabrication team with all required / necessary equipments / tools tackles etc. alongwith availability of required ndt team with required consumable for attending the emergency of gas leak / burst / damage to steel pipe line ( upto size 10 ) in firozabad ( the scope includes all emergency related works, trenching as required, execution of work which may include replacement of pipe piece / installation of leak repair clamp / welding if reqd / ndt if required / coating if required and thereafter back filling / restoration of site as reqd ) . the pipe, pipe fittings & leak reapir clamp are free issue materials. all otehr materials $ consumables are in the scope of contractor. welding if required will be paid separately as per sor items. the readiness & availability with qualified team with all resources to be ensured as early as possible or within 06 hrs after intimation from eic. this sor is to be based on incident basis. 5 for mdpe pipeline 6 emergency mobilisation of team comprising adequate skilled & unskilled manpower and machinery, tools & tackles, etc. as applicable for providing services for jointing of underground mdpe pipeline size 20 125 mm dia. in case of any damage resulting in gas leakage including excavation, squeezing the pipeline, cutting, preparing and fusion welding the fittings, leak test, backfilling and complete restoration of site to its original condition in all respect. the work includes deployment of machineries like jcb, de watering pump, fusion welding machine, etc. in all type of surface such as normal soft surface, hard surface, rcc pavement, etc. the contractor shall also ensure barricading of site, public handling, etc. the supply of all materials ( except mdpe pipe fittings ) shall be in the scope of contractor. mdpe pipes & mdpe fittings will be supplied by gail gas. the readiness and availability of team with all resources to be ensured as early as possible or within 04 hrs. after intimation from eic. this sor item is based on per incident basis. 7 pipeline laying / installation ( carbon steel pipes ) 8 receiving and taking over as defined in the specifications, handling, loading, transportation and unloading of owner supplied 3 layer pe coated line pipes alongwith associated fittings and valves from owners designated stock yard ( in agra city gate station / fzd cgs / bharatpur stores / kosi stores as mentioned in scope of work ) to contractors stock yard / workshop / work site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipe line right of use / pipeline route alignment, carrying out inspection of company supplied materials including line pipes at the time of taking over, laying / installation of coated line pipes, associated fittings and accessories ( including elbows / bends / valves / ij / flanges / reducers / tees, etc. the supply part is separate ) , including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional lands required for contractors storage, fabrication, access for construction, procurement and supply of all materials ( except owner supplied materials ) , consumables ( such as gaskets of required size / nut bolts / studs / flanges if required etc ) , equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per drawings, specifications, other provisions of contract document and instructions of engineer in charge, including but not limited to carrying out the following works. however, the above ground pipe line laying / installation / erection works may be considered through mechanical works, if additional.checking, cleaning, aligning, bending, cutting and bevelling ( as required ) of pipes for welding and field adjustments including pipe fittings, welding, carrying out ndt of welds as required including 100% radiography by x ray / gamma ray as per specification in piping of all types ( sizes / thickness / schedule ) by an approved vendor with all relevent competent supporting documents ( interpretation of ndt by owners appointed / approved third party ) and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective, carrying out re radiography and other tests as required on repaired joints etc. as mentioned in special condition of contract ( scc ) & particular job specification. line pipe laying & installation with radiography by x ray / gamma ray. installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings etc. at designated depth by open cut ( including laying of casing pipe ) ( except at hdd / moling / boring cased crossings which is covered separately elsewhere in this sor ) .protective coating including supply of coating & other materials duly approved by owner for all piping valves, fittings, structural steels etc. for buried installation and inside the valve pit. 9 carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with required quantity of corrosion inhibitor including pre testing of designated sections complete as per specification and approved by engineer in charge to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, ( if required dead weight tester, pressure recorder, thermocouples etc. also ) and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defect attributable to contractor ( rectification of defects in linepipe material not attributable to contractor shall be paid separately as per other item of schedule of rate ) , re testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by engineer in charge. complete commissioning of the laid pipe line after filling nitrogen ( inert atmosphere ) and as per standard procedures approved by the third party / consultant / authorized representative of gail gas as per instruction of eic. all the site requirement or consumables are included in the scope of contractor and the decision of eic will be final in any case. complete back filling or restoration of the trench loose soil or digged soil ( throughout the pipe line lenth ) to be back filled as normal and final clean up of the area up to the satisfaction of consultant / gail gas / eic and the reports are to be submitted, however if the additional work is invoved in restoration that is to be paid extra if needed. 10 note: the above ground pipe line works for ( any size ) is to be taken care from the mechanical works and payments are be regulaized as per mech works sor. 11 specified size ( nb ) 12 50 mm ( 2 ) , cs, ( equal / less pipe dia ) 13 100 mm ( 4 ) , cs, ( equal / less pipe dia / including above 2 to 4 ) 14 150 mm / 200mm / 250mm ( 6 / 8 / 10 ) cs 15 sleeve welding 16 longitudinal butt welding and circumferencial lap welding of sleeve / clamp of any size / thk ( dia up to 10 ) on the carrier pipe line ( charged gas pipe line ) 17 installation of full encirclement of split sleeve by welding on natural gas charged pipe line ( up to dia 10” ) with proper procedures & safety. this all will include the shifting / transporting of sleeve from desisnated gail gas stores to the site, excavation on site as per requirement, peeling off / removal of coating from the pipe line, carrying out the described jobs, all type of ndt / tests, as per requirements & instruction of eic, coating of the sleeve and back filling & clearing of the site by a qualified team ( welder / fitter / etc ) as per other site coordination, if required is in the scope of contractor. the complete responsibility of complete works lie with the contractor, including any liasioning required during the work execution. contractor has to manage all sorts of compensation / insurance policy, as required. 18 supply of fittings 19 bends ( r=3d ) 4 nb, 7.1mm angle 46 to 90 degree 20 bends ( r=3d ) 4 nb, 7.1mm w.t. angle upto 45 degree 21 bends ( r=3d ) 8 nb, 7.1 mm w.t., angle 46 to 90 deg ( or dia 6 ) or sch 80 22 bends ( r=3d ) 8 nb, 7.1 mm w.t., angle upto 45 deg ( or dia 6 ) or sch 80 23 elbow 90 deg 2 thk 6.4 mm ( a234, gr. wpb, b 16.9, 1.5 d ) including below 2. 24 elbow 45 deg 2 thk 6.4 mm ( a234, gr. wpb, b 16.9, 1.5 d ) including below 2. 25 elbow 90 deg 4 thk 7.1 mm ( a234, gr. wpb, b 16.9, 1.5 d ) including above 2 to 4. 26 elbow 45 deg 4 thk 7.1 mm ( a234, gr. wpb, b 16.9, 1.5 d ) including above 2 to 4. 27 equal tee 4x4x4 thickness ( a234, gr. wpb, asme 16.9 ) or mss sp75 gr wphy 42 or equivalent ( tech data attached. ) or as per site requirement 28 equal tee 2x2x2 thickness ( a234, gr. wpb, asme 16.9 ) or mss sp75 gr wphy 42 or equivalent ( tech data attached ) or as per site requirement 29 unequal tee 8x4 thickness 7.1 mm ( a234, gr. wpb, asme 16.9 ) or mss sp75 gr wphy 42 or equivalent ( tech data attached ) or as per site requirement 30 unequal tee 4x2 thickness 6.4 mm ( a234, gr. wpb, asme 16.9 ) or mss sp75 gr wphy 42 or equivalent ( tech data attached ) or as per site requirement 31 unequal tee3x2 thickness 6.4 mm ( a234, gr. wpb, asme 16.9 ) or mss sp75 gr wphy 42 or equivalent ( tech data attached ) or as per site requirement 32 reducer 4x3 ( a234, gr. wpb, b 16.9 ) thickness 6.4 mm 33 reducer 3x2 ( a234, gr. wpb, b 16.9 ) thickness 6.4 mm 34 reducer 4x2 ( a234, gr. wpb, b 16.9 ) thickness 6.4 mm 35 reducer 2x1 1 / 2 or 1 ( a234, gr.wpb, b 16.9 ) thickness 6.4 mm 36 end cap ( a234, gr.wpb, b 16.9 ) 2 thickness 6.4 mm 37 end cap ( a234, gr.wpb, b 16.9 ) 1 to 1 1 / 12 thickness 6.4 mm 38 end cap ( a234, gr.wpb, b 16.9 ) from dia 3 or 4 thickness 6.4 mm 39 end cap 8 ( a234, gr.wpb, b 16.9 ) 40 insulation joint dia 2x 300# ( sch 80 ) api 5l gr b 41 insulation joint dia 4x 300# ( sch 80 ) api 5l gr b 42 note : materials for fittings / end caps / elbows has to be as per complaince of pngrb specification & standards. supply part excludes the laying and installation with main pipe line works for which additional payment to be made. 43 supply of butt weld ball valves 44 2 # 300, bw, cs, full bore valve 45 4 # 300, bw, cs, full bore valve 46 8 # 300, bw, cs, full bore valve 47 note : ball valve, carbon steel, butt welded, full bore for natural gas pipeline service ( astm a105 & as per technical specification approved and to be procured from approved vendors of gail / gail gas / mecon / eil / pdil / equivalent ) ) 48 note : the installation of fitting / valves / ij / surge diverter / etc is to be considered as normal working of pipe line laying works and the payments for the works is to be done on the basis of normal items of excavation / welding / ndt / coating / etc as per sor covered in the contract. 49 installation of carrier pipe crossings by hdd method at crossing without casing pipe 50 complete work of installation of carrier pipe at crossings ( between the limits as defined in approved drawings ) by hdd method for road, nallah, drain and canal wherever required in all types of soils and terrains including receiving and taking over owner supplied three layer pe coated line pipes from owners designated place of issue / dump site ( s ) and transportation to contractors stock yard / work shop / work site including all handling, loading, unloading, aligning etc. supply of all contractor supplied material including manpower, equipment, consumables, other resources and aquiring the required land for storage, fabrication inclduing string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type heat shrink sleeve and repair of pipeline coating with special repair patch materials as per specification, strapping of cs conduit with main pipeline subducted with hdpe conduit for laying / blowing of ofc cable, pre testing etc. of complete string made, etc. and execution of, but not limited to, following works in accordance with specifications and instruction of engineer in charge and as per all provision of contract document. 51 note:the length mentioned in sor is indicative for all the crossing to be done by hdd & locations shall be decided by gail gas / consultant prior to start of job depending upon site condition. payment for the length of final tied in carrier pipeline string with mainline laid by hdd are inclusive in this above item rate. no any separate payment shall be made under other clauses mentioned elsewhere. 52 installation of 2 nb coated carbon steel pipe 53 installation of 4 nb coated carbon steel pipe 54 installation of 10 / 8 / 6nb coated carbon steel pipe 55 crossing ( uncased ) 56 installation of casing pipe by jacking / boring / moling for road, rail, nalah, drain etc. crossings wherever required in all types of soils and terrains, including all associated works like supply of all other contractor supplied materials viz. casing insulators and casing end seals, materials for casing vents and drain etc. including supply of all other materials, equipment, consumables, manpower, welding including visual inspection of all weld joints, installation of casing insulators end seals, vent and drain off pipes, backfilling and restoration as original of the facility crossed and performing all works as per drawings, specifications and instructions of engineer in charge and provisions of contract document. 57 note: the length mentioned in sor is indicative for all the crossing to be done by jacking / boring numbers & locations shall be decided by gail gas / consultant prior to start of job depending upon site condition. width of the above crossing mentioned is tentative. actual length & cover from top of casing pipe string may vary depending upon site conditions, crossing methods, approved drawings etc. and / or decided by concerned authority / engineer in charge. the length mentioned in sor is indicative for all the crossing & locations shall be decided by engineer in charge depending upon site condition. payment for the length of final tied in carrier pipeline string with mainline laid by jacking / boring method & moling are inclusive in this above item rate. no any separate payment shall be made under other clauses mentioned elsewhere. 58 installation of 2 nb coated carbon steel pipeline without casing 59 installation of 4 nb pe coated carbon steel pipeline without casing 60 installation of 6 / 8 / 10 nb pe coated carbon steel pipeline without casing 61 repair of coating defects ( not attributable to contractor ) 62 coating on pipe lines ( repair / bare pipe line / fitting additional ( not attributed to contractor ) 63 apply of all coating materials including supply as per heat shrink sleeve or cold tape application methedology with specification to be compatible with pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation by sand blasting, repairing of coating defects ( resulting in holiday ) for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of engineer in charge. this rate shall be applicable per running meter of the exposed steel area. 64 for pipeline size 2 nb 65 for pipeline size 4 nb 66 for pipeline size 10 / 8 / 6 nb 67 hot tap works ( excluding split tee / weldolet / ball valve ) 68 complete work for providing hot tap off, excavation for required depth & back filling / restoration to original condition including installation of valves & flanges, etc. on underground pipeline, arranging all manpower, machineries, tools & tackles, consumables ( such as flanges / blinds of required size / gaskets / studs, nut bolts / etc and coating on fitiings if required ) . 69 hot tapping machine for making hot tap also to be provided by the contractor with all safety precautions, as per standard norms / practice & instruction of engineer in charge. 70 2 hot tapping on 4 / 6 / 8 / 10 natural gas pipeline 71 4 hot tapping on 4 / 6 natural gas pipeline 72 4 hot tapping on 8 / 10 natural gas pipeline 73 hot tapping fittings supply ( split tee ) 74 supply & installation of split tee of the required / specified specification suitable for api 5l gr.x 46, 6.4 mm / available thichness header pipe line. ( complete with backing bars and run off plates ) or suitable for hydro carbon services for cgd networks as per pngrb guidelines. 75 4x 2 spilt tee class 300# rf 76 8x4 spilt tee class 300# rf 77 8x 2spilt tee class 300 # rf 78 hook up with existing pipeline after shut down of operating pipeline 79 complete work for providing tap off on underground / aboveground pipeline including supply of all associated required fittings, flanges, consumables, excluding valves ( which are covered separately ) , arranging all manpower, machineries, tools & tackles, consumables ( coating on the welded portion or opened cleaned buffed portion for shut down including supply of coating materials ) , excavation for the pipe line trenching up to the required depth & sizes and restoration to original condition after works completion and ndt also for hook up with existing pipeline with all precautions, as per standard norms / practice & instruction of engineer in charge. instead of hook up with existing pipeline the work may involve removing existing leak repair clamp by cutting damaged pipe piece out & replacement with welding of 1 m ( approx. ) cs pipe including hydrotesting & transportation of the cs pipe piece from gail gas stores at firozabad kosi & cutting, beveling, ndt, etc. note: above work may involve inertization & purging of the pipeline section with nitrogen prior to start of welding work and payment will be made separately as per respective sor item. wherever applicable dismantling of existing structures such as rcc drain, etc is to be done without stopping the flow of water by making alternative arrangement for water flow till completion of work and reconstruction of the dismantled structure. the rate to include necessary arrangement for maitaining water flow. payment for dismantling and reconstruction will be made separately through respective sor items. 80 2 pipe line to be hooked up to existing pipeline sizes from dia 2 to dia 10 81 4 pipe line to be hooked up to existing pipeline sizes from dia 2 to dia 10 82 6 / 8 / 10 pipe line to be hooked up to existing pipeline sizes from dia 4 to dia 10 83 metering skid 84 erection / installation of metering skid on foundation at the desired location ( skid type upto g 600 metering skid with size up to 4.5 mtr. x 2.5 mtr. / 5.0 mt of weight ) including the labour cost / arrangement of crane or required machinery cost & necessary coordination at site. 85 transportation of metering skid: shifting of metering skid ( type upto g 600 metering skid with size up to 4.5 mtr. x 2.5 mtr. / 5.0 mt of weight ) ) , from firozabad cgs, agra cgs or kosi store yard and erection / installation on foundation in the premises of consumer ( or ) removal from foundation from the consumer premises and shifting to acgs / fcgs / kosi store yard. the item also includes the arrangement for loading / unloading and the necessary labour cost etc. 86 disconnection of existing connectivity: 87 disconnection of existing cs pipeline: excavation of pit suitable for work, disconnection of existing connectvity upto 4 size of cs line during shut down ( to be arranged by owner ) from the main / branch line by cold cutting, capping / plugging by end cap of requisite size ( to be provided by owner ) through welding, its ndt including supply of all manpower, machineries & nitrogen gas for local purging etc. the work shall also include removal of above ground pipe spool, fittings ( size upto 4 ) , tlp etc. from the premises of consumer and its shifting to gail gas designated stores / yard as per instruction of eic. the pipeline piece which can not be recovered shall be dealt as unusable. ( however, the above ground disconnection is to be treated as normal joint. ) 88 miscellaneous mechanical works : 89 welding works: receiving, handling, loading, transportation and unloading of all owner supplied materials from owners designated stock yards to contractors own stock yards / workshops / work sites including, preparation of drawing, welding of pipe spools & associated fittings, supply of all consumables, manpower / machineries, supervision and shifting of welded spools to consumer end as per instructions of engineer in charge. 90 cutting & re beveling: removal of flanges / fittings from existing piping spools by gas cutting / grinding, edge preparation inlcuding supply of all manpower, supervision, consumables etc. 91 radiography ( x ray / gamma ray ) : performance of radiographic inspection on piping of all types, sizes, thickness including providing or hiring of all necessary equipment, tools and tackles though not expressly mentioned but requied to perform the work as per specification and instruction of engineer in charge. radiographs & reports shall be submitted to the engineer in charge. 92 purging with nitrogen for existing u / g pipline system: inertization & purging of the pipeline section with nitrogen for existing underground pipeline network prior to carrying out hotwork during shutdown, including supply of all equipment, man power, consumables ( including nitrogen required for purging / filling ) , materials for all temporary works and performing all associated works, complete as per the relevant specifications, and instructions of engineer in charge. 93 8 pipeline 94 4 pipeline 95 3 pipeline & below 96 steel fabrication & mechanical works 97 fabrication of ms structural / mechanical works of different sizes ( all materials to be isi marked ) including procurement of materials i.e hinges nuts, bolts, washers of all sizes etc. / ms plates / sheets of reqd size as per site requirements / eic, primer, coating / painting etc. and transportation at site, as required ( complete in all respect ) , any specific part / piece / materials may be paid separately, if required however fabrication part remains included. fabrication & fixing of different type of fabricated structures / mechanical covers for valve pits / man holes with its frame, if required and other supports, etc. ( this will include the removal of old / damaged scrap materials from site to the designated place as instructed by eic, if required ) . 98 civil works 99 dismantling of existing rcc work / any civil structure. the purpose of dismantling is to make required space for the welding or other work to be done. 100 rcc work: providing reinforced cement concrete of grade ( 1: 1.5: 3 ) with 20mm and down grade crushed stone aggregate in all types of structures like rcc wall, foundations, pedestals, pedestal bases, pipe supports, etc. at all depths and heights complete as per drawings, specifications and direction of the eic. ( including cost of providing shuttering etc. but excluding supply of reinforcement steel which will be paid separately as per sor item ) . 101 reinforcement steel: supplying, fabricating & fixing in position hysd steel reinforcement / tmt grade fe 415 conforming to is 1786 1985 at all level ( all depth & height ) and positions including the cost of transport, straightening, cutting, bending , cranking, binding, welding, provision of necessary chairs and spacers, as per drawings and specifications and including the cost of binding wire, labour etc. as per scope of work and direction of eic. 102 excavation works: earth work in excavation below ground level for all kinds of works in all types of soil as directed by eic for a depth up to site requirements ( for the purpose meant for taking up any work by owner ) including removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, levelling, grading and ramming of bottoms, de watering of accumulated water from any source and keeping the surface dry for subsequent works and if required disposal or stacking of excavated material at undisputed place, as directed including providing temporary supports to existing service lines like water pipes, sewage pipes, ofc, electric overhead and underground cables etc. all complete. 103 painting on steel structures / skids / aboveground piping: painting of steel structures / skids / aboveground piping after surface preparation which are situated at various locations of city. scope includes removal of dust, grease and loosely adhering paint with wire brush, emery paper and cleaning with linen cloth. primer shall be high solid polyamine cured epoxy one. finish coat should be of epoxy paint of approved brand such as burger / narolac / asian paints. colour as per instruction of eic. 104 restoration 105 restoration of rcc / pcc road / area 106 restoration of damaged rcc / pcc road / area during execution / construction work by using standard tools, tackles and practices, including all bye works, complete as per existing specifications & directions and satisfaction of of e.i.c / concerned authority ( rates include cost of labour, tools, equipment, hire charges & supply of all materials and consumables ) 107 restoration of bitumin road / area 108 restoration of damaged bitumin road / area during execution / construction work by using standard tools, tackles and practices, including all bye works, complete as per existing specifications & directions and satisfaction of of e.i.c / concerned authority ( rates include cost of labour, tools, equipment, hire charges & supply of all materials and consumables ) 109 restoration of paver block area 110 restoration of damaged paver block area during execution / construction work by using standard tools, tackles and practices, including all bye works, complete as per existing specifications & directions and satisfaction of of e.i.c / concerned authority ( rates include cost of labour, tools, equipment, hire charges & supply of all materials and consumables ) 111 cathodic protection system 112 all works shall be carried out as per approved drawings & specifications. work shall include design / residual engineering, preparation of cp schematic drawing, supply, installation, testing & commissioning of complete cp system, all related civil work, including providing foundations, supply of all materials as specified in special conditions of contract, instruments, consumables, touch up epoxy paint as required, including supply of paint, tools, tackles, labour, transportation for satisfactory completion of work and as per the direction of engineer in charge. in addition to the items mentioned below the contractors scope shall include connecting the new pipelines to the existing pipelines / cathode points of tr units by means of jumpering / bonding. 113 25mm2 114 10mm2 115 6mm2 116 making cable to pipe connections: by thermit welding for following cables, including excavation for exposing pipe, removal of coating / wrapping, thermit welding, recoating of the area of weld by epoxy filling, holiday testing, backfilling, supply of all tools, tackles, consumables, thermit weld kits & labours for satisfactory completion of work. 117 6mm2 cables 118 10mm2 cables 119 25mm2 cables 120 supply & installation of test station as per drawings and technical specifications. work shall include all related civil works including foundation, termination of cables inside the test stations along with lugs & ferules sealing of cable entry space with bitumen compound, supply of all materials, consumables, tools, tackles etc. for satisfactory completion of work and as per direction of engineer in charge. 121 supply & installation of zinc anode at a depth of 1.5 2.0m on all type of soil alongwith 10m tail cable of 25mm2 high conductivity, tinned, stranded copper conductor, 650 / 1100v grade, xlpe insulated, armoured, pvc sheathed for grounding electrical surges in the pipeline at ht crossings. the work includes excavation, laying of zn anode of minimum 20 kg weight, backfilling and all related civil work, complete in all respects. the work shall also include anode to tail cable connection, cable laying and termination inside the test station. 122 supply & installation of mg anodes after pre packaged with chemical backfill as per drawing. the anodes will have to be buried at a depth of 1.5 to 2m on all types of soil at approved location. the work shall include all earth work, laying of anodes & cables in position and termination of cable inside test stations with lugs, shunt & variable resistors, supply of all tools, tackles, consumables, labours, transportation of materials etc. required for satisfactory completion of work as per direction of engineer in charge. 123 supply, installation, testing and commissioning of polarization cell ( solid state type ) 124 supply, installation, testing and commissioning of spark gap arrestors / surge diverter across insulating joints. 125 supply, installation, testing and commissioning of earth pits in all types of soils including soft rocks, as per specification direction of engineer in charge. 126 supply and installation of gi25x3 mm earth strips including bending, cutting, and jointing with suitable nut, blots and washers for connections with earthpit. 127 mdpe line works 128 disconnection of existing pe pipeline 129 excavation of pit suitable for work, disconnection of existing connection sizes upto 125mm of pe line during shut down ( to be arranged by owner ) from main / branch line by cold cutting / plugging by end cap of requisite size upto 125mm to be ( provided by owner ) through fusion wwelding, its testing including supply of all manpower, machneries & nitrogen gas for local purging etc. the work shall also include removal above ground fitting etc upto 125 mm from the premises of consumer and its shifting to stores as per eic 130 couplers / end cap mdpe ( pe 100 ) , size up to 125mm 131 elbows / bend mdpe ( pe 100 ) size upto 125mm 132 valve mdpe ( pe 100 ) upto 125mm...

