East Central Railway - Uttar Pradesh

35089541 auction sale of fish plate 60 kg 1 mtr ( broken / crack ) , fish plate 60 kg ord ( broken / crack ) , fish plate 52kg ord ( broken / crack ) , ms liner, comp fish plate 52 / 60 kg, rail screw ( broken ) , dog spike ( broken ) ....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35061118 work in deposit scheme under edd 2 moradabad 1 safe carriage of the following material from store centre majhola / jes store to work site including loading and unloading at both ends : 2 13 mtr. / 11 mtr. / 9 mtr. / 8.5 mtr. long pcc / st poles. 3 acsr weasel / dog conductor. 4 11 / 0.4 10 kva transformers. 5 11 / 0.4 25 kva transformers. 6 11 / 0.4 63 kva transformers. 7 11 / 0.4 100 kva transformers. 8 lt a.b.c. cable. 9 11 kv xlpe cable of size 3x70 sq.mm. / 3x120 sq.mm. / 3x180 sq.mm. etc. 10 line material such as cross arms, pin insulators, guarding angles, guarding wire, disc insulators and cable jointing kits etc. 11 ct / pt unit 12 11 kv pilfer proof metering cubical. 13 dismantling of the line by : 14 removing of acsr weasel / dog conductor from all phases on line, making bundle and stacking at a safe place. 15 uprooting of 13 mtr. / 11 mtr. / 9 mtr. / 8.5 mtr. long pcc / st poles. 16 for 11 kv line, single support 13 / 11 / 9 / 8.5 mtr. long st / pcc poles : excavation of foundation pit in size of 75x45 cm. having depth of 1 / 6th of the full length of the support ( pole ) , providing and laying of stone pad ( 300x300x75mm. ) in the bottom of the pit. erection of support ( pole ) complete with fixing of 11 kv v type cross arms and all other accessories by providing stone pad, cross arms, holding clamps, f bracket and nuts & bolts etc. as per respo norms. 17 for 11 kv line, double pole structure with 13 / 11 / 9 / 8.5 mtr. long st / pcc poles : excavation of foundation pit in size of 75x45 cm. having depth of 1 / 6th of the full length of the support ( pole ) . erection of support ( pole ) complete work by fixing of d.p. clamps and all other accessories. the work includes fabrication work and fixing of cross bracing sets, cutting holes complete work as per respo norms. 18 construction of tri pole structure on st poles including fabrication of ms angle channel, cross bracing etc. with proving and fitting of all type of clamps made of ms flat of size 65x8mm. with nuts, bolts & washer, grouting of pole in size of 220x45x45 cm. with cement, sand and brick ballast in the ratio of 1:4:8, as per respo norms. 19 grouting of poles single line support : grouting of support in cc 1:4:6 ( cement, sand and 40 mm. brick ballast ) grouting will be done in the block of size 45cm x 45cm x 1 / 6th of full length of the support upto ground level as per respo norms. 20 grouting of stay rods ( 20x1800mm. ) including all works of excavation, cement concrete in size of ( 0.60x0.60x0.30 ) m in the ratio of 1:4:6 ( cement, sand and 40 mm. brick ballast ) including back filling of soil and proper ramming etc. 21 fixing, tightening and nozelling of stay wire with stay rod and stay insulators with the pole of required tension by providing stay clamps, nuts, bolts etc. 22 earthing of support with ms earth rod of ( 20x2500 ) mm. long including excavation of pit and driving ms rod 3.0m apart from support and 0.5m below the ground level and connecting below the earth electrodes with the help of g.i. wire no.6 swg tightening with nuts and bolts. 23 laying, sagging, stringing and binding of acsr weasel / dog conductor with all other accessories on pole as per respo norms. 24 laying, sagging, stringing and binding of abc conductor with all other accessories on pole as per respo norms. 25 laying of 11 kv xlpe cable of size 3x70 sq.mm. / 3x120 sq.mm. / 3x180 sq.mm. and making connections as per respo norms. 26 filling and fixing of 11 kv outdoor / indoor type cable jointing kits as per respo norms. 27 construction of 11 kv underground line : 28 digging of cable trench in size of 0.45mtr.x1.05 mtr. 29 laying of 11 kv 3x70 / 120 / 185 sq.mm. cable in the trench. 30 providing 150 mm. sand cushion beneath and 150 mm. above the cable. the cable shall be duly protected by 1st class bricks, two on either side and third on top of the cable, laid in the series one after the other. 31 refilling and ramming of the left out soil, closing and trench and levelling. spare cable shall be left in the loop shape at both ends, including providing of all required material and t&p. 32 providing and fixing of danger board with clamp, nut and bolts. 33 providing and fixing of number plate with clamp, nut and bolts. 34 providing and wrapping of barbed wire on 11 kv pcc poles at a height of 2.75 mtr. from the ground level as per respo norms. 35 fitting of 11 kv pilfer proof metering cubical including making proper connections. 36 guarding of 11 kv line with g.i. wire as per respo norms. 37 mounting and fixing of 11 kv ct / pt unit on double pole including making proper connections. 38 fixing of 11 kv 3ph 4w tvm meter at double pole including making proper connections. 39 mounting and fixing of 10 kva transformer onpole including making proper connections. 40 mounting and fixing of 25 kva transformer ondouble pole including making proper connections. 41 mounting and fixing of 63 kva transformer ondouble pole including making proper connections. 42 mounting and fixing of 100 kva transformer ondouble pole including making proper connections. 43 providing g.i. pipe 6” dia for inserting 11 kv xlpe cable for safety of cable on single / double pole by providing and fixing of ms clamp, nuts and bolts. 44 fixing and fitting of single / three phase distribution box on pole for making consumers cable connection complete work. 45 carriage of following from work site to store centre majhola including loading and unloading at both ends : 46 13 mtr. / 11 mtr. / 9 mtr. long st poles. 47 acsr weasel / dog conductor / m.s. scrap. 48 ct / pt unit. 49 11 kv pilfer proof metering cubical....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35046400 work of electrification under business plan ( shukha rahat ) 2022 23 under jurisdiction of edsd akbarpurofedd pukhrayan. 1 carriage of various size 8.5 mtr p.c.c. poles from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size p.c.c. polesfrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 250 / 100 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 carriage of different size 11 kv xlpe cablefrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 7 erection and grouting of 8.5 mtr p.c.c. double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of 8.5 mtr p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 11 fixing of earthing road as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 14 mounting of 250 / 100 kva t / f on the double pole / plinth structure and connection thereof 15 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 16 safe carriage from panki store to site and installation of ctpt double metering unit on double pole of large and heavy consumer as per respo manual 17 safe carriage from panki store to site and installation and grouting of meter pilferunit as per respo manual 18 supply and proper termination of 11 kv difference sizecable jointing kit as per respo norms 19 trimming of tree branches in new 11 kv line 20 laying of lt abc ( 3x50x1x35+1x16 ) as per respo norms 21 supply off brackets with nut bolts as per respo norm 22 supply ofall type clamp with nut bolts as per respo norm...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35046391 work of electrification under business plan ( shukha rahat ) 2022 23 under jurisdiction of edsd pukhrayanofedd pukhrayan. 1 carriage of various size 8.5 mtr p.c.c. poles from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size p.c.c. polesfrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 250 / 100 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 carriage of different size 11 kv xlpe cablefrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 7 erection and grouting of 8.5 mtr p.c.c. double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of 8.5 mtr p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 11 fixing of earthing road as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 14 mounting of 250 / 100 kva t / f on the double pole / plinth structure and connection thereof 15 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 16 safe carriage from panki store to site and installation of ctpt double metering unit on double pole of large and heavy consumer as per respo manual 17 safe carriage from panki store to site and installation and grouting of meter pilferunit as per respo manual 18 supply and proper termination of 11 kv difference sizecable jointing kit as per respo norms 19 trimming of tree branches in new 11 kv line 20 laying of lt abc ( 3x50x1x35+1x16 ) as per respo norms 21 supply off brackets with nut bolts as per respo norm 22 supply ofall type clamp with nut bolts as per respo norm...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35045918 edck 50 / 2022 23 , safe carriage of following pcc / st poles store centre or from any other place to the respective site of work through the kachha pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , pcc pole 8.5 mtr , st pole 9 / 11 mtr , cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , erection of single support including complete h.t / l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc pole 8.5 mtr , stp 9 / 11 mtr. , erection of double pole on pcc pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc poles 8.5 mtr. , erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&pfixing of stay insulator etc. required for proper completion of work. , drilling and cutting of tee off channel, v cross arms.as per specification of uppcl construction manual including including loading and unloading at the both ends. , fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour. , safe carriage of xlpe cable of size 3x ( 35 / 70 / 120 / 185 ) sq. m.m. from store to respective site of work including loading unloading at both ends. , laying of 3x ( 35 / 70 / 120 / 185 ) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material ( except cable ) , labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. , filling of 3x70 / 120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor / indoor type including the cost of labour t&p carrier etc for proper completion of work. , laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , lt abc 3x50+1x35+1x16 bunch conductor , lt abc 1x16 bunch conductor , carriage and installation from store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. , 10 / 16 / 25 / 63 / 100 kva t / f , safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron ( kasganj ) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km. , erection & grouting of 11 kv pilfer proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs. , guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings ( tilli ) at a distance at 2 3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work. , cutting and chipping of tree branches which comes on ht / lt lines. , making the plinth of st poles as per respo norms. , re sagging of loose ht / lt line conductor as per direction of supervising engineer. it includes the cost of labour t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , re tightning of stay complete with nuzelling & binding including cost of labour t&p etc required for proper completion of work. , straightening of tilted pole at various places as per direction of je. , pcc poles 8.5 mtr. / stp pole 9 / 11 mtr. , grouting , pcc poles 8.5 mtr. long as per respo norms , st poles 11 mtr. long as per respo norms , installation of extra “t”on the old erected poles wherever required. , safe carriage of 11 kv ct / pt pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. , installation of 11 kv ct pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. , painting of st pole as per respo norms. , safe carriage of lt distribution box ( three phase ) from store centre soron ( kasganj ) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms. , providing & fixing of nut bolt off size on vendors cost , providing & fixing of f clamp & holding clamp for st / pcc pole on vendors cost....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35045877 tender for various works under full deposit scheme in edsd iv amanpur in the jurisdiction of edd (rural), kasganj. , safe carriage of following pcc / st poles store centre or from any other place to the respective site of work through the kachha pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , pcc pole 8.5 mtr , st pole 9 / 11 mtr , cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , erection of single support including complete h.t / l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc pole 8.5 mtr , stp 9 / 11 mtr. , erection of double pole on pcc pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc poles 8.5 mtr. , erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&pfixing of stay insulator etc. required for proper completion of work. , drilling and cutting of tee off channel, v cross arms.as per specification of uppcl construction manual including including loading and unloading at the both ends. , fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour. , safe carriage of xlpe cable of size 3x ( 35 / 70 / 120 / 185 ) sq. m.m. from store to respective site of work including loading unloading at both ends. , laying of 3x ( 35 / 70 / 120 / 185 ) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material ( except cable ) , labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. , filling of 3x70 / 120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor / indoor type including the cost of labour t&p carrier etc for proper completion of work. , laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , lt abc 3x50+1x35+1x16 bunch conductor , lt abc 1x16 bunch conductor , carriage and installation from store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. , 10 / 16 / 25 / 63 / 100 kva t / f , safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron ( kasganj ) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km. , erection & grouting of 11 kv pilfer proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs. , guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings ( tilli ) at a distance at 2 3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work. , cutting and chipping of tree branches which comes on ht / lt lines. , making the plinth of st poles as per respo norms. , re sagging of loose ht / lt line conductor as per direction of supervising engineer. it includes the cost of labour t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , re tightning of stay complete with nuzelling & binding including cost of labour t&p etc required for proper completion of work. , straightening of tilted pole at various places as per direction of je. , pcc poles 8.5 mtr. / stp pole 9 / 11 mtr. , grouting , pcc poles 8.5 mtr. long as per respo norms , st poles 11 mtr. long as per respo norms , installation of extra “t”on the old erected poles wherever required. , safe carriage of 11 kv ct / pt pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. , installation of 11 kv ct pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. , painting of st pole as per respo norms. , safe carriage of lt distribution box ( three phase ) from store centre soron ( kasganj ) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms. , providing & fixing of nut bolt off size on vendors cost , providing & fixing of f clamp & holding clamp for st / pcc pole on vendors cost....

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

35045820 shifting of lines for road widening on deposit of pwd under ee, edd, fatehpurunder edc barabanki, mvvnl, barabanki 1 safe loading carriage including unloading and proper stacking of following materials from central store barabanki / je store to site of work. 2 stppole 11met. long. 3 stp 13 meter long 4 pcc pole 8.5 met. long. 5 s / s base angel 6 t off channel. 7 acsr weasel conductor 8 dog conducter 9 33kv top channel with clamp 10 33kv disc with fitting 11 33kv stay set 12 33 kv pin with nutt 13 33 kv pin insulater 14 33 kv x arm 15 abc ( 3x120+1x95+1x16 ) 16 11 kv xlpe 3x185 sqmm cable. 17 11 cable jointing kit 3x185 o / d type 18 abc ( 1x25+1x160 ) 19 11 kv x arm. 20 11 kv x arm.holding clamp 21 f bracket. 22 11kvpininsulater with pin 23 11kv polymer discinsulator with fitting. 24 gi wire 6 / 10 no. swg 25 stay set complete 26 earthing set 27 m.s. angle iron 65x65x6mm bracing with 4 clamp 28 barbed wire 29 lt xlpe cable 3.5x70 sqmm 30 lt alu cable 1x400sqmm 31 dragging of pole from je dump store to site. 32 erection, grouting, plinthing, of single pcc / stp pole 8.5 mtr long for stringing and sagging of line of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm. 33 erection, grouting, plinthin of substation type double pole with st pole 11 mt long including mounting of |top channal dropper channel, base angle 11 kv line including grouting of support and plinthing 300 mm above gound level, fitting of 11 kv pin & insulator. 1 / 6 of total length of poles will emain under the ground and planted on stone pad of size 300x300x75 mm. 34 erection of stay set of 16x1800 mm rod duly painted with red oxide, anchor plate, thumble turn buckle and stay insulate etc. digging of pit of size of size 0.4x0.6x1.6 mm for grouting 1:3:6 cement concrete, with stay of size 7 / 8 swg, nuzzling & grouting. 35 earthing of t / f with m.s.earthing pod of size 20x2500 mm as per specification. 36 constructions of masonary type t / f plinth of size 2x2x1.5 m with cement coarse sand, sand and brick ballast, filling of sand in the hollow space plastering outer surface in ratio 1:4:6 top of the plinth 4” thickness grouting of 2 no. ms channel of size 100x50x2000 mm on the top of the plinth for placement of t / f. all the material will be provided by the contractor. ( vide p 11 of resspo cost schedule 2018 19 ) 37 fabrication & erection of wire mesh rectangle type fencing of size 5 mtr x 3 mtr having height of 2.0 mtr around the transformer with locking arrangement made of ms angle iron of 50x50x6 mm jointed with nuts and bolts. the flat of size 50x6 mm and wire mesh of size 10 swg will be used. ms angle pillers will br grouted in size 350x350x1200 mm inthe ratio of 1:4:6. required painting wil be done as per norms.all the materials will be provided by the contractor at his own cost. 38 boring type earthing of 11 / 0.4 kva substaion by boring and lowering of 25 fit deep or upto water level 1.5 “ dia b class jindal make gi pipe its connection in between transformer and boring with g.i. strip of size 50x6 mm ( all thematerials will be arranged by the contractor. ) 39 sringing and sagging of acsr weasal conductor ( weasel conductor will be provided by the department. ) 40 hoisting of 11 kv xlpe cable on double pole with proper clamping & jumpering. the cable will be passed through ms pipe of 6 dia & pipe will be clamped with pole at the bottom, middle & top of the ms pipe ( all the material will be arranged by the contractor except cable. ) 41 installation and mounting of following capacity of transformer including its connection in between 11 kv providing crimping type aluminium lugs of required sizes ( all the material except transformer will be arranged by the contractor ) 42 shifting of transformer 10 kva with safe energisation . 43 shifting of transformer 16 kva with safe energisation . 44 shifting of transformer 250 / 400 kva with safe energisation . 45 shifting of transformer 25 kva with safe energisation . 46 shifting of transformer 63 kva with safe energisation . 47 providing & fixing of various type materials. all materials shall be supplied by the contractor. 48 nut & bolt 49 top / dropper / grouting clamp. 50 danger board with clamp 51 lt clamp 52 sackle insulater 53 gaurding channel with clamp 54 clamps for top / dropper / toff / gi pipe. 55 11 kv fuse set complete 56 11 kv x arm holding clamps 57 f bracket. 58 33 kv arm holding clamps 59 33 kv f clamps 60 33 kv e bracket 61 m.s. angle iron 65x65x6mm bracing with 4 clamp 62 laying of 11 kv xlpe cable 3x18 sqmm by drilling machine. only cable shall be supplied by the deptt. 63 laying of lt xlpe cable 3.5x70 sqmm 64 laying of alumn. 1x400 sqmm cable. 65 laying of abc ( 1x25+1x160mm ) . 66 laying of abc ( 1x25+1x160mm ) . 67 guarding of 11 kv line. guarding wire shall be supplied by the deptt. 68 cutting & chopping of tree branches. 69 dismentalling of old line, pole etc. 70 carriage of old damaged weasel conductor, old st pole from work site to esc barabanki....

