Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

37011931 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 4 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of 09 mtrs. long st pole 4 supply of stone pad 5 supply of suspension clamp with eye hook 6 supply of dead end clamp with eye 7 supply of distritbution box 8 supply of earthing complete for st pole 9 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 10 supply of 11 kv xlpe cable size 3*185 sq.mm. 11 supply of acsr dog conductor 12 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable outdoor type 13 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 14 supply of 100 kva distribuition transoformer 15 supply of 250 kva distribuition transoformer 16 supply of 11 kv d.o. fuse set 17 supply of 11 kv tpmo 18 supply of al. lugs 120 sq.mm. 19 supply of 11 kv pin insulator with pin 20 supply of 11 kv disc insulator with fitting 21 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 22 supply of m.s. dropper channel size 100x50x2028 mm. 23 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 24 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 25 supply of clamps for pole 26 supply danger board with clamp 27 supply of nut, bolts & washer 28 supply of barbed wire 29 supply of l.t. pvc cable 3.5x400 sq.mm. 30 supply of l.t. incoming panel with metering equipment 31 supply of cross arm 32 supply of 11 kv vcb outgoing 200 / 100 / 05 with penal 33 supply of support wire 6 swg 34 supply ofacsr weasel conductor 35 supply of l.t. aeirel bunch cable size 3x95+1x35+1x16 sq.mm. 36 supply of i hook 37 erection 38 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 39 erection of single support by 09 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 40 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 41 laying of 11 kv xlpe cable 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 42 laying spreading, lifting and final sagging of aerial bunched cable size 3x95+1x35+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 43 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 44 laying of lt pvc cable 3.5x400 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 45 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 46 laying sagging stringing and jumpering of acsr weasel conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 47 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 48 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 49 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 50 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 51 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 52 erection of pin insulator with pin & nuts, 11 kv 53 erection of disc insulator with fittings, 11 kv 54 erection of danger board with nuts & bolts and clamps 55 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 56 erection of m.s. dropper channel size 100x50x2028 mm. 57 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 58 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 59 erection of cross arm 60 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 61 erection of stone pad 62 erection of h.t. / l.t. clamps with nuts & bolts 63 erection of eye hook with suspension clamps 64 erection of 11 kv tpmo 65 erection of 11 kv do fuse set 66 laying of barbed wire 67 installation of l.t. incoming panel with metering equipment 68 installation of 11 kv vcb outgoing 200 / 100 / 05 with penal 69 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 70 mounting of 100 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 71 mounting of 250 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

37011888 tender for various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 1 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of 09 mtrs. long st pole 4 supply of 8.5 mtrs. long pcc pole 5 supply of stone pad 6 supply of abc connector 7 supply of suspension clamp with eye hook 8 supply of dead end clamp with eye 9 supply of distritbution box 10 supply of earthing complete for st pole 11 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 12 supply of 11 kv xlpe cable size 3*185 sq.mm. 13 supply of acsr dog conductor 14 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable outdoor type 15 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 16 supply of 100 kva distribuition transoformer 17 supply of 250 kva distribuition transoformer 18 supply of 11 kv d.o. fuse set 19 supply of 11 kv tpmo 20 supply of al. lugs 240sq.mm. 21 supply of 11 kv pin insulator with pin 22 supply of 11 kv disc insulator with fitting 23 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 24 supply of m.s. dropper channel size 100x50x2028 mm. 25 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 26 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 27 supply of f braket with clamp 28 supply of clamps for pole 29 supply danger board with clamp 30 supply of nut, bolts & washer 31 supply of barbed wire 32 supply of l.t. pvc cable 3.5x240 sq.mm. 33 supply of l.t. incoming panel with metering equipment 34 erection 35 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 36 erection of single support by 09 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 37 erection of single support by 8.5 mtrs. pcc pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 38 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 39 laying of 11 kv xlpe cable 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 40 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 41 laying of lt pvc cable 3.5x240 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 42 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 43 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 44 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 45 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 46 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 47 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 48 erection of pin insulator with pin & nuts, 11 kv 49 erection of disc insulator with fittings, 11 kv 50 erection of danger board with nuts & bolts and clamps 51 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 52 erection of m.s. dropper channel size 100x50x2028 mm. 53 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 54 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 55 erection of f braket with clamp 56 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 57 plinth with fencing of 11 / .04 kv sub stations ass per resspo norms. 58 erection of stone pad 59 erection of peircing connector 60 erection of h.t. / l.t. clamps with nuts & bolts 61 erection of eye hook with suspension clamps 62 erection of 11 kv tpmo 63 erection of 11 kv do fuse set 64 laying of barbed wire 65 installation of l.t. incoming panel with metering equipment 66 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 67 mounting of 100 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 68 mounting of 250 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 69 after opening of ht & lt connections, dismantalling of25 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 70 after opening of ht & lt connections, dismantalling of63 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 71 after opening of ht & lt connections, dismantalling of100 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 72 removing of 05 mva power transformer from plinth to switchyard as per resspo manual 73 dismantling ofold & used ms scrap form existing line and its safe carriage from site to store as per resspo norms. 74 dismantling ofold & used abc scrap form existing line and its safe carriage from site to store as per resspo norms. 75 dismantling ofold & used conductor scrap form existing line and its safe carriage from site to store as per resspo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

