Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

39847466 supply of de centralized material supply of de centralized materila under edc maharajganj , supply of de centralized materials , , supply of cross arm holding clamps with bolts & nuts as per speicification. , supply of f bracket of fitting top insulator with bolts & nuts as per speicification. , supply of clamps with nuts & bolts for top channel as per speicification. , supply of off size nuts & bolts with washer as per speicification. , supply of pg clamps dog to dog conductor as per speicification. , supply of lt clamp with nuts & bolts of pcc pole with neutral as per speicification. , supply of lt shackel insulator 100x115 mm as per speicification. , supply of lt shackel strip with bolt & nut for lt section pole as per speicification. , supply of neutral cum earth wire gi wire 7.16 mm or 6 swg as per speicification. , supply of aluminium jointing sleave for aaac conductor weasel / rabbit as per speicification. , supply of aluminium jointing sleave for acsr conductor weasel / rabbit as per speicification. , supply ofspacer lt pvc as per speicification. , supply of holding clamps for top channel tpmo & fuse set etc. with bolts & nuts as per speicification. , supply of silica gel blue colour as per speicification. , supply of fuse wire for 100 kvad / tas per speicification. , supply of fuse wire for 250 kva d / t as per speicification. , supply of fuse wire for 400 kva d / t as per speicification. , supply of fuse wire for 5 mva power transformer as per speicification. , supply of aluminium lug of 185 sqmm as per speicification. , supply of aluminium lug of 250 sqmm as per speicification. , supply of aluminium lug of 300 sqmm as per speicification. , supply of aluminium lug of 400 sqmm as per speicification. , supply of 11kv vcb spout as per speicification....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39834117 tender for in the item business plan 2023 24, electricity distribution sub division under narwal kanpur city, dilapidated gi filed on the respective kd feeders of 33 / 11 kd power sub stations bidhan, naval, pali and sadh / weasel / dog to the conductor. / work of replacement of raccoon conductor and installation of pcc / stp pole between long distances. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size st polesfrom store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 5 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 6 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 7 dismentling of rusted weasal / racoon / dog conductor wire and g.i wire as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 8 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 9 supply & erection of x arm holding / holding clamp with n&b as per respo norms. 10 supply and erection of stone pad as per respo norms 11 supply & erection of f clamp with n&b as per respo norms....

Northern Coalfields Limited - Uttar Pradesh

39816243 bids are invited for pin insulator 11 kv grade , kit, hardware, suspension type. , insulator disc type 150 mm dia. , rods stay assembly complete 1.8 mtr 150 mm. , wire, stay, gi 7 by 10 swg , wire galvanised iron 7 by 14, earth wire , insulator pin type use in 33kv , kit, hardware, tension type mse total quantity : 17150...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

39812845 under the additional business plan 2023 24 work received from electricity distribution division ii mitouli, replacement of 11 kv bcb in sub centre kamhara and construction of 33 kv new line under sub centre kalakam ( semi turnkey based work / decentralized all material executing agency ) the work will be payable by ) . 1 safe loading carriage including unloading and proper stacking of following materials from store center / je store to site of work and old dismentling material to store center / je store. 2 11kv outgoing vcb 200 / 100 / 5a 3 11kv incoming vcb 600 / 300 / 5a 4 11kv jointing kit 3x185 sq. mm xlpe hs i / d 5 installation of vcb as per respo norms and dismentling of old 11kv vcb at 33 / 11kv sub station kaimahra. 6 making delta earthing 7 safe loading carriage including unloading and proper stacking of following materials from store center / je store to site of work and old dismentling material to store center / je store. 8 stay set gi 30x1800 mm 9 11kv disc insulator ( b&s ) 70kn 10 steel tubler pole11mrt. long. 11 acsr dog conductor. 12 earth wire 7 / 16 swg 13 disc fitting for dog. 14 barbed wire. 15 g.i. pin 33kv with nut & bolt. 16 stay wire gi ( 7 / 4 mm ) 7 / 8 swg 17 33 kv v type cross arm 18 earth rod 2540x20mm 19 stay clamp for 11mtr. long stp 20 pin insulator 33kv 21 construction of 33kv overhead new line with all accessries under work are of 33 / 11kv sub station kala aam. as per approved estimate. 22 supply of holding clampr for st pole. 23 supply of aluminium paint.with work of 24 supply of ms top channel ( 125x65mm ) 2240mm long. 25 suppy of f bracket for 33kv line size 75x10mm. 26 supply of 33kv bracing angle. 27 supply of danger borard with clamp for 33kv line. 28 supply of red oxide paint. 29 supply of p.g. clam [ for dog to dog conductor. 30 grouting of stay. 31 grouting of stp pole. 32 supply of stay loop insulator. 33 supply of stone pad. 34 supply of nut & bolt....

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

39811207 various system strengthening works under the jurisdiction of e.e, eudd residency, lesa cis gomti lucknow. 1 safe carriage, loading unloading with proper stacking of following materialfrom esc daliganjto work site/je dump store 2 11kv3x70/185 sq mm xlpe cable 3 11kvend termination o/door & i/door 3x70/185 sq mm 4 11/0.4 kv 400/630 kva t/f 5 lt xlpe cable 1x400/630/3.5x400 sqmm 6 st pole 9 mtr long 7 abc (3x120+1x95+1x16) sqmm 8 polymeric pin insulator 9 fabrication & erection of s/s type double pole for 11kv line on 11 m long st pole with fixing of necessary clamps & other accessories like 1 no. top channel 100×50 mm,2 no.ms angle 65x65x6mm,danger board, number plate, barbed wire, tpmo set & d.o. fuse set. 10 construction of t/f plinth of size 2x2x1.5 m on a padding 0.25m deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. rest wall should be 0.23 mtr thick. brick work in ratio 1:4 cement & cores sand in the hollow portion the sand should be filled from the ground level up to 15 centimeter below from the top of wall, cement, sand & brick ballasts should be filled up to 15 centimeter. two no. of channel 100x50 in length 1500mm will be grouded.0.35 cm.rcc will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.the t/fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand. (all the material will be arranged by the contractor .) 11 construction of retaining wall, fabrication & erection of wire mesh fencing around transformer and distribution pillar box with retaining wall & 1 no. gate with locking arrangement made of ms angle iron of size 50x50x6 mm jointed with nuts and bolts. the panel must be supported with ms flat of size 50x6 mm.wiremesh of size 10 swg rectangle type, its painting as per norms of resspo.(all the material will be arranged by the contractor at his own cost). 12 construction of massonary type distribution pillar box with first class brick ballast cement, coarse sand, local sand, brick ballast and ms round bar of 10 mm dia including straight ms angle 50x50x6x750 mm (all the material will be arranged by the contractor). 13 supply & fixing of henless fuse unit 500 amp 650 volts 14 s/c cable laying in normal soil by digging of trench 900 mm deep, 500 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. (all the material required for laying will be supplied by the contractor except 11 kv xlpe cable) 15 d/c cable laying in normal soil by digging of trench 900 mm deep, 500 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. (all the material required for laying will be supplied by the contractor except 11 kv xlpe cable) 16 supply & fixing of cu l piece for 400/630 kva t/f 17 supply & installation of d.o fuse set 18 hoisting, winding and jumpering of lt cable size 1x400/630/3.5x400 sqmm between lt distribution box/fuse unit & constructed overhead line with proper lugging and clamping 19 stringing, sagging, winding and jumpering of lt line with ab cable (3x120+1x95+1x16) conductor as per resspo norms. (ab cable provided by deptt and balance material like holding clamp,eye hook, suspension clamp and dead end clamp arranged by contractor .) 20 supply of 11 kv rmu (three way rmu (2lbs + 1cb) as per t.s/ approvedmvvnl gtp) 21 hoisting of 11kv xlpe cable/rmu of 3x70/185 sq mm cable 22 chemicalearthingsystemwithouterpipe diameter50mm,innerstrip40x6,length3000 mm. galvanization up to 200 micro, earthing pipe withcrystallineconductivemixturefilledinside thepipewithanti corrosion&highconductive alongwith50kg(as perrequired) ofbfc which should be capable to reducing the soil resistively with good moisture retaining capacity.(specificationofchemicalearthingand drawing is hereby enclosed). all material shall by supply by the contractor. 23 providing earthing strip size 50x6mm and connecting from earthing pipe/m.s.earting rod to fuse unit/transformer body/ neutral earthing (earthing rod & earthing strip arranged by contractor). 24 installation of 11/0.4 kv 400/630 kva t/f (by crane) 25 installation of rmu including grouting & plinthing 26 wiremesh fencing for rmu 27 removal of connections from the system, safe loading carriage unloading of damaged t/f from site to store centre daliganj/ transformer repair workshop, aliganj 28 400 kva transformer by tractor trolley/crane) 29 groutingofpoleindepthof1/6thelengthof poleinratio 1:4:8incementsandandbrick balast as per respo norms. 30 construction of pole plinth 300mm x 450 mm above ground level in 1:2:4 in cement, coarse sand and stone gritt as per respo norms. 31 painting of new erected st pole with two coat of red oxide paint,po red paint at top of pole 2 m & balance by two coats of best quality aluminium paint isi of burger/nerolac/asian mark as per norms. 32 taping of line 33 supply and fixing of copper strip of size 1000x50x6 mm 34 fixing of earth rod (2500x20mm) as per norms. for earthing support ofold existing poles of lt lines including 6 swg gi/earth wire . (all materials provided by contractor) ...

