34095981
erection of new acdb panel and miscellaneous work at 132 kv s / s lalkuan and 132 kv s / s industrial area ( rathi ) , under etd ii, ghaziabad 2 shifting of new acdb ( 01 no ) from store site to ground floor of control room of 132 kv s / s lalkuan by using crane, lifting machine and manually ( as required ) at 132 kv s / slalkuan 3 shifting of old acdb ( 01 no ) from acdb room in ground floor to open yard store at 132 kv s / s lalkuan s / s by using crane, lifting machine and manually ( as required ) at 132 kv s / slalkuan 4 opening electrical connection of existing old acdb panel.removal of control cable from acdb panel.removal of earthing of acdb panel and any other work to dismantle the acdb panel satisfcatorily 5 laying and termination of power / control cable of following size from substaion / circle office / colony / lightening sysytem to acdb room. 6 1.1 kv pvc frls 3.5 core 400 sqmm alumimium power cable 7 1.1 kv pvc frls 3.5 core 95 sqmm alumimium power cable 8 1.1 kv pvc frls 3.5 core 70 sqmm alumimium power cable 9 1.1 kv pvc frls 10 core* 2.5 sqmm copper control cable 10 termination of above sizes of control cable as laid above as per cable schedule and all other associated work to complete the job satisfactorily as per technical specification. 11 installation of new acdb panel including making hole in base plate, fixing of correct ferrules in power cable / control cable cores making electrical connection as per wiring diagram / required, proper tagging & dressing of cables , binding of cable core tie and proper earthing of acdb 12 repairing with complete servicing of stand by diseal pump motor and main pump motor rating of 3 phase, 415 v, 50 hz, 2900 rpm , 15 hp cgl make.the scope of work includes safe disconnection of electrical wirings of motor and proper dismantling of motor and pump removing from main header.reparing of burnt motor by cutting out burnt coils , cleaning carbon deposited on stator core thereafter complete rewinding with f class insulated fresh super enamelled copper wire of standard gauge & drying out properly after vanishing. this job also includes cleaning, oiling / greasing / lubrication of bearing , replacement of defective bearing bushes if required, replacement of wornout contacts if required , proper alignment of rotor shaft & fan wheel , proper sealing, changing of connections, leads etc.the work also includes replacement coupler of motor pump & checking the performance of tthe pumps , after connecting to the header.proper supply and starting / stopping of pumps at desired setting and free from abnormal noise.all men, material, consumables, t&p shall be provided by the contractor at his own cost. 13 painting of fire bucket stand includes cleaning of surface by rubbing , scrapping of rust and old paint then applying 1 coat of red oxide & two coat of super enamel paint of red colorof standard quality 14 painting of 132 kv / 33 kv pt & ct junction box the work includes cleaning of surface by rubbing, scrapping of rust & old paint then applying 1 coat of red oxide & two coat of super enamel standard quality smoke gray paint. the detail is given below. 15 132 kv ct junction boxes ( 600x425x145mm ) 16 132 kv cvt junction boxes ( 600x425x180mm ) 17 33 kv ct junction boxes ( 600x400x180mm ) 18 33 kv pt junction boxes ( 600x400x180mm ) 19 work at 132 kv industrial area s / s 20 erection of auxillary structures i.e alp .the work consisits of shifting of all material from store to site of erection as per drwaing & technical specifiaction 21 erection of 132 kv ct ( 400 200 / 1 1 ) 22 laying and termination of control cable of following size i.e 2c, 4c & 6c from 132 kv ct to control room and all other associated work to complete the job satisfactorily as per technical specification. 23 earthing of 132 kv ct by cutting, straightening , bending laying of following size ms flat for earthing of auxilary structure and exavation and back filing of earth including painting of earthinstrip by 50x6 mm...
Due Date : September 30, 2022
Tender Value : ₹ Ref. Documents