National Thermal Power Corporation Limited - Uttar Pradesh

33463971 procurement of zinc anode for condenser water box 5x200mw lmz turbinestage i at ntpc singruali procurement of zinc anode for condenser water box 5x200mw lmz turbinestage i at ntpc singruali , as per long text mentioned in techical data sheet...

Indian Coast Guard - Uttar Pradesh

31807485 procurement of kamewa water jet ard 2021 spares procurement of kamewa water jet ard 2021 spares procurement of kamewa water jet ard 2021 spares , cgsd chennai model kamewa 71s3, 63s3, 71s2 , adapter , bulkhead seal , centre main engine bulkhead seal / intermediate shafting bulkhead seal , change over valve v21 / magnet coil , complete shaft seal assy. ( kwjs 130b ) , contactor , counter balance valve , coupling , dowel pin , feed back cable , feedback unit , filter cartridge , filter cartridge , flow switch , hexagon head screw , hexagon head screw , hexagon head screw m 12x40 , hose , hose , hose , hose , hose , hudraulic cylinder 80 / 40 270 , hydraulic hose 722 08 / 1020 / p 86 08 16 sy , hydraulic valve , hydrolic hose complete , inflatable seal , lock nut , lock nut , lock nut , locking compound , locking plate , locknut , lubricant , manometer 0 250 bar , mechanical shaft seal , mechanical shaft seal , moloycotage g rapid + , o ring , o ring , o ring , o ring , piston rod , piston rod , plain washer , plug , protection hose , protection hose , protection hose steering , proximity switch , push button , reversing cylinder piston lock screw , roller bearing , roller bearing , sacrificial anode , sacrificial anode , sacrificial anode ( upgrading kit ) , sacrificial anode upgrading kit , screw mc 6s m 12x70 frkoppr a4 8r , screw mc6 sm 10x60 frko , screw mc65 m16x80 frkopp r a4 8r , seal kit , seal kit , seal kit , seal ring , sealing compound , sealing ring set ( position no 2 ) , sikaflex 291 , sleeve for radial bearing , socket head screw , socket head screw , spring 955917 a , steering cylinder piston lock screw , stub shaft , temperature sensor , temperature transmitter , valve , valve , valve , valve , refit ard model : kamewa 71s3, 63s3, 71s2 , bearing bushing , bearing bushing , bearing washer , bushing , counter balance valve , hydraulic cylinder , manometer ( pos 39 ) , o ring , o ring , o ring ( pos 10 ) , plain washer , rapair kit , self locking retaining ring , servo unit flang screw , cgsd porbandar , counter balancing valve ( v18 ) , mechanical shaft seal , socket head screw , roller bearing , seal supporting flange , bearing housing , lock nut , hexagonal bolt , feed back unit , bulkhead seal ( dia 240h73827c 04 ) , bulkhead seal ( dia 258h73827c 04 ) , socket head screw , o ring , lock nut , zink ring , reversing cylinder o ring , reversing cylinder piston , seal kit reversing cylinder , protection hose reversing , protection hose steering , hose reversing , bellow , foreward & aft bulk head seals , transom flange assembly ( integrated hull fitting ) , repair kit roplan kwjs , socket head screw , socket head screw , o ring , o ring , mechanical shaft seal kwjp 190 , hex head screw , stub shaft , pressure ring set ( position no 3 ) , sealing ring set ( position no 2 ) , seal kit steering cylinder , washer , hexagon head screw , hexagon head screw , sealing compound , lock nut , lock nut , hexagon head screw , plug , hexagon head screw , dowel pin , sacrificial anode , screw , dowel pins , sealing compound 0.3 kg , pc board ccn 01 , instr dlq 72 pc py revers 108059 , bearing bushing , zinc anode 955047a , sealing set , filter cartridge , sacrificial anode , fork link , bearing bushing955500a , plain washer , o ring...