Kanpur Development Authority - Uttar Pradesh

39750531 tender for dm camp office waiting area, kanpur; 1 earth work 2 cleaning of jungle including cutting of rank vegetation and disposal of waste upto 60 meter all complete as per drawing attached 3 antitermite treatment 4 excavation in foundation in ordinary soil ( loam clay or sand ) including lift upto 1.50 meter and lead with in the site includingramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the engineer incharge with in the site from the foundation trenches .dsr ( 2.6.1 ) 5 backfilling:filling soil borrowed from outside. cartage 20 km 6 cement concrete work 7 plain cement concrete in foundation & soffit of plinth beam with approved stone ballast , coarse sand 2.5 f.m. and cement ( p.c.c. ) in proportions of m 7.5 grade including supply of all materials , labour , tools & plants etc required for proper completion of the work inuding necessary centring and shuttering etc. complete.dsr ( 4.1.8 ) 8 r.c.c.work 9 rcc work with cement approved coarse sand and 2cm ( 3 / 4 ) gauge approved stone ballast in the proportion 1:1½:3 ( 1 cement : 4½ aggregates ) including necessary centering & shuttering excluding supply of reinforcement and its bending the same with 24 bwg gi binding wire and necessary centering & shuttering excluding supply of reinforcement and complete. ( analysis rate ) 10 foundation , raft , footings , column pedestals , plinth beam & plinth band etc. 11 centering & shuttering including stutting, proping etc. and ramoval of foundation, footing, bases of column etc. 12 cement concrete in super structure ( column, slab & slab beam ) with 2.00 cm ( 0.75 ) gauge approved stone grit , coarse sand 2.5 f.m. and cementin proportions of m 25 grade including supply of all materials , labour , tools & plants etc required for proper completion of the work. 13 brick work 14 first class brick work in 1:6 cement and sand of 1.25 fineness modulous mortar in sub structure including supply of all materials , labour , tools & plants etc required for proper completion of the work.dsr ( 6.1.2 ) 15 first class brick work in 1:6 cement and sand of 1.25 fineness modulous mortar in super structure including supply of all materials , labour , tools & plants etc required for proper completion of the work.dsr ( 6.4.2 ) 16 first class half brick work in 1:3 cement and sand of 1.25 fineness modulous mortar in super structure including supply of all materials , labour , tools & plants etc required for proper completion of the work.dsr ( 6.13.2 ) 17 plastering work : 18 12 to 15mm thick smooth cement internal plaster over wallslaid, cured complete and making grooves as directed at the junction of ceiling and wall :1:3 ( 1 cement: 3 coarse sand ) . dsr ( 13.7.1 ) 19 15 to 20mm thick smooth cement external plaster over wallslaid, cured complete and making grooves as directed at the junction of ceiling and wall :1:6 ( 1 cement: 6 coarse sand ) .dsr ( 13.7.2 ) 20 12 mm cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor to top level including internal rounded angles chamfers , and / or rounded angles not exceeding 80 mm. in girth and finished even and smooth. no extra for mixing any additive. ( 1 cement : 4 fine sand ) dsr ( 13.1.1 ) 21 15 mm cement plaster in 2 coats , backing coat 12 mm and finishing coat 8 mm thick ( of cement , coarse sand and fine sand in ratio 1:1:4 ) on rough side of single or half brick exterior plastering upto floor to top level including internal rounded angles. 1:1:4 ( 1 cement : 1 coarse sand : 4 fine sand ) dsr ( 13.3.1 ) 22 painting work 23 finisingwalls with exterior emulsion paint ( apex ) approved brand & manufacture and of requried shade on undecorated wallsurface to give even shade over @ 1.25 lit / 10 sqm including one coat of primer applied @ .75 lit / 10 sqm coat curing and cost of all metarial labour t&p etc. two coat 24 finishing walls with putty work 25 fabrication work 26 fabrication and ms grill 502 ii pwd sor 2020 27 flooring work : 28 tile flooring of 600 mm x 600 mm size, approved quality, of approved design and shade of approved make and flooring laid as shown in detailed drawing or as directed by the project manager. tile shall be laid over cement mortar bed of average 40 mm thick ( including tile thickness ) in mix ratio 1:6 ( 1 cement : 6 crushed sand ) including cleaning and preparing the surface for bedding, spreading neat grey cement slurry by using minimum cement about 2 kg / sqm over cleaned surface and spreading neat cement paste using minimum cement about 4.5 kg / sqm over cement mortar bed, joints to be cleaned and grouted with white cement with matching colour approved quality readymade grout, curing, cleaning, to required line, level, all complete at all leads, lifts and heights to the entire satisfaction of the project manager. the rate shall include handing over to the construction manager / company. 29 tile work : 30 providing and laying ceramic glazed floor tiles 300x300 mm ( thickness to be specified by the manufacturer ) of 1st quality conforming to is : 15622 of approved make in colours such as white, ivory, grey, fujaae red brown, laid on 20 mm thick cement mortar 1:4 ( 1 cement : 4 coarse sand ) including pointing the joints with white cement and matching pigment etc., 31 steel work 32 mild steel or iron in reinforced cement concrete required shape as necessary including bending and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level for proper completion of the work. ( over all rate ) dsr 5.22a.6 33 thermo mechanically treated bars ( fe 550 ) confirming to is 1786 1985. 34 waiting area 35 supply & installation of 3 seater sofa with wooden frame, chrome plated leg, fabric tapestry, size in mm 1920 ( l ) x 770 ( d ) x 760 ( h ) , model rosemount, make geeken / equivalent as approved by client / e.i 36 supply & installation of corner table, 25mm mdf top. chrome plated pipe frame, ( 600x600 ) . model rosemount, make geeken / equivalent as approved by client / e.i 37 supply & installation of fixed leg chair, pu adjustable arm, synchro tilt, mesh back & seat fabric tapestry, model ga 5005, make geeken / equivalent as approved by client / e.i 38 supply & installation of center table, 25mm mdf top, chrome plated pipe frame, ( 1200x600 ) , model rosemount, make geeken / equivalent as approved by client / e 39 providing and fixing of tv pannel of size ( 1500lx450wx750ht ) made of 2 layers of 19mm board with all edges to be lipped with teak wood beading & all outside exposed surface to be finished with 1mm laminate which & inner side to be finished with .8mm laminate, complete in all respect as per drawing, specification approved by architect / engineer in charge 40 tv 41 door / window 42 providing & fixing toughned glass in window with 12mm modi float glass fixed edge to edge as per design and drawing and polished where required along with neccesary hardware all complete as per drawing specification and direction of engineer incharge. 43 window 44 providing & fixing of 12 mm toughened glass door with all hardware as per design with edge polish m / c top & bottom pivot and bottom lock with handle all completeas per drawing, specification and direction as approved by engineer in charge 45 d1 46 d2 47 d3 48 false ceiling 49 providing & fixing of at all height false ceiling including providing and fixing of frame made of special section power pressed from m.s, sheet and galvonised in accordance with zinc coating of grade 350 as per is 277 and consisting of angle cleat 25x1.6mm with flanges of 22mm and 37mm at 1200mm c / c one flanged fix to the ceiling with dash fastener 12.5mm dia and and 40mm long with 6mm dia bolt to the angle hangers of 25x25x0.55 mm of required lengthened other end of angle hanger being fixed with nut and bolts to gl channel 45x15x0.90mm running at the rate of 1200 mm c / c to with the ceiling section 0.5mm thick button wedges of 80mm with tappered flenges of 26 mm each having clips of 10.5mm.at 450mmc / c shall be fixed in direction perpendicular to gi channels with connecting clips made out of 2.64mm diax230mm long gl wire at every junction including fixing the gypsum board with ceiling section and perimetre channels 0.50 mm thick 27mm high having flenges of 20mm and 30mm long, perimeter of ceiling fixed to wall / partition with help of rawl plugs at 450mm c / c with 25 mm long drive all screws @230mm interval including jointing and fixing to a flush finish of tappered end sq edge of 50 providing & making & fixing of wall panneling made with aluminium section of 2x1 @2cc frame work cladded with 12mm ply ( greenply / luxe ) & final surface to be finished with 1mm complete with teak wood polish, as per the approved design all complete as per drawing, specification and direction of engineer incharge. ar 51 providing & making & fixing all height partitions made with aluminium section of 1.75x1.75 @ 2cc section frame work cladded with 9mm ply ( greenply / luxe ) on both side & final surface to be finished with 1mm laminate complete with teak wood polish, as per the approved design all complete as per drawing, specification and direction of engineer incharge. ar 52 plumbing & sanitary 53 providing and laying water proofing treatment in sunken portion of wcs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying: ( a ) first layer of slurry of cement @ 0.488 kg / sqm mixed with water proofing cement compound @ 0.253 kg / sqm. this layer will be allowed to air cure for 4hours. ( b ) second layer of slurry! of cement @ 0.242 kg / sqm mixed with water proofing cement compound @ 0.126 kg / sqm. this layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. the rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. dsr ( 22.5 ) / 2018 54 providing and fixing chlorinated polyvinyl chloride ( cpvc ) pipes, having thermal stability for hot & cold water supply. including all cpvc plain & brass threaded fittings, 1 / c fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step cpvc solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of engineer in charge. concealed work, including cutting chases and making good the walls etc. 20 mm nominal outer dia pipes. 18.7.2 / 2022 55 providing and fixing chlorinated polyvinyl chloride ( cpvc ) pipes, having thermal stability for hot & cold water supply. including all cpvc plain & brass threaded fittings, i / c fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step cpvc solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of engineer in charge. concealed work, including cutting chases and making good the walls etc. 32 mm nominal outer dia pipes. 18.7.4 / 2022 56 providing and fixing of 110mm dia pipe 10kg pressure of supreme make or equivalent, including supply of all materials, labour and t&p etc. make jaquar / american standard / kerovit egivalent nsi 57 providing & placing of looking mirror with 19mm frame work & border claded with 4mm veneer fixed with spacer finished with melamine polish, all complete as per drawing, specification and direction as approved by the architect / engineer in 58 providing & fixing of wall hung closet with soft close seat cover fixed with jumbo bolts as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit eqivalent 59 providing and fixing of below counter wash basin as per the approved design all complete as per drawing, specification and direction engineer incharge. make jaquar / american standard / kerovit faivalent ns 60 providing & fixing of concealed cistern with push plate as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / keravit faivalent nsi 61 providing & fixing of urinal with censor as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit faivalent nsl 62 providing & fixing health faucet as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit eqivalent 63 providing and fixing of towel ring as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit faivalent nsl 64 providing and fixing of soap dish as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit eqivalent insi 65 providing and fixing of 2000 litre water tank 66 providing and fixing 2 way bib cock as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit 67 providing & fixing of wall mounted sink cock with swivel spout & flange as per the approved design all complete as per drawing, specification and direction of engineer incharge. make jaquar / american standard / kerovit eqivalent nsi 68 electrical work 69 wiring point for light with 1.5 sqmm.frlsh pvc insulated multistrand single core copper condutor cable in pvc conduit pipe partly concealed in the wall and partly laid in slab along with the reinforcement before concreting, complete with 1.5 sq.mm. frlsh copper earth contunity wire, piano type switch & ceiling rose / angle / batten holder on 3mm thick phenolic paminated backalite sheet etc.complete in all respects as directed including matching colour wash. s.1 138 +187 ( a ) 70 wiring point for fan / fresh air fan ( light duty exhaust fan ) with 1.5 sqmm.frlsh pvc insulated multistrand single core copper condutor cable in pvc conduit pipe partly concealed in the wall and partly laid in slab along with the reinforcement before concreting, complete with 1.5 sq.mm. frlsh copper earth contunity wire, piano type switch & ceiling rose / angle / batten holder on 3mm thick phenolic paminated backalite sheet etc.complete in all respects as directed including matching colour wash. s.i 1400+187 ( a ) 71 supply and fixing of power plug with 20a / 250 v flush type modular switch and 5 pin 20 a / 250 volt flush type universal modular socket switch on concealed m.s. box including supply of all material, labour t & p etc required for proper completion of work. s.1 1139 ( a ) 72 supply and wiring of submain 2 number 2.5 sqmm & 1no earth wire of 1.5sqmm fr pvc insulated 1100 v grade multistranded single core copper conductor cable in existing pvc conduit complete in all respects. s.1 291 73 same as in item 291 but with 2 nos. 4 sq mm and 1 no 25 sq mm frlsh pvc insulated copper conductor cable. s.1 291 ( a ) 74 supply fixing and concealing of 20mm dia.2mm thick pvc conduit pipe with isi mark embossed and with pvc acessories confirming to is no. 3419 for drawing wires duly sealed at joints with original resin / adhesive to make the complete piping rigid, plastering with cement sand mortar finished to level with matching colour including cost of material labour and t & p etc required for proper completion of work. asdirected at site by the engineer in charge. s.1 148 ( a ) 75 supply fixing and concealing of 25mm dia 2mm thick pvc conduit pipe with isi mark embossed and with pvc acessories confirming to is no. 3419 for drawing wires duly sealed at joints with original resin / adhesive to make the complete piping rigid, plastering with cement sand mortar finished to level with matching colour including cost of material labour and t & p etc required for proper completion of work. asdirected at site by the engineer in charge. s.i 149 ( a ) 76 supply and fixing of recess mounting round 15 mm 18 watt led down lighter having powder coated die cast aluminium housing with heat sink, diffuser / reflector and driver set complete in all respect cat aaa s.1 1403 77 supply and fixing of 36 watt to 46 watt above 3300 leumin indoor recess mounting led square fitting for armstrong ceiling having powder coated die cast aluminium housing body with extended heat sink and diffuser of special polycarbonate meterial and driver set complete in all respect. cat aaa s.1 1406 78 s&f surface / flush mounting 12ways tpn distribution board with additional metal door without mcb complete in all respect, as directed at site by engineer in charge cat a s.1 1029 ( a ) 79 supply & fixing of surface / flush mounting 8ways v tpn distribution board with additional door without dpx3 160 mccb complete in all respect, as directed at site by engineer in charge. cat a. s.i 1030 ( 1 ) 80 supplying & drawing co axial tv cable rg 6 grade, 0.7 mm. solid copper conductor, pe insulated ] shielded with fine finned copper braid and protected with pvc sheath in the existing surface / recessed steel / pvc conduit as required. for tv. socket outlet dsr ( 1.19 ) / 2018 81 supplying & fixing of telephone wire 2pair 0.55qmm solid conductor, pe insulated shielded with fine finned copper braid and protected with pvc sheath in the existing surface / recessed steel / pvc conduit as required. dsr ( 1.18.2 ) / 2018 82 providing drawing connecting and testing of enhanced categoey 4 pair lan local area network cable 24 awg conductor performance specifide se ul and cul listed in existing pvc conduit ( cat 6 network cable ) dsr ( 1.53 ) / 2018 83 blank plate for modular plate type switch boards wherever required dsr ( 1.26 ) / 2018 84 supply & fixing of led strip light all complete as per drawing and specification and direction of engineer incharge. make klite. havells philips equivalent mr 85 supply & fixing of led strip driver all complete as per drawing and specification and direction of engineer incharge. make klite. havells philips mr 86 supply and fixing of 400mm wall fan complete in all respect mr 87 supply and fixing of 200mm fresh air fan complete in all respect mr 88 supply & fixing of 24port switch complete in all respect mr 89 supply & fixing of 4u rack complete in all respect mr 90 providing & fixing of modular plate type white rj 45 cat 6 data / talephone outlet / information outlets etl verified to meet or exceed tia / eia category 6 requirements, universal wiring 98.00 label permitting to either t568a or t568b, ul listed, for n computer networking complete in all respect with cover plate, grid plate, screws, ms box, etc with connections as required with 2nos rj 45 data outlet mr 91 supply, installation, testing & commissioning of daikin inverter cassette capacity 4.0 tr4 air conmditioner as per the approved design all complete as per drawing....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39750410 tender for details of work under item business plan 2023 24 replacement of dilapidated gi / weasel conductors with weasel conductors on 11 kv feeders of 33 / 11 kv power sub station ghatampur town under power distribution subdivision i, ghatampur and long distance bus / st. pole installation work. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size st polesfrom store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel/rabbit/racoon /dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 5 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 6 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 7 dismentling of rusted weasal/racoon /dog conductor wire and g.i wire as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 8 laying, sagging, stringing, binding and jumpering etc. of weasal/racoon /dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 9 supply & erection of x arm holding / holding clamp with n&b as per respo norms. 10 supply & erection of f clamp with n&b as per respo norms. 11 supply & erection of x arm holding / holding clamp with n&b for stp pole as per respo norms. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39750375 under the item business plan 2023 24, power distribution sub division ii, under sajeti, replacement of dilapidated gi / weasel conductors with weasel conductors on 11 kv feeders related to 33 / 11 kv power sub station, baripal and the long gap between the gap. stp pole installation work. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of line material viz. weasel/rabbit/racoon /dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 4 dismentling of rusted weasal/racoon /dog conductor wire and g.i wire as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 5 laying, sagging, stringing, binding and jumpering etc. of weasal/racoon /dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 6 supply & erection of x arm holding / holding clamp with n&b as per respo norms. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39750357 tender for in the item business plan 2023 24, replacement of dilapidated g.i. / stup pole installation work carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 4 dismentling of rusted weasal / racoon / dog conductor wire and g.i wire as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 5 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 6 supply & erection of x arm holding / holding clamp with n&b as per respo norms....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39750300 bijne under electricity distribution division i, etawah. under the plan year 2023 24, the work of installing an additional 63 / 100 kva transformer in view of the problem of low voltage in the areas fed from various 33 / 11 kv sub stations. 1 carriage of the following material from store center kunera etawah to site of work under jurisdiction of edd i etawah under business plan ( 20 cr scheme ) through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 2 pcc pole 8.5 mtr 3 stp 55 pole 11 mtr long 4 line materials material i.e. conductor, g.i. wire tpmo stay rod, disc insulator, cross arm, angle channel and other required 5 weasel conductor 6 abc ( 3x95+1x70+1x16 ) sqmm 7 100 kva transformer 11 / 0.4 kv 8 grouting of pole 9 grouting of double pole structure 10 installation of stay set complete with grouting and nuzzling etc. 11 earthing of poles by fixing earthing rods and binding with earth wire 12 installation of cross arm holding clamp 13 installation of distribution box 3 phase 14 installation of distribution box clamp 15 installation of ms top channel 16 installation of 11 kv polymeter disc insulator 17 installation of fuse set 18 installation of i hook with clamp 19 installation of t / f base angle 20 installation of ms nut bolt 21 installation of suspention clamp 22 installation of joint connector 150 sqmm lt pvc cable 23 installation of ms dropper channel 24 installation of dead end clamp 25 installation of ms t off channel 26 installation of cross arm v type 27 installation of 11 kv pin insulator 28 installation of pearcing connector for abc 3x120 29 laying, sagging and stringing and jumpering / binding etc. ofacsr weasel conductor in 11 kv / lt lines as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work 30 mounting of 100 kva transformer on the single pole / double pole / plinth structures with connections thereof....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39750281 under the item business plan 2023 24, replacement of dilapidated gi wire / conductor with weasel / dog / raccoon conductor on the related 11 kv feeders of 33 / 11 kv power substation bombaypur aside under power distribution division ii chaubepur. and the work of installing sc / stp poles in the middle of the long distance. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size st polesfrom store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel/rabbit/racoon /dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 5 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 6 dismentling of rusted weasal/racoon /dog conductor wire and g.i wire as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 7 laying, sagging, stringing, binding and jumpering etc. of weasal/racoon /dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 8 laying of 11 kv xlpe 3x120 sqmm as per respo manual 9 supply & erection of x arm holding / holding clamp with n&b as per respo norms. 10 supply & erection of 11 kv i/d & o/d cable jointing kit suitable for 3x120 sqmm as per respo norms. 11 supply and erection of stone pad as per respo norms ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39750251 work of installing 250 / 400 kva transformers in areas fed from various 33 / 11 kv sub stations under the business plan year 2023 24 under electricity distribution division i, etawah. 1 carriage of the following material from store center kunera etawah to site of work under jurisdiction of edd i etawah under business plan ( 20 cr scheme ) through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 2 pcc pole 8.5 mtr 3 stp 55 pole 11 mtr long 4 line materials material i.e. conductor, g.i. wire tpmo stay rod, disc insulator, cross arm, angle channel and other required 5 abc ( 3x95+1x70+1x16 ) sqmm 6 lt pvc cable 1x400 sqmm single core 7 lt pvc cable 1x630 sqmm single core 8 250 kva transformer 11 / 0.4 kv 9 400 kva transformer 11 / 0.4 kv 10 grouting of pole 11 installation of stay set complete with grouting and nuzzling etc. 12 earthing of poles by fixing earthing rods and binding with earth wire 13 installation of cross arm holding clamp 14 installation of distribution box 3 phase 15 installation of distribution box clamp 16 installation of ms top channel 17 installation of 11 kv polymeter disc insulator 18 installation of fuse set 19 installation of i hook with clamp 20 installation of ms nut bolt 21 installation of suspention clamp with i hook 22 installation of joint connector 150 sqmm lt pvc cable 23 installation of ms dropper channel 24 installation of dead end clamp 25 installation of 11 kv pin insulator 26 installation of connecting clamp 27 installation of all. lug 250 mm 28 installation of all. lug 400 mm 29 installation of all. lug 630 mm 33 carriage of scrap 100 kva t / ffrom pit site to j.e store kunera etawah. 34 carriage of scrap 250 kva t / ffrom pit site to j.e store kunera etawah....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39749371 tender for various work under rain season ( business plan 2023 24 ) related work in the jurisdiction of edd i / ii / iii, aligarh 1 cartage of following poles store centre or from any other place to the respective site of work through the kachha pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work (dist. 0 to 50 kms.). 2 pcc poles 8.5 mtr. 3 cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. (dist. 0 to 50 kms.). 4 erection of 11 kv line double pole on st pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work 5 pcc poles 8.5 mtr. 6 laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 7 acsr weasal conductor. 8 drilling and cutting of tee off channel, v cross arms, top channel, cross bracing angle, ms garding angle, dropper chanel. as per specification of uppcl construction manual including including loading and unloading at the both ends. 9 grouting of following poles as per respo norms including cost of grouting material (cement: sand: brick ballast) size as per respo norms. 10 pcc poles 8.5 mtr. 11 providing & fixing ofclamps of lt,cross arm holding, f clamp, stay clamp, danger board clamp etc. with nut & bolts. 12 fixing of earthing rod as per respo manual and as per direction of supervising engineer including the cost of labour. 13 erection and grouting of stay set 33 kv/11 kv line including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work. 14 providing and fixing of stay insulator. 15 safe carriage & installation of transformer from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, t&p and carrier etc. required for proper completion of work (distance 0 to 50 km.). 16 63 kva t/f 17 100 kva t/f 18 demounting& carriage of following capacity transformer due to damage of pcc poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. 19 25 kva t/f 20 safe cartage of 11 kv vcb from store center, sarsol to 33/11 kv s/s, atrauli (old). 21 dismentelling of old 11 kv vcb after opening its 11 kv cable connection removing earthing bus bar cts and taking it out side switch yard at 33/11 kv s/s, atrauli (old). 22 errection and instalation of 11 kv vcb including all labour out going incoming connection with bus bar 11 kv cable boxes tapping with empire tape & h.t. tape and connecting with earthing at 33/11 kv s/s, atrauli (old). 23 earthing of 11 kv vcb providing & laying m.s. earth strip 50x6 mm including welding bending etc. at33/11 kv s/s, atrauli (old). 24 safe carriage of old 11 kv vcb from 33/11 kv s/s atrauli (old) to store centre, sarsol/lal diggi, aligarh including loading & unloading at both ends. 25 replacement of battary charger 24 volt. 26 replacement of battary set 24 volt. 27 dismentelling of old/damaged battery set 24 volt. ...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39748840 electric work under the full deposit scheme, the work of issuing combination as per application on nivesh mitra / jhatpat portal and creation of line etc. 2 carriage of fallowings from esc. bsr to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 kms. 3 s.t pole 13 mtr. long 4 s.t pole 11 mtr. long 5 pcc pole 8.5 mtr long. 6 carriage of all line material from store center bsr to j.e store sub station as acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 7 erection ofsingle pole support including complete 1 it fittings as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 8 erection of double pole / scation pole support including complete 1 it fittings as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 9 grouting of single support shall be grouted with cement, sand and birck ballast / stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast / stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 10 grouting of double pole support shall be grouted with cement, sand and birck ballast / stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast / stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 11 carriage of all line material from j.e store sub station to pit site acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 12 cutting / drilling / welding of ms angle iron for making guarding angle size 65x65x6 / 50x50x6 mm including the work of fixing the bracket on pcc / st pole for construction of the line. 13 carriage of 11 kv ct / pt metering polemounted unit varius ratio 14 carriage and installation of 11 kv pilferresistant metering cubicle with out cable termination kit 15 mounting of 11 kv ct / pt unit varius ratio 16 making / filling of 11 kv cable jointing kit varius sizexlpe cable 17 loading / unloading & carriage of t / ffrom esc. bsr to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 kms. 18 25 kva t / f 19 63 kva t / f 20 fixing of 11 kv stay rod with stay wire in proper way with nozelling 21 grouting of 11 kv stay rods 22 guarding of 11 k v line at road crossing by laying 3 nos. gl wire of size 6 / 10 swg parallel and fixing of lacings ( tilli ) at a distance at 1.5 mlrs as per direction of supervising engineer / respo mannual it. includes the cost of labour, t&p carrier etc. required lor proper completing of work 23 laying, sagging. stringing and binding and jumpering of 11 kv xlpe cable 3*70 square mm & outher size newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 24 laying, sagging. stringing and binding and jumpering of acsr weisal , rabbit, dog newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 25 acsr weisal conductor 26 acsr rabbit / dog conductor 27 abc cable 3*50 square mm 28 abc cable 3*95 square mm 29 abc cable 3*120 square mm 30 fixing of earthing rod 31 fixing of pin insulator 32 fixing of side bracket 33 fixing disc insulator 34 fixing ofv type x rm / toff channel 35 fixing ofdistrubution box. 36 fixing oftop / drop channel 37 fixing of sub station angle. 38 mounting & installation of t / f from d / p 39 25 kva t / f 40 63 kva t / f 41 the folloing material is required to be supplied by the contractor. 42 holding clamp. 43 11 kv cable jointing kit 3*70 square mm xlpe cable 44 double pole clamp 45 side bracket 46 f clamp 47 e clamp 48 lt clamp 49 pg clamp 50 i bolt with nut & bolt. 51 j hook 52 earth clamp 53 stay clamp 54 dead & clamps 55 stay insulator for 11 kv 56 suspension clamps 57 piercing connector. 58 lt insulator 59 bolt & nut off size....

