Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh
38007409 work of energizing the connections applied under the complete deposit plan item under electricity distribution division ii, chaubepur. ( package no. 276 and 304 / 2022 23 ) 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 4 erection and grouting of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 5 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 6 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 7 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 8 laying of lt abc ( 1x16+1x25 ) as per respo manual 9 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 10 laying ofarmoured cable 3.5x70 sqmm with catenary arrangementas per respo manual 11 supply & erection of clamp with n&b as per respo norms. 12 carriage & installation of 3 ph 4 w electronic kwh meter as per respo norms. 13 carriage & installation of 1 ph 2 wire static electric meter as per respo norms....