Ministry Of Petroleum And Natural Gas - Uttar Pradesh

29735578 bids are invited for part a item 1 supply & installation of manual test stations ( mts ) complete with lower bend and with pcc foundation including, terminal plate, diagram plate, cable identification ferrules, & proper cable termination with lugs, numbering of ts etc. as per drawing & specification ( with ip55 ) complete in all respect and per instruction of eic , part a item 2 supply & installation of manual test stations ( mts ) without lower bend & without pcc foundation including terminal plate, diagram plate, cable identification ferrules & proper cable termination with lugs, numbering of ts etc. as per drawing & specification ( with ip55 ) complete in all respect and per instruction of eic. , part a item 3 shifting of mts along with foundation and cable to suitable nearby location as per instruction of eic. ( cable extra ) , part a item 4 repairing of mts foundation with supply and replacement of foundation bolts & nuts including labour , tools, tackles consumeables like cement, sand aggregates, etc complete in all respect as per scope of work, specifications and direction of eic , part a item 5 repairing of mts including supply and replacement of damaged door, door locks, terminal plate, diagram plate, neoprene gasket, brass links cable identification ferrules etc in mts with proper cable termination, cable jointing, lugs, with numbering of ts complete in all respect including labour, tools, tackles, consumeables like ms / brass bolts, nuts, washers, insulation tape etc.as per scope of work specifications and the direction of eic , part a item 6 supply & replacement of damaged / missing locks in mts including labor, consumables and tools & tackles as per drawings, specifications & instructions of eic. , part a item 7 supply & installation of damaged / missing terminal plates ( all types ) with m10 brass studs, washers, links, lugs & nuts, including labor, tools & tackles and consumables as per instruction of eic , part a item 8 supply and fixing of diagram plate in the existing manual test station ( all types ) complete in all respect including labour, tools, tackles, consumeables etc. as per scope of work specifications and the direction of eic , part a item 9 identification of cables in test station: the cables inside the test station shall be identified as per diagram plate / sticker by proper dressing, identification ferrules, carrying out necessary termination with copper lugs of required size and as per the direction of eic. the cable dressing shall be strictly as per the diagram plate , part a item 10 supply and fixing of neo prene gasket in mts box sizes ( all types ) as per scope of work and directions of eic. , part a item 11 repairing of aljb including supply of new locks & latch for the outer enclosure, shunt, variable resistance, brass links, aljb doors including welding mechanical, straightening of pipe, fittings, hinges, labour, tools tackles, consumables like lugs, ms / brass nuts, bolts, washers, insulation tape etc complete in all respect as per approved drawings, specification and as per direction of eic. , part a item 12 supply of xlpe armoured copper cableof 4 sq mm as per scope of work, specifications and direction of eic , part a item 13 supply of xlpe armoured copper cableof 6 sq mm as per scope of work, specifications and direction of eic , part a item 14 supply of xlpe armoured copper cable of 10 sq mm as per scope of work, specifications and direction of eic , part a item 15 supply of xlpe armoured copper cableof 25 sq mm as per scope of work, specifications and direction of eic , part a item 16 supply of xlpe armoured copper cableof 35 sq mm as per scope of work, specifications and direction of eic , part a item 17 cable laying of 4 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part a item 18 cable laying of6 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part a item 19 cable laying of 10 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part a item 20 cable laying of 25 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part a item 21 cable laying of 35 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part a item 22 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 4 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part a item 23 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 6 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part a item 24 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 10 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part a item 25 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 25 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part a item 26 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 35 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part a item 27 making of pipe to cable connection as per approved procedure, of all types of cable including excavation and backfilling, surface preparation, pipe to cable connection by means of pin brazing its encapsulation, holiday testing of the exposed section, labour, tools, tackles etc as per scope of work, specifications and direction of eic . ( pin brazing kit and holiday detector will be in the scope of the contractor ) . , part a item 28 painting of manual test station including removing of old paint, rust etc using emery paper, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. ( final dry paint thickness not less than 100 micron ) , numbering of test station as per scope of work, specification and as per direction of eic. , part a item 29 painting of anode lead junction box including removing of old paint, rust etc using emery paper, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. ( final dry paint thickness not less than 100 micron ) , numbering of test station as per scope of work, specification and as per direction of eic. , part a item 30 supply & replacement of imported copper copper sulphate permanent refrenece cells ( make mc miller / tinker & rasor company / caproco ) necessary backfill material including excavation / backfilling cable laying, cable identification ferrules, labour, tools, tackles, consumables like sand, brick, lug, brass washers, insulation tape etc, complete in all respects as per scope of work drawings, specification and direction of eic. , part a item 31 supply and installation of pre packed magnesium anodes with cable having weight 17 pounds including excavation, backfilling, cable laying up to test station and cable termination in test station, cable identification ferrules, with consumables labour etc. as per approved drawing, specification and direction of eic , part a item 32 supply , replacement & installation of prepacked single zinc anode ( 11kg ) of reputed make including excavation, backfilling, anode to tail cable connection, cable identification, coke breeze backfill complete with labor, tools & tackles as per drawings, specifications & instructions of eic , part a item 33 supply and installation of pre packed pair of zinc grounding cell 22kg including all tools, tackles, consumables, labour, chemical back fill, excavation, backfilling, cable to insert joint, laying of tail cable, cable termination at ts complete and in all respect as per drawing, specification and as per direction of eic , part a item 34 supply of earthing strip 25 mm x 4 mm size: conducton material: gi conforming to is code 2629, zinc deposition: not less than 610 grams / square meter, length of strip: minimum 7 mtr and maximum 10mtr, thickness of zinc coating: not less than 86 micron and smooth, continuous, uniform & free from acid spot, galvanizing process: hot dip galvanized and as per scope of work& specification in all respect and as per instruction of eic. , part a item 35 supply of earthing strip 50 mm x 6 mm size: conducton material: gi conforming to is code 2629, zinc deposition: not less than 610 grams / square meter, length of strip: minimum 7 mtr and maximum 10mtr, thickness of zinc coating: not less than 86 micron and smooth, continuous, uniform & free from acid spot, galvanizing process: hot dip galvanized and as per scope of work& specification in all respect and as per instruction of eic. , part a item 36 laying of hot dip galvanized of 25 mm x 4 mm iron earth strip in buried trench at a depth of minimum upto 150 mm from fgl. work includes civil work like excavation, breaking of pcc / rcc & back filling after laying of earth strip, welding of joints & applying 2 layers of bitumen etc. as per scope of work & specfication in all respect and as per instruction of eic , part a item 37 laying of hot dip galvanized of 50 mm x 6 mm iron earth strip in buried trench at a depth of minimum upto 150 mm from fgl. work includes civil work like excavation, breaking of pcc / rcc & back filling after laying of earth strip, welding of joints & applying 2 layers of bitumen etc. as per scope of work & specfication in all respect and as per instruction of eic , part a item 38 supply of copper plate earthing, tinned annealed copper plate of size 600x600x3mm, tinned annealed copper earthing strip of size 50x6mm, tinned annealed copper earthing strip of size 25x4mm, gi earth electrode of diameter: 50mm, thickness: 4.5mm, length: 2000mm, class c, taperred cut upto 75mm from bottom, stagerred hole of 12mm dia 75mm apart upto 1500mm from bottom, removable cap of length 25mm made of 65mm dia pipe with 3mm ms plate welded to the top, funnel with steel wite mesh, galvanized , part a item 39 construction of earth pit for copper plate earthing at sv / rr / ip stations of pipeline as per the drawing provided which includes supply of all required materiallike50mm dia, 2000mm long earth electrode, 600 x 600 x 6mm copper plate & 25 x 4mm copper strip including excavation, brick work, pcc, supply of charcoal, salt, sand, ms chequered plate of 6mm thickness , copper cable, bolt, nuts / check nuts, funnel, back filling compound for filling around the electrode, and excavation of pit as per drawing up to a depth of 3.5 meter minimum, making of pit with brick, sand, cement & smooth plastering, fixing of ms cover 6mm thickness, termination of earth wire / cable / strip & connect earth pit with grid and also ensure continuity with grid. , part a item 40 construction of normal earth pit scope of woks includes erection & commissioning ofearth pits at sv / rr / ip stations of pipeline wherever it is required which includes supply of all required material as per specification like 75 mm dia, 4.5 mm thickeness earthelectrode, gi strip, copper cable, bolt, nuts / check nuts, funnel, back filling compound for filling around the electrode, and excavation of pit as per drawing up to a depth of 3.5 meter minimum, making of pit with brick, sand, cement & smooth plastering, fixing of ms cover 6mm thickness, termination of earth wire / cable / strip & connect earth pit with grid and also ensure continuity with grid , part a item 41 construction of chemical earth pit: scope of woks includes erection & commissioning of chemical earth pits at sv / rr / ip stations of pipeline wherever it is required which includes supply of all required material as per specification like electrode, gi strip, copper cable, bolt, nuts / check nuts, funnel, back filling compound for filling around the electrode, and excavation of pit as per drawing up to a depth of 3.5 meter minimum, making of pit with brick, sand, cement & smooth plastering, fixing of ms cover 6mm thickness, termination of earth wire / cable / strip & connect earth pit with grid and also ensure continuity with grid in all respect as per the scope of work and drawings and as per instruction of eic. , part a item 42 supply ofearth pit chamber ms cover of 6 mm thickness , part a item 43 preventive maintenance of anode ground bed the scope of work includes necessary excavation for carrying out ground bed curing with 500 kg of common salt and water of 18 kl. the work includes necessary backfilling and restoration to the original condition as per the direction of eic. the contractor shall measure the grounded resistance after the treatment of ground bed. the resistance of grounded after the maintenance shall be less than 01 ohm. clearance if any required from land owner for entering / working in his permisses will be in the contractors scope , part a item 44 supply and installation of cable markers ( ci / cs / ms ) for underground cables and equipment as per the scope of work and specfication in all respect and as per the instruction of eic. , part a item 45 carrying out on off close interval potential survey ( cipl ) with lateral gradient at one meter interval using data loggers and standard cu / cuso4 reference electrode including detailed reports and as per the scope of the work and specification in all respect and as per instrution of eic. , part a item 46 stray current interference survey at railway crossing or runnig parallel to gail pipelines, including 24 hours data logging, data collection from railways, study the effectiveness of existing diode bonding and recommend mitigation measures / modification required at existing doide jb, at all the railway crossings or running parallel as defined in scope of work with specification, design and detail engineering in all respect and as per instruction of eic. , part a item 47 stray current interference survey at foreign p / l crossing or runnig parallel with gail pipeline, including 24 hours data logging, data collection from foreign pipeline operator, and recommend mitigation measures at foreign pipeline crossing or running parallel to gail pipeline as defined in the scope of work, with design, specification and detail enggineering in all respect and as per instruction of eic. , part a item 48 stray current interference survey at ht crossings or runnig parallel to gail pipelines, including 24 hours data logging, collection of data from seb, calculation of human touch and step voltages, measurent and calculation of ac corrossion current and recommendation for mitigation / effectiveness of existing grounding with modification if required, at ht line crossings / parallel sections as defined in the scope of work with design, specification and detail enggineering in all respect and as per instruction of eic.. , part a item 49 adequacy of cp station , study the adequacy of existing cp stations ( cptr & cppsm ) , including effectiveness and efficiency of remote anode bed, effective span of polarised protection on the pipelines from the drain point, mode of operation for the purpose of adequacy and better operation of the cp system and as defined in the scope of work in all respect and as per instruction of eic.. , part a item 50 carryingout current attenuation test / direct current voltage gradient ( dcvg ) survey using standard dcvg equipment to pin point the coating defect / holidays on pipeline as per the specifications in all respect and as per instruction of eic.. , part a item 51 excavation of pipeline in all type of soils and ordinary rocks for a width of d+500 mm on each side of pipe and exposing the pipeline from top upto 500 mm below the bottom of pipeline including the stacking of excavated earth, stacked earth to be levelled and neatly dressed as per the scope of work and directions of eic , part a item 52 backfilling excavated earth ( excluding rock ) in trenches in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, as per the scope of work and directions of eic. , part a item 53 supply of cold applied tape, 100 mm, innerwrap as per the specifications , scope of work and directions of eic , part a item 54 supply of cold applied tape, 100 mm, outerwrap as per the specifications , scope of work and directions of eic , part a item 55 supply ofprimer, cold tape coating, din 30762 part as per the specifications , scope of work and directions of eic , part a item 56 supply oftap, mastic, roll as per the specifications , scope of work and directions of eic , part a item 57 coating repair removing the old / damaged coating / rust greese, moisture and all foreign material at defect location with scrapper, manual surface preparation using hand wire brush, emery paper, scrappers or a combination of all processes, repairng of the coating with supply of raychem sleeves / cold applied tape / perp / patch repair kit, holiday testing after repair, as per the scope of work and to the entire satisfaction of eic. multiple patch repairing at one location within one meter span shall be trated as single quantity only. coating material will be supplied by gail. ( compensation, if required to land owners shall be in the scope of contractor ) , part a item 58 supply & installation of surge diverters ( dehn / equivalent ) in mts at ht power line crossings including cable identification, labor, tools & tackles, brass studs / nuts and sundry consumables , part a item 59 supply & installation of explsoin proof spark gap arrestors of dehn exsg4 / equivalent make across insulating joints at sv / ip / rr / terminals including required cable ( 25sqmm, cu ) , lugs, nuts & bolts, labor, tools & tackles, and sundry consumables , part a item 60 supply of portable cu cuso4 half cell for measuring of psp ( pipe to soil potential ) of pipeline , part a item 61 anode lead junction box ( size : 500 x 700 x 250 ) supply, installation, testing and commissioning of anode lead junction box including required backelite plate brass nut bolts, port type resistor & shunt arrangement, civil works with materials as per eic , part a item 62 reconditioning / recharging / maintenance of existing earth pit at rr / terminals with raising the height of civil foundation, repair of cement plastering, painting of top cover plates and numbering of earthpits. supply of common salt 50 kg and water 100l for bringing down the circuit resistance including making necessary excavation, mixing & pouring of salt & water, replacement & cleaning of connecting nuts and bolts, etc complete in all respect and as per directions of eic , part a item 63 installation & commissioning of gail supplied corrosion censing probe at sv / rr stations of hvj pipeline in all kind of soil including excavation, installation, termination in manual test stations and backfilling / restoration to the original ground condition under dibiyapur region as per scope of work and direction of eic. , part a item 64 bell hole inspection: excavation in all type of soils and ordinary rocks for a width of d+500 mm on each side of pipe and exposing the pipeline from top upto 500 mm below the bottom of pipeline including the stacking of excavated earth on pipeline for bell hole inspection for checking the health of pipeline including backfilling & restoration to original condition in all respect as per direction of eic. , part a item 65 supply installation & commissioning of sspc ( solid state polarisation cell ) in new installation / existing system in case of damaged as per ace / vde specifications for protection of hv / ehv power lines crossings, iccc ( rustroll system ) , dairyland or equivalent make ( as approved by eic ) suitable for arresting induce ac fault currents, lightning & surge protection, dc voltage ( > 3 volts ) and blocking the protective cathodic protection current on the pipeline. supply of sspc, ( as per specification mentioned in this tender documents ) , test station of suitable size, required length & size of cable, consumables with testing & data logging before and after installation ( report to be submitted ) are in the scope of contractor. complete in all respect and as per direction, specification of eic , part a item 66 soil resistivity survey by wenner four point method , part a item 67 supply and installation of end seals of both side of casings upto 6 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part a item 68 supply and installation of end seals of both side of casings for 18 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part a item 69 supply and installation of end seals of both side of casings for 12 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part a item 70 supply and installation of end seals of both side of casings for 24 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part a item 71 supply and installation of end seals of both side of casings for 30 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part a item 72 rectification of short casing , part a item 73 maintenance of lightning system ( outdoor ) maintenance of lighting system at rr / sv station under dibiyapur region. ( height of pole upto 12 m ) . all consumable materials, ladder, manpower, vehicle required for maintenance of street pole light will under scope of vendor. , part a item 74 supply & installation of distribution box :supply & installation of distribution box with 63a / 100a tpmccb, bakelite fuse, bus bar, neutral link in m.s. sheet enclosure of size not less than 500x750x200mm with enamel painting and cable entry holes with lockable door. all mentioned items will be in scope of vendor. , part a item 75 supply, installation & commissioning of polarization coupon along with magnetic reed switch as per the scope of work , part a item 76 supply of solar charge contr. 12v / 10a dc at sv stations : scope of work shall include supply and installation of solar charge controller for pole mounted solar light, 12v dc, 10a ( as per installed system ) as per direction, specification & satisfaction of eic , part a item 77 supply of solar charge contr.solar plant: scope of work shall include supply and installation of solar charge controller for solar plant, 96v dc / 100a or 120v dc / 100a, 48v dc / 180a ( as per installed system ) as per direction, specification & satisfaction of eic. , part a item 78 supply of dc / dc converter at rr station : scope of work should include supply and installation of dc dc converter at rr / ip stations under dibiyapur. input 30 v 70 v. ouput 48 v , 21a. the quanity mentioned against each maintenance basemay be used in other region if required. , part a item 79 permission from statuary authority: scope of work shall include granting permission from statuary authority ( railways / highway / forest / any government related authority ) for any kind of job in their rou or in forest land as per requirement of gail. transportation and other expenses involved in the job shall be in the scope of contractor , part a item 80 preventive maintenance of window / spilt preventive maintenance of window / spilit a / c upto 3 tons as per scope of work , part a item 81 preventive maintenance of water coolers preventive maintenance of water coolers up to 150 ltrs as per scope of work , part a item 82 preventive maintenance of refrigerator / d preventive maintenance of refrigerators / deep freezers upto 350 ltrs as per scope of work , part a item 83 sitc of starting capacitor ( 80 100mfd ) , part a item 84 sitc of running capacitor ( 36 mfd ) , part a item 85 sitc of starting relay for a / c, wc, rg , part a item 86 sitc of thermostat , part a item 87 sitc of over load relay a / c, wc, rg , part a item 88 sitc of shaft for blower motor , part a item 89 sitc of bush for blower motor , part a item 90 sitc of float valve for water cooler , part a item 91 sitc of fan blade for condenser , part a item 92 sitc of selector / rotary switch a / c , part a item 93 sitc of air filter for cooling coil of a sitc of air filter for cooling coil of a / c , part a item 94 sitc of blower for a / c , part a item 95 sitc of the faulty compressor of window / split sitc of the faulty compressor of window / split ac upto 3 ton with new one in buyback scheme of old burnet compressor as per scope of work and direction of eic , part a item 96 sitc of the faulty compressor of refrige sitc of the faulty compressor of refrigerator / water cooler upto 350 ltr. with new one in buyback scheme of old burnet compressor as per scope of work and direction of eic , part a item 97 sitc of the control card for single ph sitc of the control card for single phase window / split ac as per scope of work and direction of eic , part a item 98 sitc of capillary / copper pipe require fo sitc of capillary / copper pipe require for window / split ac , water cooler refregerator application as per scope of work and direction of eic , part a item 99 supply and charging of refregient gas to supply and charging of refregient gas to the compressor of split / window ac / refregerator / water cooler as per scope of work and direction of eic total quantity : 1...