37011883 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 3 aligarh 2 supply of 33 kv control penal 3 supply of 11 kv vcb outgoing ( 400 / 200 / 5a. ) 4 supply of battery charger 24volt 5 supply of battery set 6 supply of 11 kv ct for vcb 600 / 300 / 5a set 7 supply of 11 kv ct for vcb 400 / 200 / 5a set 8 supply of 33 kv post insulator set 9 supply of control cable 4x2.5 sqmm. 10 supply of control cable 2x2.5 sqmm. 11 supply of 11 mtrs. long st pole is 410 sp 55 12 supply of 09 mtrs. long st pole 13 supply of 8.5 mtrs. long pcc pole 14 supply of stone pad 15 supply of abc connector 16 supply of suspension clamp with eye hook 17 supply of dead end clamp with eye 18 supply of distritbution box 19 supply of earthing complete for st pole 20 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 21 supply of 11 kv xlpe cable size 3*70 sq.mm. 22 supply of 11 kv xlpe cable size 3*185 sq.mm. 23 supply of 33 kv xlpe cable size 3*300 sq.mm. 24 supply of acsr dog conductor 25 supply of heat shrinkable jointing kit for 11 kv xlpe 3x70 sq.mm. cable outdoor type 26 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable outdoor type 27 supply of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable outdoor type 28 supply of l.t. aeirel bunch cable size 3x95+1x35+1x16 sq.mm. 29 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 30 supply of 100 kva distribuition transoformer 31 supply of 250 kva distribuition transoformer 32 supply of 11 kv d.o. fuse set 33 supply of 11 kv tpmo 34 supply of al. lugs 400sq.mm. 35 supply of 11 kv pin insulator with pin 36 supply of 11 kv disc insulator with fitting 37 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 38 supply of m.s. dropper channel size 100x50x2028 mm. 39 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 40 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 41 supply of f braket with clamp 42 supply of clamps for pole 43 supply danger board with clamp 44 supply of l.t. pvc cable 3.5x150 sq.mm. 45 supply of l.t. pvc cable 3.5x400 sq.mm. 46 supply of l.t. incoming panel with metering equipment 47 supply of 33 kv lightening arrestor 48 erection 49 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 50 erection of single support by 09 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 51 erection of single support by 8.5 mtrs. pcc pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 52 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 53 laying of 33 kv xlpe cable 3x300 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 54 laying of 11 kv xlpe cable 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 55 laying of 11 kv xlpe cable 3x70 sq.mm. including making proper connectionst both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 56 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 57 laying of lt pvc cable 3.5x150 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 58 laying of lt pvc cable 3.5x400 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 59 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 60 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 61 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 62 filling of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable indoor / outdoor type as per resspo norms. 63 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 64 filling of heat shrinkable jointing kit for 11 kv xlpe 3x70 sq.mm. cable indoor / outdoor type as per resspo norms. 65 installation of 33 kv control penal 66 installation of 11 kv vcb outgoing ( 400 / 200 / 5a. ) 67 installation of battery charger 24volt 68 installation of battery set 69 fixing of 11 kv ct for vcb 600 / 300 / 5a set 70 fixing of 11 kv ct for vcb 400 / 200 / 5a set 71 fixing of 33 kv post insulator set 72 laying of control cable 4x2.5 sqmm. 73 laying of control cable 2x2.5 sqmm. 74 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 75 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 76 erection of pin insulator with pin & nuts, 11 kv 77 erection of disc insulator with fittings, 11 kv 78 erection of danger board with nuts & bolts and clamps 79 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 80 erection of m.s. dropper channel size 100x50x2028 mm. 81 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 82 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 83 erection of f braket with clamp 84 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 85 erection of stone pad 86 erection of peircing connector 87 erection of h.t. / l.t. clamps with nuts & bolts 88 erection of eye hook with suspension clamps 89 erection of 11 kv tpmo 90 erection of 11 kv do fuse set 91 installation of l.t. incoming panel with metering equipment 92 installation of 33 kv lightening arrestor 93 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 94 installation of 100 kva distribution transformer on double pole / plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 95 installation of 250 kva distribution transformer on double pole / plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 96 after opening of ht & lt connections, dismantalling of10 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 97 after opening of ht & lt connections, dismantalling of25 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 98 after opening of ht & lt connections, dismantalling of63 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 99 after opening of ht & lt connections, dismantalling of100 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 100 removing of 05 mva power transformer from plinth to switchyard as per resspo manual 101 dismantling ofold & used st poles 09 mts. and its safe carriage from site to store as per resspo norms. 102 dismantling ofold & used conductor scrap form existing line and its safe carriage from site to store as per resspo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

37011876 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 2 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of 11 mtrs. long double pole is 410 sp 55 4 supply of 8.5 mtrs. long pcc pole 5 supply of stone pad 6 supply of abc connector 7 supply of suspension clamp with eye hook 8 supply of dead end clamp with eye 9 supply of distritbution box 10 supply of earthing complete for st pole 11 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 12 supply of 11 kv xlpe cable size 3*120 sq.mm. 13 supply of 33 kv xlpe cable size 3*300 sq.mm. 14 supply of acsr dog conductor 15 supply of heat shrinkable jointing kit for 11 kv xlpe 3x120 sq.mm. cable outdoor type 16 supply of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable outdoor type 17 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 18 supply of 63 kv distribuition transoformer 19 supply of 100 kva distribuition transoformer 20 supply of 250 kva distribuition transoformer 21 supply of 400 kva distribuition transoformer 22 supply of 11 kv d.o. fuse set 23 supply of 11 kv tpmo 24 supply of al. lugs 240sq.mm. 25 supply of 11 kv pin insulator with pin 26 supply of 11 kv disc insulator with fitting 27 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 28 supply of m.s. dropper channel size 100x50x2028 mm. 29 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 30 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 31 supply of f braket with clamp 32 supply of clamps for pole 33 supply danger board with clamp 34 supply of nut, bolts & washer 35 supply of barbed wire 36 supply of l.t. pvc cable 3.5x150 sq.mm. 37 supply of l.t. pvc cable 3.5x400 sq.mm. 38 supply of l.t. incoming panel with metering equipment 39 supply of 33 kv lightening arrestor 40 supply of11 kv type cross arm 41 supply ofnumber plate 42 supply ofgaurding angle 43 supply ofgi wire 6swg 44 supply ofgi wire 8swg 45 erection 46 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 47 erection of single support by 8.5 mtrs. pcc pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 48 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 49 laying of 33 kv xlpe cable 3x300 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 50 laying of 11 kv xlpe cable 3x120 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 51 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 52 laying of lt pvc cable 3.5x150 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 53 laying of lt pvc cable 3.5x400 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 54 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 55 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 56 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 57 filling of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable indoor / outdoor type as per resspo norms. 