Institute Of Financial Management Training And Research - Uttar Pradesh

35037829 bids are invited for horticulture and landscaping works at ifmtr soil , vermi composte , neem khali , bone meal , coco peat , moss ghass rod , bans ki dandiyan , sutli , fish meal , parle plant tonic , npk , dap , urea , dahalia , marigold jafri , marigod hajara , salvia , glydiolus , panzy , gazania , paper flower , dog flower , impatience , lilium , carnation bulb , sanaria , colius , raninculus , pitunia , vigonia , rose english , rose creaper , calandula , adenium , azaelia total quantity : 3862...

Employees State Insurance Corporation - Uttar Pradesh

35033280 bids are invited for department 1 / 51 artery forceps , air cannula , bipolar wet field cautery , bard parker handle , bone punch , bone gouge , bull dog clamp , capsulorhexis forceps , claymans lens holding forceps , chalazion clamp , chalazion curette , conjunctival scissors , copper ball cautery , corneal scissors universal right left , conjunctival fixation forceps , chisel , calipers , de weckers scissors , endo illuminator with fiberoptic light pipe , eye speculum self retaining , enucleation scissors , iris repositor , iris forceps , lens dialer , lid spatula , lid retractor , lacrimal cannula , lacrimal probes full set , lims forceps , lens hook , mcpherson angled forceps , muscle hook , needle holders coarse and fine , nasal speculum , punctum dilator , plain forceps , phaco chopper , fixation forceps wide , tying forceps jaffe 10 0 suture straight t , tying forceps jaffe 10 0 suture curved t , sterlisation case steel 10 12 0.75 with 2 matts , berke ptosos forceps , khan jaeger lid plate , cilia forceps , muscles hook large , muscles hook oblique , wesstcott tenotomy scissor straight , wesstcott tenotomy scissor curved , castroviejo curved corneal scissor lt , castroviejo curved corneal scissorrt , corneo scleral forceps lt , corneo scleral forceps rt , wills utility forceps , wills utility forceps wide , collibri forceps lt , collibri forceps rt , lambert chalazion forceps clamp large , lambart chalzion forceps clamp small , enucleation spoon , bunge eviseration spoon large , bunge eviseration spoon small , sinsky hook t , vans scissor straight , vans scissor curved , capsular polisher ant and pos , double ended chopper for horizontal and vertical chopping t , koch phaco chopper blunt t , bonn forceps 0,12mm ,12mm teeth length 85 mm t , suture tying straight t , suture tying curved t , hartmen curved haemostate mosquito forceps ss , hartmen straight haemostate mosquito forceps ss , cat paw retractor 4 prong. , cat paw retractor 6 prong. ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35031972 work of electrification under business plan ( shukha rahat ) 2022 23 under jurisdiction of edd ii chaubepur . 1 carriage of various size 8.5 mtr p.c.c. poles from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size p.c.c. polesfrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 250 / 100 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 carriage of different size 11 kv xlpe cablefrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 7 erection and grouting of 8.5 mtr p.c.c. double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of 8.5 mtr p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 11 fixing of earthing road as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 14 mounting of 250 / 100 kva t / f on the double pole / plinth structure and connection thereof 15 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 16 safe carriage from panki store to site and installation of ctpt double metering unit on double pole of large and heavy consumer as per respo manual 17 safe carriage from panki store to site and installation and grouting of meter pilferunit as per respo manual 18 supply and proper termination of 11 kv difference sizecable jointing kit as per respo norms 19 trimming of tree branches in new 11 kv line 20 laying of lt abc ( 3x50x1x35+1x16 ) as per respo norms 21 supply off brackets with nut bolts as per respo norm 22 supply ofall type clamp with nut bolts as per respo norm...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35031625 work of electrification under business plan ( shukha rahat ) 2022 23 under jurisdiction of edd ghatampur 1 carriage of various size 8.5 mtr p.c.c. poles from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size p.c.c. polesfrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 250 / 100 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 carriage of different size 11 kv xlpe cablefrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 7 erection and grouting of 8.5 mtr p.c.c. double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of 8.5 mtr p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 11 fixing of earthing road as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 14 mounting of 250 / 100 kva t / f on the double pole / plinth structure and connection thereof 15 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 16 safe carriage from panki store to site and installation of ctpt double metering unit on double pole of large and heavy consumer as per respo manual 17 safe carriage from panki store to site and installation and grouting of meter pilferunit as per respo manual 18 supply and proper termination of 11 kv difference sizecable jointing kit as per respo norms 19 trimming of tree branches in new 11 kv line 20 laying of lt abc ( 3x50x1x35+1x16 ) as per respo norms 21 supply off brackets with nut bolts as per respo norm 22 supply ofall type clamp with nut bolts as per respo norm...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

35031617 work of electrification under business plan ( shukha rahat ) 2022 23 under jurisdiction of edd i kanpur . 1 carriage of various size 8.5 mtr p.c.c. poles from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size p.c.c. polesfrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 3 carriage of line material viz. weasel conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 250 / 100 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 6 carriage of different size 11 kv xlpe cablefrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 7 erection and grouting of 8.5 mtr p.c.c. double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection and grouting of 8.5 mtr p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 9 erection and grouting of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 10 erection and grouting of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 11 fixing of earthing road as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 12 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 13 laying of different size xlpe cable in the trecnh / gi pipe / hdpe pipe and redressing of trench after laying of xlpe cable for proper completion of work as per respo manual 14 mounting of 250 / 100 kva t / f on the double pole / plinth structure and connection thereof 15 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 16 safe carriage from panki store to site and installation of ctpt double metering unit on double pole of large and heavy consumer as per respo manual 17 safe carriage from panki store to site and installation and grouting of meter pilferunit as per respo manual 18 supply and proper termination of 11 kv difference sizecable jointing kit as per respo norms 19 trimming of tree branches in new 11 kv line 20 laying of lt abc ( 3x50x1x35+1x16 ) as per respo norms 21 supply off brackets with nut bolts as per respo norm 22 supply ofall type clamp with nut bolts as per respo norm...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34998008 electrification work against packages to be sanctioned under deposit head in the area of eudd i, aligarh 1 safe carriage of 11 mtrs. s.t poles / 9 mtrs. st poles / 8.5 mtrs. pcc poles from store centre, sarsol to the respective site of work including the work of its loading & unloading at the repective ends. 2 safe carriage of line material viz. conductor, g.i. earth wire, cross arm, angle, channel, insulators, clamps & other material from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 3 erection of single support by 11 mtrs. s.t poles / 9 mtrs. st poles / 8.5 mtrs. pcc pole including fixing complete ht / lt fittings as per resspo munual including the cost of labour, t&p and carrier etc. required for proper completion of work. 4 grouting of single support ( 11 mtrs. s.t poles / 9 mtrs. st poles / 8.5 mtrs. pcc pole ) as per resspo manual including of the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 5 erection & grouting of 11 mtrs. st double pole including fixing complete ht / lt fitting as per resspo manual including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 6 laying, sagging, stringing, binding & jumpering of acsr weasel conductor / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 7 laying spreading, lifting and final sagging of aerial bunched cable ( all size ) . including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 8 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 9 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 10 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 11 safe carriage of 25 kva / 63 kva / 100 kva distribution transformer fromelectricity store centre, aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 12 neutral & body earthing at 25 kva / 63 kva / 100 kva distribution transformer by drilling / boringa hole of size 200 mm dia and 3000mm long in depth and then inserting the gel earthing electrodes of size 50mm dia and 3000 mm long inside the pit then mix the back fill compound nicely with the soil and re filling the empty space around the earthing electrode including making of chamber at the top of the earthing as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried outas per resspo norms. max neutral to earth voltage should be less than 3 volts and earth resistance should be less than 1 ohm. 13 fabrication of t off channel as per resspo norms. 14 fabrication of top channel as per resspo norms. 15 fabrication of dropper channel as per resspo norms. 16 fabrication of t / f base channel / angle as per resspo norms. 17 fabrication of v type cross arm as per resspo norms. 18 providing / fixing of missing nuts, bolts & washer. 19 providing & fixing of all type lt clmaps 20 safe carriage of 11 kv xlpe cable upto 3x185 sq.mm. from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 21 laying of 11 kv xlpe cable upto 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 22 providing 11 kv cable jointing kit ( o / d & i / d ) upto 3x185 sq.mm. and its filling as per resspo norms. 23 gurading of 11 kv line by laying two nos. gi wire paraller and fixing of lacings ( tilli ) at a distance at 2 3 mtrs. as per respo norms and also including the cost of arrangement of labour, t&p etc required for proper completion of work. 24 safe carriage of ct / pt pole mounting unit and its proper installation on double poole after fixing of channel with m.s. clamps and nuts & bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm.x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. 25 safe carriage of 11 kv pilfer proof metering cubical 10 / 05 amp. and its proper installation at pit site as per resspo manuals...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34997516 electrification work against packages to be sanctioned under deposit head in the area of eudd iv, aligarh 1 safe carriage of 11 mtrs. s.t poles / 9 mtrs. st poles / 8.5 mtrs. pcc poles from store centre, sarsol to the respective site of work including the work of its loading & unloading at the repective ends. 2 safe carriage of line material viz. conductor, g.i. earth wire, cross arm, angle, channel, insulators, clamps & other material from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 3 erection of single support by 11 mtrs. s.t poles / 9 mtrs. st poles / 8.5 mtrs. pcc pole including fixing complete ht / lt fittings as per resspo munual including the cost of labour, t&p and carrier etc. required for proper completion of work. 4 grouting of single support ( 11 mtrs. s.t poles / 9 mtrs. st poles / 8.5 mtrs. pcc pole ) as per resspo manual including of the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 5 erection & grouting of 11 mtrs. st double pole including fixing complete ht / lt fitting as per resspo manual including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 6 laying, sagging, stringing, binding & jumpering of acsr weasel conductor / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 7 laying spreading, lifting and final sagging of aerial bunched cable ( all size ) . including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 8 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 9 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 10 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 11 safe carriage of 25 kva / 63 kva / 100 kva distribution transformer fromelectricity store centre, aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole / placement on plinth including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 12 neutral & body earthing at 25 kva / 63 kva / 100 kva distribution transformer by drilling / boringa hole of size 200 mm dia and 3000mm long in depth and then inserting the gel earthing electrodes of size 50mm dia and 3000 mm long inside the pit then mix the back fill compound nicely with the soil and re filling the empty space around the earthing electrode including making of chamber at the top of the earthing as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried outas per resspo norms. max neutral to earth voltage should be less than 3 volts and earth resistance should be less than 1 ohm. 13 fabrication of t off channel as per resspo norms. 14 fabrication of top channel as per resspo norms. 15 fabrication of dropper channel as per resspo norms. 16 fabrication of t / f base channel / angle as per resspo norms. 17 fabrication of v type cross arm as per resspo norms. 18 providing / fixing of missing nuts, bolts & washer. 19 providing & fixing of all type lt clmaps 20 safe carriage of 11 kv xlpe cable upto 3x185 sq.mm. from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 21 laying of 11 kv xlpe cable upto 3x185 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 22 providing 11 kv cable jointing kit ( o / d & i / d ) upto 3x185 sq.mm. and its filling as per resspo norms. 23 gurading of 11 kv line by laying two nos. gi wire paraller and fixing of lacings ( tilli ) at a distance at 2 3 mtrs. as per respo norms and also including the cost of arrangement of labour, t&p etc required for proper completion of work. 24 safe carriage of ct / pt pole mounting unit and its proper installation on double poole after fixing of channel with m.s. clamps and nuts & bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm.x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. 25 safe carriage of 11 kv pilfer proof metering cubical 10 / 05 amp. and its proper installation at pit site as per resspo manuals...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34978853 tender for construction and shifting of electric line work 2 carriage of line material from store centre hansari to work site errection and commissioning of 11 kv line on single pole work includes earthing, grouting, laying, sagging, strengthing, binding of conductor andall work required to errect the line as per respo manual and rates. 3 pcc pole 8.5 / 9 mtr. long 4 st pole 11 / 13 mtr. long 5 complete stay set ( material will be provided by department ) . 6 complete earthing rod ( material will be provided by department ) . 7 weasel conductor ( material will be provided by department ) . 8 rabbit conductor ( material will be provided by department ) . 9 dog / racoon ( material will be provided by department ) . 10 abc 3x50 ( material will be provided by department ) . 11 abc 3x95 ( material will be provided by department ) . 12 abc 3x120 ( material will be provided by department ) . 13 errection and commissioning ofdouble / tri suport pcc pole 8.5 / 9 meter long / st pole 11 / 13 mtr. long work includes earthing, grouting, laying, sagging, strengthing, binding of conductor andall work required to errect the lineand work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 14 double pole structure for stp 15 double pole structure for pcc 16 concreating of support 17 concreating of stay 18 providing and fixing of nut bolt and washer as per site requirement 19 extra pit digging as per site requirement 20 errection and commissioning of11 / 0.4 kva sub station and material required for ht / lt metering system on pcc pole / meter room incuding all work required for energising the line and work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 21 16 / 25 / 63 / 100 kva transformer. 22 tree & tree branches promming / cutting 23 guarding of 11kv line at road crossing and htline inside of village by laying two nos. g.i wire paraller and fixing of lacing till at a distance at 2 3 mtr. as per respo manual and as per direction of engineer incharge. 24 fixing of distrubution box on pole as per direction of engineer incharge. 25 laying of 11 kv xlpe 3x70 & 3x120 cable as per respo maual and including costof labour. 26 fixing of 11 kv 3x70 & 3x120 i / d and o / d cable boxes 27 carriage of 11 kv metering cubical different ratio 28 instalation of 11 kv metering cubical different ratio 29 dismentlling of old pcc / stp pole 30 dismentlling of old weasal conductor...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34978725 tender for construction and shifting of electric line work 2 carriage of line material from store centre hansari to work site errection and commissioning of 11 kv line on single pole work includes earthing, grouting, laying, sagging, strengthing, binding of conductor andall work required to errect the line as per respo manual and rates. 3 pcc pole 8.5 / 9 mtr. long 4 st pole 11 / 13 mtr. long 5 complete stay set ( material will be provided by department ) . 6 complete earthing rod ( material will be provided by department ) . 7 weasel conductor ( material will be provided by department ) . 8 rabbit conductor ( material will be provided by department ) . 9 dog / racoon ( material will be provided by department ) . 10 abc 3x50 ( material will be provided by department ) . 11 abc 3x95 ( material will be provided by department ) . 12 abc 3x120 ( material will be provided by department ) . 13 errection and commissioning ofdouble / tri suport pcc pole 8.5 / 9 meter long / st pole 11 / 13 mtr. long work includes earthing, grouting, laying, sagging, strengthing, binding of conductor andall work required to errect the lineand work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 14 double pole structure for stp 15 double pole structure for pcc 16 concreating of support 17 concreating of stay 18 providing and fixing of nut bolt and washer as per site requirement 19 extra pit digging as per site requirement 20 errection and commissioning of11 / 0.4 kva sub station and material required for ht / lt metering system on pcc pole / meter room incuding all work required for energising the line and work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 21 16 / 25 / 63 / 100 kva transformer. 22 tree & tree branches promming / cutting 23 guarding of 11kv line at road crossing and htline inside of village by laying two nos. g.i wire paraller and fixing of lacing till at a distance at 2 3 mtr. as per respo manual and as per direction of engineer incharge. 24 fixing of distrubution box on pole as per direction of engineer incharge. 25 laying of 11 kv xlpe 3x70 & 3x120 cable as per respo maual and including costof labour. 26 fixing of 11 kv 3x70 & 3x120 i / d and o / d cable boxes 27 carriage of 11 kv metering cubical different ratio 28 instalation of 11 kv metering cubical different ratio 29 dismentlling of old pcc / stp pole 30 dismentlling of old weasal conductor...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34978369 tender for 03 no work under business plan 2022 23 in the area of edc ii, fatehabad. 1 carriage of following from 132 kv taj agra to 33 / 11 kv substations through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 2 8.5 mtr long pcc poles. 3 25 kvs transformer 4 11 kv 02 no incoming & 04 no outgoing vcb 5 line material viz. aerial bunch conductor / weasal conductor / dog, g.i. earth wire, cross arm, angle, insulators, clamps, stay, earth road and other line materal, if required. 6 cutting of kharanja / mettalic road / concrete portion while digging pit for reection of pcc poles and giving the exact shape after exicution work as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc reauired for proper completion of work. 7 erection of sigle pole on 8.5 mtr, long pcc including fixing of accessories for ht / lt line as per respo manual and as per direction of engineer incharge. 8 erection of double pole on 8.5 / 9 mtr, long pcc including fixing of accessories for ht / lt line as per respo manual and as per direction of engineer incharge. 9 installation and mounting of 25 kva tf of double pole. 10 making stays in 1:4:8 ratio cement, sand and stone ballst, its tightning, binding, nozelling etc of stay wire with stay and stap clamp of pole as per site requirement. 11 eathing of pole as per respo manual and as per direction of supervising engineer including the cost of arrangement of labour, t&p carrier etc required for proper completion of work. 12 acsr weasel c 13 fixing of 11 kv fuel set on double pole. 14 removal of existing 11 kv vcb after opening of all the cable connections, cutting of earthing stripa with the help of gas cutter at above s / s 15 installation of 11 kv vcb in porper alignment and direction and jointing of earthing strips with help of gas welding amaking cable connection at s / s 16 carriage of removed / damaged 11 kv incoming / outgoing vcb from 33 / 11kv s / s to esd agra including and outgoing at respective ends....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34976368 tender for electric work relating to release of commercial connections 2 carriage of fallowings from esc. bsr to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 40 kms. 3 s.t pole 11 mtr. long 4 pcc pole 8.5 mtr long. 5 11 kv 3x120sqmm. cable. 6 carriage of all line material from store center bsr to j.e store sub station as acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 7 erection ofsingle pole stp pole 11 mtr. / pcc pole 8.5 mtr. support including complete 1 it fittings as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 8 erection of double pole stp pole 11 mtr. / pcc pole 8.5 mtr. / scation pole support including complete 1 it fittings as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 9 grouting of single support shall be grouted with cement, sand and birck ballast / stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast / stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 10 grouting of double pole support shall be grouted with cement, sand and birck ballast / stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast / stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 11 carriage of all line material from j.e store sub station to pit site acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 12 cutting / drilling / welding of ms angle iron chanel and clampfor making guarding angle size 65x65x6 / 50x50x6 mm including the work of fixing the bracket on pcc / st pole for construction of the line. 13 making / filling of 11 kv cable jointing kit varius sizexlpe cable 14 fixing of 11 kv stay rod with stay wire in proper way with nozelling 15 grouting of 11 kv stay rods 16 laying, sagging. stringing and binding and jumpering of 11 kv xlpe cable 3*120 square mm & outher size newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 17 laying, sagging. stringing and binding and jumpering of acsr weisal , rabbit, dog newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 18 acsr weisal conductor 19 fixing of earthing rod 20 fixing of pin insulator 21 fixing disc insulator 22 fixing of toff channel 23 fixing of top & droper channel 24 provading & fixing of nut bolt. 25 provading & fixing of water lavel earthing. 26 provading & fixing of gi pipe 6 dia 27 provading & fixing of cable roote marker. 28 provading & fixing of barbad wair. 29 provading & fixing of hdep pipe 140mm 30 panting of pole with red oxider & aluminiem paint 31 provading & fixing of namber plate. 32 provading & fixing of denger plate. 33 garding of line 34 the folloing material is required to be supplied by the contractor. 35 holding clamp. 36 11kv cable jointing kit 3*120 square mm xlpe cable 37 double pole clamp 38 f clamp 39 pg clamp 40 earth clamp 41 stay clamp 42 stay insulator 43 ston pad...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34959828 tender for various maintenance work at 33 / 11 kv shakumbari s / s under edd behat 2 replace and fixing of 33 kv breker damage wiring. 3 replace and fixing of 33 kv breker damage coil. 4 providing and fixing of 33 kv ct damage control cable size 2.5x2mm 5 providing and fixing of 33 kv ct damage control cable size 2.5x4mm . 6 providing and fixing of 33 kv ct damage control cable size 2.5x6mm . 7 replace of brass lug ( 6 lug ) and jumper ( 50 mtr dog ) of bus isolator 8 replace of brass lug ( 6 lug ) and jumper ( 20 mtr dog ) of line isolator 9 replace of brass lug ( 6 lug ) and jumper ( 10 mtr dog ) of fuse set. 10 replace of brass lug ( 6 lug ) and jumper ( 10 mtr dog ) of 33 kv ct. 11 repairing of line and bus isolator 12 repairing of coil, relay and wiring of 33 kv control pannel single t / f. 13 rapiring of battery charger. 14 earhing with copper wire of 33 kv breaker 15 earhing with copper wire of 33 kv control pannel...