Nagar Panchayat - Uttar Pradesh

39720066 tender for ( line 10 ) under swachh bharat mission nagariya 1.0, civil construction work of 05 tpd wet weight processing ( pit composting ) in area number 890 of 0.519 hectare. 1 surface dressing of ground or cleaning jungle including up rooting of trunk vegitations grass bush wood trees and sapling of girth up to 30cms measured at height of 1mtr above ground level and removal of rubbish up to distance of 50mtrs out side of periphery of area cleared. s.i no 259 2 earth work in exacavation in trenches for foundationsin ordinary soil (loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the engineer i/c with in a lead of 50m. [pwd 251] 3 excavating, supplying & filling of local earth excluding royalty & including cartage up to 5km also including ramming & watering of earth in layers no exceeding 20 cm in trenches, plinth, side of foundation etc complete s.i. no. 253a 4 providing & laying p.c.c. 1:6:12 with 40 mm. brick ballast sand cement etc complete s.i. no. 273 5 r.c.c. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:2:4 in lintels of doors and windows,sunshades excluding supply of reinforcement and its fixing and binding the same with 24 bwg binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. s.i. no. 283 (for rcc raft, column & beams) 6 p/f mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. [pwd 504] 7 class m 150 brick work in 1:6 cement coarse sand (of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. pwd 303 8 class 150 brick work in 1:6 cement and coarse sand mortar in super structure including supply of all materials, labour tools and plants, etc. required for proper completetion of the work. [pwd 303+309] 9 12mm thick plaster with (1:4) one part of cement and four part of approved coarse sand including supply of all labour, material, t&p etc complete. s.i.no. 584 10 m.s. or iron work of small sizes and sections such as holding down bolts, hold fast tie rods, gratings etc. wrought to required from including supply of steel bolts, nuts wastage etc and fixing required for proper completion of the work. s.i. no. 502(b) 11 m.s. or iron work in heavy sizes such as, built up gate, door frame, record racks, roof work etc. wrought to required from including drilling holes, rivetting or welding where necessary and also including supply of steel bolts, nuts wastage etc and fixing required for proper completion of the work. [pwd 503] 12 supply and fixing galvaniesed corruated iron roofing 24 b.w.g. in position including supply of all material,labour,tools & plants etc. required for proper completoinof the work and including wastage. pwd 536 13 supply & fixing 6mm thich china glazzed tiles of first quality in skirting & dado laid with 1:3 cement & aproved coarse sand mortar finished with white cement slurry jointing & polishing complete including supply of all material t&p etc require for proper completion of the work. s.i. no. 628 14 finishing walls with water proofing cement weather coate of approved quality on previously new treated surface with this paint to give in even shade including supply of material, labour, t & p, etc. required for proper completionof the work. s.i.(ch.15.new item 9) 15 distempering (two coat) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surface to give an even shade over & including a priming coat with cement primer of approved brand & manufacture such as berger,j&n, shalimar, asian paints after thoroughly brushing the surface free from mortar droppings & other foreign matters & also including preparing the surface even with plaster of paris or approved synthetic material & sand papered smooth including cost ofall materials. (pwd 649+650) 16 providing wall putty on new surface with approvel quality material of berger/jk/brila or similar make two coates s.i.no(ch.15.new item 12) 17 fixing of door, windows/ventilators chaukhats in position. 18 supply and fixing isi marked flush door shutters conforming to is :2202 part i (1983) including fixing of wooden cleats , stoppers, adjustment of hinges bolt lock handles spring fiting with necessary screws to be supplied. (a) 32 mm thick pwd 470(i) 19 providing and fixing 28mm thick door shutters made of solid pvc foam profile with homogenous fine cellular structure having smooth outer integral skin having 71mm width & 28mm thick as vertical & horizontalstyles. joint are made using solvent adhesive.(pwd 9.124) 20 providing & fixing aluminium sliding door bolts isi marked with nuts and screws etc complete. (a) 250mm x 16mm . pwd 9.96.2 21 providing and fixing aluminium towerbolts (barrel type) with necessary screws etc. complete 22 providing and fixing aluminium handles with screws etc. complete (a) 125 mmpwd 9.100.1 23 painting two coat over priming coat (but including cost of priming coat) on steel and other metal surfaces up to 10 cm. width or girth or small articles not exceeding 0.10sqm in area white superior synthetic enamel such as luxol3,hi gloss apcolite superlac, dulux specified brushing to give an even shade and including cleaning the surface of all dirt,dust and other foreign matter sand papering and stoping including cost of all materials, labour tools and plants etc. required for proper completion of the work. for wooden surface. (pwd ch 15.1b+2) 24 supply & fixing 10 cminternal dia pvc pipe down pipe 25 supply & fixing 7.5 cminternal dia pvc pipe down pipe 26 wiring point for light inpvc conduit on surface , complete with 8 swg gi earth continuity wire , switch and ceiling rose /angle/ battan holder on 3 mm thickphenolic laminated backelite sheet etc complete in all respect, with 1.5 sq mm fr pvc insulated multistrand copper conductor cable as earth wire drawn inside the conduit (as per pwd s.i no 121 (b) 27 wiring point for pluginpvc conduiton surface , complete with 8 swg gi earth continuity wire , switch and ceiling rose /angle/ battan holder on 3 mm thickphenolic laminated backelite sheet etc complete in all respect with 1.5 sq mm fr pvc insulated multistrand copper conductor cable as earth wire drawn inside the conduit (as per pwd s.i no 124(b) 28 wiring point for fan/fresh air fanin pvc casing & caping used in place of pvc conduiton surface , complete with 8 swg gi earth continuity wire , switch and ceiling rose /angle/ battan holder on 3 mm thickphenolic laminated backelite sheet etc complete in all respect with 1.5 sq mm fr pvc insulated multistrand copper conductor cable as earth wire drawn inside the conduit (as per pwd s.i no 123© 29 supply & fixing led light 18w standard make all fitting complete. (m.r.) 30 supply & fixing led light 12w standard make all fitting complete. (m.r.) 31 providing and fixing water closet squatting pan ( indian type w.c. pan ) with 100mm sand cast iron p or s trap, 10 litre low level white p.v.c. flushing cistern with manually controlled device (handle lever) conforming to is:7231, parryware/hindware/seabird/orient (coral) with all fittings and fixtures complete including cutting and making good the walls and floors wherever required. pwd 17.1 32 providing and fixing white vitreous china flat back half stall urinal of size 430x260x350mm & 340x410x265mmwith white pvc automatic flushing cistern, with fittings, standard size c.p. brass flush pipe, spreaders with unions and clamps (all in c.p. brass) with waste fitting as per is : 2556, c.i. trap with outlet grating and other couplings in c.p. brass including painting of fittings and cutting and making good the walls and floors wherever required: 33 providing and fixing stone slab table rubbed, edges rounded and polished of size 75x50cm deep and 1.8cm thick fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 6mm nominal size) as per direction of engineer in charge and finished smooth. 34 providing & fixing white vitreous china wash basin including making all connections but excluding the cost of fittings. 35 providing and fixingbrass bib cock of approved quality . 36 providing and fixingbrass stop cock of approved quality . 37 providing & fixingc.p brass angle valve of approved quality 38 providing and fixing chlorinated polyvinyl chloride (cpvc) pipes, having thermal stability for hot & cold water supply including all cpvc plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00m spacing. this includes jointing of pipes & fittings with one step cpvc solvent cement and the cost of cutting chases and making good the same including testiang of joints complete as per direction of engineer in charge. concealed work including cutting chases and making good the walls etc. dsr 2021 18.2 39 15mm dia outer dia pipes (rate=513.75 513.75*18%=421.28) 40 20mm diaouter dia pipes (rate=537.15 537.15*18%=44.46) 41 20mm dia outer dia pipes (rate=327.2 327.2*18%=268.30) 42 25mm diaouter dia pipes (rate=429.4 429.4*18%=352.11) 43 supply & fixing 25mm pvc pipe in position all coplete. 44 providing & placing on terrace (at all floor levels) polyethylene water storage tank isi 12701 maked with cover and suitable locking arrangement and making necessary hole for inlet,outlet and over flow pipe but without fitting & base support for tnak. (s.i.no. 18.48) 45 handpump with sbmerseble 46 cartage of material & all t&p etc. required for proper comletion of work including loading unloding & proper stacking. 47 (a) handpump machine set complete. 48 (b) 110mm.pvc pipe 6kg/sqm pressure 49 (b) 63mm.pvc pipe 6kg/sqm pressure 50 © supply of medium class g.i. pipe 32 mm b class 51 providing necessary boaring t&p including making arrangement of water for boring of 150mm dia bore by palm pressure method in all type of strata complete item acording to moradabad jai nigam 2012 13 52 0 30 53 31 45m 54 46 60m 55 pvc assembly which loaring pvc pipe and strainer of 110/63mm dia blind pipe strainer. 56 0 30 57 31 45m 58 46 60m 59 (a) supply & pouring of coarse sand arround strainer in drilling i/c all 60 (b) filling work of betonite in between housing pipe and bore hole. 61 installation of haondpump india marka 2 including with riser 62 devolepment work till satisfactionof engineer incharge after installation of haondpump. 63 disinfection work with material after development work. 64 construction of handpump platform of 1.85m dia including all material ,labours t&p etc asper design. 65 construction of drain including all material ,labours t&p etc asper design. 66 imbosing & painting work work 67 water testing work 68 solvent & jointing kit 69 supply of 1.5 hp. submersible pump isi. marked or approved quoin as taxmo,crompton etc. required for 4 boring ,.complete item.. 70 supply of starter with pannel board. 71 supply of flate cable 3core copper 1.5 square mmfor summerseble electric connection…… complete item. 72 sign board 73 add gst 18% 74 adjustment for say ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39719224 the erection work of 11 kv lines due to bifercation of various 11 kv feeders and increasing capacity of power transformer from 8 mva to 10 mva under business plan 2023 24 under eudd, banda 1 the following works under various places / sub stations under business plan scheme 2023 24 under edd, atarra, including carriage of all required material from esc banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material / scraped from site to store centre, if any. some petty material like all types clamps, cable boxes, aluminium tape, lugs, hoisting clamp / cable hanging u clamps, danger board, number plate, angle, hdpe / gi pipes, nut bolts & washers etc. of appropriate size & all plinth / fencing materials will be arranged by contractor on his own cost. the bidder shall be responsible for complete execution of the work under the scope of tender specification. any work / activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. details of the work as given below ; 2 erection of 11 kv ht lines due to bifercation of 11 kv baberu & singhpur feeder 3 safe cartage of 11 mtr. long stp poles from store centre or from any other place to the respective site of work. 4 safe cartage of 8.5 mtr. long pcc poles from store centre or from any other place to the respective site of work. 5 safe cartage of line material viz. conductor, cable, g.i. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work. 6 erection of sp structure on 11 mtr. long st poles, including complete h.t. / l.t. fittings as per resspo manual and as per direction of engineer incharge. 7 erection of dp structure on 11 mtr. long st poles, including complete h.t. / l.t. fittings as per resspo manual and as per direction of engineer incharge. 8 erection of sp structure on 8.5 mtr. long pcc poles, including complete h.t. / l.t. fittings as per resspo manual and as per direction of engineer incharge. 9 grouting of sp structure on 8.5 / 11 mtr. long pcc / st poles, including complete h.t. / l.t. fittings as per resspo manual and as per direction of engineer incharge. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 ( 0.285 cu. mtr. each ) . 10 grouting of dp structure on 11 mtr. long st poles, including complete h.t. / l.t. fittings as per resspo manual and as per direction of engineer incharge. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 ( 0.285 cu. mtr. each ) . 11 erection and grouting of stay set with nozelling & binding as per norms. 12 fixing of earthing rod as per resspo manual. 13 laying, sagging, stringing, binding and jumpering etc. of acsr weasel conductor on the newly erected pole as per direction of supervising engineer / resspo manual. 14 laying, sagging, stringing, binding and jumpering etc. of acsr dog conductor on the newly erected pole as per direction of supervising engineer / resspo manual. 15 laying, stringing, binding and termination etc. of xlpe cable 11 kv 3x185 sq.mm. on the erected line as per direction of supervising engineer / resspo manual. 16 supply & fixing of m.s. t off channel with clamp & n&b alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 17 supply & fixing of 11 kv cross arm holding clamp with n&b alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 18 supply & fixing of 11 kv 3x185 sq.mm. cable jointing kit i / d with fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 19 supply & fixing of 11 kv 3x185 sq.mm. cable jointing kit o / d with fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 20 supply & fixing of m.s. bracing angle with 4 clamps & nut bolts alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 21 supply & fixing of clamp for channels with n&b alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 22 supply & fixing of f clamp with n&b alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 23 supply & fixing of danger board with clamp & n&b alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 24 supply & fixing of guarding angle with clamps & nut bolts alongwith fitting of all accessories as per resspo manual ( arranged by contractor at his own cost ) . 25 increasing capacity of power transformer from 5 mva to 10 mva 33 / 11 kv sub station, badausa & bisanda 26 safe removal of following capacity old transformer from existing plinth as new transformer will be replaced by store and after installation reconnecting transformer to circuit 27 5 mva transformer 28 supply & fixing of 11 kv indoor type cable jointing kit of size 3x300 sq.mm. with fitting of all accessories as per resspo manual ( arranged by tenderer at his own cost ) . 29 supply & fixing of 11 kv outdoor type cable jointing kit of size 3x300 sq.mm. with fitting of all accessories as per resspo manual ( arranged by tenderer at his own cost ) . 30 repairing cable trench from switchgear to transformer and upto 33 kv breacker and laying of 11 kv xlpe cable 3x300 sq.mm....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39717397 work of 33 kv, 11 kv line construction / strengthening , increasing capacity of power t / fs, feeder bifrecation, replacement / repairing of damaged vcbs and other associated works under system augmentation / strengthening work head on semi turn key basis under edd, kheragarh, agra. battery set 24 volt standard make 3 pg clamp 4 f bracket for fixing tap insulator nut & bolt 5 stone pad 6 number plate 7 barbed wire 8 danger board with clamp 9 part b (work/ erection)carriage of st pole 11 mtr long. from store center agra to work of site through kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00 70kms.) 10 carriage of 11 kv i/c & o/g vcbs of various sizes from store center agra to work of site through kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00 70kms.) 11 carriage of pcc pole 8.5 mtr. long. from store center agra to work of site through kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00 70kms.) 12 carriage of 250 kva t/f from store center agra to work of site through kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00 70kms.) 13 carriage of line material from store center agra to work of site through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00 70kms.)line material viz. aerial bunch conductor/weasal conductor/dog/ rabbit, g.i. earth wire, cross arm, angle, channel, insulators,clamps, dist. box and other line material, if required in estimate/package. 14 erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on single pole 11 mtr. long st poles including fixing ofall accessories for 33 kv line as per respo norms.labour, t &p and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 15 erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single pole on 8.5 mtr. longpcc poles including fixing ofall accessories, barbed wire for 11 kv/lt line as per respo norms labour, t &p and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 16 erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) double pole on 8.5 mtr. longpcc poles including fixing ofall accessories, barbed wire for 11 kv/lt line as per respo norms labour, t &p and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 17 laying sagging stringing and binding and jumperingofacsr weasel conductor at 11 kv/lt lineas per respo norms it includes the cost of labour, t & p carrier etc required for proper completion of work. 18 laying sagging stringing and binding and jumperingofacsrdog conductor at 11 kv/lt lineas per respo norms it includes the cost of labour, t & p carrier etc required for proper completion of work. 19 bore earthing of 5 mva & 10 mva power t/f by digging machine depth of 250 ft. below as per respo norms. 20 erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per respo norms including the costof arrangement of labour, t&p, carrier etc. required for proper completion of work. grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 21 fixing of earthing rod as per respo norms including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 22 installation of 11 kv i/c & o/g vcb of various size in proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works. 23 fixing of number plates on poles as per respo norms. 24 fixing ofaluminium p.g. clamps as per respo norms 25 fixing of danger boards with clamps (shock proof, rust proofs) on poles as per respo norms. 26 for the work construction of plinth, fencing of 250 kva t/f including the earthing (body/neturtal seperately) for above 250 kva t/f as per respo manual.(all material provided by the contractor at his own cost) 27 mounting of 250 kva t/f on plinth & making ht/lt connection. 28 installation & energization of battery set & charger of standard make and as per respo norms 29 removal & carriage of old / damaged 11 kv incoming/outgoing vcb from 33/11 kv s/s to 132 kv taj store agra including loading & unloading at respective ends. 30 removal & carriage of 100 kva t/f from existing double pole after opening ht/lt connections and their carriage to 132 kv taj store agra including laodiing and unloading at both end. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39717368 under the additional business plan 2023 24 ( 339 crore ) , for construction / strengthening / capacity increase / transformers of 33 kv / 11 kv line from a category experienced contractors on semi turnkey basis under the power distribution division firozabad and tundla works related to installation / worn wire / replacement of damaged cable / substation construction etc 1 33 kv jointing kit 3x300 sq.mm. 2 11 kv v type cross arm 3 11 kv v type cross arm holding clamp 4 do fuse set 11 kv 5 11 kv jointing kit 3x300 sq.mm. 6 11 kv jointing kit 3x185 sq.mm. i/d 7 11 kv jointing kit 3x185 sq.mm. o/d 8 11 kv straight through 3x185 sq.mm. 9 earthing complete 10 polymeric 11 kv pin insulator 11 dropper channel (100x50x2028 mm) 12 stone pad 13 holding clamp for top channel. tpmo & fuse set etc with bolts and nuts 14 base angle (75x75x6x2028 mm) with clamp & bolts and nuts 15 top channel (125x65x2240 mm) 16 stay set complete 17 concreting of pole 18 t off channel (125x65x1300 mm) 19 11 kv fuse set 20 gaurding angle with clamp 21 gi wire for gaurding 6/8 swg 22 chemical earthing complete 23 danger board with clamp 24 barbed wire gi 25 f bracket with n & b 26 supporting clamp for t/f with fixing clamp n & b 27 brassing 28 alluminium tap 29 road restoration charge 30 g.i. pipe 6 dia with laying charge 1475+725 31 cable laying charge along with digging 32 control cable 4*2.5 sq mm 33 control cable 2*2.5 sq mm 34 33kv pinwith nut 35 pg clamp dor jumpring 36 33kv fuse set 37 earth wire clamp with bolts & nuts 38 danger board with clamps 39 bolts nuts & washers 40 aluminium paints 41 red oxide paints 42 aluminium binding wire 6 swg 43 earthing of pole by ms earthing rod of 20x2500mm and 6 swg earthing wire etc. 44 ms angle iron 65x65x6mm, 4300mm long bracing with clamp 45 25 feet folding ledder 46 batterycharger 24 volt 47 batteryset 24 volt 48 tail less unit 49 received back material from site 50 11/0.4 kv 25 kva transformer 51 11/0.4 kv 63 kva transformer 52 acsr gi wire scrap 53 acsr weasel conductor (scrap) 54 5mva t/f 55 old used 11 kv xlpe cable 3x185 sqmm ( not damage ) 56 reccon/dog condutor 57 stp 11 mtr per pole 180 kg 58 33 kv xlpe cable 3x300 sqmm 59 11 kv xlpe cable 3x300 sqmm 60 11 kv xlpe cable 3x185 sqmm ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39717352 under the item business plan 2023 24, replacement of dilapidated g.i. work of installation of middle pcs / stp pole. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of line material viz. weasel/rabbit/racoon /dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 4 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 5 dismentling of rusted weasal/racoon /dog conductor wire and g.i wire as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 6 laying, sagging, stringing, binding and jumpering etc. of weasal/racoon /dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 7 supply & erection of x arm holding / holding clamp with n&b as per respo norms. 8 supply & erection of f clamp with n&b as per respo norms. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39717324 under the item business plan 2023 24, work of replacing the dilapidated conductor of 11 kv feeders with lta cable under 33 / 11 kv power sub station ghatampur town under power distribution division iii. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of line material viz. weasel/rabbit/racoon /dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. 4 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 5 laying of lt abc ( 3x120+1x95+1x16)as per respo manual 6 laying of lt abc ( 3x50+1x35+1x16)as per respo manual 7 supply & erection of suspention clamp as per respo norms. 8 supply & erection of dead end clamp as per respo norms. 9 supply & erection of eye hook clamp with n&b as per respo norms. 10 supply & erection of pearcing connector as per respo norms. 11 chemical earthing for 400 kva t/f ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39716453 work of strengthening of 11 kv lines at business plan 2 year 2023 24 scheme under edd karwi chitrakoot 2 cartage ofpole & material from store centrefrom any other place to the respective site of work through the kachha pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. 3 pcc pole 8.5 mtr long 4 st pole 11 mtr long 5 11kv vcb for i/c ctr 600/300/5a, 350 mva 6 11kv vcb for o/g ctr 200/100/5a, 350 mva 7 11 kv xlpe cable 3x185 8 safe cartage of line material viz. conductor, cable, gi earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. 9 erection of 8.5 mtr. single pcc pole including complete. h.t/l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 10 grouting of 8.5 mtr. single pcc poleper respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 11 erection of st pole 11 mtr long including complete. h.t/l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 12 grouting of st pole 11 mtr long per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 13 erection of double poleincluding complete. h.t/l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 14 grouting of double poleper respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 15 erection and grouting of stay set completed including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t&p etc required for proper completion of work. 16 laying, sagging and binding & jumpring of acsr weasel conductor as per direction of supervising engineer. it including the cost of labour t&p carrier etc required for proper completion of work. 17 laying, sagging and binding & jumpring of acsr rabbit conductor as per direction of supervising engineer. it including the cost of labour t&p carrier etc required for proper completion of work. 18 laying of 11 kv xlpe cable 3x185 sq mm cableby digging of trench 1050 mm, deep, 750 mm wide its boxing with brick,sand after laying of cable separation of cable by brick wall local sand filling and proper levelling& ramming (all civil & hdpe pipe material shall be arranged by contractor) 19 fixing & commisioning of earthing rod complete as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 20 fixing & commisioning of ms gaurding angle with clamp as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 21 fixing & commisioning of ms top channel with clamp as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 22 fixing & commisioning of t off chanel 25x65x1300 mm with clampas per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 23 fixing & commisioning of ms dropper channel with clamp as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 24 installetion of 11kv vcb for i/c ctr 600/300/5a, 350 mva as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 25 installetion of 11kv vcb for o/g ctr 200/100/5a, 350 mva as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 26 fixing & commisioning of 11kv cable jointing kit (3x185sqmm) as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. (jointing kit arrenge by contractor on is own cost) 27 fixing & commisioning of 11kv straight through (3x185sqmm) as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. (jointing kit arrenge by contractor on is own cost) 28 rock pit for pcc/stp 29 strengting of tilted pole 30 resagging of loose conductor 31 fabication of hardware items 32 tree looping & chooping ...