58 filling of heat shrinkable jointing kit for 11 kv xlpe 3x120 sq.mm. cable indoor / outdoor type as per resspo norms. 59 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 60 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 61 erection of pin insulator with pin & nuts, 11 kv 62 erection of disc insulator with fittings, 11 kv 63 erection of danger board with nuts & bolts and clamps 64 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 65 erection of m.s. dropper channel size 100x50x2028 mm. 66 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 67 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 68 erection of f braket with clamp 69 plinth 250, 400 kva 70 fancing 250, 400kva 71 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 72 erection of stone pad 73 erection of peircing connector 74 erection of h.t. / l.t. clamps with nuts & bolts 75 erection of eye hook with suspension clamps 76 erection of 11 kv tpmo 77 erection of 11 kv do fuse set 78 laying of barbed wire 79 installation of l.t. incoming panel with metering equipment 80 installation of 33 kv lightening arrestor 81 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 82 mounting of 63 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 83 mounting of 100 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 84 mounting of 250 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 85 mounting of 400 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 86 after opening of ht & lt connections, dismantalling of 25 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole / placement on the plinth including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 87 after opening of ht & lt connections, dismantalling of63 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole / placement on the plinth including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 88 after opening of ht & lt connections, dismantalling of 100, 160 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 89 after opening of ht & lt connections, dismantalling of 250 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 90 dismantling ofold & used ms scrap form existing line and its safe carriage from site to store as per resspo norms. 91 dismantling ofold & used st poles 11 mts. and its safe carriage from site to store as per resspo norms. 92 dismantling ofold & used abc scrap form existing line and its safe carriage from site to store as per resspo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

36945939 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 4 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of 09 mtrs. long st pole 4 supply of stone pad 5 supply of suspension clamp with eye hook 6 supply of dead end clamp with eye 7 supply of distritbution box 8 supply of earthing complete for st pole 9 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 10 supply of 11 kv xlpe cable size 3*185 sq.mm. 11 supply of acsr dog conductor 12 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable outdoor type 13 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 14 supply of 100 kva distribuition transoformer 15 supply of 250 kva distribuition transoformer 16 supply of 11 kv d.o. fuse set 17 supply of 11 kv tpmo 18 supply of al. lugs 120 sq.mm. 19 supply of 11 kv pin insulator with pin 20 supply of 11 kv disc insulator with fitting 21 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 22 supply of m.s. dropper channel size 100x50x2028 mm. 23 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 24 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 25 supply of clamps for pole 26 supply danger board with clamp 27 supply of nut, bolts & washer 28 supply of barbed wire 29 supply of l.t. pvc cable 3.5x400 sq.mm. 30 supply of l.t. incoming panel with metering equipment 31 supply of cross arm 32 supply of 11 kv vcb outgoing 200 / 100 / 05 with penal 33 supply of support wire 6 swg 34 supply ofacsr weasel conductor 35 supply of l.t. aeirel bunch cable size 3x95+1x35+1x16 sq.mm. 36 supply of i hook 37 erection 38 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 39 erection of single support by 09 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 40 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 41 laying of 11 kv xlpe cable 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 42 laying spreading, lifting and final sagging of aerial bunched cable size 3x95+1x35+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 43 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 44 laying of lt pvc cable 3.5x400 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 45 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 46 laying sagging stringing and jumpering of acsr weasel conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 47 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 48 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 49 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 50 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 51 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 52 erection of pin insulator with pin & nuts, 11 kv 53 erection of disc insulator with fittings, 11 kv 54 erection of danger board with nuts & bolts and clamps 55 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 56 erection of m.s. dropper channel size 100x50x2028 mm. 57 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 58 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 59 erection of cross arm 60 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 61 erection of stone pad 62 erection of h.t. / l.t. clamps with nuts & bolts 63 erection of eye hook with suspension clamps 64 erection of 11 kv tpmo 65 erection of 11 kv do fuse set 66 laying of barbed wire 67 installation of l.t. incoming panel with metering equipment 68 installation of 11 kv vcb outgoing 200 / 100 / 05 with penal 69 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 70 mounting of 100 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 71 mounting of 250 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

36945854 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 1 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of 09 mtrs. long st pole 4 supply of 8.5 mtrs. long pcc pole 5 supply of stone pad 6 supply of abc connector 7 supply of suspension clamp with eye hook 8 supply of dead end clamp with eye 9 supply of distritbution box 10 supply of earthing complete for st pole 11 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 12 supply of 11 kv xlpe cable size 3*185 sq.mm. 13 supply of acsr dog conductor 14 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable outdoor type 15 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 16 supply of 100 kva distribuition transoformer 17 supply of 250 kva distribuition transoformer 18 supply of 11 kv d.o. fuse set 19 supply of 11 kv tpmo 20 supply of al. lugs 240sq.mm. 21 supply of 11 kv pin insulator with pin 22 supply of 11 kv disc insulator with fitting 23 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 24 supply of m.s. dropper channel size 100x50x2028 mm. 25 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 26 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 27 supply of f braket with clamp 28 supply of clamps for pole 29 supply danger board