Directorate Of Tourism - Uttar Pradesh

34959027 tender for gorakhpur mahotsav 2023 1 stage & sitting area setup 2 erection of main stage at champa devi park including all labour, material, t&p etc complete in all respect for 3 days event as under: 3 supply on rent all infrastructure, erecting temporary main stage ( approx 19 m l x 8 m w size x 1.8 m ht ) with suitable material and required underneath support / prop capable of holding atleast, decoration based on theme gorakpur mahotsav withflowers, fabric, mdf cutoutsand any other composit material as per requirement including backdrop accompnied by theled display screen with sound system complete in all respect of minimum size approx 40 l x 10 h complete in all respect. cloth masking on either side of stage, stage design as per available space for logos of sponsors and flex of gorakhpur mahotsav including stage floor carpeting, two way steps with railing on both sides of stage, furnishing as per approved design and as per directions and satisfaction of secratary mahotsav samiti including transportation, loading, unloading, dismantlingetc complete in all respect. 4 providing on rent, erecting german hanger of 40 m span x 20 m length size with central ht. of about 13.0 m and side ht. of about 6.0 m for covering of main stage with white pvc coated fabric fire retardent and water proof including safron & white color new cloth underneath masking at inside top covering to be fixed / tied seperately including transportation, loading, unloading, dismantlingetc complete in all respect. it is mandatory to keep 40 m clear span i.e. without any central support / prop. 5 supply on rent & erection of german hanger enclouser of about 40 m clear span x 40 m length size of side height of 6.0 mtrs, center height of 13.0 mtrs & covering with white pvc coated fabric fire retardant and water proof including safron & white color new cloth underneath masking at inside top covering to be fixed / tied seperately includingits transportation, loading, unloading, erection, dismantling, all labour, material, t&p etc complete for covering of public sitting area. it is mandatory to keep 40 m clear span i.e. without any centralsupport / prop. 6 additional stage for agricultural / horticultural fest artists including all labour, material, t&p etc complete in all respectfor 7 days eventas under: 7 supply on rent and erection of temporary additional stage of minimum 24 x 36 x 3with carpet top etc, steps on two sides and railing all round the stage area, cloth covering on 3 sides of required height and waterproof covering at top for minimum 5 days event as per approved design and as per directions and satisfaction of secratary mahotsav samiti including its transportation, loading, unloading, erection, dismantling, all labour, material, t&p etc complete. 8 designing and erecting of stage backdrop for additional stage accompnied with star media flex ( based on approved theme ) size 35x10. to be installed with all necessary fixtures, standee, theme based cutouts, podium and resources as per approved design andas per directions and satisfaction of secratary mahotsav samiti. 9 existing dias setup at anexy bhawan in circuit house &yogiraj baba gambhir nath auditorium including all labor, material, t&p etc complete in all respectfor 3 day eventas under: 10 designing and erecting of stage backdrop on existing dias of anexy bhawan accompnied with star media flex ( based on approved theme ) size 35x10.to be installed with all necessary fixtures, standee, theme based cutouts and resources as per approved design andas per directions and satisfaction of secratary mahotsav samiti. 11 designing and erecting of stage backdrop on existing diasof yogiraj baba gambhir nath auditorium accompnied with star media flex ( based on approved theme ) size 35x10. to be installed with all necessary fixtures, standee, theme based cutouts, and resources as per approved design andas per directions and satisfaction of secratary mahotsav samiti . 12 decoration & erection work 13 decoration of main stage at champa devi park as per directions and satisfaction of secratary mahotsav samiti including all labor, material, t&p etc complete in all respectfor 3 day event as under: 14 decoration of main stage with flowers and any other composit material as required approx 1500 sq. ft., decoration of stair cases, barricadings in front of the stage etc with flower and series of garlands, decoration of d area by floral / combination of floral and colour rangoli as per approved theme, supply of flower pots on centre tables placed near stage ( fresh flowers will be replaced on daily basis ) , podium decoration with flowers, providing deep stand & its floral decoration, floral & garland, bouquet for vvips, bouquet ordinary, garland vvip, garland ordinary, rose buds, rose patels as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 15 supplying, laying / fixing linolium flooring about 1700 sq ft on main stage 16 supplying on rent and erecting main entry gate ( about 10 m clear span ) and about 5.0 m height of champa devi park and decoration with theme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 17 supplying on rent and erecting entry gates ( about 7 m x 2.7 m ) of champa devi park and decoration with theme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 18 decoration of buddha entry gate with theme based cut outs etc, flowers, fabric & series of garlands, truss, led / neon light stripand any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samit for 7 days. 19 decoration of additional stage for agricultural / horticultural fest artists as per directions and satisfaction of secratary mahotsav samitiincluding all labor, material, t&p etc complete in all respectfor 7 day event as under: 20 decoration of stage & entry gate with theme based cut outs etc, withflowers and any other composit material as required, decoration of stair cases, barricadings in front of the stage etc with flower and series of garlands, supply of flower pots on centre tables placed near stage ( fresh flowers will be replaced on daily basis ) , podium decoration with flowers complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 21 decoration of existing dias setup at anexy bhawan in circuit house & gates including all labor, material, t&p etc complete in all respectfor 3 day eventas under: 22 decoration of existing dias of anexy bhawan withflowers, series of garlands and any other composit material as required, supply of flower pots on centre tables placed near stage / dias, complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 23 decoration of main entry gate of anexy bhawan with theme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 24 decoration of main entry gate of circuit house with theme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 25 decoration of existing dias of yogiraj baba gambhir nath auditorium withflowers, series of garlands and any other composit material as required, supply of flower pots on centre tables placed near stage / dias, complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 26 decoration of main entry gate of yogiraj baba gambhir nath auditorium with theme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti for 3 days. 27 decoration of regional sports stadium main gate with flowers, fabric, truss and other required material as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 28 decoration of gorakhnath temple main gate withflowers, series of garlands and any other composit material etc complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti. 29 decoration of katchahry club main gate withtheme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samitii for 7 days. 30 decoration of mahant digvijay nath park gates withtheme based cut outs etc, withflowers & series of garlands and any other composit material complete as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samitii for 3 days. 31 light & sound 32 automatedlightingincluding all labor, material, t&p etc complete in all respectas under for 3 days: 33 for main stage providing on rent, testing, operating and maintaining during the event period and dismantling after the end of event, infrastructure as under: trusses 60 x 30 four side , sharphy lights 16 nos, led par rgb 30 nos, par 64 20 nos, profile 02 nos, follow light 1200 watt 01no, blenders 04 nos, desk for automated lighting with operator ( avolite board ) , color filters, smoke machine 01 no, haze machine 01 no, dimmer pack 24 kv 02 nos, t poll 02 nos and led par rgb 10 nos, par 6406 nos with dmx controller, dimmer pack for side stage as per requirment andas per directions and satisfaction of secratary mahotsav samiti. 34 stage soundincluding all labor, material, t&p etc complete in all respectas under for 3 days: 35 providing on rent for main stage, erecting, testing, operating and maintaining during the event period and dismantling after the end of event, infrastructure as under: amplifiers indian from 250 watts to 5000 watts ( a+, p series , ahuja etc ) amplifiers imported from 100 watts to 9000 watts @ 4ohm : ( crown dual channel digital power amplifiers ) corded mikerophone shure sm 58, sm 57 microphone imported sennhiser 200002 no, cordless mikerophone imported shure u4rd 02 nos, lapel mikes, microphone stands as required, speakers ( indian ) , speakers ( imported ) , jbl array fames for suspending vt 4889 24 nos, vt 4880 12 nos, high fi two way speakers, monitorspeakers jbl vrx 915 08 nos, center fill vrx 932 line arry 02 nos, side fill jbl srx 835 04 nos, stage bass dual 18 02 nos, sound mixer sc 48 ch, 32 channel, 16 channel, drum kit mikerophone sennhiser 901 8 pc 01 set, lead guter amo fender 01 no, bass gutaramp hartje550001, key boad ampronald kc 550 01no, di box 10nos, senneheiser g3 in ear monitors with flying anntina 08 nos, wooden poudium with poudium mike 01 no etc as per requirementand as per directions and satisfaction of secratary mahotsav samiti. 36 for agricultural mela as under for 7 days: 37 complete audio system with amplifire a+ 3000watt08 nos, jbl srx 72504 nos, monitor speekers jbl 04 nos, side fill02 nos, corded mike 08 nos, cordless mike shure02 nos, complete audio system, wooden podium with podium mike 01, cd player, digital delay, graphic equalizer, echo champers, podium, sound to be fixed with base and treble and dividedequal., led par 12 nos, beam par10 nos dimmer pack 24 kva 02 nos, dmx player 01 no, public address system by horn 50 nos ( all over the mela ground ) as per requirement and as per directions and satisfaction of secratary mahotsav samiti. 38 for yogiraj baba gambhir nath auditorium as under for 3 days: 39 providing on rent for cordless mikerophone imported shure u4rd 02 nos, lapel mikes, microphone stands as required, speakers ( indian ) , speakers ( imported ) , wooden poudium with poudium mike 01 no etc with its electrical accessories as per requirement and up to the satisfaction of mahotsav samiti. 40 for mahant digvijay nath park as under for 3 days: 41 providing on rent for cordless mikerophone imported shure u4rd 02 nos, lapel mikes, microphone stands as required, speakers ( indian ) , speakers ( imported ) , wooden poudium with poudium mike 01 no etc with its electrical accessories as per requirement and up to the satisfaction of mahotsav samiti. 42 for katchahry club ground as under for 7 days: 43 providing on rent for cordless mikerophone imported shure u4rd 02 nos, lapel mikes, microphone stands as required, speakers ( indian ) , speakers ( imported ) , wooden poudium with poudium mike 01 no etc with its electrical accessories as per requirement and up to the satisfaction of mahotsav samiti. 44 safe house, green room, toilets, stalls and barricading etcincluding all labor, material, t&p etc complete in all respectas under: 45 supplying and erecting temporary water & fire proof safe house ( of standard size / minimum size 5 m x 10 m ) with ply / pagora for v.v.i.p. ) along with attached toilet blockof minimum size 10 x 5 ( made up of ply and covered by white cloth on all sides ) with temporary water supply arrangement with pvc tank, thermus for hot water, sofa covered with new towel cloth, complete new carpet, chair, easy chair, centre table, mirror, new towel, liquid soap, dettol, tissue paper, toilet cleaning facility with a dedicated peon to clean the room daily as per directions etc and all other necessary accessories with proper lighting and room freshner, mosquito repellant etc complete in all respect as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti for 3 days. 46 supplying and erecting temporary water & fire proof green room with complete carpeting ( of about 5 m x 5 m size ) with user sign board with air conditioning / blowers, dressing table with full size mirrors, hooks & hangers for cloths, new hand towels, one microwave oven with catering facility of orange & apple juice, fruits ( bananas, oranges & grapes ) , sandwitches veg, indian snacks ( hot ) , chips, chocolates, mineral water, tea, coffee, soft drinks etc as per requirement and approved design and as per directions and satisfaction of secratary mahotsav samiti for 3 days. 47 supply & erection on rent portable toilets / mobile vacuum toilets ( minimum inner size 3 x 3 ) for artists / vip with cleaning personnel as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti for 3 days. 48 supply on rent & erection of tin stalls 10 frontage x 10 deep with 1 tables and 2 chairs covered with gi tin from top & wall with white cloth covering, making it water proof and ground carpeting as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti for 7 days. 49 supply on rent & erection of tin stalls 10 frontage x 10 deep with 1 tables and 2 chairs covered with gi tin from top & wall with white cloth covering, making it water proof and ground carpeting as per requirement and approved design / plan to be installed at katchahry club ground for shilpi and as per directions and satisfaction of secratary mahotsav samiti for 7 days. 50 supply on rent truss pandal of 150 x 150for science exhibition covered by cloth from three sides and water proof top covering, complete ground carpeting including its transportation, loading, unloading, erection, dismantling and including all labour, material, t&p etc complete in all respect. 51 providing on rent pagora of 5 m x 5 m size for administrative office including its transportation, loading, unloading, erection, dismantling including all labour, t&p etc complete in all respect with ground carpeting, proper lighting, power plug 2 nos for 3 days. 52 supply on rent & erection of octanorm stalls 10 frontage x 10 deep with 2 tables and 2 chairs, power plug / socket and electrical wire connection as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti for 7 days. 53 supply on rent truss pandal of 150 x 150for book fare covered by cloth from three sides and water proof top covering, complete ground carpeting over ply flooring including its transportation, loading, unloading, erection, dismantling and including all labour, material, t&p etc complete in all respect for 7 days. 54 supply on rent & erection of octanorm stalls 10 frontage x 10 deep with 2 tables and 2 chairs, power plug / socket and electrical wire connection for book fare as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti for 7 days. 55 barricating for public area within the pandal, v.i.p parking area, and outside with vertical ballis tied with three rows of horizontal ballies and strong iron mesh covered with good quality of white cloth in every block as per design layout approx 2000 mtrs length, hight 5ft, as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti for 3 days. 56 mojo barricading 57 v.v.i.p single seater sofa 1 no, covered with saffron colour cloth, new towel of saffron colour as per directions and satisfaction of secratary mahotsav samiti for 3 days. 58 banquet chairs with cover for 3 days 59 moulded plastic chairs as per directions and satisfaction of secratary mahotsav samiti for 3 days. 60 moulded plastic chairs as per directions and satisfaction of secratary mahotsav samiti for 3 days. 61 moulded plastic chairs as per directions and satisfaction of secratary mahotsav samiti for 7 days. 62 synthetic matting ( red / green / fancy ) for 3 days 63 centre table with mica top and glass covering for v.v.i.p. ( brand new quality ) for 3 days 64 supply on rent drinking water dispensor of 20 litre capacity with tap and required size table for 3 days including its refilling as and when required. 65 supply and providing drinking water biodegradable disposal glass for 7 days. 66 supplying and erecting min 5 high and 24x12temporary platform covered with cloth and carpet top for media coverage with 1.5 wide ladder to approach the media platform for 3 days 67 supply and erection of temporary europen toilet and urinal including its tin enclosures for ladies and gents seprately having minimum 5 blocks for each with complete provision of proper human waste disposal for 3 days upto the satisfaction of secretary mahotsav samiti. 68 temporary construction of store room 10x20 with gi tin sheet, wood, balli etc. which will be protected by lockable doors for 3 days. 69 supplying on rent big size iron angle tables for sound and led display units for 3 days 70 supply on rent mattress, blanket, bedsheet, pillow etc. for artisans for 7 days 71 supply on rent mattress 4x6 ( good quality ) for 7 days 72 supply on rent thick mattress 2 3 thick ( good quality ) for 7 days 73 supply on rent kanaat 6 high ( full size ) good quality for 3 days 74 supply on rent white chandni ( brand new look ) for 3 days 75 supply on rent cloth walling / view cutter for 3 days 76 supply on rent cloth walling / view cutter for 7 days 77 electrical works in & around the event campusincluding all labor, material, t&p etc complete in all respectas under: 78 providing & fixing 23 watt lamps with holder including necessary wiring etc complete. 79 temporary fixation of tubelights with complete fixtures and wires 80 fixation of 450 watt metel halide light with temporary poles and wires as required 81 providing & fixing temporary halogen lamps 500 watt on 15’ long ballies including necessary wiring etc. complete. 82 providing & fixing of temporary plug point 5 amp including wiring etc. complete. 83 providing & fixing of temporary power point 15 amp including wiring etc. complete. 84 providing & laying temporary under ground cable wiring required for lighting & electrical connection as per requirement. one job 85 change over switch 200 amp tpn for generator its providing and connection complete. 86 panel distribution board and taking temp. connection up to 100 kw load. 87 distributer board of 330 amp and 440 volt 88 metal halides 89 main feeder board as required 90 p / f of lamp 200 watts. 91 patta jhalar with electric wires as required 92 strip led 100 watt 93 jhalar with wires 94 electric sajawat board 95 hot air blowers for stage and vip galary 96 power point connections 97 laying of 3.5 core 25 mm cable with earthing to provide connections to all equipments 98 providing on rent silent diesel generator with fuel, mobil & operator including all other necessary accessories in case of power faliure of required number & capacity and satisfaction of secretary mahotsav 99 providing on rent silent diesel generator with fuel, mobil & operator including all other necessary accessories for uninterrupted power supply of required number & capacity and satisfaction of secretary mahotsav 100 providing on rent silent diesel generator with fuel, mobil & operator including all other necessary accessories for uninterrupted power supply of required number & capacity for mahant digvijay nath park upto the satisfaction of secretary mahotsav for 3 days 101 providing on rent silent diesel generator with fuel, mobil & operator including all other necessary accessories for uninterrupted power supply of required number & capacity for katchahry club park upto the satisfaction of secretary mahotsav for 7 days 102 led par light complete set 103 par light complete set 104 providing and executing ground earthing 105 back drop and hoarding including all labor, material, t&p etc complete in all respect as under: 106 designing and construction of stage backdrop on star media flex ( based on approved theme ) size 35x15. to be installed with all necessary fixtures and resources as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti. 107 side wing panels on star media flex. size 10x5 to be installed at both sides of backdrop as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti. 108 construction of pillars based on approved theme. size 2 cubic feet, 15 high to be installed at mahotsav venue as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti. 109 flex hoarding of 20x10 ft size with colour printing. quoted rates should include its making and fixing charges in different areas of gorakhpur city. approx 30 hoardings as per requirement and approved design / plan and as per directions and satisfaction of secratary mahotsav samiti. 110 printing work including all labor, material, t&p etc complete in all respect as under: 111 front lit flex prints ( multi colours ) 112 vinyl prints ( multicolours ) with sunboard and lamination 8 x 8 inch 113 flex banner with multi coloursprinting of 4 mtrs. size. quoted rates should include it’s making and hanging charges in different areas of gorakhpur city 114 printing and installation of hanging on flex sheet. size 3x5. as directed by the office 115 printing and installation of hanging on flex sheet. size 10x5. as directed by the samiti including all labor, material, t&p etc complete in all respect. 116 printing and installation of arrow marks on flex. size 10x5 117 printing and installation of standees ( multi colour ) at places directed by samiti ofsize 3x7. complete job 118 printing and installation of kiosks ( four colour on flex with fittings ) 3x5 including all labor, material, t&p etc complete in all respect. 119 printing and installation of kiosks ( four colour on flex with fittings ) 4x6 including all labor, material, t&p etc complete in all respect. 120 hiring of vehicle including fuel, lubricant, driver ( excluding toll tax, night charges and parking charges to be paid extra as per actual ) complete in all respect for event period ( 3 days ) as under: 121 rate per kilometre 122 indigo / maruti desire 123 taxi fortuner 124 luxury mini bus ( 24 seater ) 125 toyota innova / mahindra xylo 126 night charges of taxi drivers for outstation vehicles 127 other itemsas under: 128 providing on rent for 3 days, erecting, testing, operating and maintaining during the event period and dismantling after the end of event, infrastructure as under: effect projector with graphics ( capable for different effects ) , 4 nos.l.e.d. display screen 10’x8’ with complete support truss erection for live operational system, with technicial staff including all electrical connections etc complete in all respect suitable for the proper display and size of the main venue as per requirement / approved design and as per directions and satisfaction of secratary mahotsav samiti. 129 zimi zip crane camera with all required infrastructure & operator complete in all respect for 3 days 130 drone camera with battery and trained operator for 3 days 131 coloured cctv camera with complete recording & operating system and one technician for 3 days 132 walky talky ( range 2 km. ) for 3 days 133 covered dustbins ( big size ) at all strategic locations for 7 days 134 security personnel guard for 3 days 135 fire tender enclosure 18 x 12 for 7 days 136 first aid fire fighting systems ( like co2 type, abc type etc ) as per site requirement and standards for 7 days 137 providing on rent coal heaters madeup of ms framefor public to be placed at different locations of ground with 50 kg coal each for 7 days. 138 framing of signage & branding 139 artist requirement as per technical rider ( if needed ) for 3 days 140 video & still coverage of all the events for 7 days 141 refreshment ( tea & coffiee ) & snacks including biodegradable disposable cup & plate for on site administrative meetings during the prepardness for minimum 50 persons for at least two such meetings. 142 refreshment ( tea & coffiee ) & snacksincluding biodegradable disposable cup & plate for closing ceremony of agricultural mela for minimum 100 persons. 143 adequate cleaning and picketing in the entire premises and proper disposal of garbage from the stalls. cleaning of the toilets and sufficient staff for 7 days. 144 providing on rent colourful flags of 3 x 2 size including its verticle rod about 3.0 m ht and fixing / tying it in mahotsav area ( from paidleygang main gate upto mahant digvijay nath ground & in champa devi park for giving festive look to the mahotsav area for 7 days 145 providing on rent and erecting stage ( 32 x 24 ft ) for 7 days 146 masking on rent for 7 days 147 providing on rent wooden tables for 7 days 148 sound system complete 149 20 halogen 150 power plugs 1205 amp 151 power plug 50 15 amp 152 supplying on rent and fixing advertisement ( filled with helium gas ) baloon of about 10 feet diameter for mahotsav brand promotion duly printed as per mahotsav logo / theme upto the satisfaction of mahotsav samiti including required manpower for 7 days 153 providing infrastructure on rent as under for dog show & hot air balloning for 3 days at mahant digvijay nath park 154 barricading 155 plastic chair 156 table with cloth 157 sound systemcomplete 158 halogen 500 watt 159 providing infrastructure on rent as under for sports stadium for 4 days 160 truss with covering 161 carpet 162 centre table 163 table with cloth 164 plastic chair 165 sound system complete 166 flower decoration 167 flex backdrop with framing 168 branding commisioners office sabhagar 169 momentoes 170 momentoes grade a & b as per requirement of mahotsava samiti 171 various printing work for gorakhpur mahotsav 2023 172 letter head 21 cm x 30 cm on 100 gsm excel bond paper 173 invitation card 21.5 cm x 28 cm on 300 gsm art card, both side printed two sheets with envelop on 130 gsm art paper 174 name sticker size 3.7 cmx 9.3 cm on self adhesive paper 175 program leaflet both side printed multicolor on 130 gsm art paper 16 cm x 24 cm 176 car pass 12 cm round multicolourself adhesive sticker 177 sticker for flap self adhesive sticker for envelop flap size 2 cm x 2 cm 178 entry / duty passes with cover &dori 9 cm x 13 cm with plastic cover &dori on 300 gsm art card multicolour 179 certificate 21 cm x 28 cm on 300 gsm art card multicolour 180 certificate with name 21 cm x 28 cm on 300 gsm art card multicolour with framing 181 seminar card & envelope size 14.5 cm x 21 cm on 300 gsm art card multicolour, envelop size15 cm x 21.5 cm 130 gsm art paper 182 programm passes 8 cm x 12.5 cm on 300 gsm art card multicolour 183 souviner book size 21 cm x 27 cm with minimum 52 colour pages & 86 b / w pages on 100 gsm art paper for text, 300 gsm art card for cover laminated and perfect binding...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34942099 tender for erection of new power connection work 1 carriage of various size pcc poles 8.5 mtr. long from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 2 carriage of various size st pole 11 mtr. long form store center or from any other place to the respective site of work distance up to 75 km through the kachha pakka road including the work of its loading & unloading at the respective ends also including the work of its dragging ect. and also including the cost of labour, t&p and carriage ect. required for proper complection of work. 3 carriage of line material viz. weasel / rabbit / racoon / dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work. 4 carriage of 63 / 25 / 16 kva t / ffrom store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work 5 work on existing pole to prepare new ht line as per instruction of sdo / je incharge. 6 erection of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 7 erection of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 8 erection of stay set including the work of nozelling etc. as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work. 9 erection of st single pole 11 mtr. long including the work of complete ht fitting as per direction of sdo / je incharge the cost of labour, t&p annd carriageect. required for proper completion of work. 10 erection of st doule pole 11 mtr. long including the work of complete ht fitting as per direction of sdo / je incharge the cost of labour, t&p annd carriageect. required for proper completion of work. 11 laying, sagging, stringing, binding and jumpering etc. of weasal / racoon / dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work. 12 supply of nut & bolt of all size. 13 supply of f clamp all size. 14 supply of x arm holding clamp all size. 15 supply of d / p clamp all size. 16 mounting of 63 / 25 / 16 kva t / f on the double pole / plinth structure and connection thereof 17 trimming of tree branches for clearness of electric line...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34940324 tender for various work under deposit scheme & other related work under edd i, aligarh cartage of following poles store centre or from any other place to the respective site of work through the kachha pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . 2 pcc poles 8.5 mtr. 3 st poles 11 mtr. 4 cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . 5 erection of single support including complete h.t / l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 6 pcc poles 8.5 mtr / st poles 11 mtr. 7 erection of 11 kv line double pole on pcc / st pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 8 pcc poles 8.5 mtr / st pole 11 mtr. 9 installation & fixing of 11 kv tpmo 10 laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 11 acsr weasal conductor 12 acsr dog conductor 13 drilling and cutting of tee off channel, v cross arms, top channel, cross bracing angle, ms garding angle, dropper chanel. as per specification of uppcl construction manual including including loading and unloading at the both ends. 14 grouting of pcc / st poles as per respo norms including cost of grouting material ( cement: sand: brick ballast ) size as per respo norms. 15 pcc poles 8.5 mtr. 16 st poles 11 mtr. 17 making the plinth of st poles 11 mtr. 18 chopping of tree branches which are touching to 11 kv / lt lines. 19 erection of section tee pole including fixing of all fittings as per respo norms. 20 providing / fixing of missing nut bolts and washer. 21 fixing of earthing rod as per respo manual and as per direction of supervising engineer including the cost of labour 22 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work 23 providing and fixing of stay insulator. 24 safe carriage of transformer from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, t&p and carrier etc. required for proper completion of work. ( distance 0 to 50 km.. 25 25 kva t / f 26 safe carriage of xlpe cable of size 3x70 / 3x120 / 3x185 sq. m.m. from store to respective site of work including loading unloading at both ends. 27 laying of 3x70 / 3x120 / 3x185 sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material ( except cable ) , labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. 28 filling of 3x70 / 3x120 / 3x185 sq.mm. 11 kv xlpe heat shrinkable cable jointing kits outdoor / indoor type including the cost of labour t&p carrier etc for proper completion of work. 29 safe carriage of 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km. 30 erection & grouting of 11 kv pilfer proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs. 31 safe carriage of 11 kv ct / pt pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. 32 installation of 11 kv ct pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. 33 providing & fixing of wearing gi pipe 6” dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply. 34 installation of extra “t” onthe old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, t&p etc. required for proper completion of work. the “t”pole shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement....