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

39712570 tender for supply of material and works against additional bp 2023 24 on semi turn key basis in eudd mayohall, bamrauli and tagore town under eudc ii, prayagraj. 2 holding clamp for top chanel (stp/pcc) 3 suspension clamp for abc cable 4 dead end clamp for abc cable 5 stone pad (300x300x75 mm) 6 earth wire clamp with bolts & nuts 7 danger board with clamp for 11kv & 33 kv 8 gi barbed wire 9 aluminium paint 10 red oxide paint 11 bolts, nut & washer all size 12 aluminium crimping lug 240 sqmm 13 aluminium crimping lug 400 sqmm 14 lt shackle insulator 15 megger (insulation tester) 5kv analog (make motwane, model b50k) battery operated 16 multi meter (make meco) 17 multi meter (make fluke) 18 digital earth tester 19 chemical earthing complete 20 chemical pipe earthing 9 ls for power t/f 21 structure for 33 kv line isolator 22 structure for post insolator 23 clamp meter(make meco 27) 24 i hook 25 lt cubical box with tailness unit 26 tailness unit 500 amp 27 tailness unit 300 amp 28 copper strip 50x6sqmm 29 gi strip 50x6 30 service clamp for st pole 31 ms angle 50x50x6 mm 18 32 u bolt with nuts 33 copper l piece 50x225x10 mm 34 gi pipe 8 35 clamp for fixing pipe 36 4 core lt mcb with box 37 clamp with nut bolt 38 variac 100a 39 variac 400a 40 omicron relay testing kit 41 transformer oil bdv test kit (30/60/ 80/100 kv) automatic 42 power transformer turns ratio tester digital 43 accucheck 33 kv 44 accucheck 11 kv 45 accucheck lt 46 3 phase cut out kit fuse unit (400 a) (5/10 mva testing board) 47 power factor meter 48 screw driver set 49 tool box kit 50 spanner set 51 phase sequence indicator 52 loading ct testing set (600 100 a/ 5a) 53 ct polarity test kit 54 substation auxiliary relays 55 relay for 33kv panel (make stelmec) 56 relay for 33kv panel (make micom) 57 relay for 11kv panel (make micom) 58 relay for 11kv panel (make stelmec) 59 pla relay 24dc/240v ac 60 11 kv stay insolator 61 mounting, fitting & erection of work as per respo norm. (part b) 62 erection of complete structure for 33 kv isolator in switch yard as per respo drawing. work also includes construction of gantry plinth of size 1.0x0.45x0.45 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all related plinthing material will be arrange by the contractor asper resspo and electrical safety rules. 63 erection of complete structure for 33 kv post insulators in switch yard. work includes installation of 3 nos. 33 kv post insulator on each structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.90x0.45x0.45 cum. the work is to be done strictly as per respo drawing. all related plinthing material will be arrange by the contractor asper resspo and electrical safety rules.. 64 laying of single 33 kv 3x300 sq mm xlpe cable by manual drilling method. the cable shall be laid at the depth of 1050 mm from the surface of road. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules. (the rates must be quoted for each cable of length per mtr.) 65 fixing and providing ofheat shrink cable type end terminations suitable for 33 kv, 3x300 sq mm xlpe cable and 33 kv 3x300 sq mmisi mark jointing kit outdoor. 66 hoisting of 33 kv 3x300 sq mm xlpe cableproviding gi pipe of size 6” dia 3 m long on single pole support including its jumpering, complete with clamps, nut & bolts. 67 construction of complete t/f plinth size 3mx3m x 0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing. top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. all material will be arrange by the contractor asper resspo and electrical safety rules.. 68 safe shifting and mounting of 33/11 kv 10 mva t/f on the transformer plinth. this work includes dragging loading, shifting, lifting and complete assembling after placing on the plinth.all special and ordinary t&p is to be arranged by the contractor. special care is to be taken to avoid tilting of t/f and loss of transformer oil. any damage in t/f will be chargeable to contractor. 69 special earthing of powert/f neutral by boring 2 dia 20 feet long g.i. pipe in the wet earth and connecting it with 35x6 mm. g.i. strip to t/f neutral giving half round turn at the t/f. two separate earthing to be provided to t/f body by connecting it with earth mat by special earthing arrangement for earthing work. material like strip of size 50x6/35x6 mm and g.i. pipe 2” dia 2.9 mm thick. all material will be arrange by the contractor asper resspo and electrical safety rules.. 70 safe shifting and removing of 33/11 kv power t/f from theplinth. this work includes dragging, loading,unloading, shifting, lifting, complete removing from the plinth and carriage from site to store.all special and ordinary t&p is to be arranged by the contractor. special care is to be taken to avoid tilting of t/f and loss of transformer oil. any damage in t/f will be chargeable to contractor. 71 5 mva 72 8 mva 73 eerection, grouting, plinthing & painting of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting , plinthingmaterial will be arranged by the contractor as per resspo and electrical safety rule,only s.t.pole provided by deptt.) 74 earthing of support/pannel complete with the help of m.s. rod 16 mm dia and 2.5 mtr. long, fastening of g.i. wire with clamps/x arm/support to m.s. earth rod. (all material will be arranged by the contractor as per resspo and electrical safety rule) 75 fixing & grouting of stay rod with cement, sand and bricks ballast in ratio !:4:8 and fasteniong the stay wire with pole and stay rod nozzling.(grouting and all material will be arranged by the contractor with one year gauranty asper resspo and electrical safety rules.) 76 laying of single 11 kv, 3x185/3x120 sq mm xlpe cable normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. the enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. the cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. after laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules (all material required for laying will be supplied by the contractor. 11 kv cable provided by deptt.) 77 fixing ofheat shrink cable type end terminations suitable for 11 kv, 3x185/3x120 sq mm xlpe cable and 11 kv 3x185/3x120 sq mmisi mark jointing kit will be arrange by the contractor with one year gauranty asper resspo and electrical safety rules. 78 outdoor/indoor jointing kit 79 straight through jointing kit 80 hoisting of 11 kv 3x185/3x120 sq mm xlpe cableproviding gi pipe of size 6” dia 3 m long on double pole including its jumpering, complete with providing all required material arrange by contractor with one year gauranty asper resspo and electrical safety rules. 81 construction of 11/0.4 kv transformer plinth in size 1.5x1.5x 1.8 mtr. height, including 0.6 mtr. below g.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. thickness of 1st class brick work should be 0.35 mtr. below g.l. and above g.l. it should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, the space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. the two channels should be grouted as per direction of site in charge. all the sides of wall above g, l. should be plastered by 1:6 cement sand mortar having 12 mm thickness. 82 providing and fixing of welded wire mesh fencing, around transformer plinth having one locking arrangements, fencing should be provided by grouting ms angle 40x40x5 mm. length of 1.5 m. on all the sides as per standard practice and design. the painting of fencing should be done by good quality green paint with two coats after rubbing and cleaning and providing one coat red oxide primer. the fencing should be 2 m. above ground level. the rates should be inclusive of all materials required for completion of above work. 83 erection & commissioningof t/f 400/250/100 on d.p. along with ht/lt connections with copper l piece. complete in all respect,as per resspo and electrical safety rule 84 earthing of transformer body and neutral by lowering of chemical pipe/rod (earthing)connecting with gi strip of size 50x6 mm with clamps, all material will be provided by contractor as per resspo and electrical safety rule 85 erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type d/p formounting of t/fs with all accessories like 11 kv fuse set, tpmo, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per resspo and electrical safety rule 86 eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like m.s.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per resspo and electrical safety rule,only s.t.pole provided by deptt.) 87 earthing of support/pannel complete with the help of m.s. rod 16 mm dia and 2.5 mtr. long, fastening of g.i. wire with clamps/x arm/support to m.s. earth rod. (all material will be arranged by the contractor as per resspo and electrical safety rule) 88 fixing & grouting of stay rod with cement, sand and bricks ballast in ratio !:4:8 and fasteniong the stay wire with pole and stay rod nozzling.(grouting and all material will be arranged by the contractor with one year gauranty asper resspo and electrical safety rules.) 89 spreading and stringing of 1 stay wire/acsr weasel continuous conductor for hanging 11 kv cable including binding of insulator complete in all respect. the work includes jumpering/connecting of conductor at sectional poleas per resspo and electrical safety rule 90 laying of single 11 kv, 3x185/3x120 sq mm xlpe cable hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. the enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. the cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. after laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules (all material required for laying will be supplied by the contractor. 11 kv cable provided by deptt.) 91 fixing ofheat shrink cable type end terminations suitable for 11 kv, 3x185/3x120/3x70 sq mm xlpe cable and 11 kv 3x185/3x120/3x70 sq mmisi mark jointing kit will be arrange by the contractor with one year gauranty asper resspo and electrical safety rules. 92 outdoor 93 laying/hanging of following lt cable of different sizes for main/distribution/connecting the main cable from t/f to tailless unit and for distribution, from tailless unit to lt section pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 94 1x400/240 sq. mm. 95 3 ½ 400/240 sq. mm. 96 3 ½x150 sq. mm. 97 erection and grouting of lt cubical box, making platform for stepping, plastering the same with cement sand in raio 1:6 fising the tailless nit 500/300 amp making lt bus bar and its taping. 98 errection andfixing the tailless unit 500/300 amp in existing lt cubical box/double pole making lt bus bar and its taping. 99 500 amp. 100 300 amp. 101 dismantling of all the ht/lt line, connections & earthing of old 11/.4 kv,250 kva transformer along with lt cubical box, cable go set, do set & t/f, safe loading carrage and unloading of dismentled item from site of work to center store naini/power house store/dump site. 102 erection & commissioningof t/f 400/250/100 on d.p. along with ht/lt connections with copper l piece. complete in all respect,as per resspo and electrical safety rule 103 earthing of transformer body and neutral by lowering of chemical pipe/rod (earthing)connecting with gi strip of size 50x6 mm with clamps, all material will be provided by contractor as per resspo and electrical safety rule 104 laying/hanging of following lt cable of different sizes for main/distribution/connecting the main cable from t/f to tailless unit and for distribution, from tailless unit to lt section pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 105 1x400/240 sq. mm. 106 3 ½ 400/240 sq. mm. 107 erection and grouting of lt cubical box, making platform for stepping, plastering the same with cement sand in raio 1:6 fising the tailless nit 500/300 amp making lt bus bar and its taping. 108 errection andfixing the tailless unit 500/300 amp in existing lt cubical box/double pole making lt bus bar and its taping. 109 500 amp. 110 300 amp. 111 dismantling of all the ht/lt line, connections & earthing of old 11/.4 kv100/250 kva transformer along with lt cubical box, cable go set, do set & t/f, safe loading carrage and unloading of dismentled item from site of work to center store naini/power house store/dump site. 112 250 kva 113 100 kva 114 erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long stpfor lt line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long stpas per resspo and electrical safety rule) 115 errection&commissioning of acsr weasl for neutral conductor in lt ab line with fixing of lt x arm, lt shackle insulator, clamps etc. at existing lt pole as per resspo and electrical safety rule 116 errection&commissioning of (3x120+1x195+1x16)/ (3x95+1x70+1x16) sq.mm abc,necessary clamps, i hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. pvc cable as per resspo norms will be arranged by the contractor exept ab cable and weasel conductor as per resspo and electrical safety rule 117 errection & commissioning of distribution boxes/kiosk on the lt poles including all clamps & materials required, connections & sealing its connection in between distribution box & abc 1x35 sq. mm lt pvc cable (all required local materialsincluding distribution box arranged by the contractor as per resspo and electrical safety rule) 118 opeing from old line & reconnection with new lt line of consumers service cable of three phase /single phase 119 single phase 120 three phase 121 cartage of 11/9 mtr stp from store to dump store/work site including loading and unloading 122 cartage of 400/250 kva transformer from store to dump store/work site including loading andunloading 123 cartage of lt 1x400, 1x240, 3.5x400, 3.5x240 sqmm from store to dump store/work site including loading and unloading 124 cartage of 3x185, 3x120, 3x70 sq mm xlpe 11 kv xple cable from store to dump store/work site including loading and unloading 125 cartage of lt abc from store to dump store/work site including loading and unloading 126 cartage of acsr weasel conductor from store to dump store/work site including loading and unloading 127 other petty materials as conductor, cross arms, channels, angles, d.o. fuse set, tpmo, lt cubical box, clamps etc. 128 cartage of 10 mva transformer with comlete part of t/f & t/f oil from store to dump store/work site including loading andunloading ...