with clamp 30 supply of nut, bolts & washer 31 supply of barbed wire 32 supply of l.t. pvc cable 3.5x240 sq.mm. 33 supply of l.t. incoming panel with metering equipment 34 erection 35 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 36 erection of single support by 09 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 37 erection of single support by 8.5 mtrs. pcc pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 38 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 39 laying of 11 kv xlpe cable 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 40 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 41 laying of lt pvc cable 3.5x240 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 42 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 43 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 44 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 45 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 46 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 47 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 48 erection of pin insulator with pin & nuts, 11 kv 49 erection of disc insulator with fittings, 11 kv 50 erection of danger board with nuts & bolts and clamps 51 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 52 erection of m.s. dropper channel size 100x50x2028 mm. 53 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 54 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 55 erection of f braket with clamp 56 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 57 erection of stone pad 58 erection of peircing connector 59 erection of h.t. / l.t. clamps with nuts & bolts 60 erection of eye hook with suspension clamps 61 erection of 11 kv tpmo 62 erection of 11 kv do fuse set 63 laying of barbed wire 64 installation of l.t. incoming panel with metering equipment 65 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 66 mounting of 100 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 67 mounting of 250 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 68 after opening of ht & lt connections, dismantalling of25 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 69 after opening of ht & lt connections, dismantalling of63 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 70 after opening of ht & lt connections, dismantalling of100 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 71 removing of 05 mva power transformer from plinth to switchyard as per resspo manual 72 dismantling ofold & used ms scrap form existing line and its safe carriage from site to store as per resspo norms. 73 dismantling ofold & used abc scrap form existing line and its safe carriage from site to store as per resspo norms. 74 dismantling ofold & used conductor scrap form existing line and its safe carriage from site to store as per resspo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

36945632 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 3 aligarh 2 supply of 33 kv control penal 3 supply of 11 kv vcb outgoing ( 400 / 200 / 5a. ) 4 supply of battery charger 24volt 5 supply of battery set 6 supply of 11 kv ct for vcb 600 / 300 / 5a set 7 supply of 11 kv ct for vcb 400 / 200 / 5a set 8 supply of 33 kv post insulator set 9 supply of control cable 4x2.5 sqmm. 10 supply of control cable 2x2.5 sqmm. 11 supply of 11 mtrs. long st pole is 410 sp 55 12 supply of 09 mtrs. long st pole 13 supply of 8.5 mtrs. long pcc pole 14 supply of stone pad 15 supply of abc connector 16 supply of suspension clamp with eye hook 17 supply of dead end clamp with eye 18 supply of distritbution box 19 supply of earthing complete for st pole 20 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 21 supply of 11 kv xlpe cable size 3*70 sq.mm. 22 supply of 11 kv xlpe cable size 3*185 sq.mm. 23 supply of 33 kv xlpe cable size 3*300 sq.mm. 24 supply of acsr dog conductor 25 supply of heat shrinkable jointing kit for 11 kv xlpe 3x70 sq.mm. cable outdoor type 26 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable outdoor type 27 supply of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable outdoor type 28 supply of l.t. aeirel bunch cable size 3x95+1x35+1x16 sq.mm. 29 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 30 supply of 100 kva distribuition transoformer 31 supply of 250 kva distribuition transoformer 32 supply of 11 kv d.o. fuse set 33 supply of 11 kv tpmo 34 supply of al. lugs 400sq.mm. 35 supply of 11 kv pin insulator with pin 36 supply of 11 kv disc insulator with fitting 37 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 38 supply of m.s. dropper channel size 100x50x2028 mm. 39 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 40 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 41 supply of f braket with clamp 42 supply of clamps for pole 43 supply danger board with clamp 44 supply of l.t. pvc cable 3.5x150 sq.mm. 45 supply of l.t. pvc cable 3.5x400 sq.mm. 46 supply of l.t. incoming panel with metering equipment 47 supply of 33 kv lightening arrestor 48 erection 49 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 50 erection of single support by 09 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 51 erection of single support by 8.5 mtrs. pcc pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 52 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 53 laying of 33 kv xlpe cable 3x300 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 54 laying of 11 kv xlpe cable 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 55 laying of 11 kv xlpe cable 3x70 sq.mm. including making proper connectionst both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 56 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 57 laying of lt pvc cable 3.5x150 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 58 laying of lt pvc cable 3.5x400 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 59 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 60 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 61 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 62 filling of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable indoor / outdoor type as per resspo norms. 63 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 64 filling of heat shrinkable jointing kit for 11 kv xlpe 3x70 sq.mm. cable indoor / outdoor type as per resspo norms. 65 installation of 33 kv control penal 66 installation of 11 kv vcb outgoing ( 400 / 200 / 5a. ) 67 installation of battery charger 24volt 68 installation of battery set 69 fixing of 11 kv ct for vcb 600 / 300 / 5a set 70 fixing of 11 kv ct for vcb 400 / 200 / 5a set 71 fixing of 33 kv post insulator set 72 laying of control cable 4x2.5 sqmm. 73 laying of control cable 2x2.5 sqmm. 74 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 75 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 76 erection of pin insulator with pin & nuts, 11 kv 77 erection of disc insulator with fittings, 11 kv 78 erection of danger board with nuts & bolts and clamps 79 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 80 erection of m.s. dropper channel size 100x50x2028 mm. 81 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 82 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 83 erection of f braket with clamp 84 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 85 erection of stone pad 86 erection of peircing connector 87 erection of h.t. / l.t. clamps with nuts & bolts 88 erection of eye hook with suspension clamps 89 erection of 11 kv tpmo 90 erection of 11 kv do fuse set 91 installation of l.t. incoming panel with metering equipment 92 installation of 33 kv lightening arrestor 93 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 94 installation of 100 kva distribution transformer on double pole / plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 95 installation of 250 kva distribution transformer on double pole / plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 96 after opening of ht & lt connections, dismantalling of10 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 97 after opening of ht & lt connections, dismantalling of25 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 98 after opening of ht & lt connections, dismantalling of63 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 99 after opening of ht & lt connections, dismantalling of100 kva distribution transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends. 100 removing of 05 mva power transformer from plinth to switchyard as per resspo manual 101 dismantling ofold & used st poles 09 mts. and its safe carriage from site to store as per resspo norms. 102 dismantling ofold & used conductor scrap form existing line and its safe carriage from site to store as per resspo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