Urban Development Department - Uttar Pradesh

34936083 bids are invited for vidhyut samgiri for mrf insulator , mcb 63 fp , mcb 63 tp , tep pvc , mcb bux4 , clip packaging 25 mm , kacha rubber tape , copper lug 70 mm , copper lug 20 mm , pvc gulli 2 inch , ss pech 1.5 inch , electric dog fence wire , copper conductor cable , burring of safe earthing total quantity : 422...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34918712 supply of safe carriage of following pcc / st poles store centre or from any other place to the respective site of work through the kachha pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , pcc pole 8.5 mtr , st pole 9 / 11 mtr , cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , erection of single support including complete h.t / l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc pole 8.5 mtr , stp 9 / 11 mtr. , erection of double pole on pcc pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc poles 8.5 mtr. , erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&pfixing of stay insulator etc. required for proper completion of work. , drilling and cutting of tee off channel, v cross arms.as per specification of uppcl construction manual including including loading and unloading at the both ends. , fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour. , safe carriage of xlpe cable of size 3x ( 35 / 70 / 120 / 185 ) sq. m.m. from store to respective site of work including loading unloading at both ends. , laying of 3x ( 35 / 70 / 120 / 185 ) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material ( except cable ) , labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. , filling of 3x70 / 120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor / indoor type including the cost of labour t&p carrier etc for proper completion of work. , laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , lt abc 3x50+1x35+1x16 bunch conductor , lt abc 1x16 bunch conductor , carriage and installation from store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. , 10 / 16 / 25 / 63 / 100 kva t / f , safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron ( kasganj ) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km. , erection & grouting of 11 kv pilfer proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs. , guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings ( tilli ) at a distance at 2 3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work. , cutting and chipping of tree branches which comes on ht / lt lines. , making the plinth of st poles as per respo norms. , re sagging of loose ht / lt line conductor as per direction of supervising engineer. it includes the cost of labour t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , re tightning of stay complete with nuzelling & binding including cost of labour t&p etc required for proper completion of work. , straightening of tilted pole at various places as per direction of je. , pcc poles 8.5 mtr. / stp pole 9 / 11 mtr. , grouting , pcc poles 8.5 mtr. long as per respo norms , st poles 11 mtr. long as per respo norms , installation of extra “t”on the old erected poles wherever required. , safe carriage of 11 kv ct / pt pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. , installation of 11 kv ct pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. , painting of st pole as per respo norms. , safe carriage of lt distribution box ( three phase ) from store centre soron ( kasganj ) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms. , providing & fixing of nut bolt off size on vendors cost , providing & fixing of f clamp & holding clamp for st / pcc pole on vendors cost....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34918660 various works under full deposit scheme in edsd iv amanpur in the jurisdiction of edd ( rural ) , kasganj. , safe carriage of following pcc / st poles store centre or from any other place to the respective site of work through the kachha pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , pcc pole 8.5 mtr , st pole 9 / 11 mtr , cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . , erection of single support including complete h.t / l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc pole 8.5 mtr , stp 9 / 11 mtr. , erection of double pole on pcc pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. , pcc poles 8.5 mtr. , erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&pfixing of stay insulator etc. required for proper completion of work. , drilling and cutting of tee off channel, v cross arms.as per specification of uppcl construction manual including including loading and unloading at the both ends. , fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour. , safe carriage of xlpe cable of size 3x ( 35 / 70 / 120 / 185 ) sq. m.m. from store to respective site of work including loading unloading at both ends. , laying of 3x ( 35 / 70 / 120 / 185 ) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material ( except cable ) , labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. , filling of 3x70 / 120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor / indoor type including the cost of labour t&p carrier etc for proper completion of work. , laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , lt abc 3x50+1x35+1x16 bunch conductor , lt abc 1x16 bunch conductor , carriage and installation from store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. , 10 / 16 / 25 / 63 / 100 kva t / f , safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron ( kasganj ) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km. , erection & grouting of 11 kv pilfer proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs. , guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings ( tilli ) at a distance at 2 3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work. , cutting and chipping of tree branches which comes on ht / lt lines. , making the plinth of st poles as per respo norms. , re sagging of loose ht / lt line conductor as per direction of supervising engineer. it includes the cost of labour t&p carrier etc. required for proper completion of work. , acsr weasel conductor / rabbit / dog conductor , re tightning of stay complete with nuzelling & binding including cost of labour t&p etc required for proper completion of work. , straightening of tilted pole at various places as per direction of je. , pcc poles 8.5 mtr. / stp pole 9 / 11 mtr. , grouting , pcc poles 8.5 mtr. long as per respo norms , st poles 11 mtr. long as per respo norms , installation of extra “t”on the old erected poles wherever required. , safe carriage of 11 kv ct / pt pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. , installation of 11 kv ct pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. , painting of st pole as per respo norms. , safe carriage of lt distribution box ( three phase ) from store centre soron ( kasganj ) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms. , providing & fixing of nut bolt off size on vendors cost , providing & fixing of f clamp & holding clamp for st / pcc pole on vendors cost....

Indian Army - Uttar Pradesh

34903693 bids are invited for scent reducer with wooden base for detection dog training , scent imprinting square wooden box for dog training , scent imprinting rectangle wooden box for dog training , glass containers for storage of explosives for dog training , metal containers of stainless steel for airtight storage of detection target material , movable trolleys for scenario based article search training of detection dogs. , receptacle large size with shoulder hanging for training of detection dogs. , receptacle small size with shoulder hanging for training of detection dogs. , simulated kiln for explosive detection dog training , simulated morsel for explosive detection dog training , head armor for trg of ied detection dogs , audio simulation system for trg of explosive detection dogs , midget toys for scenario based trg of explosive detection dogs , plastic moving toys for scenario based trg of explosive detection dogs , food and tid bits reward pouches for training of military working dogs , curved jaw pattern forceps length 200 mm stainless steel for explosive handling detection dog trg , transparent disposable hand gloves for explosive detection training , clickers for training of military working dogs , electronic collars for training of military working dogs , dummy weapons , bite sleeve hidden , full bite sleeves , dog bite suit upper for training of military working dogs , padded harness for deployment and training of military working dogs , bite tugs for assault and guard dog training , pillow bite for assault and guard dog training , obedience box for deployment and training of military working dogs , training blinds for hideout simulation for deployment and training of military working dogs , synthetic rugged full bite trg suit for training of assault and guard dogs , reinforced rubber bite developer non toxic triangular kong , reinforced rubber bite developer non toxic round balls with rope , tactical harness with camera mounting...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34903582 electrification work against sanctioned package no. 02, 03, 04, 07, 10 and 11 / eudd i / alg. / 2022 23 under deposit head in the area of eudd i, aligarh 1 safe carriage of following s.t poles / pcc poles from store centre, sarsol to the respective site of work including the work of its loading & unloading at the repective ends. 2 11 mtrs. long s.t.pole 3 9 mtrs. long s.t.pole 4 8.5 mtrs. long pcc pole 5 safe carriage of line material viz. conductor, g.i. earth wire, cross arm, angle, channel, insulators, clamps & other material from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 6 erection of following single support including fixing complete ht / lt fittings as per resspo munual including the cost of labour, t&p and carrier etc. required for proper completion of work. 7 11.0 mtrs. long s.t. pole 8 9 mtrs. long s.t.pole 9 8.5 mtrs. long pcc pole 10 grouting of single support as per resspo manual including of the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 11 11.0 mtrs. long s.t. pole 12 9 mtrs. long s.t.pole 13 8.5 mtrs. long pcc pole 14 erection & grouting of 11 mtrs. st double pole including fixing complete ht / lt fitting as per resspo manual including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 15 laying sagging stringing and binding of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 16 laying sagging stringing and binding of acsr weasel conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 17 laying spreading, lifting and final sagging of aerial bunched cable size3x50+1x35+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 18 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 19 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 20 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 21 safe carriage of 63 kva distribution transformer fromelectricity store centre, aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 22 fabrication of t off channel as per resspo norms. 23 fabrication of top channel as per resspo norms. 24 fabrication of dropper channel as per resspo norms. 25 fabrication of t / f base channel / angle as per resspo norms. 26 fabrication of f braket as per resspo norms. 27 fabrication of v type cross arm as per resspo norms. 28 safe carriage of 11 kv xlpe cable 3x70 sq.mm. from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 29 laying of 11 kv xlpe cable 3x70 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 30 safe carriage of 11 kv pilfer proof metering cubicle and its proper installation at pit site as per resspo manuals 31 providing 3x70sq.mm. 11 kv cable jointing kit ( o / d & i / d ) and its filling as per resspo norms. 32 safe carriage of ct / pt pole mounting unit and its proper installation at pit site as per resspo manuals...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34903561 carrying out the electrification work against sanctioned package no. 19, 20, 22, 23 and 24 / eudd i / alg. / 2021 22 under deposit head in the area of eudd i, aligarh 1 safe carriage of following s.t poles / pcc poles from store centre, sarsol to the respective site of work including the work of its loading & unloading at the repective ends. 2 11 mtrs. long s.t.pole 3 9 mtrs. long s.t.pole 4 8.5 mtrs. long pcc pole 5 safe carriage of line material viz. conductor, g.i. earth wire, cross arm, angle, channel, insulators, clamps & other material from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 6 erection of following single support including fixing complete ht / lt fittings as per resspo munual including the cost of labour, t&p and carrier etc. required for proper completion of work. 7 11.0 mtrs. long s.t. pole 8 9 mtrs. long s.t.pole 9 8.5 mtrs. long pcc pole 10 grouting of single support as per resspo manual including of the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 11 11.0 mtrs. long s.t. pole 12 9 mtrs. long s.t.pole 13 8.5 mtrs. long pcc pole 14 erection & grouting of 11 mtrs. st double pole including fixing complete ht / lt fitting as per resspo manual including the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 15 laying sagging stringing and binding of acsr dog conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 16 laying sagging stringing and binding of acsr weasel conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 17 laying spreading, lifting and final sagging of aerial bunched cable size3x50+1x35+1x16 sq.mm. including fixing of all accessories as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. : 18 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual. 19 fixing & connecting of earthing rods as per resspo manual including the cost of labour, t&p etc. required for proper completion of work. 20 fixing of lt distribution box including making connections of distribution box with lt mains by piercing clamps for aerial bunched cable.the work will also include the opening of the service connection of the consumer and its connecting in distribution box. 21 safe carriage of 25 kva distribution transformer fromelectricity store centre, aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 22 safe carriage of 63 kva distribution transformer fromelectricity store centre, aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole including proper jumpering from 11 kv line to the transformer and also connecting the lt site cables as per resspo manual. 23 neutral & body earthing at 25 kva distribution transformer by drilling / boringa hole of size 200 mm dia and 3000mm long in depth and then inserting the gel earthing electrodes of size 50mm dia and 3000 mm long inside the pit then mix the back fill compound nicely with the soil and re filling the empty space around the earthing electrode including making of chamber at the top of the earthing as per direction of supervising engineer. it includes the cost of all material labour, t&p, carrier etc. required for proper completion of work. the aforesaid work shall be carried outas per resspo norms. max neutral to earth voltage should be less than 3 volts and earth resistance should be less than 1 ohm. 24 fabrication of t off channel as per resspo norms. 25 fabrication of top channel as per resspo norms. 26 fabrication of dropper channel as per resspo norms. 27 fabrication of t / f base channel / angle as per resspo norms. 28 safe carriage of 11 kv xlpe cable 3x70 sq.mm. from store centre, sarsol to the respective site of work including the work of its loading & unloading at the respective ends. 29 laying of 11 kv xlpe cable 3x70 sq.mm. including making proper connections at both ends. the work includes the cost of labour, t&p and carrier etc. required for proper completion of work. 30 providing 3x70sq.mm. 11 kv cable jointing kit ( o / d & i / d ) and its filling as per resspo norms. 31 safe carriage of 11 kv pilfer proof metering cubicle and its proper installation at pit site as per resspo manuals 32 dismantling ofold & used acsr dog conductor form existing line and its safe carriage from site to store as per resspo norms. 33 dismantling ofold & used ms scrap form existing line and its safe carriage from site to store as per resspo norms. 34 safe carriage of ct / pt pole mounting unit and its proper installation at pit site as per resspo manuals...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34899655 various site damage pole line and other material replacement work 2 pcc pole 8.5 mtr 3 acsr weasel conductor 4 dog conductor 5 abc 3x50+1x35+1x16 sqmm 6 11 kv xlpe cable 3x70 sqmm 7 11 kv xlpe cable 3x185 sqmm 8 lt xlpe cable al 1x240 mm 9 aluminium scrap acsr ( cat a ) old & used 10 11 kv vaccume interrupter for vcb 1600 a 11 11 kv cable jointing kit o / d 3x70 sqmm 12 11 kv cable jointing kit i / d + o / d 3x185 sqmm 13 11 kv cable jointing kit o / d type 3x300 sqmm 14 l.t. pvc cable 2vx4 mm , 50 acsr weasel conductor old & used 51 acsr dog conductor old & used 52 gi wire scrap 53 al scrap 54 ms scrap 55 11 kv damage cable...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34880408 release new connection of different category at nivesh mitra and jhatpat portal under full deposit scheme in edd dibai. 2 carriage of fallowings from esc bsr to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 km. approx. 3 st pole 11 mtr/pcc pole 8.5 mtr long. 4 carriage of all line material from store to j.e store sub station as acsr weasel conductor, abc conductor gi wire, earth wire. earth wire, m.s. channel, angle, stay & earthig rods, barbed wire. disc insulator etc. 5 erection ofsingle support including complete 1 i.t.fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 6 erection ofdouble pole support including complete 1 i.t.fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work. 7 grouting of single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, brick ballast/stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 8 grouting of double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, brick ballast/stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 9 fixing of 11 kv stay rod with stay wire in proper way with nozelling. 10 grounting of 11 kv stay rod. 11 carriage of line material from j.e store to site as acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 12 laying, sagging. stringing and binding and jumpering of acsr weisal, rabbit, dog newly erected poles as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 13 acsr weisal conductor. 14 abc cable 3*50 square mm. 15 carriage of 25/63 kva transformar 16 installation of 25/63 kva transformar 17 fixing of earthing rod. 18 the following material is required to be supplied by the contractor. 19 holding clamp. 20 distribution box. 21 lt clamp. 22 pg clamp. 23 bolt & nut off size. 24 stay clamps for 11 kv 25 stay insulator for 11 kv. 26 extra milage charge and carriage for pcc/stp and other material for each 10 km. 27 above supply shall be done as per uppcl/respo rules. ...

