Public Works Department - Uttar Pradesh

39662484 tender for repair work of fire fighting equipment installed in the district court jaunpur premises. 1 sitc of smoke detector as per fire specification including making connection with wire system 2 sitc of manual call point break glass type housed in m.s. sheet including make connection 3 sitc of electronic lmt hooterhoused in m.ssuitable forwall mounting / ceiling , including connection 4 supply and wiring ofsub main with 2 no. 1.5 mm2 pvc insulation 1100 volt grade single core copper conductor cable in 20mm dia heavy risid steel conduit on surface. 5 sitc of single headed s.s hydrant valve comprising of 80mm dia flanged bend 63 mm dia s.s oblique pattern landing valve complete with blank cap etc. 6 sitc of rrl hose 63mm dia 15 mtr long complete with s.s couplingconfirming to is 636 7 repairingofhosebox m.ssheetwithglassfronteddoorincluding locking arrangementtoaccommodate2nos.rrlhose&1nos.ssbranchpipewithnozzel. 8 repairingof fire alarm local control panel for above complete 9 repairingof fire alarm main panel for above complete in all respect. 10 first aid hose reel pipe 30 meter long rubber pipe shut of nozzle, 20mm dia gate valve complete 11 repairing of electrical operated main fire pump consisting of1. horizontaltype, multistage, centrifugal, splitcasingpumpofcastironbody&bronze impeller with stainless steel shaft, mechanical seal conforming to is 1520 for 2280 lpm at 70 mtr head.2. suitablehptefctypesquirrelcageinductionmotorof minimum60hp.suitablefor operationon415volts, 3phase50hz, acsupplywithip55protectionforenclosure, horizontal foot mounted type with class f insulation, conforming to is 325.3. completeinstallationwithconcretefoundation ( alledgesshouldbeprotectedwith 50mmx50mmx5mm angle iron ) , common bed plate of iron channel, coupling , coupling guard, vibration pads etc. complete work as per requirement. 12 repairing of diesel engine driven pump consisting of1. horizontaltype, multistage, centrifugal, splitcasingpumpofcastironbody&bronze impeller with stainless steel shaft, mechanical seal conforming to is 1520 for 2280 lpm at 70 mtr head.2.suitable hp, 1500rpm, minimum 60 hp, water cooled, auto start mechanism diesel engine with flexible coupling, exhaust pipe insulatedwith 50 mm glass wool with 1.0 mm thick aluminium sheet cladding, with silencer etc.confirming pollution norms.3. completeinstallationwithconcretefoundation ( alledgesshouldbeprotectedwith 50mmx50mmx5mmangle iron ) and commonbed plate of ironchannel etc. for mounting the diesel engine and pump. complete in all respects. 13 repairing of electrical driven jockey pumpconsisting of1. horizontaltype, multistage, centrifugal, splitcasingpumpofcastironbody&bronze impeller with stainless steel shaft, mechanical seal conforming to is 1520 for 180 lpm at 70 mtr head.2. suitablehptefctypesquirrelcageinductionmotorofminimum10hp.suitablefor operationon415volts, 3phase50hz, acsupplywithip55protectionforenclosure, horizontal foot mounted type with class f insulation, conforming to is 325.3. completeinstallationwithconcretefoundation ( alledgesshouldbeprotectedwith 50mmx50mmx5mm angle iron ) , common bed plate of iron channel, coupling , coupling guard, vibration pads etc. complete work as per requirement. 14 repairing of factory fabricated wired metalclad dust & vermin proof floor mounting main electric control panel for main electrical fire pump, diesel engine pump 1no. jockey pump with starter switch volt meter amp. meter & battery charger with battery. hrc type 315 amp. / 415 volt. main switch engine control relay 75hp star delta starter with timer, single phase protector led indicator lamn etc 15 gst extra @18%...

Kanpur Electricity Supply Co Limited - Uttar Pradesh

39291881 maintenance of 11 kv epcos make capacitor bank and related 11kv control relay panel of capacitor bank installed at different 33 11 kv substations alongwith cost of required spares under eudc i, ii, iii, and iv kesco, kanpur....