36927983 various electric works on turn key basis for electrification and strengthening of infrastructure due to extension of nagar nigam area eudd 2 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of 11 mtrs. long double pole is 410 sp 55 4 supply of 8.5 mtrs. long pcc pole 5 supply of stone pad 6 supply of abc connector 7 supply of suspension clamp with eye hook 8 supply of dead end clamp with eye 9 supply of distritbution box 10 supply of earthing complete for st pole 11 supply of stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 12 supply of 11 kv xlpe cable size 3*120 sq.mm. 13 supply of 33 kv xlpe cable size 3*300 sq.mm. 14 supply of acsr dog conductor 15 supply of heat shrinkable jointing kit for 11 kv xlpe 3x120 sq.mm. cable outdoor type 16 supply of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable outdoor type 17 supply of l.t. aeirel bunch cable size 3x120+1x95+1x16 sq.mm. 18 supply of 63 kv distribuition transoformer 19 supply of 100 kva distribuition transoformer 20 supply of 250 kva distribuition transoformer 21 supply of 400 kva distribuition transoformer 22 supply of 11 kv d.o. fuse set 23 supply of 11 kv tpmo 24 supply of al. lugs 240sq.mm. 25 supply of 11 kv pin insulator with pin 26 supply of 11 kv disc insulator with fitting 27 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 28 supply of m.s. dropper channel size 100x50x2028 mm. 29 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 30 supply of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 31 supply of f braket with clamp 32 supply of clamps for pole 33 supply danger board with clamp 34 supply of nut, bolts & washer 35 supply of barbed wire 36 supply of l.t. pvc cable 3.5x150 sq.mm. 37 supply of l.t. pvc cable 3.5x400 sq.mm. 38 supply of l.t. incoming panel with metering equipment 39 supply of 33 kv lightening arrestor 40 supply of11 kv type cross arm 41 supply ofnumber plate 42 supply ofgaurding angle 43 supply ofgi wire 6swg 44 supply ofgi wire 8swg 45 erection 46 erection of single support by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 47 erection of single support by 8.5 mtrs. pcc pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 48 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 49 laying of 33 kv xlpe cable 3x300 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 50 laying of 11 kv xlpe cable 3x120 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 51 laying spreading, lifting and final sagging of aerial bunched cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 52 laying of lt pvc cable 3.5x150 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 53 laying of lt pvc cable 3.5x400 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 54 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 55 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 56 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 57 filling of heat shrinkable jointing kit for 33 kv xlpe 3x300 sq.mm. cable indoor / outdoor type as per resspo norms. 58 filling of heat shrinkable jointing kit for 11 kv xlpe 3x120 sq.mm. cable indoor / outdoor type as per resspo norms. 59 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 60 painting of single pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 61 erection of pin insulator with pin & nuts, 11 kv 62 erection of disc insulator with fittings, 11 kv 63 erection of danger board with nuts & bolts and clamps 64 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 65 erection of m.s. dropper channel size 100x50x2028 mm. 66 erection of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 67 erection of m.s. t off channel size 125x65x6 mm, 2240 mm. long with clamp 68 erection of f braket with clamp 69 plinth 250, 400 kva 70 fancing 250, 400kva 71 neutral & body earthing of 11 / 0.4 kv sub stations installed by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 72 erection of stone pad 73 erection of peircing connector 74 erection of h.t. / l.t. clamps with nuts & bolts 75 erection of eye hook with suspension clamps 76 erection of 11 kv tpmo 77 erection of 11 kv do fuse set 78 laying of barbed wire 79 installation of l.t. incoming panel with metering equipment 80 installation of 33 kv lightening arrestor 81 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 82 mounting of 63 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 83 mounting of 100 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 84 mounting of 250 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 85 mounting of 400 kva distribution transformer on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 86 after opening of ht & lt connections, dismantalling of 25 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole / placement on the plinth including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 87 after opening of ht & lt connections, dismantalling of63 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole / placement on the plinth including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 88 after opening of ht & lt connections, dismantalling of 100, 160 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 89 after opening of ht & lt connections, dismantalling of 250 kva distribution transformer from double pole and its safe carriage from respective site to other placeincluding loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv tpmo to the transformer and also connecting the lt site cables as per resspo manual. 90 dismantling ofold & used ms scrap form existing line and its safe carriage from site to store as per resspo norms. 91 dismantling ofold & used st poles 11 mts. and its safe carriage from site to store as per resspo norms. 92 dismantling ofold & used abc scrap form existing line and its safe carriage from site to store as per resspo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34599227 release the connection for use in habitat center ( nagar nigam ) aligarh on turnkey basis in the area of eudd 4 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of pin insulator with pin & nuts, 11 kv 4 supply of disc insulator with fitttings, 11 kv 5 supply of stay complete for 11kv ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 6 supply of acsr dog conductor 7 supply of clamps with nuts & bolts 8 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type 9 supply of 11 kv xlpe cable size 3*185 sq.mm. 10 supply of number plate 11 supply of danger board with clamps 12 supply of gi barbed wire 13 supply of stone pad 14 supply of aluminum tape 15 supply of earthing complete for st pole 16 supply of cross bracing angle 17 supply of hdpe pn 6 pipe ( 160 mm. dia ) with clamp etc. 18 supply of 11 kv pilfer proof metering cubicle 19 supply of gi pipe 6 dia 20 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 21 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 22 supply of m.s. dropper channel size 100x50x2028 mm. 23 supply of 11 kv do fuse set 24 supply of 11 kv vcb o / g ctr 200 / 100 / 5a, 350mva 25 erection 26 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 27 digging of trench by excavation of earth, laying of bricks to cover the cable and filling of sand & earth ramming and dressing properly with complete job for laying 11 kv xlpe cable upto sizes 185 sq.mm. including cost of bricks, sand, clamps ete for laying of cable in double curcuit ( pakka road ) 28 erection of hdpe pipe ( upto 160 mm. dia ) / gi pipe ( upto 8 dia ) over head ( overhead structure like flyover etc ) for laying of 11 kv xlpe cables of suitable size ( upto size 185 sq.mm. ) in hdpe pipes / gi pipes. 