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

39712534 supply of material and works against system augmentation / strengthening works in different districts head on semi turn key basis in eudd mayohall, bamrauli and tagore town under eudc ii, prayagraj 1 supply of materials (part a) 2 holding clamp for top chanel (stp/pcc) 3 clamp distribution box lt 4 suspension clamp for abc cable 5 dead end clamp for abc cable 6 stone pad (300x300x75 mm) 7 earth wire clamp with bolts & nuts 8 bolts, nut & washer all size 9 control cable 4x2.5 sqmm sizes 10 aluminium crimping lug 70sqmm 11 aluminium crimping lug 120 sqmm 12 aluminium crimping lug 240 sqmm 13 aluminium crimping lug 400 sqmm 14 aluminium crimping lug 630 sqmm 15 lt shackle insulator 16 chemical earthing complete 17 i hook 18 prc 120 sqmm 19 dd wire pvc 70 sqmm 20 lt cubical box for tailness unit 21 tailness unit 500 amp 22 tailness unit 300 amp 23 copper strip 50x6sqmm 24 gi strip 50x6 25 u bolt with nuts 26 copper l piece 50x225x10 mm 27 gi pipe 6 28 mounting, fitting & erection of work as per respo norm. (part b) 29 eerection, grouting, plinthing & earthings of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting , plinthing and all required material will be arranged by the contractor with one year gauranty as per resspo and electrical safety rule,only s.t.pole provided by deptt.) 30 laying of single 11 kv, 3x120 sq mm xlpe cable hanging method with help of stay wire/ normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. the enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. the cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. after laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules (all material required for laying will be supplied by the contractor. 11 kv cable provided by deptt.) 31 fixing ofheat shrink cable type end terminations suitablefor 11 kv, 3x120 sq mm xlpe cable and 11 kv 3x185/3x120/3x70 sq mmisi mark jointing kit will be arrange by the contractor with one year gauranty asper resspo and electrical safety rules. 32 outdoor/indoor jointing kit 33 straight through jointing kit 34 hoisting of 11 kv 3x120 sq mm xlpe cableproviding gi pipe of size 6” dia 3 m long on double pole including its jumpering, complete with providing all required material arrange by contractor with one year gauranty asper resspo and electrical safety rules. 35 erection & commissioning of 11 kv vcboutgoing/incoming/bus coupler in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. fixing of 11 kv switchgears rag bolt with proper connection, control cable provided by contractor. 11 kv vcb provided by deptt. 36 safely removing & carriage of 11 kv vcboutgoing/incoming/bus coupler from the old switch gear room including opening all connection, 37 laying of copper control cable form c.t. t/f to transformer control panel /protection board. all control cable shall be supplied by the contractor. 38 eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like m.s.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per resspo and electrical safety rule,only s.t.pole provided by deptt.) 39 spreading and stringing of 3 phase 3 wire continuous conductor for 11 kv line including binding of insulator complete in all respect. the work includes jumpering/connecting of conductor at sectional poleas per resspo and electrical safety rule 40 acsr weasel conductor 41 laying of single 11 kv, 3x70 sq mm xlpe cable hanging method with help of stay wire/ normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. the enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. the cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. after laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules (all material required for laying will be supplied by the contractor. 11 kv cable provided by deptt.) 42 fixing ofheat shrink cable type end terminations suitable raychem rpg make for 11 kv, 3x70 sq mm xlpe cable and 11 kv 3x70 sq mmisi mark jointing kit will be arrange by the contractor with one year gauranty asper resspo and electrical safety rules. 43 outdoor jointing kit 44 construction of 11/0.4 kv transformer plinth in size 1.5x1.5x 1.8 mtr. height, including 0.6 mtr. below g.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. thickness of 1st class brick work should be 0.35 mtr. below g.l. and above g.l. it should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, the space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. the two channels should be grouted as per direction of site in charge. all the sides of wall above g, l. should be plastered by 1:6 cement sand mortar having 12 mm thickness. 45 providing and fixing of welded wire mesh fencing, around transformer plinth having one locking arrangements, fencing should be provided by grouting ms angle 40x40x5 mm. length of 1.5 m. on all the sides as per standard practice and design. the painting of fencing should be done by good quality green paint with two coats after rubbing and cleaning and providing one coat red oxide primer. the fencing should be 2 m. above ground level. the rates should be inclusive of all materials required for completion of above work. 46 erection & commissioningof t/f 400/250/100 on d.p. along with ht/lt connections with copper l piece. complete in all respect,as per resspo and electrical safety rule 47 earthing of transformer body and neutral by lowering of chemical pipe/rod (earthing)connecting with gi strip of size 50x6 mm with clamps, all material will be provided by contractor as per resspo and electrical safety rule 48 erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type d/p formounting of t/fs with all accessories like 11 kv fuse set, tpmo, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per resspo and electrical safety rule 49 eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like m.s.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per resspo and electrical safety rule,only s.t.pole provided by deptt.) 50 eerection, grouting, plinthing & earthings of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting , plinthing and all required material will be arranged by the contractor with one year gauranty as per resspo and electrical safety rule,only s.t.pole provided by deptt.) 51 earthing of support/pannel complete with the help of m.s. rod 16 mm dia and 2.5 mtr. long, fastening of g.i. wire with clamps/x arm/support to m.s. earth rod. (all material will be arranged by the contractor as per resspo and electrical safety rule) 52 fixing & grouting of stay rod with cement, sand and bricks ballast in ratio !:4:8 and fasteniong the stay wire with pole and stay rod nozzling.(grouting and all material will be arranged by the contractor with one year gauranty asper resspo and electrical safety rules.) 53 laying of single 11 kv, 3x185/3x120 sq mm xlpe cable hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. the enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. the cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. after laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules (all material required for laying will be supplied by the contractor. 11 kv cable provided by deptt.) 54 fixing ofheat shrink cable type end terminations suitable for 11 kv, 3x185/3x120/3x70 sq mm xlpe cable and 11 kv 3x185/3x120/3x70 sq mmisi mark jointing kit will be arrange by the contractor with one year gauranty asper resspo and electrical safety rules. 55 outdoor 56 laying/hanging of following lt cable of different sizes for main/distribution/connecting the main cable from t/f to tailless unit and for distribution, from tailless unit to lt section pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 57 1x400/240 sq. mm. 58 3 ½ 400/240 sq. mm. 59 3 ½x150 sq. mm. 60 erection and grouting of lt cubical box, making platform for stepping, plastering the same with cement sand in raio 1:6 fising the tailless nit 500/300 amp making lt bus bar and its taping. 61 errection andfixing the tailless unit 500/300 amp in existing lt cubical box/double pole making lt bus bar and its taping. 62 500 amp. 63 300 amp. 64 erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long stpfor lt line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long stpas per resspo and electrical safety rule) 65 errection&commissioning of acsr weasl for neutral conductor in lt ab line with fixing of lt x arm, lt shackle insulator, clamps etc. at existing lt pole as per resspo and electrical safety rule 66 errection&commissioning of (3x120+1x195+1x16) sq.mm abc,necessary clamps, i hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. pvc cable as per resspo norms will be arranged by the contractor exept ab cable and weasel conductor as per resspo and electrical safety rule 67 errection & commissioning of distribution boxes/kiosk on the lt poles including all clamps & materials required, connections & sealing its connection in between distribution box & abc 1x35 sq. mm lt pvc cable (all required local materialsincluding distribution box arranged by the contractor as per resspo and electrical safety rule) 68 construction of 11/0.4 kv transformer plinth in size 1.5x1.5x 1.8 mtr. height, including 0.6 mtr. below g.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. thickness of 1st class brick work should be 0.35 mtr. below g.l. and above g.l. it should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, the space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. the two channels should be grouted as per direction of site in charge. all the sides of wall above g, l. should be plastered by 1:6 cement sand mortar having 12 mm thickness. 69 erection & commissioningof t/f 400/250/100/63 on d.p. along with ht/lt connections with copper l piece. complete in all respect,as per resspo and electrical safety rule 70 earthing of transformer body and neutral by lowering of chemical pipe/rod (earthing)connecting with gi strip of size 50x6 mm with clamps, all material will be provided by contractor as per resspo and electrical safety rule 71 erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type d/p formounting of t/fs with all accessories like 11 kv fuse set, tpmo, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per resspo and electrical safety rule 72 all accessories like 11 kv fuse set, tpmo, top channel,on existing d/pdone properly. all required material will be arranged by the contractor with one year gauranty as per resspo and electrical safety rule, 73 laying of single 11 kv, 3x185/3x120 sq mm xlpe cable hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. the enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. the cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. after laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. the cable shall be laid strictly in compliance to resspo norms and electrical safety rules (all material required for laying will be supplied by the contractor. 11 kv cable provided by deptt.) 74 fixing ofheat shrink cable type end terminations suitable for 11 kv, 3x185/3x120/3x70 sq mm xlpe cable and 11 kv 3x185/3x120/3x70 sq mmisi mark jointing kit will be arrange by the contractor with one year gauranty asper resspo and electrical safety rules. 75 outdoor 76 laying/hanging of following lt cable of different sizes for main/distribution/connecting the main cable from t/f to tailless unit and for distribution, from tailless unit to lt section pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 77 1x400/240 sq. mm. 78 3 ½ 400/240 sq. mm. 79 3 ½x150 sq. mm. 80 erection and grouting of lt cubical box, making platform for stepping, plastering the same with cement sand in raio 1:6 fising the tailless nit 500/300 amp making lt bus bar and its taping. 81 errection andfixing the tailless unit 500/300 amp in existing lt cubical box/double pole making lt bus bar and its taping. 82 500 amp. 83 300 amp. 84 errection&commissioning of acsr weasl for neutral conductor in lt ab line with fixing of lt x arm, lt shackle insulator, clamps etc. at existing lt pole as per resspo and electrical safety rule 85 errection&commissioning of (3x120+1x195+1x16) sq.mm abc,necessary clamps, i hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. pvc cable as per resspo norms will be arranged by the contractor exept ab cable and weasel conductor as per resspo and electrical safety rule 86 dismantling of all the ht/lt line, connections & earthing of old 11/.4 kv,25/63/100/250/400/630 kva transformer along with lt cubical box, cable go set, do set & t/f, safe loading carrage and unloading of dismentled item from site of work to center store naini/power house store/dump site. 87 250 kva 88 100 kva 89 63 kva 90 25 kva 91 laying/hanging of following lt cable of different sizes for main/distribution/connecting the main cable from t/f to tailless unit and for distribution, from tailless unit to lt section pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 92 1x400/240 sq. mm. 93 3 ½ 400/240 sq. mm. 94 errection andfixing the tailless unit 500 amp in existing lt cubical box/double pole making lt bus bar and its taping. 95 erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long stpfor lt line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long stpas per resspo and electrical safety rule) 96 errection & commissioning of acsr weasl for neutral conductor in lt ab line with fixing of lt x arm, lt shackle insulator, clamps etc. at existing lt pole as per resspo and electrical safety rule 97 errection&commissioning of (3x120+1x195+1x16) sq.mm abc,necessary clamps, i hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. pvc cable as per resspo norms will be arranged by the contractor exept ab cable and weasel conductor as per resspo and electrical safety rule 98 errection & commissioning of distribution boxes/kiosk on the lt poles including all clamps & materials required, connections & sealing its connection in between distribution box & abc 1x35 sq. mm lt pvc cable (all required local materialsincluding distribution box arranged by the contractor as per resspo and electrical safety rule) 99 opeing from old line & reconnection with new lt line of consumers service cable of three phase /single phase 100 single phase 101 three phase 102 cartage of 11/9 mtr stp from store to dump store/work site including loading and unloading 103 cartage of 400/250/100/63/25 kva transformer from store to dump store/work site including loading andunloading 104 cartage of lt 1x400, 1x240, 3.5x400, 3.5x240 sqmm from store to dump store/work site including loading and unloading 105 cartage of 3x185, 3x120, 3x70 sq mm xlpe 11 kv xple cable from store to dump store/work site including loading and unloading 106 cartage of lt abc from store to dump store/work site including loading and unloading 107 cartage of acsr weasel conductor from store to dump store/work site including loading and unloading 108 other petty materials as conductor, cross arms, channels, angles, d.o. fuse set, tpmo, lt cubical box, clamps etc. 109 cartage of 11 kv vcb from store to dump store/work site including loading and unloading ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39711783 carrying out various electric works on semi turn key basis for system augmentation strengthening of infrastructure in the area of eudd i, mathura under the jurisdiction of se, eudc, mathura 1 cartage of following material from store centre, mathura to work site. 2 st pole/pcc pole (11/9/8.5 mtr. long)(bottom portion galvanized) 3 st pole pole (13 mtr. long)(bottom portion galvanized) 4 630 kva t/f 5 250 kva t/f. 6 100 kva t/f. 7 lt aerial bunch conductor. 8 lt xlpe/pvc cable 1cx630/400/240 sq.mm. 9 lt xlpe cable of size 3.5x240/185/150/120/70 sq. mm. 10 33 kv xlpe cable 3x300 sq.mm. 11 11 kv xlpe cable 3x185/70 sq.mm. 12 11 kv xlpe cable 3x300 sq.mm. 13 33 kv vcb 800 a, 750 mva 14 33 kv control panel for single t/f 15 33 kv control panel for double t/f 16 11 kv bus coupler 17 acsr dog/weasel/ins. weasel conductor 18 other line material such as cross arm, ms bracing set, ms top channel, bottom channel, tee channel with clamp , clamps,pin insulator, disc insulator nut & bolts,earth rod, earth wire, v type x arm, f bracket, tpmo, guarding wire, d.o. fuse set etc. 19 carriage of all above material from work store center, mathura to work site.(cartage rates are to filled by bidder) 20 digging of pit & erection of new single support st pole (13/11 mtr. long) including grouting of pole and fixing of all clamps, cross arm, pin/disc insulator & other accessories with providing stone pad as per relevant drawings. any fabrication if required for above support. 21 digging of pit & erection of new four pole structure st pole (13/11 mtr. long) including grouting of pole and fixing of all sturucture accessories, clamps, cross arm, pin/disc insulator & other accessories with providing stone pad as per relevant drawings. any fabrication if required for above support. 22 digging of pit & erection of new tri pole structure st pole (13/11 mtr. long) including grouting of pole and fixing of all sturucture accessories, clamps, cross arm, pin/disc insulator & other accessories with providing stone pad as per relevant drawings. any fabrication if required for above support. 23 digging of pit & erection of new double pole structure st pole (13/11 mtr. long) including grouting of pole and fixing of all sturucture accessories, clamps, cross arm, pin/disc insulator & other accessories with providing stone pad as per relevant drawings. any fabrication if required for above support. 24 provinding & fixing of 24 volt battery with battery charges 25 providing & delta earthing for i/c vcb 26 earthing of st/pcc pole/body earthing of t/f. by m.s earth rod. 27 providing & fixing of ms nut, bolt and washers 28 painting of st pole. 29 digging of pit & erection of stay rod with grouting cement sand and brick ballast including nuzzling, binding complete. (stay insulator providing by contractor) 30 installation of 33 kv vcb 800 a, 750 mva 31 installation of control pannel for single t/f 32 installation of control pannel for double t/f 33 supply and laying of control cable 4x2.5 sq.mm. 34 supply and laying of control cable 2x2.5 sq.mm. 35 plinth & foundation of 33 kv vcb 36 pipe in pipe gel earthing for 33 kv vcb & control panel 37 suppply and installation of vaccume interrupter suitable for different make 11 kv vcb (panel)1. abb make 092. stelmac make 093. bhel make 094. biecco make 095. crompton greeves 096. yamuna bansion 09 38 suppply and installation of ashida make (aditya series), numerical microcontrollerbased 4 pole, 3 o/c + 1e/f idmtprotection relay, type adr 141afeatureauxilary voltage : 18 250 volt ac/dc, ct secondary : 1/5 amp. 39 sagging of 33/11kv/lt line on dog/weasel conductor on erected poles. 40 providing & sagging of 33 kv line on panther conductor on erected poles 41 laying of ab conductor for lt line on erected poles. 42 laying of lt xlpe/pvc cable 1cx630/400/240 sq.mm. 43 laying of lt xlpe/pvc cable 3.5cx400/240/150/70 sq.mm. 44 guarding of 33/11kv line. (including g.i. wire and other related items) 45 providing & fixing of guarding angle for 33/11 kv line 46 providing & fixing of i bolt for guarding 47 providing & fixing of aluminium biding wire for guarding 48 providing & fixing of clamp for guarding angle for 11 kv line 49 providing & fixing of earth wire clamp 50 providing & fixing of danger board 51 providing & fixing of barbed wire 52 providing & fixing of stone pad 53 providing & fixing of p.g. clamp 54 fixing of 33/11 kv v type steel cross arm 55 fixing of 11 kv pin insulator with pin 56 fixing of 33 kv pin insulator with pin 57 fixing of disc insulator 45 kn & 70 kn (t&c/b&s) 58 fixing of disc fitting 45 kn & 70 kn (t&c/b&s) 59 providing & fixing of 33 kv/ 11 kv f bracket 60 providing & fixing of packing piece clamp for 33 kv/11 kv with nut & bolts 61 providing & fixing of aluminium lug 150/240/400/630 62 providing & fixing of st pole clamp 63 providing & connecting earthing strip 64 providing & fixing of cable jointing kit o/d 33 kv 3x300 sq.mm. 65 providing & fixing of cable jointing kit i/d 11 kv 3x70 sq.mm. 66 indoor 67 outdoor 68 straight through 69 providing & fixing of cable jointing kit i/d 11 kv 3x120 sq.mm. 70 indoor 71 outdoor 72 straight through 73 providing & fixing of cable jointing kit i/d 11 kv 3x185 sq.mm. 74 indoor 75 outdoor 76 straight through 77 providing & fixing of cable jointing kit i/d 11 kv 3x300 sq.mm. 78 indoor 79 outdoor 80 straight through 81 provinding & fixing of lt h/s jointing kit 3.5x240 straight through 82 provinding & fixing of lt h/s jointing kit 3.5x150 straight through 83 provinding & fixing of lt h/s jointing kit 3.5x70 straight through 84 installation of 11/0.4 kv, 630 kva t/f mobile trolley 85 trolley structure for 630 kva t/f with vehicle tyre,rim,coupling,trolly hook,earthing, painting and related accessories with complete job (accessories shall be provided by contractor) 86 providing & fixing/installation of a 2 type lt panelsupply &erracetionoffactory fabricated&wired metalcladdustandverminprooffloormounting double door type outdoor application,with m.s. channel base with bottom and top cable entreis shell be detachable type gland plateelectricalcontrolpanelwithtpnmccbs(fourpole50kawith thermalmagnaticrelease with adjustable over current and short circuit protection, ics=100% icu, suitable for 415 v ac)switchesandinstrument chamber etc.complete in all respects. the instrument chamber shallbeseparate and incomming section connecting with proper horizental /vertical busbar and outgoing section cable alley sectionandshall metering with digital multifuncation meter, with inbuilt selector switches,istrument fuses, red yellow band blue phase indicators in in comming section, currenttransormeretc.the boardshallhave suitablecapacity electrolyticaluminiumbusbarsas peris8623insulatedwithheatshrink color codesleevand mounted on non hygroscopic supports such as cmc/ dmc support with deteachable side covers and shall be suitable for extension on the sides. the switches entryboxesshallbecompletewithsuitablecable end boxes.the jobincludesthe disconnecting anddismentling of existing b 1 type distribution panel including of complete replace old burn cables ends and joint new cable with cable jointers, luges, double compression glands,etc new cables will joint as per connected sizes in incoming and outgoing sectionsgrounting ofthe panel boardas per directionsofengineer incharge.incoming : 400 ampmccb1 noand outgoing 250 amp mccb 03 nos, 160 amp 03 nos. with extended rotary handel,spreder set ,phase barrier etctheswitchboardshallbe fabicated with gelvnized primesheet with a minimum thickness of 1.6 mm/2mm. with c 9 tank process powder coated other conditions also 87 providing & fixing/installation of a 3 type lt panelsupply &erracetionoffactory fabricated&wired metalcladdustandverminprooffloormounting double door type outdoor application,with m.s. channel base with bottom and top cable entreis shall be detachable type gland plateelectricalcontrolpanelwith tpnmccbs(fourpole50kawith thermalmagnaticrelease with adjustable over current and short circuit protection, ics=100% icu, suitable for 415 v ac)switchesandinstrument chamber etc.complete in all respects. the instrument chamber shallbeseparate and incomming section connecting with proper horizental /vertical busbar and outgoing section cable alley sectionandshall metering with digital multifuncation meter, with inbuilt selector switches,istrument fuses, red yellow band blue phase indicators in in comming section, currenttransormeretc.the boardshallhave suitablecapacity electrolyticaluminiumbusbarsas peris8623insulatedwithheatshrink color codesleevand mounted on non hygroscopic supports such as cmc/ dmc support with deteachable side covers and shall be suitable for extension on the sides. the switches entryboxesshallbecompletewithsuitablecable end boxes. incoming : 630ampacb 1 noand outgoing 250 amp mccb 5 nos and 100 amp mccb 2 nos with extended rotary handel,spreder set ,phase barrier etctheswitchboardshallbe fabicated with gelvnized primesheet with a minimum thickness of 1.6 mm/2mm. with c 9 tank process powder coated.the jobincludesthe disconnecting anddismentling of existing a 3 type distribution panel including of complete replace old burn cables ends and joint new cable with cable jointers, luges, double compression glands,etc new cables will joint as per connected sizes in incoming and outgoing sectionsgrounting ofthe panel boardas per directionsofengineer incharge. 