Ministry Of Petroleum And Natural Gas - Uttar Pradesh

29735536 bids are invited for part b item 1 supply & installation of manual test stations ( mts ) complete with lower bend and with pcc foundation including, terminal plate, diagram plate, cable identification ferrules, & proper cable termination with lugs, numbering of ts etc. as per drawing & specification ( with ip55 ) complete in all respect and per instruction of eic , part b item 2 supply & installation of manual test stations ( mts ) without lower bend & without pcc foundation including terminal plate, diagram plate, cable identification ferrules & proper cable termination with lugs, numbering of ts etc. as per drawing & specification ( with ip55 ) complete in all respect and per instruction of eic. , part b item 3 shifting of mts along with foundation and cable to suitable nearby location as per instruction of eic. ( cable extra ) , part b item 4 repairing of mts foundation with supply and replacement of foundation bolts & nuts including labour , tools, tackles consumeables like cement, sand aggregates, etc complete in all respect as per scope of work, specifications and direction of eic , part b item 5 repairing of mts including supply and replacement of damaged door, door locks, terminal plate, diagram plate, neoprene gasket, brass links cable identification ferrules etc in mts with proper cable termination, cable jointing, lugs, with numbering of ts complete in all respect including labour, tools, tackles, consumeables like ms / brass bolts, nuts, washers, insulation tape etc.as per scope of work specifications and the direction of eic , part b item 6 supply & replacement of damaged / missing locks in mts including labor, consumables and tools & tackles as per drawings, specifications & instructions of eic. , part b item 7 supply & installation of damaged / missing terminal plates ( all types ) with m10 brass studs, washers, links, lugs & nuts, including labor, tools & tackles and consumables as per instruction of eic , part b item 8 supply and fixing of diagram plate in the existing manual test station ( all types ) complete in all respect including labour, tools, tackles, consumeables etc. as per scope of work specifications and the direction of eic , part b item 9 identification of cables in test station: the cables inside the test station shall be identified as per diagram plate / sticker by proper dressing, identification ferrules, carrying out necessary termination with copper lugs of required size and as per the direction of eic. the cable dressing shall be strictly as per the diagram plate , part b item 10 supply and fixing of neo prene gasket in mts box sizes ( all types ) as per scope of work and directions of eic. , part b item 11 repairing of aljb including supply of new locks & latch for the outer enclosure, shunt, variable resistance, brass links, aljb doors including welding mechanical, straightening of pipe, fittings, hinges, labour, tools tackles, consumables like lugs, ms / brass nuts, bolts, washers, insulation tape etc complete in all respect as per approved drawings, specification and as per direction of eic. , part b item 12 supply of xlpe armoured copper cableof 4 sq mm as per scope of work, specifications and direction of eic , part b item 13 supply of xlpe armoured copper cableof 6 sq mm as per scope of work, specifications and direction of eic , part b item 14 supply of xlpe armoured copper cableof 10 sq mm as per scope of work, specifications and direction of eic , part b item 15 supply of xlpe armoured copper cableof 25 sq mm as per scope of work, specifications and direction of eic , part b item 16 supply of xlpe armoured copper cableof35 sq mm as per scope of work, specifications and direction of eic , part b item 17 cable laying of 4 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part b item 18 cable laying of 6 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part b item 19 cable laying of 10 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part b item 20 cable laying of 25 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part b item 21 cable laying of 35 sq mm ( xlpe armoured cable ) inside the test station / over ground & under ground / inside the panel including excavation and backfilling, cable laying cable jointing above ground using copper sleeves, termination of cable in test station / panel, cable identification, supply & laying of bricks, sand etc including tools tackles, labour, consumables as per scope of work, specifications and the direction of eic , part b item 22 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 4 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part b item 23 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 6 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part b item 24 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 10 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part b item 25 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 25 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part b item 26 cable jointing / repairing of underground cable as per approved procedure including excavation and backfilling, cable jointing by cable jointing kit ( raychem / equivalent ) , termination & identification of cables, supply of cable jointing kit & other consumable, labour, tools, tackles, copper sleeves, heat shrink sleeves, ferol etc. for 35 sq mm. xlpe armoured cu cable as per scope of work, specifications and directions of eic , part b item 27 making of pipe to cable connection as per approved procedure, of all types of cable including excavation and backfilling, surface preparation, pipe to cable connection by means of pin brazing its encapsulation, holiday testing of the exposed section, labour, tools, tackles etc as per scope of work, specifications and direction of eic . ( pin brazing kit and holiday detector will be in the scope of the contractor ) . , part b item 28 painting of manual test station including removing of old paint, rust etc using emery paper, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. ( final dry paint thickness not less than 100 micron ) , numbering of test station as per scope of work, specification and as per direction of eic. , part b item 29 painting of anode lead junction box including removing of old paint, rust etc using emery paper, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. ( final dry paint thickness not less than 100 micron ) , numbering of test station as per scope of work, specification and as per direction of eic. , part b item 30 painting of tr unit including removing of old paint, rust etc using emery paper, surface preparation to get the smooth level surface, supply and application of 01 coat of ready mix red oxide primer of approved make, 02 coats of ready mixed first quality paint of approved brand. ( final dry paint thickness not less than 100 micron ) , numbering of test station as per scope of work, specification and as per direction of eic. , part b item 31 supply & replacement of imported copper copper sulphate permanent refrenece cells ( make mc miller / tinker & rasor company / caproco ) necessary backfill material including excavation / backfilling cable laying, cable identification ferrules, labour, tools, tackles, consumables like sand, brick, lug, brass washers, insulation tape etc, complete in all respects as per scope of work drawings, specification and direction of eic. , part b item 32 supply and installation of pre packed magnesium anodes with cable having weight 17 pounds including excavation, backfilling, cable laying up to test station and cable termination in test station, cable identification ferrules, with consumables labour etc. as per approved drawing, specification and direction of eic , part b item 33 supply , replacement & installation of prepacked single zinc anode ( 11kg ) of reputed make including excavation, backfilling, anode to tail cable connection, cable identification, coke breeze backfill complete with labor, tools & tackles as per drawings, specifications & instructions of eic , part b item 34 supply and installation of pre packed pair of zinc grounding cell 22kg including all tools, tackles, consumables, labour, chemical back fill, excavation, backfilling, cable to insert joint, laying of tail cable, cable termination at ts complete and in all respect as per drawing, specification and as per direction of eic , part b item 35 supply of earthing strip 25 mm x 4 mm size: conducton material: gi conforming to is code 2629, zinc deposition: not less than 610 grams / square meter, length of strip: minimum 7 mtr and maximum 10mtr, thickness of zinc coating: not less than 86 micron and smooth, continuous, uniform & free from acid spot, galvanizing process: hot dip galvanized and as per scope of work& specification in all respect and as per instruction of eic. , part b item 36 supply of earthing strip 50 mm x 6 mm size: conducton material: gi conforming to is code 2629, zinc deposition: not less than 610 grams / square meter, length of strip: minimum 7 mtr and maximum 10mtr, thickness of zinc coating: not less than 86 micron and smooth, continuous, uniform & free from acid spot, galvanizing process: hot dip galvanized and as per scope of work& specification in all respect and as per instruction of eic. , part b item 37 laying of hot dip galvanized of 25 mm x 4 mm iron earth strip in buried trench at a depth of minimum upto 150 mm from fgl. work includes civil work like excavation, breaking of pcc / rcc & back filling after laying of earth strip, welding of joints & applying 2 layers of bitumen etc. as per scope of work & specfication in all respect and as per instruction of eic , part b item 38 laying of hot dip galvanized of 50 mm x 6 mm iron earth strip in buried trench at a depth of minimum upto 150 mm from fgl. work includes civil work like excavation, breaking of pcc / rcc & back filling after laying of earth strip, welding of joints & applying 2 layers of bitumen etc. as per scope of work & specfication in all respect and as per instruction of eic , part b item 39 construction of normal earth pit scope of woks includes erection & commissioning ofearth pits at sv / rr / ip stations of pipeline wherever it is required which includes supply of all required material as per specification like 75 mm dia, 4.5 mm thickeness earthelectrode, gi strip, copper cable, bolt, nuts / check nuts, funnel, back filling compound for filling around the electrode, and excavation of pit as per drawing up to a depth of 3.5 meter minimum, making of pit with brick, sand, cement & smooth plastering, fixing of ms cover 6mm thickness, termination of earth wire / cable / strip & connect earth pit with grid and also ensure continuity with grid , part b item 40 construction of chemical earth pit: scope of woks includes erection & commissioning of chemical earth pits at sv / rr / ip stations of pipeline wherever it is required which includes supply of all required material as per specification like electrode, gi strip, copper cable, bolt, nuts / check nuts, funnel, back filling compound for filling around the electrode, and excavation of pit as per drawing up to a depth of 3.5 meter minimum, making of pit with brick, sand, cement & smooth plastering, fixing of ms cover 6mm thickness, termination of earth wire / cable / strip & connect earth pit with grid and also ensure continuity with grid in all respect as per the scope of work and drawings and as per instruction of eic. , part b item 41 supply ofearth pit chamber ms cover of 6 mm thickness , part b item 42 preventive maintenence of polarisation cells / kirk cells supply of koh electrolyte, complete in all respect to make the cell in working condition and as per specifications and instructions of eic , part b item 43 preventive maintenance of anode ground bed the scope of work includes necessary excavation for carrying out ground bed curing with 500 kg of common salt and water of 18 kl. the work includes necessary backfilling and restoration to the original condition as per the direction of eic. the contractor shall measure the grounded resistance after the treatment of ground bed. the resistance of grounded after the maintenance shall be less than 01 ohm. clearance if any required from land owner for entering / working in his permisses will be in the contractors scope , part b item 44 supply and installation of cable markers ( ci / cs / ms ) for underground cables and equipment as per the scope of work and specfication in all respect and as per the instruction of eic. , part b item 45 carrying out on off close interval potential survey ( cipl ) with lateral gradient at one meter interval using data loggers and standard cu / cuso4 reference electrode including detailed reports and as per the scope of the work and specification in all respect and as per instrution of eic. , part b item 46 stray current interference survey at railway crossing or runnig parallel to gail pipelines, including 24 hours data logging, data collection from railways, study the effectiveness of existing diode bonding and recommend mitigation measures / modification required at existing doide jb, at all the railway crossings or running parallel as defined in scope of work with specification, design and detail engineering in all respect and as per instruction of eic. , part b item 47 stray current interference survey at foreign p / l crossing or runnig parallel with gail pipeline, including 24 hours data logging, data collection from foreign pipeline operator, and recommend mitigation measures at foreign pipeline crossing or running parallel to gail pipeline as defined in the scope of work, with design, specification and detail enggineering in all respect and as per instruction of eic. , part b item 48 stray current interference survey at ht crossings or runnig parallel to gail pipelines, including 24 hours data logging, collection of data from seb, calculation of human touch and step voltages, measurent and calculation of ac corrossion current and recommendation for mitigation / effectiveness of existing grounding with modification if required, at ht line crossings / parallel sections as defined in the scope of work with design, specification and detail enggineering in all respect and as per instruction of eic.. , part b item 49 adequacy of cp station , study the adequacy of existing cp stations ( cptr & cppsm ) , including effectiveness and efficiency of remote anode bed, effective span of polarised protection on the pipelines from the drain point, mode of operation for the purpose of adequacy and better operation of the cp system and as defined in the scope of work in all respect and as per instruction of eic.. , part b item 50 carryingout current attenuation test / direct current voltage gradient ( dcvg ) survey using standard dcvg equipment to pin point the coating defect / holidays on pipeline as per the specifications in all respect and as per instruction of eic.. , part b item 51 excavation of pipeline in all type of soils and ordinary rocks for a width of d+500 mm on each side of pipe and exposing the pipeline from top upto 500 mm below the bottom of pipeline including the stacking of excavated earth, stacked earth to be levelled and neatly dressed as per the scope of work and directions of eic , part b item 52 backfilling excavated earth ( excluding rock ) in trenches in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, as per the scope of work and directions of eic. , part b item 53 coating repair removing the old / damaged coating / rust greese, moisture and all foreign material at defect location with scrapper, manual surface preparation using hand wire brush, emery paper, scrappers or a combination of all processes, repairng of the coating with supply of raychem sleeves / cold applied tape / perp / patch repair kit, holiday testing after repair, as per the scope of work and to the entire satisfaction of eic. multiple patch repairing at one location within one meter span shall be trated as single quantity only. coating material will be supplied by gail. ( compensation, if required to land owners shall be in the scope of contractor ) , part b item 54 supply & installation of surge diverters ( dehn / equivalent ) in mts at ht power line crossings including cable identification, labor, tools & tackles, brass studs / nuts and sundry consumables , part b item 55 supply & installation of explsoin proof spark gap arrestors of dehn exsg4 / equivalent make across insulating joints at sv / ip / rr / terminals including required cable ( 25sqmm, cu ) , lugs, nuts & bolts, labor, tools & tackles, and sundry consumables , part b item 56 supply of portable cu cuso4 half cell for measuring of psp ( pipe to soil potential ) of pipeline , part b item 57 anode lead junction box ( size : 500 x 700 x 250 ) supply, installation, testing and commissioning of anode lead junction box including required backelite plate brass nut bolts, port type resistor & shunt arrangement, civil works with materials as per eic , part b item 58 reconditioning / recharging / maintenance of existing earth pit at rr / terminals with raising the height of civil foundation, repair of cement plastering, painting of top cover plates and numbering of earthpits. supply of common salt 50 kg and water 100l for bringing down the circuit resistance including making necessary excavation, mixing & pouring of salt & water, replacement & cleaning of connecting nuts and bolts, etc complete in all respect and as per directions of eic , part b item 59 installation & commissioning of gail supplied corrosion censing probe at sv / rr stations of hvj pipeline in all kind of soil including excavation, installation, termination in manual test stations and backfilling / restoration to the original ground condition under dibiyapur region as per scope of work and direction of eic. , part b item 60 bell hole inspection: excavation in all type of soils and ordinary rocks for a width of d+500 mm on each side of pipe and exposing the pipeline from top upto 500 mm below the bottom of pipeline including the stacking of excavated earth on pipeline for bell hole inspection for checking the health of pipeline including backfilling & restoration to original condition in all respect as per direction of eic. , part b item 61 supply installation & commissioning of sspc ( solid state polarisation cell ) in new installation / existing system in case of damaged as per ace / vde specifications for protection of hv / ehv power lines crossings, iccc ( rustroll system ) , dairyland or equivalent make ( as approved by eic ) suitable for arresting induce ac fault currents, lightning & surge protection, dc voltage ( > 3 volts ) and blocking the protective cathodic protection current on the pipeline. supply of sspc, ( as per specification mentioned in this tender documents ) , test station of suitable size, required length & size of cable, consumables with testing & data logging before and after installation ( report to be submitted ) are in the scope of contractor. complete in all respect and as per direction, specification of eic , part b item 62 soil resistivity survey by wenner four point method , part b item 63 supply and installation of end seals of both side of casings for 8 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part b item 64 supply and installation of end seals of both side of casings for 18 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part b item 65 supply and installation of end seals of both side of casings for 24 carrier pipes including making suitable trench necessary excavation upto to pipe around 1.5 mtrs, expose, replace & backfilling complete in all respect as per instructions of eic and as per scope of work , part b item 66 rectification of short casing , part b item 67 maintenance of lightning system ( outdoor ) maintenance of lighting system at rr / sv station under dibiyapur region. ( height of pole upto 12 m ) . all consumable materials, ladder, manpower, vehicle required for maintenance of street pole light will under scope of vendor. , part b item 68 supply & installation of distribution box :supply & installation of distribution box with 63a / 100a tpmccb, bakelite fuse, bus bar, neutral link in m.s. sheet enclosure of size not less than 500x750x200mm with enamel painting and cable entry holes with lockable door. all mentioned items will be in scope of vendor. , part b item 69 supply, installation & commissioning of polarization coupon along with magnetic reed switch as per the scope of work , part b item 70 supply of solar charge contr. 12v / 10a dc at sv stations : scope of work shall include supply and installation of solar charge controller for pole mounted solar light, 12v dc, 10a ( as per installed system ) as per direction, specification & satisfaction of eic , part b item 71 supply of solar charge contr.solar plant: scope of work shall include supply and installation of solar charge controller for solar plant, 96v dc / 100a or 120v dc / 100a, 48v dc / 180a ( as per installed system ) as per direction, specification & satisfaction of eic. , part b item 72 supply of dc / dc converter at rr station : scope of work should include supply and installation of dc dc converter at rr / ip stations under dibiyapur. input 30 v 70 v. ouput 48 v , 21a. the quanity mentioned against each maintenance basemay be used in other region if required. , part b item 73 permission from statuary authority: scope of work shall include granting permission from statuary authority ( railways / highway / forest / any government related authority ) for any kind of job in their rou or in forest land as per requirement of gail. transportation and other expenses involved in the job shall be in the scope of contractor , part b item 74 preventive maintenance of window / spilt preventive maintenance of window / spilit a / c upto 3 tons as per scope of work , part b item 75 preventive maintenance of water coolers preventive maintenance of water coolers up to 150 ltrs as per scope of work , part b item 76 preventive maintenance of refrigerator / d preventive maintenance of refrigerators / deep freezers upto 350 ltrs as per scope of work , part b item 77 sitc of starting capacitor ( 80 100mfd ) , part b item 78 sitc of running capacitor ( 36 mfd ) , part b item 79 sitc of starting relay for a / c, wc, rg , part b item 80 sitc of thermostat , part b item 81 sitc of over load relay a / c, wc, rg , part b item 82 sitc of shaft for blower motor , part b item 83 sitc of bush for blower motor , part b item 84 sitc of float valve for water cooler , part b item 85 sitc of fan blade for condenser , part b item 86 sitc of selector / rotary switch a / c , part b item 87 sitc of air filter for cooling coil of a sitc of air filter for cooling coil of a / c , part b item 88 sitc of blower for a / c , part b item 89 sitc of the faulty compressor of window / split sitc of the faulty compressor of window / split ac upto 3 ton with new one in buyback scheme of old burnet compressor as per scope of work and direction of eic , part b item 90 sitc of the faulty compressor of refrige sitc of the faulty compressor of refrigerator / water cooler upto 350 ltr. with new one in buyback scheme of old burnet compressor as per scope of work and direction of eic , part b item 91 sitc of the control card for single ph sitc of the control card for single phase window / split ac as per scope of work and direction of eic , part b item 92 sitc of capillary / copper pipe require fo sitc of capillary / copper pipe require for window / split ac , water cooler refregerator application as per scope of work and direction of eic , part b item 93 supply and charging of refregient gas to supply and charging of refregient gas to the compressor of split / window ac / refregerator / water cooler as per scope of work and direction of eic total quantity : 1...