29 laying of 11 kvxple cable of suitable size ( upto 185 sq.mm. ) in hdpe pipes / gi pipes 30 road restoration charges ( pakka road ) 31 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 32 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 33 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 34 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 35 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 36 erection of disc insulator with fittings, 11 kv 37 erection of pin insulator with pin & nuts, 11 kv 38 erection of danger board with nuts & bolts and clamps 39 erection of number plate 40 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 41 erection of m.s. dropper channel size 100x50x2028 mm. 42 erection ofm.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 43 earthing of sub station indoor equipment 44 erection of stone pad 45 laying of gi barbed wire 46 erection of 11 kv do fuse set 47 erection of cross bracing angle 48 installation of 11 kv pilfer proof metering cubicle 49 erection of gi pipe 6 dia 50 installation of 11 kv vcb o / g ctr 200 / 100 / 5a, 350mva 51 installation of 11 kv ct / pt pole mounting unit 100 / 5a...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34536434 release the connection for use in habitat center ( nagar nigam ) aligarh on turnkey basis in the area of eudd 4 aligarh 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of pin insulator with pin & nuts, 11 kv 4 supply of disc insulator with fitttings, 11 kv 5 supply of stay complete for 11kv ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 6 supply of acsr dog conductor 7 supply of clamps with nuts & bolts 8 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type 9 supply of 11 kv xlpe cable size 3*185 sq.mm. 10 supply of number plate 11 supply of danger board with clamps 12 supply of gi barbed wire 13 supply of stone pad 14 supply of aluminum tape 15 supply of earthing complete for st pole 16 supply of cross bracing angle 17 supply of hdpe pn 6 pipe ( 160 mm. dia ) with clamp etc. 18 supply of 11 kv pilfer proof metering cubicle 19 supply of gi pipe 6 dia 20 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 21 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 22 supply of m.s. dropper channel size 100x50x2028 mm. 23 supply of 11 kv do fuse set 24 supply of 11 kv vcb o / g ctr 200 / 100 / 5a, 350mva 25 erection 26 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 27 digging of trench by excavation of earth, laying of bricks to cover the cable and filling of sand & earth ramming and dressing properly with complete job for laying 11 kv xlpe cable upto sizes 185 sq.mm. including cost of bricks, sand, clamps ete for laying of cable in double curcuit ( pakka road ) 28 erection of hdpe pipe ( upto 160 mm. dia ) / gi pipe ( upto 8 dia ) over head ( overhead structure like flyover etc ) for laying of 11 kv xlpe cables of suitable size ( upto size 185 sq.mm. ) in hdpe pipes / gi pipes. 29 laying of 11 kvxple cable of suitable size ( upto 185 sq.mm. ) in hdpe pipes / gi pipes 30 road restoration charges ( pakka road ) 31 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 32 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 33 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 34 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 35 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 36 erection of disc insulator with fittings, 11 kv 37 erection of pin insulator with pin & nuts, 11 kv 38 erection of danger board with nuts & bolts and clamps 39 erection of number plate 40 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 41 erection of m.s. dropper channel size 100x50x2028 mm. 42 erection ofm.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 43 earthing of sub station indoor equipment 44 erection of stone pad 45 laying of gi barbed wire 46 erection of 11 kv do fuse set 47 erection of cross bracing angle 48 installation of 11 kv pilfer proof metering cubicle 49 erection of gi pipe 6 dia 50 installation of 11 kv vcb o / g ctr 200 / 100 / 5a, 350mva 51 installation of 11 kv ct / pt pole mounting unit 100 / 5a...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34338222 release new connection for icc habitat centre, ceo, aligarh smart city, aligarh against sanctioned package no. 17 / 2022 23 under deposit head in the area of eudd iv, aligarh on turnkey basis 2 supply of 11 mtrs. long st pole is 410 sp 55 3 supply of pin insulator with pin & nuts, 11 kv 4 supply of disc insulator with fitttings, 11 kv 5 supply of stay complete for 11kv ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, bolts, nuts & washers ) 6 supply of acsr dog conductor 7 supply of clamps with nuts & bolts 8 supply of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type 9 supply of 11 kv xlpe cable size 3*185 sq.mm. 10 supply of number plate 11 supply of danger board with clamps 12 supply of gi barbed wire 13 supply of stone pad 14 supply of aluminum tape 15 supply of earthing complete for st pole 16 supply of cross bracing angle 17 supply of hdpe pn 6 pipe ( 160 mm. dia ) with clamp etc. 18 supply of 11 kv pilfer proof metering cubicle 19 supply of gi pipe 6 dia 20 supply of m.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 21 supply of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 22 supply of m.s. dropper channel size 100x50x2028 mm. 23 supply of 11 kv do fuse set 24 supply of 11 kv vcb o / g ctr 200 / 100 / 5a, 350mva 25 erection 26 erection of double pole structure by 11 mtrs. st pole including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per resspo manual 27 digging of trench by excavation of earth, laying of bricks to cover the cable and filling of sand & earth ramming and dressing properly with complete job for laying 11 kv xlpe cable upto sizes 185 sq.mm. including cost of bricks, sand, clamps ete for laying of cable in double curcuit ( pakka road ) 28 erection of hdpe pipe ( upto 160 mm. dia ) / gi pipe ( upto 8 dia ) over head ( overhead structure like flyover etc ) for laying of 11 kv xlpe cables of suitable size ( upto size 185 sq.mm. ) in hdpe pipes / gi pipes. 29 laying of 11 kvxple cable of suitable size ( upto 185 sq.mm. ) in hdpe pipes / gi pipes 30 road restoration charges ( pakka road ) 31 laying sagging stringing and jumpering of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 32 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 33 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 34 filling of heat shrinkable jointing kit for 11 kv xlpe 3x185 sq.mm. cable indoor / outdoor type as per resspo norms. 35 painting of double pole structure of st pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips. 36 erection of disc insulator with fittings, 11 kv 37 erection of pin insulator with pin & nuts, 11 kv 38 erection of danger board with nuts & bolts and clamps 39 erection of number plate 40 erection of m.s. top channel size 125x65x6 mm, 2240 mm. long with clamp 41 erection of m.s. dropper channel size 100x50x2028 mm. 42 erection ofm.s. base angle size 75x75x6mm., 2028 mm. long with clamp for t / f base 43 earthing of sub station indoor equipment 44 erection of stone pad 45 laying of gi barbed wire 46 erection of 11 kv do fuse set 47 erection of cross bracing angle 48 installation of 11 kv pilfer proof metering cubicle 49 erection of gi pipe 6 dia 50 installation of 11 kv vcb o / g ctr 200 / 100 / 5a, 350mva 51 installation of 11 kv ct / pt pole mounting unit 100 / 5a...