88 providing & fixing/installation of a 1 type lt panelsupply &erectionoffactory fabricated&wired metalcladdustandverminprooffloormounting double door type outdoor application, with m.s.channel base with bottom and top cable entries shall be detachable type gland plateelectricalcontrolpanelwithtpnacb(65 ka,4pole elect draw out , micro processer release icu=icw=ics 1sec) with short circuit protectionand tpnmccbs(fourpole50kawith thermalmagneticrelease with adjustable over current and short circuit protection, ics=100% icu, suitable for 415 v ac)switchesandinstrument chamber etc. complete in all respects. the instrument chamber shallbeseparate and incoming section connecting with proper horizontal /vertical busbar and outgoing section with cable alley sectionandshall metering with digital multifunction meter with inbuilt selector switches,instrument fuses, red yellow and blue phase indicators in incoming section, currenttransformeretc.the boardshallhave suitablecapacity electrolyticaluminumbusbarsas peris8623insulatedwithheatshrink color codesleeveand mounted on non hygroscopic supports such as cmc/ dmc support with detachable side covers and shall be suitable for extension on the sides. the switches entryboxesshallbecompletewithsuitablecable end boxes. (incoming : 1250ampacb1 noand outgoing 400 amp mccb 6 nos and 250 amp mccb 2 nos with extended rotary handel,spreder set ,phase barrier etc) theswitchboardshallbe fabricated with galvanized primesheet with a minimum thickness of 1.6 mm/2mm. with seven tank process powder coated switchgear.the jobincludesthe disconnecting anddismantling of existing a 1 type distribution panel including of complete replace old burn cables ends and joint new cable with cable jointers, luges, double compression glands, etc new cables will joint as per connected sizes in incoming and outgoing sections, the grounding ofthe panel boardas per directionsofengineer incharge. 89 providing & fixing/installation of b 1 type lt panelsupply &erracetionoffactory fabricated&wired metalcladdustandverminprooffloormounting double door type outdoor application,with m.s. channel base with bottom and top cable entreis shell be detachable type gland plateelectricalcontrolpanelwithtpnmccbs(fourpole50kawith thermalmagnaticrelease with adjustable over current and short circuit protection, ics=100% icu, suitable for 415 v ac)switchesandinstrument chamber etc.complete in all respects. the instrument chamber shallbeseparate and incomming section connecting with proper horizental /vertical busbar and outgoing section cable alley sectionandshall metering with digital multifuncation meter, with inbuilt selector switches,istrument fuses, red yellow band blue phase indicators in in comming section, currenttransormeretc.the boardshallhave suitablecapacity electrolyticaluminiumbusbarsas peris8623insulatedwithheatshrink color codesleevand mounted on non hygroscopic supports such as cmc/ dmc support with deteachable side covers and shall be suitable for extension on the sides. the switches entryboxesshallbecompletewithsuitablecable end boxes.the jobincludesthe disconnecting anddismentling of existing b 1 type distribution panel including of complete replace old burn cables ends and joint new cable with cable jointers, luges, double compression glands,etc new cables will joint as per connected sizes in incoming and outgoing sectionsgrounting ofthe panel boardas per directionsofengineer incharge.incoming : 400 ampmccb1 noand outgoing 250 amp mccb 03 nos, 160 amp 03 nos. with extended rotary handel,spreder set ,phase barrier etctheswitchboardshallbe fabicated with gelvnized primesheet with a minimum thickness of 1.6 mm/2mm. with c 9 tank process powder coated switchgear 90 providing & fixing/installation of b 2 type lt panelsupply &erracetionoffactory fabricated&wired metalcladdustandverminprooffloormounting double door type outdoor application,with m.s. channel base with bottom and top cable entreis shall be detachable type gland plateelectricalcontrolpanelwith tpnmccbs(fourpole50kawith thermalmagnaticrelease with adjustable over current and short circuit protection, ics=100% icu, suitable for 415 v ac)switchesandinstrument chamber etc.complete in all respects. the instrument chamber shallbeseparate and incomming section connecting with proper horizental /vertical busbar and outgoing section cable alley sectionandshall metering with digital multifuncation meter, with inbuilt selector switches,istrument fuses, red yellow band blue phase indicators in in comming section, currenttransormeretc.the boardshallhave suitablecapacity electrolyticaluminiumbusbarsas peris8623insulatedwithheatshrink color codesleevand mounted on non hygroscopic supports such as cmc/ dmc support with deteachable side covers and shall be suitable for extension on the sides. the switches entryboxesshallbecompletewithsuitablecable end boxes. incoming : 200 ampmccb1 noand outgoing 125 amp mccb 6 nos with extended rotary handel,spreder set ,phase barrier etctheswitchboardshallbe fabicated with gelvnized primesheet with a minimum thickness of 1.6 mm/2mm. with c 9 tank process powder.the jobincludesthe disconnecting anddismentling of existing b 2 type distribution panel including of complete replace old burn cables ends and joint new cable with cable jointers, luges, double compression glands,etc new cables will joint as per connected sizes in incoming and outgoing sectionsgrounting ofthe panel boardas per directionsofengineer incharge. 91 providing & fixing/installation of c type lt paneldisconeccting and dismentlingof existing c panel and supply,installation testing commisioning offactory fabricated&wired metalcladdustandverminproof double door typeoutdoor application stand mounting,m.s. channel base incliding channel stand with bottom cable entreis the panel boardshall havesuitablecapacity electrolytic alumininum busbars asper is8623 or above istulated with heat shrink sleeving and mounted on nonhygroscopic supports such as cmc/bmc support. panel shall be completewithsuitablecableendboxes, double compression glands. panel comparment having special provision for internal locking system for stop the electricity theft the panelboard shall be fabricated with gelvnized prime sheet with a minimum thickness of 1.6mm/2mm. with seven tank process powder coated. panel haveing proper space for connectingincomming and outgoing cable terminations. 92 providing & laying of hdpe pipe 160 mm od pn 4 pe 80 grade uv stabilized hdpe as per is: 4984 of 6 meter length 93 horizontal drilling underground installation piping hdpe pipe 160mm dia with minimum depth of pipe 1.2 below surface for double circuit length of line 94 laying of 33/11 kv xlpe cable in hdpe pipe/trench/double pole structure/loop etc. 95 digging of trench by excavation of earth 0.90/1.5 mtr. deep put brick on both side, filling of sand & brick on cable & earth ramming and dressing properly with complete job for laying 33/11 kv xlpe cable in trench 96 laying of u/g lt xlpe cable 3.5x70/150/240 with complete job 97 installation of d.o. fuse set of 11 kv 98 supply, install, testing and commisioning of 11 kv 630 amps 21 ka for 3 sec. sf6 insulated, one side extesible, outdoor duty 3 way r.m.u. manual operate, in combination of 01 nos. vcb modules (o/g) & 2 nos. load breakerswitch modules (i/c), consitiing of copper busbar in sf6 insulated 304 (non ferrite non magnetic grade) stainless steel enclosure of thickness 2.5 mm with manometer fixed on the tank. the breaker shall have mechanical on/off indicator with hand trip device and spring charging, spring relase coil, auxiliary switch of 02 no +2nc. the hv switchgerar and control gear should be confirming to iec 62271 100, iec 62271 200 2003 & iec 60694 1996. the rmu gas tank should be internal arc tested for 21 ka for 1second with iac afl classification for gas tank. the complete rmu should have ingress protection of minimum ip54. the rmu design should support site replaceable ht cable bushing. all the type test certified as per iec from third party lab to be submitted. rmu should have : 01 nos. micorprocessor based self powered numerical relay with over current/earth fault & short circuit protection wiht each vcb feeder. 3nos. protection ct shall be of burden 2.5 va, ratio 200/1a, class of accuracy class 5p10 for o/c and e/f protection for each vcb. (ct ration is indicative and may vary during detailed engineering) 1 no. manometer for each tank 1 nos. voltage passage indicator for each feeder. 1 nos. fault passage indicator for each lbs module. right angle boots for all the feeder modules basic insulation level of complete system shall be 28kv(rms)/75kv(peak) vacuum interrupter & rmu should be of same make for better life cycle optimization. 99 installation of tpmo of 11 kv 100 providing and fabrication of 33 kv terminal gantry with complete accessories 101 concreting of pole (st 13 mtr./11 mtr.) pcc pole 102 installation & fixing with accessories of 11kv bus coupler 103 provding accessories for 11 kv bus coupler 1250 amp. copper flat with nut & bolt others acc. for connection 02 different i/c 104 removal of old transformer(160/100/63/25/16 kva) with all connected accessories from existing double pole. 105 the construction of new plinth of size 5’x5’x4’ aboveground level and one ft. below the ground level for 400/250 kva transformer 106 installation of following transformer on plinth/double pole with all connecting accessories jumering etc. including carriage of transformers from store centre, mathura to work site. 107 250 kva transformer on plinth 108 100 kva transformer on double pole structure 109 providing and installation of tail less unit complete with structure 110 construction of m.s angle fencing of size (3m x3m x2m) around the plinth of 400/250 kva transformer and gap between the m.s angle should not be more than 65mm. 111 complete gel earthingof 11/0.4 kv 250/400 distribution transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe in pipe) isi mark b grade & connecting with g.i strip of size 50mm x 6mm with neutral/body of 11/0.4 kv distribution transformer to above pipe in pipe (pip) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe in pipe) up to 3 mtr. including making of chamber at the top of the earthing. other details are as below: 1.earth pipe material – mild steel, galvanised.2 main electrode diameter – 42.4mm.3 auxiliary electrode pipe, diameter – 76mm.4 wall thickness of main electrode : 2.6mm.5 wall thickness of auxiliary ist whole: 3.2mm.6 length of earthing electrode (pip): 3 meter. 112 road restoration kaccha/pakka 113 dismantling of single support st/rail pole(13/11/9mtr.) with complete accessories and cartage of material from work site to store center, mathura. 114 dismantling of ht line and cartage of material from work site to store centre, mathura. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39711314 work of strengthening of 33 kv lines at business plan year 2023 24 scheme under edd karwi 2 cartage ofpole & material from store centrefrom any other place to the respective site of work through the kachha pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. 3 stp pole 13 mtr long 4 stp pole 11 mtr long 5 33kv xlpe cable 3x300 sqmm 6 safe cartage of line material viz. conductor, cable, gi earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. 7 erection of stp pole 11/13 mtr longincluding complete. h.t/l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 8 grouting of stp pole 11/13 mtr longper respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 9 fixing & commisioning of earthing comoleteas per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 10 erection and grouting of stay set complete including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t&p etc required for proper completion of work. 11 laying, sagging and binding & jumpring of acsr weasel conductor as per direction of supervising engineer. it including the cost of labour t&p carrier etc required for proper completion of work. 12 fixing & commisioning of 33kv cable jointing kit (3x300sqmm) as per norms complete in all respect as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. (jointing kit arrenge by contractor on is own cost) 13 strengting of tilted pole 14 resagging of loose conductor 15 fabication of hardware items 16 tree looping & chooping ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39711217 under the jurisdiction of power distribution division hamirpur, under frontier power distribution division hamirpur ( 1 ) 33 / 11 kv. 5 m.b.a. in power substation mishripur. work of earthing the sacred transformer no. 2 ( 2 ) b. at 33 / 11 kv power sub station mishripur. c.v. work of changing the channel ( 3 ) work of installation of cube set for protection of medium transformers in 33 / 11 kv power sub station vishripur ( 4 ) 33 / 11 kv. 24 volt battery and 33 kv battery charger in the power sub station mishripur. l.a. 11 kv. whose outgoing and incoming xlpe kevis change work? 2 33 kv pt 33 kv/110 v (provided by department) 3 xlpe cable 3x185 sqmm for 11 kv line (provided by department) 4 11 kv 3 core 185 mm xlpe cable (provided by department) 5 11 kv 3 core 120 mm xlpe cable (provided by department) 6 11 kv cable jointing kit 185 sqmm (indoor & outdoor) (provided by department) 7 11 kv cable jointing kit 120 sqmm (indoor & outdoor)(provided by department) 8 33 kv lightening arrestor(provided by department) 9 33 kv vcb with double t/f control panel & ct 400/200/100 amp(provided by department) 10 painting of substation structure and equipment 11 structure for pt 12 alluminium lugs 1000 sqmm 13 11 kv switchgear i/c 600/300/5a 350 mva 14 11 kv switchgear o/c 200/100/5a 350 mva 15 laying of 11 kv cable including cost of sand & bricks 16 structure for lightening arrestor 17 24 volt battery & battery charger with cabinet 18 cost of gi pipe 32 mm dia 19 cost of copper core 750 gm weight 20 cost of copper wire 6 swg 21 copper bond 22 pipe boarging earthing 23 control cable 4x2.5 mmsq 24 control cable 2x2.5 mmsq 25 make hold of size 18 mm dia in gi pipe 26 11 kv dropper angle (for fuse set) 27 11 kv pollymer pin insulator 28 holding clamp with nut & bolt 29 sub station base angle for lt fuse set 30 s/s holding clamp with n & b 31 lt shackle insulator (100x115 mm) 32 8 bolt with nut of shackle insulator (full thread) 33 wooden board (48x24x1.5) size 34 3.5x150 mm lt pvc cable 35 lt crimping thimble lug 240 mm2 36 1x150 mm lt pvc cable (lt stud to do fuse set) 37 l/z copper clammp (thickness of 10 mm & lenth 300 mm) 38 earthing rod 39 gi wire 5/6 swg 40 earth wire thimble lug 41 fuse wire 20 swg/ 18 swg/16 swg 42 fuse wire 12 swg/10 swg/8swg 43 pipe boaring earthing ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39710462 tender for various works under additional business plan in edsd 3, gonda ( edd 4, iglas ) on semi turn key basis 1 st pole 11 mtr. long 2 pcc pole 8.5 mtr. long 3 stone pad (300x300x75 mm) 4 top channel (125x65x3240mm) (10.70 kg/m) 5 v type steel cross arm with clamp 6 33 kv v type steel cross arm with clamp 7 33 kv cross arm holding clamps with bolts & nuts 8 11 kv pin insulator with pin complete 9 33 kv polymeric pin insulator with pin complete 10 33 kv polymeric disc insulator 70 kn (b&s type) with fitting 11 m.s. angle iron (65x65x6x4300mm) long bracing with clamp 12 m.s. t off channel with clamp b&n (100x50x1300mm) 13 33 kv f bracket for fitting top channel 14 f bracket for fitting top channel 15 armour rod with ferules 16 earth wire clamp with bolts & nuts 17 danger board with clamp n&b 18 number plate with clamp n&b 19 complete stay (gi stay rod 20x1800mm, stay wire 7/8 swg 10 kg, stay clamp, belt, nut & washer with concreting grouting) 20 stay complete ( for 11 kv) 21 earth of pole by m.s. earthing rod (2500x20mm) and 6 swg erathing wire etc. 22 earthing complete 23 pg clamp 24 bolt, nut & washers 25 barbed wire g.i. 26 red oxide paint 27 aluminium paint 28 phase wire acsr rabbit conductor 29 phase wire acsr dog conductor 30 dismantling and removal of existing conductor/cable/gi wire from the various area preparing their coils and then stacking in the respective je’s (store) as per direction of supervising engineer. it includes the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work. 31 acsr weasel conductor 32 concreating of pole 33 guarding of11 kv line by laying two nos. gi wire parallel and fixing of lacings (tilli) at a distance at 2 3 mtr. as per respo manual and also including the cost of arragement of labour, t & p etc. required for proper completion of work. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39710171 various works under additional business plan in edsd 2, hastpur ( edd 4, iglas ) on semi turn key basis 1 st pole 11 mtr. long 2 stone pad ( 300x300x75 mm ) 3 top channel ( 125x65x3240mm ) ( 10.70 kg / m ) 4 dropper channel ( 100x50x2028mm ) 5 v type steel cross arm with clamp 6 11 kv pin insulator with pin complete 7 33 kv polymeric pin insulator with pin complete 8 11 kv disc insulator with fitting 9 33 kv polymeric disc insulator 70 kn ( b&s type ) with fitting 10 33 kv cross arm holding clamps with bolts & nuts 11 guarding angle with clamp 12 m.s. angle iron ( 65x65x6x4300mm ) long bracing with clamp 13 m.s. t off channel with clamp b&n ( 100x50x1300mm ) 14 f bracket for fitting top channel 15 11 kv tpmo with fixing clamp 16 11 kv fuse set with fixing clamp 17 armour rod with ferules 18 earth wire clamp with bolts & nuts 19 danger board with clamp n&b 20 number plate with clamp n&b 21 stay complete 22 stay wire ( 4.00mm ) 7 / 8 swg ( gss wire ) 23 m.s. earthingrod ( 2540x20mm ) 24 earthing complete 25 pg clamp 26 pg clamp panther to dog 27 pg clamp dog to dog 28 bolt, nut & washers 29 11 kvjointing kit 3x185 sq.mm. outdoor 30 11 kvjointing kit 3x185 sq.mm. indoor 31 11 kv cable jointing kit 3x300 sq.mm indoor 32 11 kv cable jointing kit 3x300 sq.mm outdoor 33 g.i. wire 5 mm 65 wg 34 g.i. wire 10 swg 35 g.i. wire 08 swg 36 barbed wire g.i. 37 red oxide paint 38 aluminium paint 39 phase wire acsr rabbit conductor 40 phase wire acsr dog conductor 41 33 kv bus insulator 800 a 42 structure for 33 kv bus insulator with plinth & foundation 43 33 kv post insulator set 44 structure for 33 kv post insulator ( 3 nos. ) with plinth & foundation 45 33 kv ligtning arrestor 46 structure for 33 kv lightning arrester ( 3 nos. ) with plinth & foundation 47 33kv fuse set 48 structure for 33 kv fuse set ( 3 nos. ) with plinth & foundation 49 90 lbs rail pieces ( 44.64 kg ) 50 11 kv vcb incoming ctr 600 / 300 5a, 350 mva630a 51 11 kv vcb outgoing ctr 200 / 100 5a, 350 mva 52 11 kv 3x185 sq.mm xlpe cable 53 11 kv 3x300 sq.mm xlpe cable 54 laying of 11 kv xlpe cable ug includnig cost of sand and bricks by open tranch method 55 outdoor equipment earth mat 56 indoor equipment earth mat 57 chemical pipe earthing as additional earthing ( for t / f, la, ct & pt ) with gi strip ( 50x6 mm ) 58 making of 11 kv cable boxes mounted with switchgears and transformers. 59 10 mva 33 / 11 kv power transformer with accessories 60 05 mva 33 / 11 kv power transformer with accessories 61 05 mva power transformer plinth of size 3.46x4.46 mtr. having 0.5 mtr. below ground level and 0.4 mtr. above ground level. 62 4x2.5 sq.mm control cable 63 2x2.5 sq.mm control cable 64 painting of indoor equipments 65 sundries 66 24 volt battery & battery charger set 67 demounting & carriage of following capacity transformer due to overloaded including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. 68 08 mva 33 / 11 kv power transformer with accessories 69 dismantling and removal of existing conductor / cable / gi wire from the various area preparing their coils and then stacking in the respective je’s ( store ) as per direction of supervising engineer. it includes the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work. 70 acsr weasel conductor 71 acsr rabbit conductor 72 concreating of pole...