Indian Coast Guard - Uttar Pradesh

24162212 online bids for procurement of obm routine kits ard 19 spares , cgsd ( pbd ) ard , washer , bearing kit , roller bearing , carrier assy , pin reverse lock , screw drain , seal , spring , thermostat 130 , tie strap , tie strap @ 100 , tilt tube edp , washer , insert threaded , reel , lever lock red , lock reverse , nut , priming bulb , thermostat , bearing needle , bearing roller , clamp bracket ( stbd long ) , gasket lower water pump , hose assembly fuel , hose molded , starter assembly recoil , tubing , bearing , fuel line assembly , gasket upper water pump , housing , bearing assy center , cylinder block , filter assy fuel , fuel line assembly , lock lever starter , petrol tank , rod starter lock , sender temp , stop switch only , ecu , ecu , grommet , housing water , liner , piston kit std , propeller , blkmx 101/8* 15 , seal oil , tube water , bolt , bolt , bushing , cap assembly , collar , fuel connector , ignition coil , wave washer , nut , retainer , reed block assy , anode kit @2 , bearing assy , bering assy , seal kit g/h , gear housing seal kit , gasket set , sp ql77cc@6 ( spark plug ) , belt , seal , cable assy , cable assy for braided , filter , oil filter , in line , diaphragm , clamp , gasket , gasket set , seal , sensor ( map ) , check valve , check valve , check valve , check valve , bearing ball , ball bearing ( lower ) , 2 4 c lubricant w/lelfon ( 227 gms ) , primer bulb , priming bulb , flow torq ii hub assembly kit , o ring , o ring , mount , anode kit , anode assembly , washer , washer , thermostat 130 , washer , wahser , nut , corrossion guard , corrosion gurd , gasket , throttle shift cable , throttle shift cable , spark plug ( ngk bpshn 10 c 10 ) @ 10 , water pump repair kit , impeller water pump , anti corrosion grease @6 , anti ncorresion grease , screw ( m10x110mm ) , spring starter , spark plug ( ngk bp8h @10 ) , screw con rod , screw , roller bearing , roller bearing , impeller , impeller , corrosion guard @ 12 , high performance gear lube @ 6 , power tune engine cleaner @ 12 , filter , fuel strainer kit , fuel strainer kit , piston assembly stbd 0 . 015 , grommet , diaphrgam kit , roller bearing , seal , bearing thrust , water tube ( x long ) , seal , water separator fuel filter @6 , seal @ 6 , bushing @ 2 , water pump repair kit , spark plug , tank assy oil , cup , tpi , trim switch assembly , trim switch , fitting tell cable , needles brg @ 102x10 , bearing , needle , needle bearing , o ring , o ring , pump kit fuel , pump kit fuel , carrier assembly , bearing , bearing assembly , roller tppered , ball bearing , bearing , bearing assembly , tapered , o ring @10 , o ring , fuel line 12 ft , gear lub @2 , high performance gear lub , seal cowl , check valve , check valve , check valve , spacer , fitting , fitting , oil pwr t/s @12 , power trim , power trim fluid , cover black , seal kit , clamp , clamp for thermostat , crank shaft assy , screw , washer , connector , ring set piston , connecting rod kit , bolt , bolt , cap assy , filter block , filter assembly fuel , ring retaining , screw lower mount , trim cylinder assy , bearing cage kit , bearing cage kit , end cap assy , cable assy , plug , plug stop , nut , latch , cdi unit assembly , filter , trim tab , adaptor , anode , anode@3 , bolt , bumper , bushing , bushing , cable assembly , cable assy , cap , clamp for flush hose , coil kit , coil cut , connecting assy weather cap male , drive shaft , long , exhaust plate gasket , front pivot mount qutboard cylinder , fuel line 12 feet , gasket , ignition coil , leaver assy , oring , o ring , o ring , ( . 612x . 103 ) , pin , pin groove , plate , plate kit exhaust , pulley , pump assembly oil , pump assy oil , repair kit w/p , retainer , ring , ring lock , screw , screw , screw , screw ( m 6 x 25 ) , seal kit , seal , oil ( lower ) , seal , shaft , shim assembly , special lubricant 101 , starter motor assembly , starter seal kit , thrust washer , top cowl , valve/seal inlet , washer@2 , water seprater fuel filter , switch assy , gasket , filter kit , screw and seal kit , nut propeller @ 5 , gasket , plug , bushing , repair kit carburator , anode , pump assy , fuel , obm mariner make 30 hp 4 strock with propeller , primer , hub kit , valve check , valve check , piston assy ( stbd 0 . 030 ) , trim sensor , o ring , seal , anode , bearing/shim kit , flushing kit , repair kit carb , drive shaft , elbow , cylinder head , seal , carries assy bearing , sleeve wear , fuel lines , connecting assy weather cap 6 pin , frond handily , fuel line , fuel line , gasket set , gear lube pump , link shaft , lub oil tank , nut , nut , nut , oring kit , oring kit , reflex hub kit , ring , retaining , smart craft guage , solenoid assembly ( 817109a2 ) , spacer thrust , steering hose 24 feet each , throttle body kit , throttle shift cable , thrust washer , transom bracket kit , trim oil , washer , pressure regulator kit , power head assembly , cdm assembly , cgsd ( mbi ) ard , flushing kit , cam module assembly , carb . repair kit , repair kit crab , trim tab anode , washers , key , fuel filter , fuel pump feed , shift shaft , tiller handle , ring set piston , repair kit w/p , gear oil , hi performance gear lube , pulley , cover , fly wheel assembly , stator , trigger , brearing assy . roller , gasket set power head , plug kit , drive kit , boot kit , seal oil , float , fuel line assembly 8 ft , cable assy black ( cable assy ) , gasket , nut ( m16 x 1 . 5 ) , ring set pistion , filter oil inline , starter solenoid , read block , hi tension cable , sender trim , diaphragm kit , fuel filter , filter , fuel strainer kit , power trim fluid , water separator fuel , prime bulb , spark plug , thermostat , thermostat ( 143 deg f ) , belt , water pump assembly , trim switch , pump kit fuel , power head assembly , cdm assembly , water pump repair kit , pressure regulator , gasket set , harness assembly trim , ecu assembly cdi 225 , ecu assembly cdi 250 , ecu assembly cdi 250 , ecu assembly cdi 225 , ecu assembly cdi 250 , cgsd ( chn ) ard , engine oil , fuse , hi performance gear lube , hi performance gear lube , reed valve assembly , o ring/seal , seal , anti corroision grease , anti corrosion grease , special lubricant , stop switch , o ring , oil seal , o ring , fuel hose , nut , diaphragam kit , diaphragm kit , read block assy , repair kit water pump , water pump repair kit , cup , reel , stater assembly , corrosion guard , corrosion guard , thermostat , anode , boot , gasket , trim tab , diaphragm , diaphragm , diaphragm , connector , oil drain screw , fuel line assembly , gasket set , gasket set , gasket set , gasket set lower unit , gasket set l/u , gasket set l/u , fuel line , fuel line assy , piston ring set , lower mount , piston std ( box ) , washer , bolt , bushing , filter assembly fuel , filter fuel , clip , seal , gasket , o ring , bolt , bearing needle , bolt , screw , s plug b7hs , bolt , thrust plate , thrust plate , seal , washer , washer , washer , o ring , clip , piston pin , bearing ball , fuel tank , zinc anode , anode , shaft assembly , steering , gasket , steering cable , anode , primer , cable inter lock , carb repair kit , o ring , oil seal , seal oil lower , thermostat , thermostat , gasket , spark plug , seal , repair kit crab , repair kit carburetor , seal , trim tab , trim tab , bushing , repair kit w/p , rope starter , seal , seal oil , spark plug ( ngk bpshn 10 c 10 ) @ 10 , spark plug ( ngkbp811n10@10 ) , thrust hub , washer , spark plug , spark plug ( ngk bp8h @10 ) , thermostat 54a c 13 a deg f , o ring 2 . 173 x . 175 , steering cable , fuel pump assly , mount upper assemply , bolt , fuel filter , solenoid assy , gasket kit , fuel line 12 ft , filter fuel , flushing kit , gasket ( lower carburetor ) , diaphragm ( lower carburetor ) , gasket ( lower carburetor ) , senso...