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

34870388 work of line maintenance to ensure uninterruptible power supply during makar sakranti mela 2023 ( under o&m ) under electricity urban distribution division ii, gorakhpur 2 refixing / readjustment and painting of 250 / 400 / 630 kva t / f fencing including cost of labour materials and t&p 3 loading / unloading and carriage of lt pvc cable 3.5x120 mmsq. 210 mtr from store center, gkp. to je dump store & je dump to work site & replacement of lt pvc cable 3.5x120 mmsq. for energizing of c type box at gorakhnath mandir campus, gkp. 4 replacement of damaged copper z clamps with material for 400 kva distribution t / f ( wherever req. ) 5 repairing of damaged / rusted steel tubular pole by digging of pit around pole of size 1.0 mtr x 1.0 mtr x 1.0 mtr is to be done for proper position and then cleaning of rust & descaling with the help of hard of hard wire brush & welding on three circle with pole after completing of above work grouting & plinthing 300 mm above level with cement concrete & sand & bricks ballast ( all material labour and t&p will be provided by the contractor ) . 6 replacement ofburnt mcb ( 120 amp. ) of b type panel in mandir campus with t&p & material. 7 repairing of t / f fencing with t&p & material near by gorakhnath mandir. 8 repairing of t / f plinth after removing existing fence of the dtr & again installation of the fencing with t&p & material near by gorakhnath mandir. 9 stringing sagging & binding of acsr dog conductor 10 resagging & tightening of lt line 11 fabrication and erection of new wire mesh fencing 2 meter height with 2 nos gate and grouting of fabrication m.s angle 65x65x6 mm support plinth of fencing / support with all material at 630 kva main & additional distribution transformer within premises of gorakhnath temple also includes painting of the structure as per drawing complete in all respect. 12 construction of bricks wall fencing size 50 cmx25 cm with 1st class bricks and 1:6 cement coarse sand mix and duty plastering with cement sand mortar of 1:6 ratio suitable for grouting of wire fencing supply. 13 dressing and leveling of earth in yard property for easy movement and suitable for working condition...