Kanpur Electricity Supply Co Limited - Uttar Pradesh

39708859 supply of various type of line hardware items , electrical items : , earth wire 7 / 14 swg as per sample , g.i. barbed wire with clamp as per sample , g.i.wire6 swg as per sample , g.i.wire 8 swg as per sample , stay wire 7 / 10 swg as per sample , stay rod 20x1800 mm as per sample , earthing rod 20x2540 sqmm. as per sample , galvanized mild steel guarding eye bolt as per sample , nut and bolt with off size washer as per sample , danger board with clamp as per sample , lt bracket 18 as per sample , lt bracket 36 as per sample , ms flat 50x6 as per sample , bracing clamp 7½ as per sample , bracing clamp 6½ as per sample , stay clamp 4½ as per sample , stay clamp 5½ as per sample , stay clamp 6½ as per sample , m.s. clamp 4½ as per sample , ms clamp 5½ dia ( 50 x 6 mm ) as per sample , m.s. clamp 6½ as per sample , m.s. clamp 7½ as per sample , c.i. packing 4½ as per sample , c.i. packing5½ as per sample , c.i. packing6½ as per sample , c.i. packing7½ as per sample , pin insulator 11kv as per sample , pin with nut for 11 kv pin insulator as per sample , pin insulator 33kv as per sample , pin with nut for 33 kv pin insulator as per sample , 11 kv disc insulator b&s type 70 kn as per sample , stay insulator as per sample , disc fitting 70 kn b&s type as per sample , ms pipe 200 mm dia as per sample , g.i. pipe 6 dia as per sample , 11 kv drop out fuse set as per specification...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39685082 bill of quantities for repairing, renovation and allied works of 33 / 11 kv sub station s / s geegla, nanau, barbana district hathras. 1 excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (csi no. 4.01) 2 earth filling under floors and/or sub station area including cost of earth when obtained from with in 8 kmoutside uppcl area including its roylty and carriage including watering, ramming in 20 cm layers and dressing of earth etc. all complete. (csi no. 4.10) 3 concrete with 4cm gaugestone ballast, coarse sand (f.m. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (s. no. 5.02) 4 concrete with 4cm gauge i class brickballast, coarse sand (f.m. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundations and under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (csi no.5.01 ) 5 cement concrete with 2cm gauge approved hard stone ballast,coarse sand (f.m. 1.8 to 2.5) and cement in proportion of 4:2:1including supply of all materials, labour,side shuttering ifrequired and t&p etc. required for proper completion of work. (csi no. 5.06) 6 concreting of 40 mm thick rcc trench covers in mild steel framework with rcc 1:1.5:3 in cement,chopan coarse sand(f.m. 1.8 to 2.5) and 2cm gaugegraded hard stone ballast with 3mm thick floating coat of neatcement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (csi no. 5.18) 7 concrete work with 40 mm gauge brick ballast obtained from breaking brick bats (brick bats supplied by the department free of cost) in proportion of 12:6:1 as in csi no. 5.01 includingcost of all labour,materials, t&p etc required for proper completion of work. (csi no. 5.20) 8 rcc work with cement, approved coarse sand(f.m. 1.8 to 2.5) and2 cm gauge graded approved hard stone ballast like granite, quartzite etc from dalla, jhansi or other quarries in proportion 1:1.5:3in lintels of doors and windows, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and t&p. . (csi no. 5.23) 9 rcc work with cement, approved coarse sand(f.m. 1.8 to 2.5) and2 cm gauge graded approved hard stone ballast like granite, quartzite etc from dalla, jhansi or other quarries in proportion 1:1.5:3inslab, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and t&p (csi no. 5.24) 10 first class brick work in 1:6 cement and coarse sand(f.m.1.8 to 2.5) mortar in foundation and plinth including supply of allmaterials, labour & t&p etc. required for proper completion of work. (csi no. 6.01) 11 first class brick work in 1:6 cement and coarse sand (f.m.1.8 to 2.5)mortar in super structure including supply of allmaterials, labour & t&p etc. required for proper completion of work but for walls of one brickthickness . (csi no. 6.01+6.08) 12 first class brick work in 1:4 cement and coarse sand (f.m.1.8 to 2.5)mortar in super structure including supply of allmaterials, labour & t&p etc. required for proper completion of work but for walls of 1/2 brick (115 mm)thickness . (csi no. 6.03+6.09) 13 brick work in foundation & plinth with old dismantledbricks (supplied by department free of cost) and coarse sand of f.m. 1.8 to 2.5mortar in 1:6 including supply of all other materials, labour, removing mortar & cleaning of old & used bricks,t&p etc complete. (csi no. 6.18) 14 removal of cement mortar from dismantled bricks and stacking in countable position at place as directed by the engineer in charge, including cost of all labour and t&p required for proper completion of work. (csi no. 6.22) 15 supply and filling brick bat in soak pit including all labour,material and t&p etc complete. (for 01 soak pit) (csi no. 6.23) 16 2.5 cm. thick damp proof course of cement concrete consisting of 1 part cement 1.5 parts approved coarse sand (f.m.1.8 to 2.5), and3 parts approved 12 mm. graded stone grit and also including liquidwater proofing material as approved by the engineer incharge in the proportions specified by the manufacturer. (csi no. 7.02) 17 mild steel or iron work in heavy sizes such as trusses built upgates, door frames, record, racks roof work gates etc. wrought torequired form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (csi no. 9.01) 18 tmt/tor steel in plain work such as reinforced concrete orreinforced brick work (when not included in an over all rates)wrought to required shape as necessary including bending forproper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (steel shall be arranged by the contractor) (csi no. 9.03) 19 supply and fixing galvanised mosquito proof jali (16x24 gauge) withm.s. flat of 20 x 3 mm. size, on both sides screwed or welded to windowor door frame. (csi no. 9.18) 20 s/f welded wire mesh size 75x25mm and rectangular made out of 10 swg over m.s. angle frame with m.s. flat with nut and bolt welded as required including cost of drilling holes, bolts, nuts, washer wilding etc as required including cost of all material, labour and t&p etc. required for proper completion of work. exept cost of angle iron flat. (s.no. 9.22) 21 12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and t&p etc for proper completion of work. (csi no. 11.07) 22 12 mm thick plaster with cement mortar consisting of one part of cement & six part of coarse sand(1:6),minimum thickness not to be less then 10 mm including supply of all material, labour and t&p etc for proper completion of work.(csi no. 11.09) 23 2 cm. thick cement plaster in dado or skirting in 1:2 consisting of onepart of cement and two parts of approved coarse sand laid inpanels finished with 3mm.floating coat of neat cement or cementand marble dust in ratio of 5:1 including supply of all materials, labour & t&p etc. required for proper completion of the work. (csi no.11.13) 24 s/mixing approved water proofing compound (cico,dr fixit etc) in cementmortar in plaster or concrete work in the proportion as recommended by the manufacturer. (csi no. 11.15) 25 providing (12x15) mm section groove in plasterincluding all material, labour andt&p etc. required for proper completion of the work. (csi no. 11.16) 26 3 mm thick floating coat of neat cement finish including supply of all materials,labour and t&p etc. required for proper completion of the work.( cement consumption 0.044 bag/sq.m.) (csi no. 11.20) 27 4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and t&p etc, required for proper completion of the work. without base cc (csi no. 12.04) 28 supply and laying 8 mm thickglazed floor tiles of somany, johnson or equivalent make, , laid with1:3 cement and approved coarse sand mortar finished with whitecement slurry, jointing and polishing complete, including supplyof all materials, labour and t&p etc. required for proper completion of the work.(csi no. 12.11) 29 supply and laying 6 mm thickglazed tiles in skirting / dado laid with1:3 cement and approved coarse sand mortar finished with whitecement slurry, jointing and polishing complete,including supplyof all materials, labour and t&p etc. completion required for proper completion of the work.(csi no. 12.12) 30 providing and fixing glass strips of 3.15 mm thickness & 40mm depth in jointsof floor and skirting at the time of laying floors, flush withfloor level including supply of all materials, labour& t&p etc. required for proper completion of work. (csi no. 12.14) 31 supply of 80 mm thick i shaped mechanically compressed inter locking cement concrete paver block manufactured by high pressure & controlled vibration machine having plan dimension 200x(160+120 mm) with minimum 5 mm thick toping of o.p.cement mixed with 25% marble powder. the compressive strength of concrete pavers blocks shall not be less than 30 mpa & 4.5 kg/no. including cost of all material, labour, t&p etc. required for proper completion of work as directed by engineer in charge but excluding g.s.t. which shall be paid extra as per rules. (csi no.12.23) 32 providing and laying18mm. thickkotastonein flooring or skirtingoverbasecementmortar 1:4 mix and jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing and polishing complete and including supply of all materials labour and t&p etc required for proper completion of the work. (csi no. 12.17) 33 painting or varnishing new iron work in small areas or new woodwork with one coat of ready mixed priming paint and one coat ofapproved superior quality ready mix paint luxol or equivalentbrand or varnish including supply of all materials, labour and t&p etc. required for proper completion of the work. paint to be used should conform to the i.s. 103 1950.(csi no. 13.01) 34 as in item 13.01 above but every coat after the first coat. (csi no. 13.02) 35 as in item 13.01 above but for every coat on previously paintedold wood or iron work including its sand papering,rubbing andcleaning as required, for proper completion of work. (csi no. 13.03) 36 one priming coat and one coat oil bound distemper on new work includingsupply of all materials,labour and t&p etc. required for propercompletion of the work. (csi no. 13.08) 37 as in item 13.08 but for every coat after the first coat. (csi no. 13.09) 38 as in item 13.08 but for every coat on previously old oil bound distemper surface. (csi no. 13.10) 39 applying birla or equivalent putty on new interior or exterior surface over one coat of water based cement primer of ici or equivalent brand for smoothening and levelling of the surface as per requirement and direction of engineer i/c including cost of all material, labour, t & p etc required for proper completion of work. (csi no. 13.20) 40 applying birla putty or equivalent putty on previousaly bila putty smoothen surface over one cost of water base cement primer of ici or equivalent brand for smoothining and leveling of the surface as per requirement and direction of e/i including cost of all material , labour and t&p required for proper completion of work.(csi no.13.21) 41 dismantling brick work or stone work in lime or cement mortar andincluding stacking of materials as directed by theengineer in charge within a distance of 60 metres.(csi no. 15.01) 42 dismantling reinforced cement concrete or reinforced brick work,including stacking of dismantled materials as directed by theengineer incharge within a distance of 60 metres. (csi no. 15.03) 43 dismantling cement concrete or brick or granolithic floorsincluding base concrete and including stacking of dismantledmaterials as directed by the engineer in charge within a distanceof 60 metres. (csi no. 15.05) 44 dismantaling doors and windowschowkhatsincluding stacking of materials as directed by engg in charge within a distance of 60 meters. (csi no. 15.10) 45 dismantling existing plaster including disposal of refuse asdirected by the engineer i/c within a distance of 60 m. (csi no. 15.11) 46 renewing panes of 4.8 to 5.7 mm glass including supply of glass with putty and brads including supply of all materials, labour and t&p etc. required for proper completion of the work.(a) glass of 5 mm thick. (csi no. 20.04) (i)same as above itembut 4 mm thick panes. 47 s/laying chicken mesh of (20 mm.)hexagonal heavy quality over roofs of joints of roof as per direction of the engineer in charge.(csi no. 20.21) 48 drilling bore for 150mm dia to be completed as per direction of engineer i/c .(csi no. 19.04)h(i) from 0 m bgl to 90 m bgl. 49 providing110mm dia plain pvc casing pipes (aroma /supreme) (pressure10 kg./ sqcm.) for making tubewell assembly and cartage to boring site, including cost of all labour, materials and t&p required for assembly making and proper completion of work. (csi no. 19.08) 50 providing110mm dia slotted pvc casing pipes (aroma /supreme) (pressure10 kg./ sqcm.) for making tubewell assembly and cartage to boring site, including cost of all labour, materials and t&p required for assembly making and proper completion of work. (csi no. 19.10) 51 supply and fixing of pvc top plug of heavy qualityincluding all labour material & t&p.(csi no. 19.19) a 110 mm dia. 52 supply and fixing c.i. non return valveisi marked and approved make with nuts, bolts, packing etc completeincluding all labour material & t&p.(csi no. 19.23) e 32mm dia. 53 supply and fixing support clamps for column pipesmade out of ms flats, pairs of bolt nuts etc complete with all material, labour, t&p.(csi no. 19.24) e 32 mm dia. 54 supply & installation of electrical control panel of l&t / havells or equivalent make for submersible pump / pumpset containing contractor relay condenser.(csi no. 19.31) a) for 1 h.p pump set single phase 55 supply & installation ofsubmersible pump of k.s.b/ calama. or eqt. make including cost of labour, t&p and material required for completion of work.(csi no. 19.32) a) 1 hp outlet 32mm dia. or more, head 78/30, discharge 1100/2800 lph 56 p/f of 32mm dia upvc pipe of approved quality (isi marked) for tubewell column assembly in 3m lowering with socket (nsi) 57 supply and fixing of submersible cable havelsor equivalent make, for submersible pump complete in all respect.(csi no. 19.33) b) 2.5 mm2 for pumpabove 1 hp and up to 3 hp. 58 supply & fixing of steel wire rope forsubmersible pump including cost of labour, t&p and material required for completion of work.(csi no. 19.34) 59 providing and fixing 15 mm dia jindal, jtc, isi marked g.i. pipes complete with special such as bend, tee, socket, cross, clamp etc earth work including filling the trenches etc required for proper completion of the work. the rate also includes external gi fitting where required, cutting and making good the walls etc and all materials, labour and t&p complete. (csi no. 26.02)a 60 same as above but for 25 mm dia.(csi no. 26.02)c 61 same as above but for 32 mm dia.(csi no. 26.02)d 62 providing and fixing full way 15mm dia g.m. gate valvewith wheel, isi mark heavy quality including supply of all materials, labour and t&p required for proper completion of work.(csi no. 26.04)a 63 gm full way gate valve 20 mm dia.(csi no. 26.04)b 64 gm full way gate valve 25 mm dia.(csi no. 26.04)c 65 providing and fixing pvc connection pipe, 300x15 with 2 brass units isi mark heavy quality including supply of all materials, labour and t&p required for proper completion of work.(csi no. 26.09)a 66 p/f gi unions nominal bore 15 mm, isi mark heavy quality including supply of all materials, labour and t&p required for proper completion of work. (csi no. 26.10)a 67 gi unions 20 mm nominal bore (csi no. 26.10)b 68 gi unions 25 mm nominal bore (csi no. 26.10)c 69 supply and fixing of syntex or equivalent make water storage tank including all materials, labours, t&p etc required for proper completion of work. (csi no. 26.12) 70 p/fbrass bib cock, 15 mm dia (400 gsm) isi mark heavy quality including supply of all materials, labour and t&p required for proper completion of work. (csi no. 26.13)a 71 brass bib cock 15 mm dia. 200 gms( l & k and equi.) (csi no. 26.13)b 72 providing and fixing of 110 mm dia pvc pipe 6 kg/ sq.cm forwith special such as tee, bend, socket, elbow etc including supply of all labour,material,t & p etc complete required for proper completion of work. (csi no. 26.17) 73 providing and fixing 15 mm dia isi approved cpvcpipes complete with special such as bend, tee, socket, cross, clamp etc earth work including filling the trenches etc required for proper completion of the work. the rate also includes concealed gi fitting where required, cutting and making good the walls etc and all materials, labour and t&p complete. (csi no. 26.19) 74 providing and fixing 20 mm dia isi approved cpvcpipes complete with special such as bend, tee, socket, cross, clamp etc earth work including filling the trenches etc required for proper completion of the work. the rate also includes concealed gi fitting where required, cutting and making good the walls etc and all materials, labour and t&p complete. (csi no. 26.20) 75 providing and fixing 25 mm dia isi approved cpvcpipes complete with special such as bend, tee, socket, cross, clamp etc earth work including filling the trenches etc required for proper completion of the work. the rate also includes concealed gi fitting where required, cutting and making good the walls etc and all materials, labour and t&p complete. (csi no. 26.21) 76 providing and fixing first quality white glazed orissa pattern w.c.pan hindware, cera make. size 580 mm.(hindware,cera make) with out p trapincluding supply of all materials,labour and t&p etc.complete. (csi no. 27.01) 77 providing and fixing flat back 465 mm.x 355 mm x 265 mm. size lipped front urinal basin of white glazed earthern ware first quality (hindware, neycer make) i.s.i. marked including supply of all materials,labour and t&p etc. required for proper completion of the work.(csi no. 27.05) 78 providing and fixing 550x400 mm wash hand basin of white glazed earthern ware first quality i.s.i. marked ((hindware,neycer / cera make) including supply of all materials, labour and t&p etc. required for proper completion of the work.(csi no. 27.08) 79 providing and fixing 10 litres low level pvc flushing cistern, complete with all fittings including supply of all materials, labour and t&p etc. required for proper completion of the work. (csi no. 27.12) 80 providing and fixing in position 32 mm. dia p.v.c.waste pipe for wash basin. including supply of all materials,labour and t&p etc.required for proper completion of the work. (csi no. 27.14) 81 supply and fixing of 3 blade ceiling fan 1200 mm of havells or equivalent including all material, t&p etc required for proper completion of work as approved by engineer in charge.(csi no. 28.39) 82 finishing walls with water proof exterior emulsion paint oface (asian) or equivalent brand on already well prepared new wall surfaces with one coat of primer (ici) followed by two coats of ace exterior empulsion paint to give an even shade including thorough washing with water including as per direction of e/i direction of including cost of all materials, labour, t&p etc requried for proper completion of the work (nsi) 83 finishing walls with water proof exterior emulsion paint oface (asian) or equivalent brand on old surfaces to give an even shade including thorough washing with water including as per direction of e/i direction of including cost of all materials, labour, t&p etc requried for proper completion of the work (nsi) 84 supply & fixing of zinc/aluminium alloy coated high tensile steel sheet of 0.50mm thickness have minimum yield strength of 550 mpa with a profile width of 1072mm & efective width of 1015mm of durashine tata blue scope roof & wall sheets as per approved shade & sample by engineering in charge in position on trusses including supply of maerials, labour t&p etc. (nsi) 85 wiring point for light with 1.5 sq. mm.frlsh pvcinsulated multistrand single core copper conductor cable in pvc conduit pipe on surface, complete with 14 swg copper earth continuity wire,gp box ,piano type switch and ceiling rose/angle/ batten holder on 3 mm. thick phenolic laminated backelite sheet etc. complete in all respect, as directed . 2018 pwd 121c 86 wiring point for fan /fresh air fan(light duty exhaust fan) with 1.5 sq.mm.frlsh pvc insulated multistrand single core copper conductor cable in pvc conduit pipe on surface complete with 14 swg copper earth continuity wire, piano type switch & ceiling rose on 3 mm. thick phenolic laminated backelite sheet etc, complete in all respect 2018 pwd 123c 87 wiring point for plug with 1.5 sq. mm.frlsh pvc insulated multistrand single core copper conductor cable in pvc conduit pipe on surface,complete with 14 swg copper earth continuity wire , gp box and piano type switch and socket etc. complete in all respect.2018 pwd 124c 88 supply and wiring of submains with 2 nos. 4 sq mm & with 1 no earth wire of 2.5 sq mm frlsh pvc insulated 1100 v grade single core multistrand copper conductor cable in existing pvc conduit complete, including supply of all material, labour and t & p etc. required for proper completion of the work as directed by engineer in charge 2018 pwd 291 a 89 s&f of 6 amp to 32 amp. spmcb (10 ka) c curve 1002 pwd cat b ...