Military Engineer Services - Uttar Pradesh

33534756 preventive maintenance of street light including connected works under ge ( af ) bamrauli 1 excavation in trenches / pits in any type of soil ( soft / loose ) , n.exc. 1.5m wide and n.exc. 1.5m deep and getting out complete, all as specified & directed . 2 returning filling in with the earth obtained from item no 1here in before including spreading, leveling and well ramming in layers n.exc. 25cm thick complete all as specified & directed. 3 removal of surplus excavated material to a distance n.exc. 50 mtr and depositing where directed at a level n.exc. 1.5 mtr above starting point complete all as specified & directed 4 supply and laying sub class b bricks ( old size ) laid flat in trenches as cable covers complete all as specified and directed 5 supply and spreading clean and dry sand ( unwashed ) in trenches around the cable and in the cable ducts of ltpanels for cushioning all as specified & directed 6 site clearance in soft / loose soil and getting out complete all as specified and directed. 7 supply and lay in replacement of cable xlpe insulated screened pvc bedded, galvanized steel strip or wire armoured, electric power cables ( heavy duty ) 1100 volts grade with standard aluminium conductor of size 25 sqmm 3.5 core including taking down old u / s cable complete all as specified and directed. 8 all as oer item no.7 but of size 16 sqmm 4 core. 9 all as per item no. 7 of size 10 sqmm 4 core. 10 s & f in replacement of pvc insulated sheathed aluminium 2.5 sqmmtwin core cable, 1100 volt grade complete all as specified and directed. 11 ditto all as per item no 10 here in before but of size 4 sqmm twin core. 12 ditto all as per item no 10 here in beforebut of size 6 sqmm twin core. 13 ditto all as per item no 10 here in before but of size 10 sqmm twin core. 14 m&l for painting of 11 m steel polewith cross arms, clamp of any length and shape for ht overhead line / street light with two coat of aluminium paint including preparation of the existing surface including marking pole numbers in a 15 cm dia yellow circle & markingthree blue& two white bends width 30 cm by fluorescent paint, from bottom of pole to 1.5 mtr height, complete all as specified and directed. 15 m&l for painting of 9 m steel polewith cross arms, clamp of any length and shape for lt overhead line / street light with two coat of aluminium paint including preparation of the existing surface including marking pole numbers in a 15 cm dia yellow circle & markingthree blue& two white bends width 30 cm by fluorescent paint, from bottom of pole to 1.5 mtr height, complete all as specified and directed. 16 m&l for painting ofsteel pole hight up to 4 mtrwith clamp of any length and shapewith two coat of aluminium paint including preparation of the existing surface complete all as specified and directed. 17 s& f in replacement timer panel factory made cpri approved outdoor type 415 volts 3 phase 4 wire ac 50 hz cubical type weather & vermin proof 3.15 mm thick sheet crca sheet suitable size conopy roof extended on all four sides by not less than 10cm painting with powder coating including locking arrangement and mounted on wall / pole, frontopening with single shtter and one earth terminals suitable cable gland for all cbale incoming &out goining including testing complete all as specified and directed & directed by engineer in charge including the following accessories: ( i ) mccb 63 amp, 3 pol, 10 ka as incommer ( ii ) power connector 40 amp tp 3 phase 415 volts 01 no. ( iii ) digital timer 24 hours 01 no. ( iv ) auto / manual selector switch 01no. ( v ) ryb phase indicators for main supply. ( vi ) mcb 40 amp tpn 30 ka c seriese 03 no as outgoing. ( vii ) start / stop push button. ( viii ) internal wiring with pvc insulated copper conductor multistranded cable 10 volts grade is 694 marked of appropriate gauge including all cable copper lugs. 18 supply and laying in replacement of gi pipe “light grade” in trenches, under floors, roads, along poles for protection of cables, including sealing ends all asspecified & directed of following size : ( clamps to be measured and paid under appropriate item ) 19 ( a ) 40mm bore 20 ( b ) 50mm bore 21 taking down unserviceable street light fittings led / sodium / mercury vapour / metal halide / solar / high mast / post top lantern / torsio / down lighterof any wattage or size for repair / replacement of burn out / worn out / weak accessories and re fixing in position after repair / replacement of accessories and testing etc complete.note : 1. parts requierdfor replacement, shall be measured & paid separately under appropriate items. 22 supply only following parts for street lights: 23 electronic drive, 230 v, 50 hz, protection grade ip 66, with surge protection suitable for 100 / 90 watt street light and flood light fittings. 24 electronic drive, 230 v, 50 hz, protection grade ip 66, with surge protection suitable for 60 / 70 watt street light and flood light fittings. 25 electronic drive, 230 v, 50 hz, protection grade ip 66, with surge protection suitable for 45 / 50 watt street light and flood light fittings. 26 s&f in replacement led bulb 5 watt 27 s&f in replacement led bulb 7 watt 28 s&f in replacement led bulb 9 watt 29 s&f in repair wiring in street light pole from junction box to light fitting three core1.5 sq mmcopper conductorinsulatedwith standard copper conductor drawing through poles and lugs. 30 s & f insulation pvc tape roll of size 1.80 cm x 25 mtr 31 s&f in replacement of led street light fitting 45 watt, with surge protection 4kv inbuilt in driver and minimum 10 kv separate, ip66 having pressure dia cast aluminum housing with heat resistant toughened glass, individual led lenses complete making connection with suitable in size 3 core of wire and suitable for mounted on 40 / 50mm dia pole. ( i ) the driver should be potted ant vibration type, ip66 should be sustain 440 volt for 2 4 hrs ( ii ) lm 79 and lm 80 test report with 50000burning hrs led life from nabl lab shall be provided ( iii ) cri ( colour rendering index of fixture shall be greater then 70 ( iv ) cct ( colour correlated temperature ) of fixture shall be ± 300k ( v ) system lumen efficiency shall be > 100 lumen / watt complete all as specified and directed. 32 s&f in replacement of led street light fitting 60 watt, with surge protection 4kv inbuilt in driver and minimum 10 kv separate, ip66 having pressure dia cast aluminum housing with heat resistant toughened glass, individual led lenses complete making connection with suitable in size 3 core of wire and suitable for mounted on 40 / 50mm dia pole. ( i ) the driver should be potted ant vibration type, ip66 should be sustain 440 volt for 2 4 hrs ( ii ) lm 79 and lm 80 test report with 50000burning hrs led life from nabl lab shall be provided ( iii ) cri ( colour rendering index of fixture shall be greater then 70 ( iv ) cct ( colour correlated temperature ) of fixture shall be ± 300k ( v ) system lumen efficiency shall be > 100 lumen / watt complete all as specified and directed. 