Indian Army - Uttar Pradesh

34843990 bids are invited for ration items biscuits , pickle , tomato sauce , cornflakes , cornflour , chocolate , sausage fresh veg , groundnut , bournvita , horlicks , jelly , dog biscuit , lactozen , brandy 750 ml , complain , match box local purchase of hospital comfort and officer total quantity : 1366...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34843042 implementation of mscl project network , strengthening, capacity enhancement, implementation of scada for power supply under smart city mission ( scm ) in moradabad city 1 supplying and laying of 33 kv, 3cx 300 sq.mm, xlpe, armoured cable undergrounding workfor existing overhead 1 ckt 33 kv line ( with spare cable ) by using horizontal directional drilling technique ( 85% of total length ) 2 33 kv polymer disc insulator b&s type 70 kn 3 33 kv disc fitting b&s type 70 kn 4 33 kv composite polymer pin insulator with nut and washers 5 33kv ms danger board with clamp and n&b 6 33kv ms number plate with clampand n&b 7 33 kv stay set ( g.i stray rod 20*2100mm, stay wire 7 / 8 wire swg , stay clamp bolt , nut & washerwith concerte ) as per ts 8 p.g. clamp for acsr dog / raccoon 9 13 mtr. lattice tower ( ungalvanised ) 10 foundation of lattice structure including excavation, base padding, pillar, grouting with complete accessories. 11 ms earthing rod of 20x2500 mm with 25x3 mm gi strip 12 aluminium binding wire 6 swg 13 hdpe pipe 160 mm for cable riser 14 33kv e bracket with n&b 15 gi top channel 125x65mm, 3200 mm with clamp, bolts, nuts and washers 16 33 kv line isolator 17 33kv 3x300 mm2xlpe cable 18 heat shrinkable outdoor type termination kit suitable for 33kv xlpe 3x300 sq. mm. cable size 19 straight through joint boxes suitable for h.t xlpe cable of size 300 sq.mm / 3c for 33 kv 20 hdpe pipe for cable laying ( pipe to be laid by hdd method ) ( for road crossing ) 21 laying of 3x300 sq. mm. 33 kv xlpe insulated cable underground in hdpe pipe or trenches ( for road crossing ) 22 drilling & laying of ht underground cable using hdd method without using hdpe pipe 23 mounting of cable on dp structure ( including loop and riser ) 24 cable route marker 25 dismantling of old damaged ht poles and transportation up to store 26 dismantling of existing overhead line and transportation of materials to nearest pvvnl store. 27 supplying and laying of 11kv, 3cx 185 sq.mm, xlpe, armouredcable undergrounding workfor existing overhead 1 ckt 11 kv line ( with spare cable ) 28 11kv 3x185 mm2xlpe cable 29 heat shrinkable outdoor type termination kit suitable for 11kv xlpe 3x185 sq.mm. cable size 30 straight through joint boxes suitable for h.t xlpe cable of size 300 sq.mm / 3c for 11 kv 31 drilling & laying of ht underground cable using hdd method without using hdpe pipe 32 hdpe pipe for cable laying ( pipe to be laid by hdd method ) ( for road crossing ) 33 mounting of cable on dp structure ( including loop and riser ) 34 laying of 3x185 sq. mm. 11 kv xlpe insulated cable underground in hdpe pipe / trenches / riser 35 cable route marker 36 hdpe pipe 160 mm for cable riser 37 11 mtr. lattice tower ( ungalvanised ) 38 gi top channel 125x65mm, 3200 mm with clamp, bolts, nuts and washers 39 11 kv polymer disc insulator b&s type 45 kn 40 disc fitting b&s type 45 kn 41 p.g. clamp for acsr dog / raccoon 42 11kv ms number plate for clamp with n&b 43 11kv msdanger board with clamp, bolts & nuts 44 aluminium binding wire 6 swg 45 11 kv stay set ( g.i stray rod 16*1800 mm, stay 7 / 8 swg wire , stay clamp with bolt , nut & washerwith concerte ) as per ts 46 ms earthing rod of 20x2500 mm with 25x3 mm gi strip 47 foundation of lattice structure including excavation, base padding, pillar, grouting with complete accessories. 48 dismantling of old damaged ht poles and transportation up to store 49 dismantling of existing overhead line and transportation of materials to nearest pvvnl store. 50 supplying and laying of various sizes of 1.1 kv al lt cable for lt cable undergrounding work, service connections to existing / new consumerswith all accessories. 51 1.1 kv pvc cable of 1 cx300 sq.mm from transformer lt bushing to lt feeder pillar box 52 supply of 1.1 kv armoured xlpe cable of 3.5 cx150 sq.mm from lt main pillar box to consumer distribution boxes 53 laying of under ground 3.5 cx150 sq.mm lt xlpe cable including excavation of 30cmx120cm.deep trench in pacca road and refilling by 25 cm thick layer of sand a class bricks covering refiling soil in the remaining portion. 54 drilling & laying of3.5 cx150 sq.mm underground cable using hdd method without using hdpe pipe 55 supply of xlpe armoured cable of 2cx6 sq.mm from consumer distribution boxes to consumer end ( service line ) ( for existing lt system to be converted to underground ) . 56 laying of under ground 2cx6 sq.mmlt xlpe cable including excavation of 30cmx120cm.deep trench in pacca road and refilling by 25 cm thick layer of sand a class bricks covering refiling soil in the remaining portion. 57 supply of xlpe armoured cable of 4cx10 sq.mm from consumer distribution boxes to consumer end ( service line ) from imperial tiraha to budh bazar chauraha ( for existing lt system to be converted to underground ) . 58 laying of under ground 4cx10sq.mm lt xlpe cable including excavation of 30cmx120cm.deep trench in pacca road and refilling by 25 cm thick layer of sand a class bricks covering refiling soil in the remaining portion. 59 laying of xlpe armoured cable with pvc pipe for consumer connection 60 al lugs for incoming and outgoing cables of vaious sizes 61 pvc pipefor consumer connection with all acessories for cable laying & dressing 62 road crossing by hdpe pipe 160 mm, 6 meter, using hdd method 63 replacement of existing lt bare lines and damaged ab cable by new ab cable ( 3x120+ 1x95 + 1x16 ) with all accessories includingfor strengthning works . 64 9 mtr forlt pole, long gi steel single tubular pole with all fitting material and accessories with stone pad ( 300x300x75mm ) & concreting of pole / support ( 0.44 cu.m. ) , 65 ms earthing rod of 20x2500 mm, gi wire 6 swg 66 ltstay set ( g.i stray rod 16*1800mm, stay wire 7 / 10 wire swg10 , stay clamp bolt , nut & washerwith concerte ) as per ts 67 dead end clamps with i hook ( insulated ) 68 suspension clamp with i hook ( insulated ) 69 lt insulation piercing connectors of 95 / 50 sq. mm 70 / 35 sq. mm ( for messenger wire jumpering & energizing db neutral ) 70 pole clamps with nut and bolt 71 holding clamp for round pole with nut and bolt 72 lt insulation piercing connectors of 120 50 sq. mm 50 35 sq. mm size for energizing distribution kiosk / box 73 lt insulation piercing connectors ( 16 sq. mm 16 sq. mm ) suitable for street light connection 74 three phase smc distribution box with clamps 75 lt abc of 3x120+1x70+1x16 sq. mm 76 1x35 mm2 xlpe insulated al. cable for energising the distribution boxes / kiosks. 77 end cap for lt ab cable 78 pg clamps for messenger wire 79 dismantling of existing overhead line and transportation of materials to nearest pvvnl store. 80 dismantling of old damaged poles and transportation up to store 81 replacement of existing overhead 33 kv old / damaged dog conductor with new 33 kv dog conductor with fittings and all accessories 82 acsr dog conductor 83 13 mtr. stp withconcreting of pole / support ( 0.44 cu.m. ) 84 ms earthing rod of 20x2500 mm 85 gi wire 6 swg 86 33 kv composite polymer pin insulator with nut and washers 87 aluminium paint 88 red oxide paint 89 33kv msdanger board with clamp and n&b 90 33kv ms number plate with clampand n&b 91 g.i. barbed wire 92 33 kv polymer disc insulator b&s type 70 kn 93 disc fitting b&s type 70 kn 94 33 kv stayset ( g.i stray rod 20*2100mm, stay wire 7 / 8 swg wire , guy insulator, stay clamp bolt , nut & washerwith concerte ) as per ts 95 dismantling of existing overhead line and transportation of materials to nearest pvvnl store. 96 dismantling of old damaged poles and transportation up to store 97 replacement of existing overhead 11 kv old / damaged dog conductor with new 11 kv dog conductor with fittings and accessories . 98 acsr dog conductor 99 11 kv polymer disc insulator b&s type 45 kn 100 disc fitting b&s type 45 kn 101 11 kv composite polymer pin insulator with nut and washers 102 11kv ms danger board with clamp, bolts & nuts 103 11kv ms number plate for clamp with n&b 104 11 kv stay set ( g.i stray rod 16*1800 mm, stay 7 / 8 swg wire , guy insulator, stay clamp with bolt , nut & washerwith concerte ) as per ts 105 p.g. clamp for acsr dog / raccoon 106 armour rod with ferrule for acsr dog / panther / raccoon helical performed 107 11 mtr. stp 410 sp 55 as per ts 108 concreting of pole / support ( 0.44 cu.m. ) 109 ms earthing rod of 20x2500 mm 110 aluminium binding wire 6 swg 111 aluminium jointing sleeves 112 g.i. barbed wire 113 gi wire 6 swg 114 gi wire 8 swg 115 gi wire 16 swg 116 eye bolt 117 turn buckle 118 red oxide paint 119 aluminium paint 120 11kv `f bracket with n&b 121 cross arm holding clamp with nuts & bolts 122 v type cross arm for 11kv line, 100x50x6 mm, gi 123 guarding angle 75x75x6 mm, 2200 mm long with holding clamp, packing piece, nut & bolts etc. 124 dismantling of old damaged ht poles and transportation up to store 125 dismantling of existing overhead line and transportation of materials to nearest pvvnl store. 126 existing transformer strengthening works 127 replacement of old / damaged feeder pillar box 128 1.1 kv pvc unarmoured cable of 1 cx300 sq.mm from transformer lt bushing to lt feeder pillar box 129 1.1 kv pvcarmoured cable of 3.5cx150 q.mm forlt distribution box 130 earthing of transformerby ms earthing rod of 20x25000 mm. and 6 swg earthing wire etc. 131 11kv tpmo complete set 132 11kv do fuse set ( 3 phase ) 133 11kv lightening arrestor 134 g.i. barbed wire 135 11kv ms danger board with clamp, bolts & nuts 136 11 kv stay set ( g.i stray rod 16*1800 mm, stay 7 / 8 swg wire , stay clamp with bolt , nut & washerwith concerte ) as per ts 137 red oxide paint 138 aluminium paint 139 al. crimping lugs 140 renovation of damaged plinth & fencing of transformers 141 repair of damaged plinth of transformers 142 fencing work of existing transformers with best available solutions 143 replacement of old / damaged 11 mtr, long gi steel single tubular pole with all fitting material and accessories 144 polymer disc insulator b&s type 45 kn 145 disc fitting b&s type 45 kn 146 composite polymer pin insulator with nut and washers 147 ms danger board with clamp, bolts & nuts 148 ms number plate for clamp with n&b 149 11 kv stay set ( g.i stray rod 16*1800 mm, stay 7 / 8 swg wire , guy insulator , stay clamp with bolt , nut & washerwith concerte ) as per ts 150 11 mtr. stp 410 sp 55 as per ts 151 concreting of pole / support ( 0.44 cu.m. ) 152 ms earthing rod of 20x2500 mm 153 g.i. barbed wire 154 gi wire 6 swg 155 red oxide paint 156 aluminium paint 157 `f bracket with n&b 158 cross arm holding clamp with nuts & bolts 159 v type cross arm for 11kv line, 100x50x6 mm, gi 160 dismantling of old damaged ht poles and transportation up to store 161 replacement of old / damaged11 mtr, long gi steel double tubular pole by u / g lattice structure / steel double tubular pole 11 meter long with all fitting material and accessories 162 11 mtr. lattice tower ( ungalvanised ) 163 11 mtr. stp 410 sp 55 as per ts. 164 polymer disc insulator b&s type 45 kn 165 disc fitting b&s type 45 kn 166 composite polymer pin insulator with nut and washers 167 11 kv ms danger board with clamp, bolts & nuts 168 ms number plate for clamp with n&b 169 11 kv stay set ( g.i stray rod 16*1800 mm, stay 7 / 8 swg wire , guy insulator, stay clamp with bolt , nut & washerwith concerte ) as per ts 170 concreting of pole / support ( 0.44 cu.m. ) 171 ms earthing rod of 20x2500 mm 172 g.i. barbed wire 173 gi wire 6 swg 174 red oxide paint 175 aluminium paint 176 `f bracket with n&b 177 cross arm holding clamp with nuts & bolts 178 v type cross arm forline, 100x50x6 mm, gi 179 gi top channel 125x65mm, 3200 mm with clamp, bolts, nuts and washers 180 ms earthing rod of 20x2500 mm with 25x3 mm gi strip 181 dismantling of old damaged ht poles and transportation up to store 182 foundation of lattice structure including excavation, base padding, pillar, grouting with complete accessories. 183 replacement of old / damaged9 mtr for lt pole, long gi steel single tubular pole with all fitting material and accessories 184 9 mtrlt pole, single tubular pole 185 lt clamp with nut bolt 186 lt shackle insulator with nut bolt 187 concreting of pole 188 suspension clamp with nut bolt 189 ms earthing rod of 20x2500 mm with 6 swg gi wire 190 stay set with complete acessories 191 dead end clamp with nut bolt 192 ltdb box with clamp 193 lt piercing connectors 194 pole clamp with nut bolt 195 red oxide paint 196 aluminium paint 197 1x35 mm2 xlpe insulated al. cable for energising the distribution boxes / kiosks. 198 dismantling of old damaged ht poles and transportation up to store 199 replacement of old / damaged13 mtr, long gi steel single tubular pole with all fitting material and accessories 200 polymer disc insulator b&s type 70 kn 201 disc fitting b&s type 70 kn 202 composite polymer pin insulator with nut and washers 203 ms danger board with clamp, bolts & nuts 204 ms number plate for clamp with n&b 205 33 kv stay set set ( g.i stray rod 20*2100mm, stay wire 7 / 10 wire swg, guy insulator, stay clamp bolt , nut & washerwith concerte ) as per ts 206 13 mtr. stp 207 concreting of pole / support ( 0.44 cu.m. ) 208 ms earthing rod of 20x2500 mm 209 g.i. barbed wire 210 gi wire 6 swg 211 red oxide paint 212 aluminium paint 213 `f bracket with n&b 214 cross arm holding clamp with nuts & bolts 215 v type cross arm forline, 100x50x6 mm, gi 216 dismantling of old damaged ht poles and transportation up to store 217 replacement of old / damaged13 mtr, long gi steel double tubular pole with all fitting material and accessories 218 13 m lattice tower ( un galvanised ) 219 polymer disc insulator b&s type 70 kn 220 disc fitting b&s type 70 kn 221 composite polymer pin insulator with nut and washers 222 ms danger board with clamp, bolts & nuts 223 ms number plate for clamp with n&b 224 33 kv stay set set ( g.i stray rod 20*2100mm, stay wire 7 / 10 wire swg, guy insulator , stay clamp bolt , nut & washerwith concerte ) as per ts 225 13 mtr. stp 226 concreting of pole ( 0.64 cu.m. ) 227 ms earthing rod of 20x2500 mm 228 g.i. barbed wire 229 gi wire 6 swg 230 red oxide paint 231 aluminium paint 232 e bracket with n&b 233 gi top channel 125x65mm, 3200 mm with clamp, bolts, nuts and washers 234 gi angle 65x65x6mm, 4300 mm long bracing with 4 clamps, bolts, nuts and washers 235 foundation of lattice structure including excavation, base padding, pillar, grouting with complete accessories. 