Matexnet Limited - Uttar Pradesh

39678505 auction sale of scrap ms form box ms wire rope re informcement steel ms template jacks solar street lights lt cab le plastic items iron/ms items incl gi tower parts gi bolt & nuts al conductor mix gi earth wire pp rope aluminium scrap gi sheet wooden scrap...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39665478 under business plan 2023 24 part 2, work of replacement of dilapidated wire of lt line and installation of pole in the middle of long span and construction of new lt line under power distribution division pukhrayan, kanpur dehat. 1 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size st poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 100 / 63 / 25 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 250 / 400 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 erection and grouting of s.t.p double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 7 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of s.t.p four pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 11 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole / old poleas per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of abc of different size ( 3x 50 sqmm , 3 x 95 sqmm and 3 x 120 sqmm ) as per respo manual. 14 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 15 construction of t / f plinth suitable for 250 / 400 kva t / f as per respo norms . 16 mounting of 100 / 63 / 25 kva t / f on the double pole / plinth structure and connection thereof as per respo norms. 17 mounting of 250 / 400 kva t / f on theplinth structure and connection thereof as per respo norms. 18 guarding between two poles like single / double / tri / four poles etc. to guard lt / 11 kv / telephone line , road / river crossing ect. with g.i. wire 6 swg and g.i. wire 8 swgincluding fixing of guarding channel with clamp and nut & bolts etc. as per relevent drawing .all required material will be provided by firm . ( guarding angel , guarding clamp and g.i. wire 8 / 10 swg ) 19 dismantling of existing 33kv / 11 kv / l.t. line and removal of all accessories & fittings from poles, re rolling of conductor and proper stacking and cartage of dismantled conductor & accessories from site of work to dvvnl, store. 20 supply & erection of clamp with n&b all size as per respo norms . 21 supply & erection of g.i. pipe 6 dia as per respo norms . 24 supply & erection of clamp with n&b all size as per respo norms ....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39665465 under business plan 2023 24 part 2, work of replacement of dilapidated wire of lt line and installation of pole in the middle of long span and construction of new lt line under power distribution division jheezhak, kanpur dehat. 1 carriage of various sizepcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size st poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 100 / 63 / 25 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 250 / 400 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 erection and grouting of s.t.p double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 7 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of s.t.p four pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 11 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole / old poleas per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of abc of different size ( 3x 50 sqmm , 3 x 95 sqmm and 3 x 120 sqmm ) as per respo manual. 14 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 15 construction of t / f plinth suitable for 250 / 400 kva t / f as per respo norms . 16 mounting of 100 / 63 / 25 kva t / f on the double pole / plinth structure and connection thereof as per respo norms. 17 mounting of 250 / 400 kva t / f on theplinth structure and connection thereof as per respo norms. 18 guarding between two poles like single / double / tri / four poles etc. to guard lt / 11 kv / telephone line , road / river crossing ect. with g.i. wire 6 swg and g.i. wire 8 swgincluding fixing of guarding channel with clamp and nut & bolts etc. as per relevent drawing .all required material will be provided by firm . ( guarding angel , guarding clamp and g.i. wire 8 / 10 swg ) 19 dismantling of existing 33kv / 11 kv / l.t. line and removal of all accessories & fittings from poles, re rolling of conductor and proper stacking and cartage of dismantled conductor & accessories from site of work to dvvnl, store. 20 supply & erection of clamp with n&b all size as per respo norms . 21 supply & erection of g.i. pipe 6 dia as per respo norms . 22 supply & erection of 33kv i / d & o / d cable box suitable for 33 kv 3x300 sqmm xlpe cable. 25 supply & erection of clamp with n&b all size as per respo norms ....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39665241 tender for under business plan 2023 24 part 2, work of replacement of dilapidated wire of lt line and installation of pole in the middle of long span and construction of new lt line under power distribution division raniya, kanpur dehat. 1 carriage of various sizepcc polesfrom store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various sizest poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 100 / 63 / 25 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 250 / 400 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 erection and grouting of s.t.p double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 7 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 11 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole / old poleas per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 12 laying of abc of different size ( 3x 50 sqmm , 3 x 95 sqmm and 3 x 120 sqmm ) as per respo manual. 13 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 14 construction of t / f plinth suitable for 250 / 400 kva t / f as per respo norms . 15 mounting of 100 / 63 / 25 kva t / f on the double pole / plinth structure and connection thereof as per respo norms. 16 mounting of 250 / 400 kva t / f on theplinth structure and connection thereof as per respo norms. 17 guarding between two poles like single / double / tri / four poles etc. to guard lt / 11 kv / telephone line , road / river crossing ect. with g.i. wire 6 swg and g.i. wire 8 swgincluding fixing of guarding channel with clamp and nut & bolts etc. as per relevent drawing .all required material will be provided by firm . ( guarding angel , guarding clamp and g.i. wire 8 / 10 swg ) 18 dismantling of existing 33kv / 11 kv / l.t. line and removal of all accessories & fittings from poles, re rolling of conductor and proper stacking and cartage of dismantled conductor & accessories from site of work to dvvnl, store. 19 supply & erection of clamp with n&b all size as per respo norms . 20 re sagging of loose conductor....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39665207 under business plan 2023 24 part 2, work of replacement of dilapidated 11 kv feeder wire and installation of pole in the middle of the long span and construction of new 11 kv line under power distribution division pukhrayan, kanpur dehat. 1 carriage of various size st polesfrom store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 100 / 63 / 25 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 250 / 400 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 erection and grouting of s.t.p double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 7 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of s.t.p four pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 11 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole / old poleas per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of abc of different size ( 3x 50 sqmm , 3 x 95 sqmm and 3 x 120 sqmm ) as per respo manual. 14 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 15 construction of t / f plinth suitable for 250 / 400 kva t / f as per respo norms . 16 mounting of 100 / 63 / 25 kva t / f on the double pole / plinth structure and connection thereof as per respo norms. 17 mounting of 250 / 400 kva t / f on theplinth structure and connection thereof as per respo norms. 18 guarding between two poles like single / double / tri / four poles etc. to guard lt / 11 kv / telephone line , road / river crossing ect. with g.i. wire 6 swg and g.i. wire 8 swgincluding fixing of guarding channel with clamp and nut & bolts etc. as per relevent drawing .all required material will be provided by firm . ( guarding angel , guarding clamp and g.i. wire 8 / 10 swg ) 19 dismantling of existing 33kv / 11 kv / l.t. line and removal of all accessories & fittings from poles, re rolling of conductor and proper stacking and cartage of dismantled conductor & accessories from site of work to dvvnl, store. 20 supply & erection of clamp with n&b all size as per respo norms . 21 supply & erection of g.i. pipe 6 dia as per respo norms . 24 supply & erection of 11kv i / d & o / d cable box suitable for 11 kv 3x185 sqmm xlpe cable....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39665096 under business plan 2023 24 part 2, power distribution division jheezhak, kanpur dehat under this, replacing the dilapidated wire of 11 kv feeder and replacing the pole in the middle of the long span. installation and construction work of new 11 kv line. 1 carriage of various size st polesfrom store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 100 / 63 / 25 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 250 / 400 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 erection and grouting of s.t.p double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 7 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of s.t.p four pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 11 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole / old poleas per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of abc of different size ( 3x 50 sqmm , 3 x 95 sqmm and 3 x 120 sqmm ) as per respo manual. 14 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 15 construction of t / f plinth suitable for 250 / 400 kva t / f as per respo norms . 16 mounting of 100 / 63 / 25 kva t / f on the double pole / plinth structure and connection thereof as per respo norms. 17 mounting of 250 / 400 kva t / f on theplinth structure and connection thereof as per respo norms. 18 guarding between two poles like single / double / tri / four poles etc. to guard lt / 11 kv / telephone line , road / river crossing ect. with g.i. wire 6 swg and g.i. wire 8 swgincluding fixing of guarding channel with clamp and nut & bolts etc. as per relevent drawing .all required material will be provided by firm . ( guarding angel , guarding clamp and g.i. wire 8 / 10 swg ) 19 dismantling of existing 33kv / 11 kv / l.t. line and removal of all accessories & fittings from poles, re rolling of conductor and proper stacking and cartage of dismantled conductor & accessories from site of work to dvvnl, store. 20 supply & erection of clamp with n&b all size as per respo norms . 21 supply & erection of g.i. pipe 6 dia as per respo norms . 22 supply & erection of 33kv i / d & o / d cable box suitable for 33 kv 3x300 sqmm xlpe cable. 25 straightening of tilted pole...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

39664825 shifting of all goods, records of the section office in the newly constructed building 33 / 11 kv s / s sector 14 ( old ) , its arrangement and non availability in the new building against ee, eudd munshipulia, lesa, transgomti, lucknow. 2 wiring point for light with 1 mm single core copper wire in heavy guage pvc conduit pipe concealed in wall with 1.5 mm copper wire as earth wire for switch, celling rose & boutton holders. 3 wiring point for plug amp as per item. 4 supply and wiring of sub main box with 2 no. 4mm copper wire 2.5mm earth wire in heavy duty pvc pipe. make havells. 5 dismantaling and fixing of fan and tubelight from old place 16 / 1452 & shifing & fixing to new place sector 14 s / s 6 dismantaling and fixing division address board near office on road. 7 supply and making gi earthing with 50mmx3mtr earth electyrode complete with chemical etc. 8 supply and fixing of mcb 6 amp fitted in mcb box. make havells. 9 safe loading, carriage & unloading office items from old place to new place almirah, tables, cooler, chairs, computer, fan, lights & shifitng all office documents. 10 providing & fixing of new change over. 11 dismantaling locker from old place 16 / 1452 & shifitng & fixing to new place sector 14 old s / s. 12 supply & fixing of cutains. 13 dismantaling & fixing of old ac from old place to new place. 14 supply & fixing of new tubelights....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39664142 various electric work against business plan 2023 24 for quality power supply in aligarh city on semi turn key basis under the area eudd 2, aligarh 1 safe carriage of following material from store centre, sarsol, aligarh to the respective site of work including the work of its loading & unloading at the repective ends and its erection as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work as per resspo norms: 2 st pole 11 meter long 3 st pole 09 meter long 4 earthing rod with earth wire 5 stay complete ( gi stay rod 16x1800mm, 5 kgs. stay wire 7 / 8, stay clamps, insulator, bolts, nuts & washers ) 6 11 kv xlpe cable 3x70sq.mm. 7 11 kv xlpe cable 3x120sq.mm. 8 11 kv xlpe cable 3x185sq.mm. 9 acsr weasel conductor 10 acsr dog conductor 11 ab cable 3x120+1x95+x16 sq.mm. 12 ab cable 3x95+1x70+1x16 sq.mm. 13 distribution transformaer100 kva 14 distribution transformaer250 kva 15 distribution transformaer400 kva 16 11 kv d.o. fuse set 17 11 kv tpmo 18 11 kv pin insulator with pin 19 11 kv pin with nut 20 11 kv polymer pin insulator with pin 21 11 kv disc insulator 22 11 kv discfitting 23 11 kv f clamp 24 l.t. pvccable 1x400 mm. 25 l.t.xlpe cable 3.5x400 mm. 26 lt incoming panel with metering equipment 27 11 kv v type cross arm 28 gi wire 8 swg 29 distribution box with clamp 30 11 kv cable jointing kit 3x70sq.mm. ( outdoor type ) 31 11 kv cable jointing kit 3x120sq.mm. ( outdoor type ) 32 11 kv cable jointing kit 3x185sq.mm. ( outdoor type ) 33 stone pad 34 abc connector 35 suspension clamp with i hook 36 deadend clamp withi hook 37 al lugoff size 38 top channel size 125x65x2240 mm. 39 dropper channel size 100x50x2028 mm. 40 tee off chennal size 125x65x1300 mm. 41 base angle size 75x75x6x2028 mm. 42 pole clamp 43 danger board with clamp 44 barbed wire 45 nut bolt & washer 46 number plate with clamp 47 neutral & body earthing of distribution transformer by digging of pit upto water level depth ( approx. 125 feet ) and then inserting 1 ¼” dia gi pipe of ‘a’ grade, conforming to the requirement of is specification and then connecting the top of the inserted pipe and transformer body through gi strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried out as per resspo norms. 48 construction of plinth at various 11 / 0.4 kv sub station suitable for distribution transformer having size 5’x 5’ x 5’ out which 2’ below the ground. work will include digging of foundation 2’ deep & brick work with ist class bricks having cement and sand mortar of ratio 1:6 on all the walls, each of 9” thickness. the area inside the wall shall be duly filled by mud up to the height of appropriate level from ground level and shall be duly watered & rammed. above the filling c.c. of ration 1:6:12 ( cement sand and brick ballast ) giving 4” layer shall be provided. above c.c. layer rcc layer having 4” thickness and with ratio 1:2:4 of cement sand and stone ballast shall be provided re enforcement shall be provided by providing net of ( 8 nos. + 8 nos. ) m.s. rods of size 10 mm dia and each of 5’ length in the middle of the top of c.c. layer. the plinth shall be plastered with 12mm thick plaster in ratio 1:4 at all sides. this work will include cost of labour, t&p and all material required for construction of plinth which shall be provided by the contractor as per resspo norms. 49 providing and fixing of welded wire mesh fencing around transformer plinth with m.s. angle of size 35x35x6 mm. length and 1.20 meters height, such panels shall be supported on m.s. angle from of size 40x40x6 mm. having 04 nos. corner supports of height 1.65 meters including extended legs for grouting which will be used as a door for entry of the personnel or removal / shifting of transformer with welded hinges, sliding belt etc. for locking the arrangement as per drawing and specifications the fencing will be painted one coat of red oxide primer and then two coats of bus green synthetic enamel paint. the rates should be inclusive of all materials required for proper completion of above work ( length of each fencing approx. 11 meters ) 50 dismantling and removal of following material from the existing line and then stacking in the respective je’s ( store ) as per direction of supervising engineer. it includes the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work. 51 dismentling of old and used conductor / abc / xlpe cabel 52 dismentling of old and used st pole 53 dismentling of old and used iron scrap 54 dismentling of 63kva distribution transformer 55 dismentling of 100kva distribution transformer 56 dismentling of 250kva distribution transformer...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39664077 system improvement work under additional business plan 2023 24 on semi turn key basis in the area of edd ii, mathura 1 pcc pole8.5 mtr. long 2 st pole 11 mtr. long sp 55 (bottom portion galvanized) 3 st pole 13 mtr. long sp 55 (bottom portion galvanized) 4 11 kv vcb i/c ctr 600/300/5a, 350 mva 5 11 kv vcb o/g ctr 200/100/5a, 250 mva 6 11/0.4 kv 400 kva transformer 7 11/0.4 kv 250 kva transformer 8 11/0.4 kv, 100 kva t/f 9 acsr dog conductor 10 acsr weasel conductor 11 arial bunch conductor 3x95 sqmm 12 arial bunch conductor 3x120 sqmm 13 lt pvc cable 1x240 sqmm 14 lt pvc cable 1x400 sqmm 15 lt 1x630 sqmm xlpe cable 16 lt 1x400 sqmm xlpe cable 17 lt 1x240 sqmm xlpe cable 18 11 kv3x185 sqmm xlpe cable 19 11 kv 3x300 sqmm xlpe cable 20 11 kv v type x arm 21 11 kv pin insulator with pin & nut 22 11 kv disc insulator with fitting 23 11 kv stay set complete 24 distribution panel 25 x arm clamp 26 distribution box with clamp 27 d/p clamp 28 earthing of pole as per respo norms 29 lt fuse set with clamp 30 jointing kit for 11 kv 3x300 sqmm xlpe cable 31 jointing kit for 11 kv 3x185 sqmm xlpe cable 32 stone pad 33 nut & bolt with washer 34 battery set 24 volt with charger 35 t clamp/ guarding clamp/lt clamp pcc/ p.g. clamp/ danger board clamp/ earth wire clamp etc.with nut & bolt 36 m.s. tee channel 37 ms. top channel for 11 kv line 38 ms dropper channel for 11 kv line 39 m.s. angle t/f base 40 water level earthing 41 body/netural earthing t/f and vcb chemical earthing 42 mash fencing of sub station 43 the construction of new plinth of size 6’x6’x4’ aboveground level and one ft. below the ground level for 400/250 kva transformer 44 concreting of pole as per respo norms 45 concreting of stay as per respo norms 46 dismantling of existing 250//100/63 kva transformers(1+2+1 = 4 nos.). 11 kv & lt line, pole with associated infra along with cartage from work site to store centre, mathura 47 dismantling of 06 nos. old vcb at various sub stations to store center mathura with associated infra along with cartage from work site to store centre, mathura ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

39664070 system improvement work under additional business plan 2023 24 on semi turn key basis in the area of edd i, mathura 1 pcc pole8.5 mtr. long 2 st pole 11 mtr. long sp 55 ( bottom portion galvanized ) 3 11 / 0.4 kv 400 kva transformer 4 11 / 0.4 kv 250 kva transformer 5 11 / 0.4 kv, 100 kva t / f 6 11 / 0.4 kv, 16 kva t / f 7 acsr dog conductor 8 acsr weasel conductor 9 arial bunch conductor 3x16 sqmm 10 arial bunch conductor 3x50 sqmm 11 lt pvc cable 630 sqmm 12 lt pvc cable 1x240 sqmm 13 lt pvc cable 3.5x400 sqmm 14 33 kv 3x300 sqmm xlpe cable 15 11 kv pin insulator with pin & nut 16 11 kv disc insulator with fitting 17 33 kv pin insulator with pin & nut 18 33 kv disc insulator with fitting 19 11 kv stay set complete 20 33 kv stay set complete 21 11 kv v type x arm 22 33 kv x arm 23 distribution box with clamp 24 dp clamp 25 x arm clamp 26 33 kv f bracket 27 earthing of pole as per respo norms 28 g.i. wire 8 swg 29 jointing kit for 33 kv 3x300 sqmm xlpe cable 30 stone pad 31 nut & bolt with washer 32 barbed wire 33 number plate 34 all. lug 240 sqmm 35 all. lug 400 sqmm 36 11 kv drop out fuse set with clamp 37 p.g. clamp for dog to dog 38 danger board clamp 39 t clamp / guarding clamp / lt clamp pcc / earth wire clamp etc. with nut & bolt 40 m.s. tee channel 41 ms. top channel for 11 kv line 42 ms dropper channel for 11 kv line 43 ms. top channel for 33 kv line 44 ms dropper channel for 33 kv line 45 m.s. angle t / f base 46 m.s. angle iron bracing with clamp 47 guarding angle 48 body / netural earthing t / f chemical earthing 49 mash fencing of sub station 50 the construction of new plinth of size 6’x6’x4’ aboveground level and one ft. below the ground level for 400 / 250 kva transformer 51 concreting of pole as per respo norms 52 concreting of stay as per respo norms 53 dismantling of existing 250 / 100 / 63 kva transformers ( 3+4+14 = 21 nos. ) . 11 kv & lt line, pole with associated infra along with cartage from work site to store centre, mathura...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

39662495 carriage of material from 765 / 400 kv tps bara to 220 kv s / s rewa road, under electy. trans. division ii, prayagraj. shifting, loading & unloading, carriage of following materials at 3x660 mw bara tps in private carrier vehicle. 2 shifting loading of empty t / f oil drum at 765 / 400 kv bara tps switchyad. 3 shifting loading of acsr bessimis / bull conductor and earth wire drum at 765 / 400 kv bara tps switchyad ( 04 nos. drum ) . 4 shifting loading of power / control cable drum at 765 / 400 kv bara tps switchyad ( 25 nos. drum ) . 5 shifting loading of clamp & connectors in cubical boxes at 765 / 400 kv bara tps switchyad ( 03 nos. wooden box ) . 6 shifting loading of 624 kv lighting arresterat 765 / 400 kv bara tps switchyad. 7 shifting loading of 210 kn disc insulator approx 1200 nosat 765 / 400 kv bara tps switchyad. 8 carriage of following materials from 3x660 mw bara tps to 220 kv s / s rewa road, prayagraj in private carrier vehicle. 9 carriage of empty t / f oil drum in private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km 10 carriage ofacsr bersimis / bull conductordrum in private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km 11 carriage ofacsrpower / control cabledrum in private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km 12 carriage ofclamp & connectors in cubical boxesin private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km 13 carriage of624 kv lighting arresterin private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km 14 carriage of210 kn disc insulator approx 1200 nosin private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km 15 carriage of20 kl oil storage tank in private truck from 765 / 400 kv bara switchyard to 220 kv rewa road store distance approx 40 km including loading and unloading 16 unloading of following materials at 220 kv s / s rewa road, prayagraj 17 unloading and stacking of empty t / f oil drum at 220 kv rewa road 18 unloading and stacking of acsr bessimis / bull conductor and earth wire at 220 kv rewa road ( 04 nos. drum ) . 19 unloading and stacking of power / control cable drum at 220 kv rewa road ( 25 nos. drum ) . 20 unloading and stacking of clamp connector in cubical boxes at 220 kv rewa road ( 03 nos. wooden box ) . 21 unloading and stacking of 624kv lightening arrester at 220 kv rewa road 22 unloading and stacking of 210 kn disc insulator approx 1200 nos. at 220 kv rewa road...