Indian Coast Guard - Uttar Pradesh

23889953 procurement of routine kit and ard 19 spares for obm , cgsd ( pbd ) ard , washer , bearing kit , roller bearing , carrier assy , pin reverse lock , screw drain , seal , spring , thermostat 130 , tie strap , tie strap @ 100 , tilt tube edp , washer , insert threaded , reel , lever lock red , lock reverse , nut , priming bulb , thermostat , bearing needle , bearing roller , clamp bracket ( stbd long ) , gasket lower water pump , hose assembly fuel , hose molded , starter assembly recoil , tubing , bearing , fuel line assembly , gasket upper water pump , housing , bearing assy center , cylinder block , filter assy fuel , fuel line assembly , lock lever starter , petrol tank , rod starter lock , sender temp , stop switch only , ecu , ecu , grommet , housing water , liner , piston kit std , propeller , blkmx 101/8* 15 , seal oil , tube water , bolt , bolt , bushing , cap assembly , collar , fuel connector , ignition coil , wave washer , nut , retainer , reed block assy , anode kit @2 , bearing assy , bering assy , seal kit g/h , gear housing seal kit , gasket set , sp ql77cc@6 ( spark plug ) , belt , seal , cable assy , cable assy for braided , filter , oil filter , in line , diaphragm , clamp , gasket , gasket set , seal , sensor ( map ) , check valve , check valve , check valve , check valve , bearing ball , ball bearing ( lower ) , 2 4 c lubricant w/lelfon ( 227 gms ) , primer bulb , priming bulb , flow torq ii hub assembly kit , o ring , o ring , mount , anode kit , anode assembly , washer , washer , thermostat 130 , washer , wahser , nut , corrossion guard , corrosion gurd , gasket , throttle shift cable , throttle shift cable , spark plug ( ngk bpshn 10 c 10 ) @ 10 , water pump repair kit , impeller water pump , anti corrosion grease @6 , anti ncorresion grease , screw ( m10x110mm ) , spring starter , spark plug ( ngk bp8h @10 ) , screw con rod , screw , roller bearing , roller bearing , impeller , impeller , corrosion guard @ 12 , high performance gear lube @ 6 , power tune engine cleaner @ 12 , filter , fuel strainer kit , fuel strainer kit , piston assembly stbd 0 . 015 , grommet , diaphrgam kit , roller bearing , seal , bearing thrust , water tube ( x long ) , seal , water separator fuel filter @6 , seal @ 6 , bushing @ 2 , water pump repair kit , spark plug , tank assy oil , cup , tpi , trim switch assembly , trim switch , fitting tell cable , needles brg @ 102x10 , bearing , needle , needle bearing , o ring , o ring , pump kit fuel , pump kit fuel , carrier assembly , bearing , bearing assembly , roller tppered , ball bearing , bearing , bearing assembly , tapered , o ring @10 , o ring , fuel line 12 ft , gear lub @2 , high performance gear lub , seal cowl , check valve , check valve , check valve , spacer , fitting , fitting , oil pwr t/s @12 , power trim , power trim fluid , cover black , seal kit , clamp , clamp for thermostat , crank shaft assy , screw , washer , connector , ring set piston , connecting rod kit , bolt , bolt , cap assy , filter block , filter assembly fuel , ring retaining , screw lower mount , trim cylinder assy , bearing cage kit , bearing cage kit , end cap assy , cable assy , plug , plug stop , nut , latch , cdi unit assembly , filter , trim tab , adaptor , anode , anode@3 , bolt , bumper , bushing , bushing , cable assembly , cable assy , cap , clamp for flush hose , coil kit , coil cut , connecting assy weather cap male , drive shaft , long , exhaust plate gasket , front pivot mount qutboard cylinder , fuel line 12 feet , gasket , ignition coil , leaver assy , oring , o ring , o ring , ( . 612x . 103 ) , pin , pin groove , plate , plate kit exhaust , pulley , pump assembly oil , pump assy oil , repair kit w/p , retainer , ring , ring lock , screw , screw , screw , screw ( m 6 x 25 ) , seal kit , seal , oil ( lower ) , seal , shaft , shim assembly , special lubricant 101 , starter motor assembly , starter seal kit , thrust washer , top cowl , valve/seal inlet , washer@2 , water seprater fuel filter , switch assy , gasket , filter kit , screw and seal kit , nut propeller @ 5 , gasket , plug , bushing , repair kit carburator , anode , pump assy , fuel , obm mariner make 30 hp 4 strock with propeller , primer , hub kit , valve check , valve check , piston assy ( stbd 0 . 030 ) , trim sensor , o ring , seal , anode , bearing/shim kit , flushing kit , repair kit carb , drive shaft , elbow , cylinder head , seal , carries assy bearing , sleeve wear , fuel lines , connecting assy weather cap 6 pin , frond handily , fuel line , fuel line , gasket set , gear lube pump , link shaft , lub oil tank , nut , nut , nut , oring kit , oring kit , reflex hub kit , ring , retaining , smart craft guage , solenoid assembly ( 817109a2 ) , spacer thrust , steering hose 24 feet each , throttle body kit , throttle shift cable , thrust washer , transom bracket kit , trim oil , washer , pressure regulator kit , power head assembly , cdm assembly , cgsd ( mbi ) ard , flushing kit , cam module assembly , carb . repair kit , repair kit crab , trim tab anode , washers , key , fuel filter , fuel pump feed , shift shaft , tiller handle , ring set piston , repair kit w/p , gear oil , hi performance gear lube , pulley , cover , fly wheel assembly , stator , trigger , brearing assy . roller , gasket set power head , plug kit , drive kit , boot kit , seal oil , float , fuel line assembly 8 ft , cable assy black ( cable assy ) , gasket , nut ( m16 x 1 . 5 ) , ring set pistion , filter oil inline , starter solenoid , read block , hi tension cable , sender trim , diaphragm kit , fuel filter , filter , fuel strainer kit , power trim fluid , water separator fuel , prime bulb , spark plug , thermostat , thermostat ( 143 deg f ) , belt , water pump assembly , trim switch , pump kit fuel , power head assembly , cdm assembly , water pump repair kit , pressure regulator , gasket set , harness assembly trim , ecu assembly cdi 225 , ecu assembly cdi 250 , ecu assembly cdi 250 , ecu assembly cdi 225 , ecu assembly cdi 250 , cgsd ( chn ) ard , engine oil , fuse , hi performance gear lube , hi performance gear lube , reed valve assembly , o ring/seal , seal , anti corroision grease , anti corrosion grease , special lubricant , stop switch , o ring , oil seal , o ring , fuel hose , nut , diaphragam kit , diaphragm kit , read block assy , repair kit water pump , water pump repair kit , cup , reel , stater assembly , corrosion guard , corrosion guard , thermostat , anode , boot , gasket , trim tab , diaphragm , diaphragm , diaphragm , connector , oil drain screw , fuel line assembly , gasket set , gasket set , gasket set , gasket set lower unit , gasket set l/u , gasket set l/u , fuel line , fuel line assy , piston ring set , lower mount , piston std ( box ) , washer , bolt , bushing , filter assembly fuel , filter fuel , clip , seal , gasket , o ring , bolt , bearing needle , bolt , screw , s plug b7hs , bolt , thrust plate , thrust plate , seal , washer , washer , washer , o ring , clip , piston pin , bearing ball , fuel tank , zinc anode , anode , shaft assembly , steering , gasket , steering cable , anode , primer , cable inter lock , carb repair kit , o ring , oil seal , seal oil lower , thermostat , thermostat , gasket , spark plug , seal , repair kit crab , repair kit carburetor , seal , trim tab , trim tab , bushing , repair kit w/p , rope starter , seal , seal oil , spark plug ( ngk bpshn 10 c 10 ) @ 10 , spark plug ( ngkbp811n10@10 ) , thrust hub , washer , spark plug , spark plug ( ngk bp8h @10 ) , thermostat 54a c 13 a deg f , o ring 2 . 173 x . 175 , steering cable , fuel pump assly , mount upper assemply , bolt , fuel filter , solenoid assy , gasket kit , fuel line 12 ft , filter fuel , flushing kit , gasket ( lower carburetor ) , diaphragm ( lower carburetor ) , gasket ( lower carburetor ) , sensor speed /temp , gasket ( lower car...

Indian Coast Guard - Uttar Pradesh

23799306 procurement of ard 19 spares of kamewa water jets , model: wj kamewa 71s3 , 63s3 , 71sii , bearing 23032cc/w33 , bearing 29432e , bearing bushing 65/55x40x45 ( se971047a/021 ) , bearing bushing 955500a / bushing , bearing bushing 955501 , bearing bushing 955506 , bearing housing , bearing washer 95517 , bushing washer 955513a , bushing washer 955515a , cable gland , contact pg 7 , cooper bearing temperature sensor , coupling xge 12 sr/sy , dowel pin ( pos 7 ) , drain hose , f004411 pc board , fairing cover , feed back transmitter , feed back unit , filter cartridge ( pos 30 ) , flow switch , flow switch , flow switch , hex head screw , hexagon head screw , hexagon head screw , hexagon head screw , hexagon head screw , hexagon head screw m 12x40 , hexagon head screw m20 x 110 , hexagon nut , hexagon nut , hose , hose , hose , hose , hose , hose , hose ( pos 34 ) , hose 241x06x700 143708 , hose ( 821 08/1200/p86 08 16sy , hose ( pos 35 ) , hose reversing , hydraulic hose complete , hydraulic valve , hydraulic valve ( pos 19 ) , impeller , inflatable seal , lamp cap / mounting block , lamp cover/protection cover , lamp holder , lens tranparent /lens , lock nut , lock nut , lock nut , lock nut , lock nut , lock nut , locking boss ( plate ) 955479 , locking plate , locking plate 8x30x120 , loctite 243 , l s pressure hose , l s pressure hose , lubricant , lubricant , manometer 0 250 bar , mechancal shaft seal ( pos 6 ) , mechanical face seal , mechanical seal ( pos 2 ) , mechanical shaft seal , mechanical shaft seal , o ring , o ring , o ring , o ring , o ring , o ring , o ring ( pos 16 ) , o ring 499 . 30x5 . 70 , plain washer , plain washer , plug , potentiometer for transmitter r984664a , printed circuit board for transmitter r984664a , protection cover silicon/protection cover , protection hose ( pos 26 ) , proximitry switch , push button , relief valve ( v4 ) , repair kit ( pos 2 ) , repair kit roplan kwjs 130b , reversing cylinder piston lock screw/set screw , roller bearing , roller bearing ( pos 5 ) , roller bearing ( pos 6 ) , sacrifical anode , sacrificial anode , sacrificial anode pos no 7 , screw mc 6s m 16 x 100 frkoppr a4 8r , seal kit , seal kit ( pos 4 ) , seal kit steering cylinder , seal support flange ( distance piece ) , sealing compound 0 . 3 kg , sealing set , shaft seal bellow dia 140mm , shaft seal flow sensor , sikaflex ( tubes for repair on seal housing ) , socket head crew , socket head screw , socket head screw , socket head screw , socket head screw , socket head screw , socket head screw ( pos 10 ) , socket head screw mx16x80 , split pin , spring 955917 a , steering cylinder , steering cylinder pin , steering cylinder piston lock screw/set screw , steering indicator , stub shaft , temperature sensor , temperature transmitter , valve ( pos 50 ) , washer , washer 955482a a , manometer ( pos 39 ) , counter balance valve v 18 , o ring470 . x5 . 0 mi04/15 , isolation amplifier , pc board ccn 01 , hydraulic cylinder steering , instr dlq 72 pc py revers 108059 , sacrificial anode , zinc anode 955047a , feedback cable , axial bearing 29430e , radial bearing 23022cc/w33 , zinc ring , washer , locking plate , hexagon head screw , hose , hose , hexagon head screw , pc board gti , pc board slio 01 , feedback cable , dowel pins...

Indian Army - Uttar Pradesh

21021286 supply of mfr and indn items: alloy steel round bar, zinc anode, zinc passivation salt, zinc purifier, hydrochloric acid, quenching oil, copper wire=> limited....

Ministry Of Defence - Uttar Pradesh

10023444 procurement of electroplating equipment ( ( i ) acid pickling tank made of poly propylene 12mm thickness outside with pp insulate for ms support covering poly propylene support thickness 12mm with drain valve poly propylene size 1” tank size 1220mm x 750mm x 915mm ( ii ) water rinse tank made of poly propylene 12mm thickness outside with pp insulate for ms support covering poly propylene support thickness 12mm with drain valve poly propylene size 1” tank size 1220mm x 915mm x 915mm ( iii ) acid dip tank made of poly propylene 12mm thickness outside with pp insulate for ms support covering poly propylene support thickness 12mm with drain valve poly propylene size 1” tank size 1220mm x 750mm x 915mm ( iv ) hno3 tank made of poly propylene 12mm thickness outside with pp insulate for ms support covering poly propylene support thickness 12mm with drain valve poly propylene size 1” . tank size 1220mm x 750mm x 915mm ( v ) passivation tank made of poly propylene 12mm thickness outside with pp insulate for ms support covering poly propylene support thickness 12mm with drain valve poly propylene size 1” tank size 1220mm x 750mm x 915mm ( vi ) pp filter size 12” x 18plate with magnetic pump 100no and pvc flexible pipe with complete filter fitting. ( vii ) centrifugal dryer size 18” made ms body thickness of 4mm, base thickness of 12mm, with ss basket 304grade, 2mm thickness size 12”x18”. belt dryer system motor 1hp 700rpm. ( viii ) turbine air blower 1hp 3phase sound free with air filter. ( ix ) titanium basket size 900x400x110mm for acid zinc plating tank ( x ) titanium heater 2.5 kwh for anodic cleaning and soak cleaning tank ( xi ) pvc heater stand for titanium heater ( xii ) rectifier 1000 amp 20v and all electrical connections ( xiii ) aluminium bus bar 3” x 8mm thickness strip type ( xiv ) anode / cathode copper pipes and all electrical connections ( xv ) registrant board 500ampere for anodic cleaning tank ( xvi ) chemicals ( as under ) nomenclature a steelex k.20 b zinc bond 808 c zinthobrite 937a d zinthobrite 937br e zinthobrite 942m f zinthobrite 942r g boric acid h ginthox q550 j ginthox 982l k zinc anode )...