236 dismantling of old damaged ht poles and transportation up to store 237 sitc of lt pillar box, distribution boxes and fixing ofexisting / new 1 ph, 3ph meters ( at consumer premises ) for lt cable undergrounding work, service connections to existing / new consumers 238 lt distribution pillar box 400 a 239 lt distribution box 200 a ( for consumer distribution ) 240 ms earthing rod of 20x2500 mm with 25x3 mm gi strip 241 foundation for feeder pillar box 242 installation of single phase meter with / without meter box ( complete unit ) at the premises ofexisting / new consumer with all accessories 243 installation of three phase meter with / without meter box ( complete unit ) at the premises ofexisting / new consumer with all accessories 244 supplying and laying of armoured 3.5 cx150 sq.mm, 1.1 kv xlpe cable for undergrounding work of lt overhead line road crossing . 245 3.5cx150 mm2xlpe cable 246 heat shrinkable outdoor type termination kit suitable for xlpe 3.5cx150 sq.mm. cable size 247 hdpe pipe for cable laying ( pipe to be laid by hdd method ) ( for railway crossing / road crossing ) 248 mounting of cable on pole ( including loop and riser ) 249 laying of armoured 3.5cx150 sq. mm.1.1 kv xlpecable underground in hdpe pipe / trenches / riser 250 cable route marker 251 ms earthing rod of 20x2500 mm with 25x3 mm gi strip 252 sitc ofoil type transformer with plinth and all fitting & accessories 253 11 / 0.40 kv 400kva transformer as per ts 254 11 / 0.40kv 250 kva transformer as per ts 255 st pole 11 mtr. is 410 sp 55 256 stone pad ( 300x300x75mm ) 257 concreting of supports with plinth ( 0.44 cu.m. each ) 258 m.s. top channel 125x65 mm, 2240 mm ( 10.7kg / mt ) with clamp, bolts, nuts and washers 259 copper l piece of size 400x50x6 mm for lt bushing rod of transformer 260 lt aluminium unarmoured xlpe cable 1x400 sq.mm for i / c 261 lt aluminium unarmoured xlpe cable 1x50 sq.mm for ht jumpering 262 lt aluminium unarmoured xlpe cable 1x240 sq.mm. 263 11kv tpmo complete set with channel, clamps and nuts & bolts ( as per specification ) 264 11kv do fuse set ( 3 phase ) 265 11kv lightening arrestor 266 m.s. channel 100x50x2028mm ( dropper for fuse set ) 267 holding clamps for top channel tpmo & fuse set etc. with nuts & bolts 268 plinth of t / f with rcc top of size 2x2x1.6 mtr. incl. 2 nos. ms channel 269 11kv polymer disc insulator t&c type 45 kn 270 disc fittings t&c type 45 kn 271 11 kv composite polymer pin insulator with nut and washers 272 g.i. barbed wire 273 11kv ms danger board with clamp, bolts & nuts 274 11kv / lt stay set complete ( as per annexure 9 ) 275 earthing of pole by ms earthing rod of 20x2500 mm. and 6 swg earthing wire etc. 276 smc lt distribution box with 4 pole mccbfor dtr 277 al. crimping lugs 400 sq.mm. 278 al. crimping lugs 240 sq.mm. 279 al. crimping lugs 50 sq mm. 280 aluminium paint 281 red oxide paint 282 augmentation of 400 kva transformer through cable 283 transformer structure half 4 pole ( gi ) 284 11 / 0.40 kv 400kva transformer as per ts 285 11 / 0.40kv 250 kva transformer as per ts 286 structure foundation 287 sitc of 11kv rmu ( 2lbs+ 1vcb ) 288 lt distribution pillar box 400 a with earthing and all accessories 289 supply of 11 kv armoured xlpe cable of 3cx185 sq.mm from transformer to rmu unit with spare. 290 lt incoming panel with metering equipment & fixing arrangement ( ls ) 291 coppper l piece 50x225x10 mm ( ls ) 292 coppper l piece 62x225x12 mm ( ls ) 293 lt pvc cable ai 3.5x400 sq.mm 294 lt pvc cable ai 1x400 sq.mm 295 lt pvc cable ai 1x240 sq.mm 296 4 core lt mcb with box ( ls ) 297 ms danger board barbed wire including jumper 298 earthing of transformer by ms earthing rod of 20x2250 mm & 6swg earthing wire etc. 299 11 / 0.4 kv substation structure set complete with rmu, pillar box, ht and lt cable ( without transformer ) 300 transformer structure half 4 pole ( gi ) 301 structure foundation 302 sitc of 11kv rmu ( 2lbs+ 1vcb ) 303 lt distribution pillar box 400 a with earthing and all accessories 304 supply of 11 kv armoured xlpe cable of 3cx185 sq.mm from transformer to rmu unit with spare. 305 lt incoming panel with metering equipment & fixing arrangement ( ls ) 306 coppper l piece 50x225x10 mm ( ls ) 307 coppper l piece 62x225x12 mm ( ls ) 308 lt pvc cable ai 3.5x400 sq.mm 309 4 core lt mcb with box ( ls ) 310 danger board barbed wire including jumper 311 earthing of transformer by ms earthing rod of 20x2250 mm & 6swg earthing wire etc. 312 scada compatiable ring main unit ( 2 isolators + 1 breaker ) 313 ring main unit ( 2 isolators + 1 breaker ) for 11kv feeder 314 heat shrinkable jointing kit suitable for 11 kv xlpe 3x185 sq.mm. cable size ( indoor / outdoor ) 315 foundation structure for rmu for cable entry etc. ( concrete 1:3:6 ) 316 earthing of rmu by ms earthing rod of 20x2250 mm & 6swg earthing wire etc. 317 scada compatiable ring main unit ( 1 isolators ) 318 ring main unit ( 1 isolators ) for 11kv feeder 319 heat shrinkable jointing kit suitable for 11 kv xlpe 3x185 sq.mm. cable size ( indoor / outdoor ) 320 foundation structure for rmu for cable entry etc. ( concrete 1:3:6 ) 321 earthingof rmu by ms earthing rod of 20x2250 mm & 6swg earthing wire etc. 322 supply and laying of 33 kv, 3cx 120 sq.mm, xlpe, armoured cable undergrounding work from 132 kv substation at kanth roadto district court and district hospital via ptc tiraha ( single circuit cable ) 323 33 kv polymer disc insulator b&s type 70 kn 324 disc fitting b&s type 70 kn 325 33 kv composite polymer pin insulator with nut and washers 326 33kv ms danger board with clamp and n&b 327 33kv smc number plate with clampand n&b 328 33 kv stay set set ( g.i stray rod 20*2100mm, stay wire 7 / 10 wire swg, guy insulator, stay clamp bolt , nut & washerwith concerte ) as per ts 329 p.g. clamp for acsr dog / raccoon 330 13 mtr. lattice towerfor cable riser ( ungalvanised ) 331 foundation of lattice structure including excavation, base padding, pillar, grouting with complete accessories. 332 ms earthing rod of 20x2500 mm with 25x3 mm gi strip 333 aluminium binding wire 6 swg 334 hdpe pipe 160 mm for cable riser 335 gi top channel 125x65mm, 3200 mm with clamp, bolts, nuts and washers 336 33kv 3x 120 mm2xlpe cable 337 heat shrinkable outdoor type termination kit suitable for 33kv xlpe 3x120 sq. mm. cable size 338 straight through joint boxes suitable for h.t xlpe cable of size 120 sq.mm / 3c for 33 kv 339 hdpe pipe for cable laying ( pipe to be laid by hdd method ) ( for road crossing ) 340 laying of 3x120 sq. mm. 33 kv xlpe insulated cable underground in hdpe pipe or trenches ( for road crossing ) 341 drilling & laying of ht underground cable using hdd method without using hdpe pipe 342 mounting of cable on dp structure ( including loop and riser ) 343 cable route marker 344 miscellaneous activities 345 resagging & tightening of dog / raccon / rabbit conductor 346 resagging & tightening of lt abc cable 3x120+ 1x95 + 1x16 347 additional items 348 11 kv v cross arm ( 100x50x6 ) mm 349 33 kv v cross arm ( 100x50x6 ) mm 350 f bracket for 33 kv 351 f bracket for fitting top insulator with bolts & nuts for 11 kv 352 complete stay ( g.i stay rod 20x1800 mm , stay wire7 / 8 wire swg 10 kg, stay clamp, bolt, nut & washer with concerte grounting ) 353 bolts nuts & washers all sizes 354 polymeric disc insulator 45 kn ( b&s ) 355 polymeric 11 kv pin insulator 356 pg clamp 357 red oxide paint for existing poles 358 aluminium paint for existing poles 359 gi ms channel / ms angle / ms flat of various sizes for cantilever, for foundation, for supports, for structures etc. 360 400 kvamobile transformer with all cable and fixing arrangements for urgent services 361 sitc of scada compatible rmus 362 outdoor type 11 kv sf6 type extensible and motorized 5 way smart ring main unit ( rmu ) complete with three vcb and two lbs withfpi along with frtu & modem ( modem should be double sim on 4g / 5g ) and with the provision of self powered supply through 1 kva auxilliary power transformer 11 / 0.230 kv as per nigam specs along with other allied material like cable, ternination kits etc.to connect the same with system 363 outdoor type 11 kv sf6 type extensible and motorized 3 way smart ring main unit ( rmu ) complete with two vcb and two lbs with fpi along with frtu & modem ( modem should be double sim on 4g / 5g ) and with the provision ofself powered supply through 1 kva auxilliary power transformer 11 / 0.230 kv as per nigam specs along with other allied material like cable, ternination kits etc.to connect the same with system 364 fpi 365 communicable 366 ug cable from pole top to rmu and from rmu to dts 367 supply, laying of 11 kv xlpe, 3 c x 185 sq.mm cable insulated ug cable including provision for proper support to hold the cable at pole dtr end till it reaches the ground level and laying under ground as per site condtion for connections of overhead conductor to rmu and as well as from rmu to distribution transformer complete in all respects as per specification 368 control / power cable for rtusfrom outdoorswitchgear, if any at s / s and numericalrelays 369 control cable armoured ( 1 sq mm for control and monitoring element wiring ) ( as required ) with miscellaneous consumables items for e.g. connectors, thimbles etc ( 30 mtr per dss ) 370 control cable armoured ( 2.5 sq mm for ct & pt wiring ) ( as required ) with miscellaneous consumables items for e.g. connectors, thimbles etc ( 30 mtr per dss ) 371 numerical relay 372 11 kv indoor switchgear panel complete in all respects as per speciication and direction of employer / pmc. 373 simplex cubicle switchgear panel for transformer incomer complete in all respects as per specification and direction of employer / pmc. 374 simplex cubicle switchgear panel for outgoing line complete in all respects as per specification and direction of employer / pmc. 375 simplex cubicle switchgear panel for bus coupler complete in all respects as per specification and direction of employer / pmc. 376 bus vt pt1 and pt2 for measauring panels complete in all respects 377 spares 378 simplex control and relay panel for hv side of 33 / 11 kv transformer at taxistand substation complete in all respects as per specification and direction of employer / pmc. 379 auxiliary power supply ; main equipments control centre 380 ups with suitable rating running in parallel redundant mode* withvrla type battery banks for above ups for minimum 30 min. backup duration 381 for rtu / data concentrator / communication eqpts. 382 dc power supply ( dcps ) system based on smps and battery bank for above dcps ( vrla type ) for minimum 4 hrs backup 383 for frtu 384 48v dc power supply ( dcps ) system based on smps andbattery bank for above dcps ( vrla type ) for minimum 4 hrs backup 385 spares 386 communication system mpls 387 6 core fo cable including laying as per nigam specs along with other allied material like ties, joint boxes etcto connect the same with system 388 fibre optic teremination system complete in all respects as per nigam specs 389 mpls router 390 gprs 391 annual chargesfor 2mbps links with frtus / fpi for two years 392 modems 393 spares 394 rtus 395 rtu base equipment comprising panels, racks, sub racks, power supply modules, cpu, interfacing equipment, required converters & all other required items / accessories including complete wiring for all modules. 396 multifunctuions transducers 397 contact multiplying relays ( cmrs ) 398 heavy duty relays for control 399 dummy breaker latching relays 400 transformer transducers 401 single tft pc for ldms 402 serial communication cable ( 2 pair armoured with steel conduit ) to integrate existing relay or mfm ( 100 mtr per pss ) . 403 ethernet cat6 cable with steel conduitto integrate existing relay, bcu, bpu & bcpu ( 100mtr per pss ) with miscellaneous consumables items like rj 45 connectors & patch code etc. 404 software for ldms 405 ldms software 406 test equipments for rtu 407 rtu database configuration & maintenance software tool 408 master station cum rtu simulator & protocol analyser software tool 409 laptop pc for above software tools along withinterfacing hardware including hub 410 mandatory spare 411 frtus 412 mini pole mounted frtu base equipment along with enclosure suitable to work in open environment ( adequate protection from water & dust ) , racks, sub racks, power supply modules with power backup , i / o modules, cpu, interfacing equipment, required converters & all other required items / accessories including complete wiring for all modules 413 contact multiplying relays ( cmrs ) 414 heavy duty relays for control 415 multifunction trnasducer 416 test equipments for frtu 417 frtu database configuration & maintenance software tool 418 master station cum frtu simulator & protocol analyser software tool 419 laptop pc for above software tools along withinterfacing hardware including hub 420 spares 421 software for control centre 422 scada software 423 isr software 424 dms software 425 dts software 426 developmental software 427 network management software 428 gis adaptor / engine for importing data from gis system under it system 429 backup software compatible to proposed architecture 430 spares 431 scada / dms control centre server / workstationhardware 432 scada server 433 dms server 434 fep server with interface switches 435 isr server 436 nms server 437 dts server 438 developmental server 439 commnuicationserver 440 web / directory server 441 sms gaterway 442 workstation with dual tft monitors ( s / s monitoring ) 443 workstation with dual tft monitors ( network monitoring ) 444 remote vdus with one tft monitors 445 developmental console with one tft 446 dts / workstation console withdual tfts 447 dlp / led based video projection system with 3x4 module configuration with each module at least 67 diagonal with common projector 448 storage & backup devices 449 external raid mass storage device ( for 24 months online backup ) 450 switches 451 layer ii switch ( scada / dms lan ) 452 layer ii switch ( planning & development system lan ) 453 security system ( dmz ) 454 firewall & network ids / ips 455 layer ii switch 456 other active devices 457 gps timesynchronisation system 458 time, day & date digital displays 459 printers 460 color inkjet printer 461 b / w laser printer 462 software for control centre 463 facility managament services for 2 years after go live...