33 s & f in replacement of holder suitable for ptl / decorative fittings 34 s&f in replacement integral led aviation light comprising of aluminium housing with polycarbonate enclosureincluding provn of three core cable of copper conductor of size 2.5 sqmm 3 core of white coveringfor making connection, fixing the fitting on wall including all necessary fixing accessories complete all as directed. 35 m&l for attending and rectifying any type of street light, flood lights, perimeter lights fittings, high mast lights, gate light , post top lantern, garden lights, switches sockets, bulb, holders , pole box, power points , dbs , mcbs service connection by decarbonising neutrals , checking for any loose connections in the boardsall complaints by electrician and helper in north camp, tech area, happy home, 71 rmu, 820 su, begum bazar, 14 p&su, map, south camp, new project, veer path and other area as directed by engr in charge. note ( i ) the contractor will be responsible for safety, security as per mes standard. ( ii ) all tools and plants like plier, screw driver, tester, test lamp, clamp meter, bamboo ladder etc will be provided by contractor. ( iii ) each job contains minimum 5 complaints. ( iv ) each job ( minimum five complaints ) done by one electricin including helper. ( v ) complaint shall be attended round the clock without refusing as and when called for by engr in charge. 36 m & l for earthing complete with galvanized steel earth plate electrode60 cm x 60cm x 6.0mm thick buried directly in ground vertically to a depth not less than2.25 mtr below ground level with top edge of the earth plate not less less than 1.5 mtr below normal ground level and connectedto earth plate 32mm x 6mm thick by means of bolts, nuts etc surrounded by 15 cm thick packed layers of charcoal dust and common salt and protected by galvanized iron or steel pipe light grade 40mm bore and water pipe 20mm bore gi light grade with funel and connecting to test point including construction of chamber in cement concrete 1:3:6 type c 2 and rcc cover provn of test point and all as shown in electric plate no 3 of mes sch part i of 2009.including dismantling / taking out old earthing with all accessories complete. note: rcc pit cover shall be pre cast of rcc ( 1:2:4 ) type, b 1 80mm thick reinforced with xpm weighting not less than 4 kgs / sqm in lieu of ci cover. 37 m&l for cutting of tree branches touching / fallingon over head line upto 2 m distance from conductors including clearing the site complete.note : cutting of tree branches shall be done only at places / spans where thick / dense trees are existing around over head lines. 38 s&f in replacement of flexible led strip 25w, ip 65 ww uses high brightness , transparent , heat resistant with pvc covering duly visible in dark from far off distance fitted with suitable connectors for inter connection compl ete plug and socket arrangement suitable to be fitted on edges of buildings, pathways and outer periphery of boundary walls , maingates , hardstandings etc complete with clamping at suitabledistance to take the shape of required physical structure of warm whiteall as directed and specified. 39 m & l for painting of af color strip up to 1.5 mtr height on pcc / steel pole including junction box & marking of pole no by trained painter etc complete as specified and directed by engineer in charge. 40 supply and fixing in replacement of street light bracket ( with two set of clamp, nuts & bolts ) made out of 32 mm medium grade gi pipe bend to shape and with fixing arrangement duly welded all as directed, length of pipe should not be lessthan 1.2 mtrs complete all as directed. 41 s&f in replacement of led flood light fitting 150 watt, with surge protection 4kv inbuilt in driver and minimum 10 kv separate, ip66 having pressure dia cast aluminum housing with heat resistant toughened glass, individual led lenses complete making connection with suitable in size 3 core of wire and suitable for mounted on angle iron frame. ( i ) the driver should be potted ant vibration type, ip66 should be sustain 440 volt for 2 4 hrs ( ii ) lm 79 and lm 80 test report with 50000burning hrs led life from nabl lab shall be provided ( iii ) cri ( colour rendering index of fixture shall be greater then 70 ( iv ) cct ( colour correlated temperature ) of fixture shall be ± 300k ( v ) system lumen efficiency shall be > 100 lumen / watt complete all as specified and directed. 42 m&l for cutting of grass, roots touching / fallingon elect pole upto top of pole including clearing the site complete. note : cutting of grass, roots shall be done only at places / spans where all are existing around elect pole. 43 supply & fixing in replacement of contactor suitable for street light timer panel any type following size. 44 ( a ) mnx 32 45 ( b ) mnx 25 46 ( c ) mnx 50 47 ( d ) mnx 63 48 s&f in replacement of ledpost top lanterns 25w spherical shape polycarbonate diffuser & ip65 protection. led efficacy more then 100 lm / watt, 6500k, pf not less then 0.95 thd < 10 % suitable for mounting on 40 / 50 mm pole, necessary pre cast conector for connecting wire, complete. 49 supply & fixing in replacement of junction box [ frp ] of size 250 x 200 x 100 mm complete with bakelite connector100 apms capacity 4 way mcb sp 06 amps capacity with necessary fixing arrangements by providing ms clamps 2 nos made out of ms flat 25 x 5mm including nut bolts etc complete. 50 s&f in replacement of led bollards 8watt / 9watt in cylindrical shape with opal acrylic diffuser and ip 65 protection complete with all accessories including provn of three core cable of copper conductor of size 2.5 sqmm 3 core of white covering , for making connection including all necessary fixing accessories complete all as directed make : havells / philips / crompton / wipro. 51 s& f in replacement of digitel type timer switch, 415 volts 3 phase suitable for existing timer panel complete all as specified and directed by engineer in charge. 52 s& f in replacement of mcb tpn , 415 volts , 32 amps, c series, 10ka. make : legrand / l&t / schneider 53 s& f in replacement of mcb tpn , 415 volts , 63 amps, c series, 10ka.make : legrand / l&t / schneider 54 s& f in replacement of mcb spn, 240 volts, 5 to 32, amps c series, 10ka. make :legrand / l&t / schneider 55 s& f in replacement of mcb spn, 240 volts, 63, amps c series, 10ka. make :legrand / l&t / schneider 56 note : credit shown in credit schedule of tender document shall be considered by the tenderer while quoting the rates of various items. the same shall be recovered from various payment to contractor before handing over old material....