Ordance Factory Board - Uttar Pradesh

8914961 expression of interest for vendor registration 1 acid boric technical 2 acid chromic 3 acid hydrochloric ( technical ) 4 acid nitric ( technical ) 5 acid sulphuric ( technical ) ( packed in 50 kg. plastic containers ) . 6 aduvax lbi / lipodern liqoer 1 / balmol sfo ec / coripol xo / baykanol licker ofs / indotan leather 7 oil / fourolic lb i / fenoil 393 ( fenasia product ) 8 al.alloy tube 32 mm o / d x 28 mm i / d in standard length of 1.83 mtr. 9 alo resin abrasive cloth of 50 mtrs. roll, size 38mm wide grit no. 3 ( zircon ) 10 alotectic flux 11 alu alloy rod 9.5 mm + 0.2 mm 0.2 mm 12 alu alloy tube 15 mm o / d x 2.5 mm wall thickness in length of 1584 mm + 1.00 mm and 0.00 13 mm 14 alu.alloy sheet 3 mm thick x 900 x 2400 mm 15 aluminium alloy filler rod 1.6mm dia x 500mm long 16 aluminium alloy sheet 1.5.mm thick 17 aluminium alloy sheet 2.5mm thick x 900mm x 2400mm 18 aluminium alloy sheet 4mm x 1200 mm x 2500 mm 19 aluminium alloy sheet size 3 x 900 x 2400 mm. 20 aluminium frame complete pure epoxy powder coated biack to minimum 50 micron 21 0.05mm ) fitted with straps retainers ( eye ) 22 aluminium frame complete with straps retainer ( eye ) for synthetic web equipment without 23 epoxy coated 24 bag for tool and spares for tent extendable 25 bags large size 87x28 ( 221x71cm ) made of jute c clooth with 2 side stitchedand one side left 26 open ] 27 bags made of jute c cloth size 34x28 with 2 side stitched and one side left open 28 bags med. size 50x28 ( 127 x 71cm ) 29 balcide f001 of balmer lawrie & co. / vernastat r of colour chem / polysept g 77 of inqui mica 30 busan 30l of buckman / preventol np of lanxess / aracit 4a of 31 balmertan ca ( balmerlawrie ) / bilutan asc ( basf ) / sasystan ca ( syntan & colloids ) 32 balmol bl sf0 ( barmer lawrie ) / derminol nc liquid ( clariant ) / lipoderm liquir e xs 33 basf ) / chromopol sg ( tfl ) 34 balmol gl / coripol bzn / baykanol licker fgw / indofil oil wgl / fourolic gl / fenoil lf ( ferasia 35 product ) 36 balmol igt special ( balmar lawrie ) / vernol liquor pn ( clariant ) / lipoderm liquor fb 37 16 ( basf ) / sasyol cb 20 ( syntan & colloids ) 38 basyntan d 1 / vernatan os / balsyn pfk / sellasol rs / tanigan op / indotan sd / fouryl rn 390 39 basyntan fb 6 / vernatan r 7 / balsyn mf 7 / sellasol bc / ratingan orm indotan im / fouryl rn 6 40 black es ( basf ) / collosol colours black ( syntan colloids ) / hynil e dyes black ( tfl ) / black liquid n 41 01 ( lanxess ) 42 borax technical 43 box fiber board rigid corrugated triple wall 7 ply of internal diamentions 550 mm x 550 mm 44 x 350mm 45 box fiber board rigid corrugated triple wall 7 ply of size 650 mm x 690 mm x390 mm 46 box fiber board rigid corrugated tripplewall 7 ply of internal diamentions 700 mm x 600 mm 47 x 500mm 48 box fibre board rigid corrugated double wall 5 ply size 420mm x 330mm x 375mm 49 box fibre board rigid corrugated size 1560 mm x 810 mm x 160 mm 50 box fibre board rigid corrugated triple wall 7 ply off size ( internal dimension ) 640 mm x 420 mm 51 x 510 mm 52 box fibre board rigid corrugated triple wall 7 ply size 640 x 420x 360mm 53 box fibre board rigid corrugated triple wall 7 ply size 700x450x400 mm 54 box fibre board rigid corrugated triple wall 7 ply with internal dimensions 700 mm x 450 mm 55 x450 mm 56 brass hooks for high ankle boot dvs 57 brazing flux. 58 brazing rod 1.6 mm.thick. 59 buckl brass roller single 38 mm polishedwith steel tongue td. 60 buckle al.alloy 57 mm male & female for belt waist ick ( modified version ) 61 buckle alu. alloy 38mm black anodised 62 buckle alu. alloy 51mm black anodized 63 buckle alumn. alloy 25mm black anodised 64 buckle alumn. alloy q.r. 19mm black anodised 65 buckle brass 25mm w.e. 66 buckle serrated ( aluminium for belt waist of synthetic web equipment 67 buff vt insole for boot dvs size 8l 68 buff vt sole bend 69 button plastic khaki 16mm 70 butyl acetate 71 cadmium brightner 72 cadsal z ( cmpz ) / cadmium plating salt 73 canvas flax ( tow ) 56 cm chhagul test 74 carbon steel strip size 1.00 mm thick x 102 mm wide. 75 catch assembled with link ( without strap ) as per drg.no.sv 290 ( 2221 b / pk ) 76 caustic soda technical 77 chalk french technical 78 clean process scrap from copper ( c 1 1 ) 79 clip iron ( for tent extendable ) 80 cloth c heavy 72cm ( cat part no. h2 / 8305 000142 81 cloth calico cotton khaki 91cm 82 cloth calico cotton white bleached 91cm 83 cloth canvas flax ( tow ) 56cms ( p.h. test ) 84 cloth canvas flax ( tow ) 86cm wide ) 85 cloth cotton closely woven 170 gr. o.g.wr 91 cms 86 cloth cotton dossuti o.g. 91 cms wide 87 cloth duck cotton 340 gms scoured 91 cms 88 cloth duck cotton 475 grm. black w.p, r.p. ( vat dyed ) 91 cms. 89 cloth duck cotton 610 gr. khaki w.p 76 cm wide 90 cloth duck polyester / cotton blended rip stop og wp rot proof 135 cm. 91 cloth hessian light variety 92 cloth muslin white bleached 91 cms. wide 93 cloth polypropylene og tpo coating 115 cms wide. 94 coloured screen printing with packing details on the outer packing details on the outer 95 packing box 96 composition rust preventive / protective px 2 97 copper anode flat 10x300x300mm 98 copper scrap misc ( c 12 ) 99 cord cotton braided u / d 4 mm dia 100 cord cotton u / d 2 mm dia. 101 cord elastic loop for tent extendable fly inner 4 m / 2m unit. 102 cord elastic ring for tent extendable fly inner 4 m / 2m unit. 103 cord elastic ring for tent extendable fly outer 104 cord nylon 3120 nbl o.g. 105 cord nylon o.g. 1785n 106 corrugated box 3 ply ( duly printed ) for high ankle boot dvs as per drg. no.sk 1174a size 107 365x335x125mm 108 cotton fabric scoured for s.d parchute type i 91 cm 109 cotton knitted fabric 2 / 2 rib knit white bleached 46 +_ 1 cms. wide unprrofed 110 cotton knitted fabric plain rib knit white bleached tubular form 4 +_1 cms. unproofed 111 cotton sewing thread 100 d tex / 6 khaki 112 cotton sewing thread 100 dtex / 6 white 113 cotton sewing thread 165 d tex / 6 o.g. 114 cotton sewing thread 165 d tex / 27 o.g. 115 cotton sewing thread 165 dtex / 6 white 116 cotton sewing thread 270 d tex / 9 black 117 cotton sewing thread 270 d tex / 9 khaki 118 cotton sewing thread 590 dtex / 3 o.g. 119 cotton sewing thread 590 dtex / 3 white 120 crate wood packing style no. 5, class a internal size: 620 mm l x 350 mm h x350 mm wide. drg. 121 no. sk 927. 122 crate wood style no 5, class a.to internal size 1900mm l x 215 h x 265 wsk 842 123 cupsal ( cx ) 124 d ring 19 mm nikcle plated x 10.5 mm x 2 mm dia ( for pouches ammun. ) synthetic web 125 equpt. 126 ring 18 mm for bag water proof 127 dees steel 350mmx230mmx6.3mm 128 dees steel 38 mm x 32 mm x 4 mm a.f. 129 dees steel 38mmx32mmx4mm 130 desmonder r or equivalent 131 diammonium phosphate 132 drill cotton proofed white ( bleached ) 71 cm 133 duck cotton 610 gms o.g. w.p. 91 cms 134 dye indine black 135 dye solution black for suitable of boot high ankle leather and fabric both ( no stain of 136 fabrics and leather ) 137 electrodes welding quasi arc similar to gauge 10 grade i size 3.15 x 350 mm 138 epoxy powder coating black of aluminium frame for synthetic web equipment pack ick as per 139 terms & condition.1. firm should give test certificate. 140 euderm filler cc 4555 ( lanxess ) / q fill d ( tfl ) / synfil995 ( sytancollids ) cfd 8682 ( component & 141 equipment ) / melio filler di ( clariant india ) / lepton filler k ( basf ) 142 eyelet alu. alloy ( chemicaly passivated ) no.24 with turnover washer 143 eyelet brass no.21 with plain washer bronzed black 144 eyelet brass no.28 with turn over washerbronzed black145 eyelet metallic black 10 mm dia with 6.8 +_ 0.1 mm overall height 146 eyeleting operation in respect of ground sheet tpo og 147 eyelets aluminium alloy chemically passivated no 28 with turn over washer 148 fabric 410 gms og wp p.v. dope dyed rip stop 148cms 149 fabric green 205 gms spun p.v. blended dope dyed 148cms. 150 fabric nylon 66 airtextured pu coated indian army print 135 / 136 cms 151 fabric nylon 66 breathable poly urethene coated disruptive army comoflage patter n 180 +2 cm 152 ( no negative tolerance ) wide 153 fabric nylon 75 gms o.g. polyurethane coated 100 cm wide. 154 fabric nylon black 250 gms p u coated 172 cms wide. 155 fabric pp tpo coated with f.r. treated for flooring 115 cm wide 156 fabric water proof rubberised white 91cm 157 fabrication of end curtain of tent extendable frame supported 4m / 2m ( army ) ( each set 158 consisting of two ( 2 ) numbers ) 159 fabrication of rubber adhesive for rubber compound for sole & heel for boot ankle leather 160 dvs.no material will be provided by the factory.all required matrials 161 fabrication of rubber compound for sole & heel for boot ankle leather dvs, no material will 162 be provided by the factory. all required materials for fabrication 163 fabrication of tefs 4m fly inner 164 fastener hook / loop tape syn. og 50 mm ( for syn. wep. equpt. imp. ver. pouches ammn. ) one set 165 consisting of: 166 fastener plastic slide heavy duty o.g.61cm long ( closed end one way with non lock slider ) 167 fastener plastic slide med. duty o.g. 32cm long ( closed end one way with non lock slider 168 fastner hook tape 25 mm og 169 fastner hook / loop tape syn.og 25mm ( for syn. web equpt. imp. ver. pouches ammn.ick ) one set 170 consisting of: 171 fastner hook / loop tape synt. og ( for bag sleeping mk 4 complete with linner inner ) one set 172 consisting of : ( i ) fastner hook tape synt. og 25mm 173 fastner hook / loop tape synthetic og 25mm ( for syn. web equpt.imp. version haversack ick ) 174 one set consisting of: i ) fastner hook tape syn. og 25mm 0.1133 175 fastner loop tape 25 mm og. 176 female cap ( push fit ) as per o.e.f.c. drg.no. sk 914 177 fevicol white adhesive. 178 flannelette lining brown 142 + 1cm wide with firm selvage 179 formic acid 80% 180 four way mild steel joint. 181 fourolic c / evcoriol ksp z ( t.f.l ) / lipamin liqouor s.o. ( basf ) catalix ( sandoz ) / vernaminolkw ( 182 colour chem ) / sapcolenerm ( auchtel ) / atlasol20 ( atlasrefinery, inc, newj 183 full socks leather with eva cushion size 8l 184 gal. m.s. seal for 12 mm wide iron hoop 185 galvanized mild steel seals suitable foruse with tape polythine rayon strapping 12.5 + / 0.5mm 186 galvenised mild steel wire 2 mm dia 187 gas diss acetylene 188 gas oxygen 189 guide ( z section ) of pcad for an 32 air craft ( in multiple length of 1.82 mtr. ) 190 gunny old & cutting ( unserveciable ) 191 hammer sladge double faced 2 kg. with handle 192 handle clip as per drg. no.se 221 of sheet 2 / 2 det.5 193 handle clip for box c 18 194 hdpe bag white of size 750 x 500 x1000mm 195 heat activated thermoplastic sheet for toe puff & counter stiffner 196 heater space oil burning controlvalve body. 197 heel tip filler made of pulp board / light wood. as per drg. no. sk 1056. 198 hessian laminated cloth medium 102 cms 199 hexagonal bolt m 6 x 50n with nut 200 hexagonal bolt with loop 201 hexagonal bolt with loop fitted with wing nut with bracket 202 hing clip complete assembled with link for box c 18 203 hing complete assembled with link as perdrg.no.se 232 det.5 204 hing with link complete assembled as perdrg.no.se 221 of sheet 2 / 2 det.6 205 hinge fixing & finishing of platform cargo for air delivery for an 32 206 hinge fixing & finishing of skid board 1500mm x 750mm x 12mm for pratap ( mi 8 ) helicopter 207 hook iron 208 hook steel for bag water proof 209 hot melt ( yellow ) cement make: unifast / texon / bostic / essebi, italy sipol, italy / ruichem 210 indofil binder mp 211 indofil c 6 / cera 08 ( fenasia product ) 212 indotan 540 ( indofil company ) / relugan rf ( basf ) / tycon af ( component & equipt. ) / retan 540 213 ( lanxess india pvt. ltd. ) / sasyntan 540 ( syntan & colloids ) / 214 iron hoop 23 bg ( 0.71mm ) thickx12 mm wide 215 kapok indian ( semul ) gr.2 ( h2 / 8320 000057 ) 216 kapok indian ( semul ) gr.3 ( cat no. h2 / 8320 000010 ) 217 label card board 45 x 25 mm with tie on tag 218 label carton 50 x 25 mm 219 label carton 50 x 25 mm 220 laces nylon black 160 cm. 221 lasted upper of various sizes for boot high ankle dvs 222 latex foam 10.00mm thick x 0.6 m x 1.6 m 223 latex foam rubber sheet solid type 13mm thick x .60m x 1.20m 224 latex foam rubber sheet solid type 50 mm thick x 0.60 mtr. x 1.20 mtr. 225 latex foam rubber solid type 25mm thick x .60m x 1.20m 226 lea. td. buff. cuttings 227 leather buff cd 7, 8 swg 228 leather buff chrome tanned side black football print 229 leather buff wet blue for zuggrain / football print / upper leather 230 leather chrome cutting 231 leather chrome td.side black plain smooth finished 1.4 to 1.6mm thick 232 leather cloth black ( venyl coated fabaric ) 127 / 130 cm. ( 50 x 51 ) wide 233 leather cow semi chrome td.hides2.00mm 234 leather lining black combination tanned dry milled 235 leather lining plain natural combination tanned ( wihout pigment finish ) 236 leptan black fb 1 ( basf ) / aci eco jet black ( tfl ) / neosan 2000 cover black 30 in liq ( stahl ) 237 lepton binder fb sd of basf / venamine binder im of cleariant / colour chem / euederm binder 238 of ( bayer ) lanxess / hycryl 55 of quinn india / tfl binder ac 200 of tfl indofi 239 licquor clear nitro cellulose base 240 line hemp h / l 4mm dia 241 link for hinge for carrier 13 a drg. no.sk 1002 242 lipoderm liquor 2fb / vernol liquor pn / balmol str 1 / coripol gv / stasoft oil j / baykanol lickers 243 / fourolic so2 / fenoil np ( fenasia product ) 244 lipoderm liquor saf / vernol liquor asn / balmol sf 30 / baykanol licker efl / solvoil sf / fourolic 245 sf 246 lipoderm oil fb sk ( basf ) / vernol oil cp ( clariant ) / sasyol cs ( syntan&colloids ) / balmol 247 clp ( balmer lawrie ) 248 liquor amonia . . 249 lock complete assembled with link as perdrg. no.se 232 det.i, 14 & 9 250 long cloth cotton white bleached 91 cms 251 m.s. csk head screw metric slotted coarse pitch bm 6x75 mm long with hexagonal nut & 252 washer 253 mild steel wire 6 mm dia 254 mimosa powder 255 myrab extract spray dried powder 256 n.c.laquor k 51 ( sadguru ) / hylac s 05 ( tfl ) / corial finish fb g ( basf ) / synlac sg ( syntan & 257 colloids ) / fourolac :25sc ( fourint ) 258 nails steel wire counter sunk head 50mm x 13 swg 259 nails wire steel counter sunk head 1.42 to 1.63mm dia x 19mm long 260 nails wire steel csk head 2.5 mm dia x 45 mm long 261 nails wire steel csk head 2mm dia x40mm long 262 naphtholene balls cat. no. 6840 000007 263 net mosquito polyester round mesh o.g 264 netting mosquito round mesh hdpe o.g. 122 cms. 265 nickle anode flat 266 nickle coated snap fastner ( four pieces ) spring type 7 / 7 with plastic washer in bronzed black 267 finish. 268 nisal 168 / nickel additive 22 ( g&w ) / omni additive 912 ( artck ) / riko r 269 nylon sewing thread black. 270 nylon sewing thread black, variety no. h 1 271 nylon sewing thread black, variety no. l 2 272 nylon sewing thread for aero space purpose verety no. h1 og 273 oil linseed raw274 oil m 80 / oil m 58 275 operation of screen printing ( ground sheet tpo og ) 276 outer component for gloves leather white lined ( medium size ) 277 p u foam 3.00 mm thick x 0.90m x 1.90m278 paint ready mixed air drying matt finishfor general purpose sprashing brunswick green along 279 with thinner competiable with paint ( 15% of the paint quantity ) 280 paint ready mixed air drying matt finishfor general purpose spraying og along with thinner 281 competiable with paint ( 15% of the paint quantity ) 282 paint rfu priming red oxide of iron zinc chromate, universal, syathetic ( brushing / spraying ) ds 283 cat no.h1 ( a ) 8010 000110. ( yohana ) 284 paint rfu war equipment air drying brushing / spraying o.g.matt finish, scamic isc no.294 285 alongwith thinner petroleum hydrocarbon sol. low aromatic 145 / 205gd 286 paper wrapping craft, grade 3, 80 gsm + 5% , 841 mm x 100 mtr 287 paper wrapping water proof plain 841mm x 100 mtr ( in roll of 100 mtr each ) 288 phosphating chemicals one set consisting of : 289 pile fabric ( woven ) 3mm x 76cms 290 pile fabric ( woven ) 6mm x 76cm wide 291 pin tent angle iron med.mk ii 292 pin tent carbon steel small 8340 000508 293 plastic slide fastener closed end heavy duty reversib le slider o.g. shade 990mmlong 294 plastic slide fastner medium special closed end a / l ( auto lock ) og 32 cm. 295 plastic stopper 296 plastic stopper ( black ) 297 plastic toggle black ( bell cap ) 298 plastic toggle type i 299 plate hook as per drg.no.se 232 det.2 300 ply wood 7 ply 12 mm thick x 1500 mm x 750 mm 301 plywood board 3 ply 4 mm thick wwr grade type ab size 240 x 120 cms 302 plywood for general purpose gr mr / aa 7 ply x 12 mm 303 poly urethane foam 8 mm thick x 90 cm x 190 cm . 304 polypropelene strapping 12mm 305 poly propylene strapping 0.5 mm thick & 15 mm wide 306 polythene bag of size 870 mm x 380 mm x 0.04mm thickness 307 polythene bag size 335x455mm x0.08 mm thick 308 polythene bag with self sealing tape of 55 cm ( l ) x35 cm ( w ) x0.04 mm thickness. 309 polythene bags size 42mm i / d x 1900 mmlong x 0.04mm thick 310 polythene film 0.04mm thick 91.5 cms wide in roll of 100 mtrs. 311 polythene film of size o.o4 mm thick x 120 cms wide for packing 312 polythin bag 0.04 mm thick ( internally ) 18x9 1 / 2 ) 313 polythine bag of size 360 mm x 170 mm x 0.04 mm thickness 314 polythine bag size38cm widthx72cm lengthx0.04mm thick 315 poly urethane foam 8 mm thick sheet of 190 cms x 90 cms 316 pouch silica gel. 1 gram. 317 pp plastic tape for semi automatic strapping equipment ( magenatic type ) size 12mm width x 318 mm thick approx. sporn ( paper cone ) size o / d 227 mm x i / d 203mm 319 printed size label 150 mm x 51 mm for flooring tpo og with fr for tefs supported 4m unit in 320 bilingual ( hindi & english ) 321 printed size label 60 x 45 mm for rain cape multipurpose disruptive ( poncho ) inbilingual ( hindi 322 & english ) 323 printed size label 60mm x 45mm for ick haversack ( modified ) in bilingual ( hindi & english ) 324 printed size label 60mm x 45mm for ick pack with aluminium fram ( modified ) in bilingual 325 ( hindi & english ) 326 printed size label 60mm x 45mm for ick pouches ammunition ( modified in bilingual ( hindi & 327 english ) 328 printed size label 60x45 mm for bag sleeping mk 4 liner inner size medium in bilingual ( hindi 329 english ) 330 printed size label 60x45 mm for bag kit universal with p.v.dope dyed fabric o.g.bilingual ( hindi 331 english ) 332 printed size label 60x45mm for bag sleeping mk 4 main body size medium in bilingual ( hindi 333 english ) 334 printed size label 60x45mm for mattress kapok mk 2 co mplete with cover size large in 335 bilingual ( hindi english ) 336 printed size label 75 mm x 150 mm for cover water proof 7.3 x 5.5 mspecn. cqa schedule 337 no. cqa ( t&c ) / tc 6 / 1988 / 1 ( a ) except that tuffta silk 338 printed size label 75 x 150 mm for screnlatrine mk.iii scren 339 printed size label 81 x 35 mm for frog bayonet 340 printed size lable 60 x 45 mm for belt waist ( modified ) ick in bilingual ( hindi& english ) 341 pure cadmium anode flat 300mmx300mmx9.5 mm ( 12x12x3 / 8 ) 342 pure zinc anode flat 300 x 300 x 9.5mm ( 12 x 12 x 3 / 8 ) 343 pyroclean 1 344 rivet 6 mm dia x 45 mm long cold forged steel flat counter sunk head 345 rivet alum. alloy snap head size dia 5 x 24 mm long 346 rivet alum. alloy snap head size dia 5 x 21 mm long 347 rivet for strengthening joint at vamp of high ankle boot dvs 348 rivet m.s. snap head 6mm dia x 65mm long 349 rivet steel flat head 3.15mm dia x 28mm long 350 rivet steel flat head 3.15mm dia x 8mm long 351 rivet steel flat head 5mm dia x 10mm long ( 3 / 8x 6 swg ) 352 rivet steel flat head 5mm dia x 8mm long 5 / 16 x6swg 353 rope polyproplene 3 strand h / l o.g. 6 mm dia 354 rope polypropline h / l 3 strand o.g. 8mm dia 355 rope polypropylene multifilament 3 strands h / l 6mm dia undyed. 356 rubber adhesive 357 rubber adhesive for temporary joining of leather components of boot ankle dvs 358 rubber compound for sole and heel 359 rubber foam cutting ( unserviceable ) 360 rubber solution 361 rubber stud round black 362 rubbish misc 363 m. 6mm dia 364 m. scrap commercial quality melting scrap 365 m. sheet 0.8mm thick x 1000mm x 2500mm 366 m. sheet 1.25mm x 1400 x 3600 mm ( 18 bg ) ( cr shhet ) 367 m. sheet 1.6x1000x2500 mm 368 m. wire annealed 2 mm dia 369 m. wire bright drawn half hard 3.15mm dia 370 m. wire bright drawn half hard 4mm dia371 m. wire bright drawn hard 4.00mm dia 372 m.angle 25x25x3mm in length of 4.75 mtrs 373 m.low carbon filler rod 1.6mm dia x 500mm 374 m.sheet 1.6 x 1000 x 2500 mm 375 m.sheet 1x1250x3600 mm 376 m.wire annealed 0.71mm dia 377 screen impression of oef logo with month & year identification at made up boot 378 screw wood m.s. slotted csk head g.n. 10x40mm long 379 screw wood steel slotted csk head g.no. 6x20mm 380 self adhesive cellophone pvc tape 75 mm wide. 381 self adhesive cellophone pvc tape 50mm wide 382 self adhesive cellophone pvc tape, 63 mm wide 383 self sealing polythene bag 560mm x660 mm0.08mm thick 384 sella fast dye black ig ( tfl ) / luganil black fb nt ( basf ) / melioderm black af 135 p ( stahl ) 385 sewing theread spun polyester o.g. ( v.no.4 ) 386 sewing thread linen 920d tex / 3 white 387 sewing thread spun polyester 145 d tex / 6 o.g. 388 sewing thread spun polyester 145 d tex / 3veriety no 5 t.no. 70 natural white 389 sewing thread spun polyester 145 d tex / 4 veriety no. 7t.no. 50 natural white 390 shank steel ribbed ( rust proof ) . 391 shirting angola drab no.1 152 cm 392 silicon emulsion 393 slats wood 70 mm wide x10mm thick x600 mm long / bamboo strips ( preseved ) 394 slides black anodised for belt waist of synthetic web equipment 395 sodium acetate technical 396 sodium bi carbonate 397 sodium cyanide 398 sodium formate 399 sodium perborate 400 sodium stannate 401 spanner open jaw fixed double ended steel plated ( mm ) 10 x 11 ( cat.no.5120 001555 402 spec insta bond cynoacrylate grade 40 ( in comercial packing of 20 grms each. ) 403 spring clip complete assembled with linkwithout strap for box c 18 404 steel bolt washer 6 mm x 14 mm x 1.6 mm thick 405 steel carbon 5 mm dia 406 steel mild rod 10mm dia straight in multiple length of 1825 mm. 407 steel mild round 12mm dia 408 stiffener plate as per drg. no.se 221 of sheet 2 / 1 det.3 409 strap retaining eye ( set consits of two nos ) 410 strengthening piece for box c 18 411 stud rubber to drg. pt. no. 1656 isv ( oef drawing no. sk 938 ) 412 sweing thread spun polyster 145 / dtex / 3 khaki 413 synthetic ( plastic ) slide fastener special purpose og medium duty 28 cm 414 synthetic ( plastic ) slide fastner special purpose o.g.medium special duty 32 cm auto lock 415 synthetic rubber based adhesive for joining of components of boot high ankle dvs adhesive 416 dunlop s 758 ( dunlop ) / fixobondpc 70a ( dentrite ) / fevicole sr 505 ( pidili 417 tack lasting ( machine ) 10mm r.p ( imported ) 418 tacks common hand lasting 10mm r.p 9 419 tacks common hand lasting 13 mm rust proof 420 taffeta silk 1.5width ( 3.5 cm ) for sizelable. 421 tape adhesive transparent water proof 50 mm wide 422 tape cotton superfine u / d 6mm 423 tape elastic white 6 mm 424 tape newar o.g. 13 mm 425 tape newar og off sizes ( for bag sleepingmk 4 complete with linner inner ) 426 tape newar polyester o.g. 25 mm 427 tape newar polyester o.g. off sizes ( forfly outer for tefs 4m unit ) 428 tape newar polyester o.g. off sizes ( forliner inner tefs 2 m ) 429 tape newar polyester og off sizes for fly outer ( for tefs 2 m ) 430 tape newar polyster o.g. off sizes ( for end curtain for tefs 4m / 2m unit ) 431 tape newar polyster og off sizes ( for tent extendable frame supported 4m unit complete ) 432 tape newar polyster og off sizes ( for tent extendable frame supported 2 m unit complete 433 tape newar u / d 65 mm 434 tape nylon 19 mm thin black . 435 tape nylon o.g. 19mm 436 tape nylon thick 25 mm black 437 tape nylon thick 25mm og 438 tape nylon thick 51 mm black. 439 tape nylon thick og off sizes ( for bag kit universal ( new pattern ) a f ) 440 tape nylon thick og off sizes ( for syn. web equipt. improved version frog bayonet ick ) 441 tape nylon thin 13mm og 442 tape nylon thin / thick og off sizes ( for synthetic web equipment pack with alu. frame modified 443 version ) 444 tape nylon thin / thick og off sizes ( for synthetic web equipt. improved version haversack ) 445 tape nylon thin / thick og off sizes ( for synthetic web equipt. improved version pouches ammn. ) 446 tape polythene / rayan strapping 12.5+_0.5mm wide braking strength shall be 80 kg. min. 447 tent ring ig 12.5mm 448 tergolix dtc in liquid of stahl / zelon nt 953 of smzs / bilsopan lpk of basf / borron saf of 449 tfl / tanigan orq of bayer / fourolic hls of fourient 450 textile cutting ( not less then 10cm wide ) 451 thread linen 3 cord no.18 black ( rotproffed & polished ) 452 thread linen 5 cord no 18 black rotproffed & polished 453 thread m / c 3 cord no 10 drab 454 thread sewing spun polyester og 125 d tex / 3 455 three way mild steel joint with base plate 456 three way roof pole mild steel joint. 457 timber chir plank gr i size 25 mm x 225 mm x 1.8 mtr. 458 timber chir, khasipine or kail plank gr 1size 55 mm x 110 mm x 3.00 mtr. 459 timber softwood ( coniferous ) sleeper gr. i species chir / fir size 125mm x 200mm x 3.00 mtr. 460 botanical name : chir pinus roxburghii, fir abies spp 461 tissue paper size 47 x 76 cm. ( for boot ankle dms ) is: 8460. 462 trade assistance for complete finishing operation to be carried out for boot various 463 trade assistance for final assly with rivet ( m.s.flat head rivet size 5x10 qty: 16 464 nos ) folding, closing, sealing & rubberstud fixing & stacking in carrier 13a. 465 trade assistance for hot dip galvanisation of pin tent carbon steel small 466 trade assistance for hot dip galvanisation of pin tent angle iron med. mk ii 467 trade fabrication of bag kit universal with pv dope dyed fabric og 468 trade fabrication of belt waist modified 469 trade fabrication of pack with aluminiumframe ( modified ) 470 trichloroethylene technical 471 turkey red oil 472 twine ( sewing and stitching ) 473 twine jute 3 ply ( cat / part no. h2 / 4020000195 ) 474 twisted pins. 475 upper lifter insert for boot ankle dms for airforce asper drg.no.sk 1162 476 user hand book for tent extandable frame supported 477 vernamine binder eb ( clariant ) / hycryl 50 ( tfl ) . corial binder fb ub ( basf ) 478 vernol liquor sp ( clariant / colour chem ) / fouric scp ( fourient ) baykanol liq.asp ( bayer ) / vismon 479 a201 ( vismon ) / lipo.liq fb16 ( basf ) / coripol slp ( tfl ) / balmol sgt ( balmer ) 480 web cotton black thick 25 mm 481 web cotton black thin 13 mm 482 web cotton black thin 25 mm 483 web cotton sulphur khaki thin 13mm 484 web cotton white thin 25mm ( bleached ) 485 web cotton white thin 51mm 486 web nylon thick 57mm og 487 wet blue for lining leather 488 wing nut with bracket 489 wire low carbon m.s. filler 3.15 for welding 490 zinthobrite clz 937 b 491 zinthobrite clz 937a 492 zinthobrite clz 942m 493 zinthobrite clz 942r...