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - Uttar Pradesh

34831417 overhauling of pressure parts & air pre heater of unit no 02 of 3x210 mw, atps, anpara. 1 erection and dismantling of cup lock scaffolding 2 h.p. jet cleaning of boiler pressure parts and de slugging of tubes of water wall, scw, platen s / h, crh, hrh, final s / h, ltsh, economizer, baskets of aph. 3 general survey of boiler pressure parts 4 repairing of furnace ceiling of penthouse in first pass, second pass and roof of dog house, inspection and rectification of all hanger support, refractory work at different area of boiler and air tightness test ( att ) 5 rectification / replacement of damaged / eroded pressure parts tubes / bends / dmw / reducer. 6 build up of eroded portion of the tubes caused by ash / steam erosion using suitable welding electrodes matching with parent metal composition. depth of erosion up to 2.5 mm, length of erosion up to 250 mm 7 repairing and rectification of economizer coil with measurement and rectification of coil pitches ( one coil counted for top & bottom ) 8 fins welding of water wall, scw and saw cut fins. 9 providing additional ss half shield in s / h, screen & hanger tubes, w / w tubes, ltsh / economizer coil / bends and other area of pressure parts. 10 repairing / rectification of buck stay corner attachment in boiler 1st & 2nd pass 11 alignment of horizontal & vertical buck stay beam. 12 replacement of all types of seals with holding strips including seal tabs in both aph. 13 replacement of all static seals and rotor post seal with repairing of seal ring segments and spool piece in both aph. 14 repairing of eroded sector plates of both aph. 15 repairing of bracing pipe in fg side with proper shield in both aph. 16 removal and shifting of h.e. baskets of both aph to zero meter for jet cleaning with minor repairing. 17 removal and shifting of c.e. baskets of both aph to zero meter for jet cleaning. 18 repairing work by replacing plate not less than 300x1000 mmm in both aph. 19 leveling of all sector plates ce & he, adjustment of axial seal plates, rotor leveling, sealing of adjusters of sector plates and replacement of axial seal plate assembly of both aph. 20 inspection and servicing of support bearing assembly of both aph. 21 checking, inspection and servicing of guide bearing and servicing of lube oil system and all its components of both aph. 22 checking of drive unit including servicing of gear box, fluid coupling, air motor and servicing / repairing / replacement of soot blowers of both aph. 23 repairing of expansion bellows of pa / sa / fg duct. 24 repairing / rectification of and tightening of all hanger supports / tie rods of pa / sa / fg duct 25 optional work 26 replacement of he / ce sector plate 27 replacement of support bearing 28 replacement of guide bearing...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34805972 work of business plan against sanction packages at various divisions 33 / 11 kv s / s under edc 1 agra. 1 carriage of following from 132 kv taj agra to work related 33 / 11 kv s / s through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. ( distance 00 50kms. ) a ) pcc pole 8.5 mtr. long 2 carriage of following from 132 kv taj agra to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. ( distance 00 50kms. ) c ) 400 / 250 kva t / f 3 carriage of following from 132 kv taj agra to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. ( distance 00 50kms. ) d ) 100 / 63 kva t / f 4 carriage of following from 132 kv taj agra to work related 33 / 11 kv s / s through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. ( distance 00 50kms. ) c ) line material viz. aerial bunch conductor / weasal conductor / dog, g.i. earth wire, cross arm, angle, channel, insulators, clamps and other line material, as required 5 installation of400 / 250 kva t / f on plinth in proper alignment by making its ht / lt side connections properly as per direction of superivsing engineer. 6 installation of100 / 63 kva t / f on plinth in proper alignment by making its ht / lt side connections properly as per direction of superivsing engineer. 7 dismentaling / removal of 250 kva t / f from existing double pole after opening ht / lt connections and their carriage work site to 132 kv taj store / je store agra including loading and unloading at both end. 8 dismentaling / removalof 63 / 25 / 10 kva t / f from existing double pole after opening ht / lt connections and their carriage work site to 132 kv taj store / je store agra including loading and unloading at both end. 9 erection and grouting of single pole on 8.5 mtr. long pcc poles in 1:2:4 ( cement sand, and bricks blast ) , including fixing ofaccessories for double pole s / s as per respo manual. 10 erection and grouting of double pole on 8.5 mtr. long pcc poles in 1:2:4 ( cement sand, and bricks blast ) , including fixing ofaccessories for double pole s / s as per respo manual. 11 making ht t off connection on existing mains labour, t &p and carrier etc. required for proper completion of work. 12 laying sagging stringing and binding and jumpering etc of in lt line as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carrier etc reauired for proper completion of work. a ) ab conductor 3x50 / 3x95 sqmm. 13 erection and grouting of stays as per respo manual and as per direction of supervising engineer including the costof arrangement of labour, t&p, carrier etc. required for proper completion of work. grouting material i.e. cement, sand, brick ballast / stone ballast etc. shall be arranged by the contractor at his own cost. 14 fixing of earthing rod as per respo manual and as per direction of supervising engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 15 laying sagging stringing and binding and jumpering etc of in lt line as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carrier etc reauired for proper completion of work. a ) acsr weasel conductor...

North Central Railway - Uttar Pradesh

34755279 balance work for construction of rcc boundary wall & provision of dog kennel in parade ground of subedarganj.balance work for construction of rcc boundary wall & provision of dog kennel in parade ground of subedarganj., ...

Employees State Insurance Corporation - Uttar Pradesh

34743251 bids are invited for department 1 / 50 artery forceps , air cannula , bipolar wet field cautery , bard parker handle , bone punch , bone gouge , bull dog clamp , capsulorhexis forceps , claymans lens holding forceps , chalazion clamp , chalazion curette , conjunctival scissors , copper ball cautery , corneal scissors universal right left , conjunctival fixation forceps , chisel , calipers , de weckers scissors , endo illuminator with fiberoptic light pipe , eye speculum self retaining , enucleation scissors , iris repositor , iris forceps , lens dialer , lid spatula , lid retractor , lacrimal cannula , lacrimal probes full set , lims forceps , lens hook , mcpherson angled forceps , muscle hook , needle holders coarse and fine , nasal speculum , punctum dilator , plain forceps , phaco chopper , fixation forceps wide , tying forceps jaffe 10 0 suture straight t , tying forceps jaffe 10 0 suture curved t , sterlisation case steel 10 12 0.75 with 2 matts , berke ptosos forceps , khan jaeger lid plate , cilia forceps , muscles hook large , muscles hook oblique , wesstcott tenotomy scissor straight , wesstcott tenotomy scissor curved , castroviejo curved corneal scissor lt , castroviejo curved corneal scissorrt , corneo scleral forceps lt , corneo scleral forceps rt , wills utility forceps , wills utility forceps wide , collibri forceps lt , collibri forceps rt , lambert chalazion forceps clamp large , lambart chalzion forceps clamp small , enucleation spoon , bunge eviseration spoon large , bunge eviseration spoon small , sinsky hook t , vans scissor straight , vans scissor curved , capsular polisher ant and pos , double ended chopper for horizontal and vertical chopping t , koch phaco chopper blunt t , bonn forceps 0,12mm ,12mm teeth length 85 mm t , suture tying straight t , suture tying curved t , hartmen curved haemostate mosquito forceps ss , hartmen straight haemostate mosquito forceps ss , cat paw retractor 4 prong. , cat paw retractor 6 prong. ...

Military Engineer Services - Uttar Pradesh

34740541 addition / alteration of dog kennel concertina coil improvement to coo complex ladies toilet and toilet at scito complex and construction of x ray room under ge af gorakhpur...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

34704981 supply of material under edd iii pallavpuram meerut , supply of following material under edd iii, meerut , supply of 33 kv isolator clamps made of aluminium alloy suitable for acsr dog conductor , supply of isolator end clamp made of aluminium alloy lm 6 suitable for acsr panther conductor...

Agra Municipal Corporation - Uttar Pradesh

34690897 supply of spare parts of swaraj mazda vehicle 1 engine 2 liner ( sleeve ) 3 piston assembly 4 ring set 5 main 6 begin 7 c.r. bush 8 valve 9 guide 10 sheet 11 seal 12 timing seal 13 main seal 14 thrust washer 15 packing set 16 head gaskit 17 gear 18 counter shaft 19 main shaft 20 needle bearing 21 main shaft bearing 22 ist gear with sleeve 23 iigear with sleeve 24 iiigear with sleeve 25 ivgear with sleeve 26 reversegear with sleeve 27 special gear with sleeve 28 synchronizer ring 29 dog lock set 30 main shaft lock set 31 suspension parts 32 main leaf 33 aux a leaf 34 i leaf 35 ii leaf 36 iii leaf 37 kamani bush set 38 kamani pin 39 clip set 40 center bolt 41 v bolt ( rakab ) 42 silencer 43 silencerdholki 44 exhaust pipe 45 tail pipe 46 center pipe 47 steering 48 steering unit 49 steering rod 50 steering bush 51 head light 52 headlight assembly 53 indicator light 54 combination switch 55 clutch work 56 pressure plate 57 clutch plate 58 clutch bearing 59 flywheel bearing 60 flywheel 61 clutch master cylinder 62 clutch sleeve cylinder 63 clutch booster cylinder 64 brake system 65 axle shaft assembly 66 brake booster 67 brake master cylinder 68 brake sleeve cylinder 69 front wheel cylinder 70 rear hub bolt 71 break leather front 72 break leather rear 73 king pin assembly 74 filter 75 air filter 76 diesel filter 77 oil filter 78 water seperator filter 79 steeringfilter 80 glassi filter 81 horn assembly 82 differential 83 pinion oil seal 84 crown wheel pinion set 85 spider kit 86 crown handi 87 pinion check kit 88 crown bearing 89 center bearing 90 pinion bearing 91 shaft 92 shaft cross 93 center jhulla bearing 94 yoke & teeth 95 cross holer 96 cooling system 97 water pump assembly 98 radiator assembly 99 hose pipe kit 100 radiator core 101 wiper arm 102 wiper blade 103 hydraulic pump 104 hydraulic cylinder seal 105 fan belt 106 mirror 107 side mirror 108 front glass 109 door glass 110 iren sheet 111 10 gauge 8x4 112 12 gauge 8x4 113 14 gauge 8x4 114 16 gauge 8x4...

Agra Municipal Corporation - Uttar Pradesh

34690859 tender for eicher 20.16 supply of vehicle spare parts 1 engine 2 liner ( sleeve ) 3 piston assembly 4 ring set 5 main 6 begin 7 c.r. bush 8 valve 9 guide 10 sheet 11 seal 12 timing seal 13 main seal 14 thrust washer 15 packing set 16 head gaskit 17 gear 18 counter shaft 19 main shaft 20 needle bearing 21 main shaft bearing 22 ist gear with sleeve 23 iigear with sleeve 24 iiigear with sleeve 25 ivgear with sleeve 26 reversegear with sleeve 27 special gear with sleeve 28 synchronizer ring 29 dog lock set 30 main shaft lock set 31 suspension parts 32 main leaf 33 aux a leaf 34 i leaf 35 ii leaf 36 iii leaf 37 kamani bush set 38 kamani pin 39 clip set 40 center bolt 41 v bolt ( rakab ) 42 silencer 43 silencerdholki 44 exhaust pipe 45 tail pipe 46 center pipe 47 steering 48 steering unit 49 steering rod 50 steering bush 51 head light 52 headlight assembly 53 indicator light 54 combination switch 55 clutch work 56 pressure plate 57 clutch plate 58 clutch bearing 59 flywheel bearing 60 flywheel 61 clutch master cylinder 62 clutch sleeve cylinder 63 clutch booster cylinder 64 brake system 65 axle shaft assembly 66 brake booster 67 brake master cylinder 68 brake sleeve cylinder 69 front wheel cylinder 70 rear hub bolt 71 break leather front 72 break leather rear 73 king pin assembly 74 filter 75 air filter 76 diesel filter 77 oil filter 78 water seperator filter 79 steeringfilter 80 glassi filter 81 horn assembly 82 differential 83 pinion oil seal 84 crown wheel pinion set 85 spider kit 86 crown handi 87 pinion check kit 88 crown bearing 89 center bearing 90 pinion bearing 91 shaft 92 shaft cross 93 center jhulla bearing 94 yoke & teeth 95 cross holer 96 cooling system 97 water pump assembly 98 radiator assembly 99 hose pipe kit 100 radiator core 101 wiper arm 102 wiper blade 103 hydraulic pump 104 hydraulic cylinder seal 105 fan belt 106 mirror 107 side mirror 108 front glass 109 door glass 110 iren sheet 111 10 gauge 8x4 112 12 gauge 8x4 113 14 gauge 8x4 114 16 gauge 8x4...