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

39238319 work erection of 33kv baba saheb bhim rao ambedkar bay and other associated works at 220kv s / s amethi under etd, sultanpur 1 the following work is to be carried out for construction of new 33 kv baba saheb bhim rao ambedker bay at 220kv s / s amethi. supply of material: 2 supply of pg clamp duly made of lm 6 aluminium alloy, suitable for tarantulla to moose conductor complete with 4 no. 16x90 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 3 supply of pg clamp duly made of lm 6 aluminium alloy, suitable for moose to panther conductor complete with 4 no. 16x90 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 4 supply of pg clamp duly made of lm 6 aluminium alloy, suitable for tarantulla to panther conductor complete with 4 no. 16x90 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 5 supply of pg clamp duly made of lm 6 aluminium alloy, suitable for panther to panther conductor complete with 4 no. 16x90 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 6 supply of 33kv ct bi metallic terminal connectors duly made of lm 6 aluminium alloy along with bi metallic sleeve plate suitable for twin acsr panther conductor with 4 no. 12 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 7 supply of 33kv isolator bi metallic terminal connectors duly made of lm 6 aluminium alloy along with bi metallic sleeve plate suitable for twin acsr panther conductor with 4 no. 12 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 8 supply of 33kv pt bi metallic terminal connectors duly made of lm 6 aluminium alloy along with bi metallic sleeve plate suitable for twin acsr panther conductor with 4 no. 12 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 9 supply of 33kv cb bi metallic terminal connectors duly made of lm 6 aluminium alloy along with bi metallic sleeve plate suitable for twin acsr panther conductor with 4 no. 12 mm size gi bolts, nuts, spring & plain washers as per technical specification & sample 10 carriage of material 11 sorting, weighting and loading of galvanized sub station structures on private truck at efu naini, prayagraj 12 safe transportation of galvanized sub station structures by private truck arrangedby the contractor from efu naini, allahabad to 220kv s / s amethi ( 100 km. approx. ) including toll charges. 13 unloading, sorting & proper stacking of galvanized sub station structures from private truck at store yard of 220kv s / s amethi. 14 carriage of misc. items like cts, pts, cb, isolators, control cables, conductors, m.s. round bar, m.s. earthingstrips etc. from designated primary sub station within 80 km distance to 220kv sub station amethi including its loading and un loading. 15 erection works 16 erection of following auxiliary structure as per drawing / bom is to be carried out by the contractor at 132kv s / s musafirkhana. the job consists of shifting of all materials i.e. structure parts, nuts, bolts, washers etc. from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt matching of holes, cutting, matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. all material to be erected shall be supplied by upptcl free of cost but all men, material and t&p required for satisfactorily completion of work shall be arranged by the contractor at his own cost. auxiliary structures: 1. abl ( 03set x 0.33766 / set=1.01298mt ) 2. alp ( 09set x 0.125833 / set= 1.132497mt ) 17 erection of following equipment in proper alignment in switchyard on the erected structures as per manufactures drawing or as per direction of supervising engineer, after leveling including shifting the equipment from store to site of work etc. alongwith their junction boxes, control cubicles and accessories and all related works to complete the erection work at 132kv s / s musafirkhana. all labors, t&ps etc. will be arranged by the contractor at his own cost. 18 36 kv vcb 19 36 kv bus isolator with other associated works 20 36 kv line isolator with e / s with other associated works 21 36 kv c.t. & 36kv p.t. 22 36 kv c.t. & p.t. junction box 23 33kv feeder control & relay panel 24 energy meter cubical 25 making of jumper of all equipment, jumpering work of all equipment horizontally from equipment to equipment and vertically from bus to equipment with acsr moose / panther conductor, fitting of suitable clamps including cutting, bending, giving proper shape. all required skilled labor, t&p shall be arranged by the contractor for completion of work. conductor and clamp will be provided by the department. 26 laying of following sizes control cables in cable trenches from control & relay panels in control room to various equipments, junctions boxes etc. in switchyard as per cable schedule including shifting of cables in drums from storage place at the sub station to erection site and shifting back the balance cables to stores at the sub station. 27 2c x 2.5 sq mm 28 4c x 2.5 sq mm 29 6c x 2.5 sq mm 30 termination of both sides control cable on ct, pt, cb and control & relay panel etc. as per drawing including cost of cable, glands, lugs and ferrules complete as per drawing & site requirement 31 earthing ofauxiliary structure, various equipments with the help of 50x6 mm & 25x6 mm size m.s. flat for double earthing along with cutting, straightening, bending, laying as per drawing of earthing and standard practice including cost of all required consumable materials, t&p, labor tec. for proper completion of work ( ms flat will be provided by upptcl ) 32 earthing ofcable trenchwith the help of25x6 mm ms flatalongwith cutting, straightening, bending, laying as per drawing of earthing and standard practice including cost of all required consumable materials, t&p, labor tec. for proper completion of work ( ms flat will be provided by upptcl ) 33 painting of m.s. earthing strips by rubbing with sand paper & wire brush, then painting with 1 coat of red oxide primer & 2 coats ( the 2nd coat of paint shall be applied at the gap of 48 hrs. when 1st coat of paint is done &.checked by concerneds.d.o.. / j.e. ) of .1st qualitysyntheticenamelpaintofasian / berger / nerolacmakeinbusgreen / black colour as per details below: 34 50 x 6 mm size m.s. earthing strip in bus green colour. 35 25 x 6 mm / 25 x 5 mm size m.s. earthing strip in black colour. 36 providing of junction box of.size 280 x225x150 mm duly made of 16 swg sheet and painted with smoke grey colour synthetic enamel paint and fitted with 1 no. 6 amp. sp mcb on anodizedm.s. channel, 1 no. bakelite fuse fitting with 6 amp. ns 6 type hrc fuse, 1 no. copper neutral link, bakelite terminal block of 4 terminals, cable glands suitable for 2c / 4c x2.5 sq.mm size incoming / outgoing control cables etc., then installation of junction box on g.i. column structures at designated height with the help of suitable m.s. clamps alongwith earthing of the junction box with 12 swg g.i. wire including cable termination with satisfactory testing & commissioning. 37 providing & fixing of g.i. pole bracket duly made of 40 mm dia. 1.2 meter long b class pipe and bent at one end by quarter circle in 1.0 meter at an angle of 30 degree for fixing of 125 watt led street light luminaries fitting on g.i. column structure with the help of m.s.clamps. 38 providing & fixing of 125 watt l.e.d. street light luminaries fitting of philips / crompton greaves / havells make in single piece die cast aluminium alloy housing with pot optics reflector & toughened clear glass cover with frame for lamp compartment inlcuding cable terminations. 39 laying of 2c x 2.5sq.mm. size control cables form junction box to led street light luminaries fittings through inside the m.s. pole / gi stricture including necessary fixing of cable on gi structure....

