23111040
various work under business plan and other work under edd iii aligarh cartage of following poles store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . 1.01 pcc poles 8.5 mtr.ist pole 11 mtr. 2 cartage of line material viz weasal condudtor, gl earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respedtive site of work through the kachha pacca road including the work of its loading & unloading at the respedtive ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . 3 erection of single support including complete h.t / l.t fittings as per respo manual and as per diredtion of engineer incharge including the cost of labour, t & p and carrier etc. required for proper 3.01 completion of work. — pcc poles 8.5 utr. / st pole 11 mtr. & 3 erecaion of 11i1kv line douale pole on pcc / s4palw including the work of complete line as per respo 4 norm manual and as per direction or engmeer lncharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 4.01 pcc poles 8.5 m1tr. / st pole 11 mtr. 4.02 installation & fixing of 11 1kv tpmo laying. sagging. stringing. binding and jumpering — etc. of old line condudtor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for ___________ proper completion ot work. 5.01 acsr weasal condudtor — 5.02 acsr dog conductor drilling and culling of tee off channel, v cross arms, top channel, cross bracing angle, ms 6 garding angle, dropper chanel. as per specification of uppcl construdtion manual including including loading and unloading at the , nth anjdlc — grouting of pcc / st poles as per respo norms 7 including cost of grouting material ( cement sand: brick ballast ) size 1s00x450x45o mm ) . — 8 making the plinth or st pole 11 mtr. chopping of tree branches which are touching to 11 kvilthnes. dismantling and removal of existing conductor from the vanous area preparing their coils and 10 then stacking in the respective je’s ( store ) as per direction of supervising engineer. it inducles the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work 10.01 acsr weasal conduclor!gl wire fixing of earthing rod as per respo manual and 11 as per direction of supevsing engineer induding the cost of labour eredtion and grouting of stay set including the work of nozing etc. as per respo manual and also 12.01 including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work 12.02 providing and fixing of stay insulator. providing s filling of 3x70!3x120 sq.mm. 11 ky 13 xlpe heat shninkable cable jointing kits outdoorllndoor type induding the cost of labour tsp carrier etc for proper completion of worl. safe camnage of transformer from store center or from any oilher place to the respective site of work through the kachha pacca road including the work 14 of its loading 8. unloading at the respective ends. including the work of dragging etc. and also including the cost of labour, tsp and earner etc. required for proper completion of work. ( distance 0 to 50 km.. , transformer , safe carriage of old line material viz. conductor, gi. earth wire, abc conductor, cross arm, mgle, channel, insulators, clamps 8 other line material 15 from any other place or from site o1 work to the work of its loading 8 unloading at the respedtive ends induding the cost of labour, t&p and carrier etc. required for proper completion of work. lnstallation of extra ton the old eredted poles wherever required alongwith all fifing as per direction of supervising engineer induding the cost of labour, t&p etc. required for proper 16 completion of work. the tpole shall be grouted with cement sand and brick ballastistone ballast in ratio 1:4:8 including the cost of arrangement of cement sand, brick ballastfstone ballast stone pad etc as per adtual site requirement. sate carnage oixlpe cable of size 3x7013x120 sq. 17 mmm. from store to respedve site of work including loading unloading at both ends. safe carmiage of xlpe cable of size 3x7013x120 sq. 17 mom. from store to respective site of work induding loading unloading at both ends. laying of 3m7013x120 sq.mm. 11 ky under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. nhe cable shall be duly protected by lst dlass bricks, two on either side and third on top of the cable, laid in series 18 one after mhe other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in hhe trench in the shape of rings at both ends. all material ( ercept cable ) , labour, t&p carner etc, required for proper completion of work will be arranged by me contradtor at his own cost 19 safe carriage or lt distribution box ( three p from store centre sarsol to pit site inclu ng loading and unloading at both ends mounbn nd fixing on pole also by making connections as per respo norms 20 providing and fixing of lt shackle insulator with nut & bolts as per respo norms. 21 demounting & carriage of site to store of following capacity transformer due to damage of pcc poles including the work of its loading & unloading, dragging etc. and also induding the cost of labour and t&p etc. required for proper completion of work. 21.01 25kvat / f 21.02 250 kvat / f re s agging of loose htilt line conductor as per 22 direction or superwising engineer it includes the cost of labour t&p carrier etc. required for proper completion of work. 22.01 acsrweasal condutor retighting of stay complete with nozelling & 23 binding including cost of labour t&p etc required for proper completion of work. 24 straightening or tiited pole at various places as per direction of je. giving connedtions to the genuine consmers by connedting cable thought installed lt distribution 25 box as per direction of supervising engineer it includes the cost of labour, t&p, carrier etc required for.proper. completion. 26 providing and fixing clamp with nur & bolts as per respo norms. 27 straightening or tilted double pole at various places as per direction of je body and neutral earthing o1400 kva transformer installed by digging of pit up to water level depth ( approx. 100 ) and then inserting 1 114 dia g.l. pipe of of ‘w grade, conforming to the requirement of is specdication and then connecting the top of 28 the inserted pipe and transformer bocfythrough cl strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per diredtion of supevsing engineer induding the cost of arrangement of all materal, labourer, t&p, carrier etc. required for proper completion of work. construction of plinth of size 5x5x4’ above ground level and one ft. below the ground level of 9’. after excavation of 4 earth, bnick ballast shall be provided and rammering will be done properly after that a retaining wall of g’ width by first class brick in ratio 1:4 of cement and sand shall be made. the earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided up to 6’ from the earth level and prop 29 rammering shall be done. one no. jall of 12 m mis. tor shall be fixed in the hollow of plinth a one ft. thick rcc in ratio of cement sand an stone ballast shall be laid on the top of the plintin the 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. the contradtor shall be responsible to complete the work as per diredtion of supervising engineer lt including the cost of all material, labour t&p, carrier etc. required for proper completion of work , etc...
Due Date : January 07, 2020