Ordance Factory Board - Uttar Pradesh

7997946 expression of interest for vendor registration 1 1001940208 zinthobrite clz 942r 2 1001723050 sodium cyanide 3 9910281299 spring steel wire 1.20 mm dia 4 1582120811 nickle anode flat 5 1582231240 copper anode flat 10x300x300mm 6 9910280472 brazing flux. 7 830200000 tin ingot 8 1001723400 sodium perborate 9 1001940108 zinthobrite clz 942m 10 2101779953 cotton sewing thread 270 d tex/9 o.g. 11 9910281302 rivit aluminium alloy flat head size 5.00mm dia x 12 mm long 12 9910234964 wire steel mild 1/4 hard bright 2 m.m. 13 1004710334 soap laundry (yellow) size 7 x 2 1/4 x2 approx weight of each bar 510 gms (18ozs) 14 9910280471 brazing rod 1.6 mm.thick. 15 1582301800 pure zinc anode flat 300 x 300 x 9.5mm (12 x 12 x 3/8) 16 1001714000 sodium acetate technical 17 1001940008 zinthobrite clz 937a 18 2101786765 twine (sewing and stitching) 19 9910231066 s.m.wire annealed 0.71mm dia 20 1752020104 washer copper hose tinned 5.5 mm i/d x 14mm o/d x 1.25mm thick 21 2101780092 adhesive speb 7 22 1001775210 spirit white/oil mineral/turpentine 23 9910281298 aluminium alloy rod 6.50 mm dia 24 133011056 s.m. wire annealed 0.56 mm dia 25 611510320 aluminium alloy wire 3.2 mm 26 1001102700 cupsal(cx) 27 1001940018 zinthobrite clz 937 b 28 2101058053 bags made of jute (c) cloth size 67x28 (170x71cm) with 2 side stitched and one side left open 29 1001724904 sodium stannate 30 1001533006 nisal 168 / nickel additive 22(g&w) / omni additive 912(artck) / riko r 31 9910227111 alotectic flux 32 1747420306 rivet copper hose tinned 5mm dia x 20mm long 33 1011419018 paint r.f.u. priming etching base. 34 9910281303 aluminium alloy round 12 mm dia 35 2101495255 cloth muslin white bleached 91 cms. wide 36 799052000 copper scrap misc (c 12) 37 1001010806 acid chromic 38 1001721260 cadmium brightner 39 1781913432 aluminium alloy filler rod 3.15mm dia x 1000mm long 40 9910264639 nylon sewing thread black. 41 1011419019 paint r.f.u. matt finish o.g.(d.s.cat n0.8010 0022 252.) 42 101000012 steel mild round 12mm dia 43 1003134010 desmonder r or equivalent 44 712510265 wire brass hard 12 swg 45 1004090517 pyroclean 1 46 2101211520 cotton fabric scoured for s.d parchute type i 91 cm 47 1003470110 lezyme a(basf)/al bate(spic india)/alkali bate ab(maps india)/k l bate(advance technology)/sasyntan a(syntans & colloids) 48 2101779941 cotton sewing thread 590 dtex/3 o.g. 49 9910281316 leather chorme tanned zug grian black 3.3 mmthick. 50 9910281304 latex foam rubber solid type,13 mm thickx .60 m x1.20 m. 51 1781913116 aluminium alloy filler rod 1.6mm dia x 500mm long 52 2101058048 bags made of jute c cloth size 34x28 with 2 side stitched and one side left open 53 2101058052 bags large size 87x28 (221x71cm) made of jute c clooth with 2 side stitchedand one side left open] 54 2002400028 latex foam rubber solid type 25 mm thickx .60 m x 1.20 m . 55 9910281301 aluminuim alloy round 8.00 mm dia 56 2101530002 sewing theread spun polyester o.g. (v.no.4) 57 1001773405 trichloroethylene technical 58 2550010442 wax emulsion 59 9910235038 box fibre board rigid corrugated triple wall 7 ply size 640 x 420x 360mm 60 9910260727 sewing thread linen 920d tex/3 white 61 1745050328 rivet steel flat head 3.15mm dia x 28mm long...