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

39099491 tender for work of construction of 01 no. 33 kv bay including all works at 132 kv s / s augasi under etd banda.; 1 details of work. 2 erection of auxiliary structure consisting of columns, beams, peaks, masts, etc and auxiliary structure required for installation of isolators, cts, pts, l.a.s and all other equipments. all material to be erected shall be applied by upptcl free of cost but all men, material and t&p required for satisfactorily completion of work shall be arranged by contractor at his own cost. 3 33 kv side ( auxilliary structure ) 4 erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material / equipments from store to erection site including all other associated work to complete the job satisfactorily. 5 36 k.v. c.b. 6 36 kv pt 7 36 kv ct 8 36 kv line isolator 9 36 kv bus isolator 10 ct / pt junction box 11 36 kv conventional triple feeder panel 12 abt meter 13 cutting, strengthening, bending, laying 800 mm below inside and above ground of following size of ms flat for earthing of main and auxiliary structure , equipment structure and its material, etc including welding with main earth mat and with object to be earthed / excavated of trenches it’s backfilling. 14 50 x 6 mm 15 25 x 6 mm 16 interconnection of following equipments and bus bar including cutting, bending of conductor and jumpering, clamping along with all other associated work to complete the job satisfactorily as per drawing and technical specification. 17 33 kv bay 18 preparation of interconnection diagram of various connection between cb, ct, pt, & triple feeder panel. 19 laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes and jb, etc in switchyard as per cable schedule. 20 2c x 2.5 sq mm. unarmoured. 21 4c x 2.5 sq mm. unarmoured. 22 6c x 2.5 sq mm. unarmoured. 23 termination of following sizes of cable as laid above as per cable schedule including making necessary holes in glands plates or box wherever required, supply and fixing of cable glands of appropriate size, supply &providing ferrules & nos for each core of cable and it’s termination with crimping type lugs of dowell / tension make and all associated work to complete the job satisfactorily. 24 2c x 2.5 sq mm. unarmoured. 25 4c x 2.5 sq mm. unarmoured. 26 6c x 2.5 sq mm. unarmoured. 27 work of illumination 28 supply &fixing of 120 watt led lamp crompton greaves, bajaj / havellsmake fitting including lamp, ballast igniter etc. for fixing on structure including cost of all material labour and t&p for completion of work 29 supply & fixing of junction box on lighting poles of size 200x200x150 mm. of ms sheet swg duly painted with synthetic enamel paint box should be fixed and backlite terminal strip of 4 nos terminal bothshould be fixed on sun mica sheet and half round m.s. clamp with gi pipe for fixing the junction box on the structure 30 supply & fixing of 16 amp. mcb make crompton greaves, bajaj / havells make fitting on structure including cost of all material labour and t&p for completion work. 31 laying of 2x2.5 / 4x2.5 sq mm pvc cable 50cm.blow the ground level in pvc conduct pipe after excavation and back fitting including all labor pvc pipe etc. 32 rates qouted by the bidders shall be without taxes. taxes applicable if any to paid extra...

Kanpur Electricity Supply Co Limited - Uttar Pradesh

39057550 supply of various type of relay , electrical items : , auxilliary relay 3no+2nc+1r make siemens/crompton greaves/abb/schneider/areva/alosthom/g.e (scada compatible) , 11 kv o/c & e/f digital relay, 3 oc +1 ef, in 1/5a , v x 24 60v make siemens/crompton greaves/abb/schneider/areva/alosthom/g.e (scada compatible) , 33 kv control relay pannel for single transformer make siemens/crompton greaves/abb/schneider/areva/alosthom/g.e (scada compatible) , 33 kv control relaypannel for double transformer make siemens/crompton greaves/abb/schneider/areva/alosthom/g.e (scada compatible) , master relay for 33 kv control digital relay pannel make siemens/crompton greaves/abb/schneider/areva/alosthom/g.e (scada compatible)...

Indian Oil Corporation Limited - Uttar Pradesh

38828739 supply of abb spares relays , list of item(s) / work(s) as per tender documents , relay,ref615,p/n:hbfjaeagnda1bna11g,abb , feeder prot. relay, abb, ref615 , motor protection relay abb rem 615 , relay,under voltage,reu 615, abb , feeder prot./control relay, abb, ref620 , fdr prot relay, abb make, ref 615e_g...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

38710383 work of acdb & dcdb along with associated work at 132 kv substation kosikalan under etd mathura 1 installation of 110v dcdb 2 carrige of 110 v dcdb panel from 132 kv s / s aurangabad to 132 kv s / s kosikalan work includes loading of its from 132 kv s / s aurangabad and unloading of its at 132 kv s / s kosikalan store and associated work required to complete the job satisfactorily. 3 installation and erection of 110v dcdb as per instruction specifications including shifting of it from store to control room with the help of hydra and men power & its proper earthing . 4 developing interconnection schedule as per new dcdb for making connection. 5 making electrical connections in dcdb panel side by newly laid cable as per manual and drawingto complete the job satisfactorily work includes as required as per direction of supervising engineer to complete the job satisfactorily 6 laying of following sizes of control cable in the cable trench from control relay panel to various equipments marshalling boxes of following size as below. 7 2x2.5 sq. mm ( each end ) 8 safely removing termination of different control cable from existing dcdb panel 9 installation of 415v acdb in lt room 10 installation and erection of 415v acdb as per instruction specifications including shifting of it from store to control room with the help of hydra and men power & its proper earthing . 11 installation and erection of 415 v ldb as per instruction specifications including shifting of it from store to switchyard with the help of hydra and men power & its proper earthing . 12 making electrical connections in ldb / breaker / control panel side by newly laid cable as per manual and drawingto complete the job satisfactorily work includes as required as per direction of supervising engineer to complete the job satisfactorily 13 laying of following sizes of control cable in the cable trench from control relay panel to various equipments marshalling boxes of following size as below. 14 6x2.5 sq. mm ( each end ) 15 4x2.5 sq. mm ( each end ) 16 2x2.5 sq. mm ( each end ) 17 removel of damaged / defective cable of various size from the cable trench laidfrom control panel to various equipments as below. 18 6x2.5 sq. mm ( each end ) 19 4x2.5 sq. mm ( each end ) 20 2x2.5 sq. mm ( each end ) 21 laying of 3x95 / 50 sq mm lt power cable 50 cm. blow the ground level after exacavation and to put the bricks and river sand along the side of cable and back filling.and all other associated work to complete the job satisfactory as per direction of supervising engineer....

East Central Railway - Uttar Pradesh

38678183 supply, erection, testing & commissioning of control & relay panel for 25kv tss as per rdso specification no. ti / spc / psi / protect / 6071. control voltage 220vdc ( for single transformer & single feeder ) or latest [ warranty period: 30 months after the date of delivery ] ...

Northern Railway - Uttar Pradesh

38581800 supply of high speed transformer auxiliary tripping relay for 2 x 25 kv control & relay panel of tss as per rdso spec no: ti / spc / psi / protct / 7100 ( 07 / 2012 ) with a & c slip no.1or latest [ warranty period: 30 months after the date of delivery ] ...

East Central Railway - Uttar Pradesh

38395694 supply, erection, testing & commissioning of control & relay panel for 25kv tss as per rdso specification no. ti / spc / psi / protect / 6071. control voltage 220vdc ( for single transformer & single feeder ) or latest [ warranty period: 30 months after the date of delivery ] ...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

38219610 construction of 132 kv bay and conversion of 01 no. 132kv radialbay to normal at 132kv ss mauranipur under etd jhansi 1 erection of following different type main and auxiliary structure, columns, beams, peaks, masts ets. suitable for placing of 132kv equipments. 2 main structure & auxiliary structure 3 erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material / equipments from store to erection site including all other associated work to complete the job satisfactorily. 4 132kv c.b. 5 132kv bi 6 132kv li 7 132kv ti 8 132kv double feeder simplex type control panel 9 132kv dpp 10 132kv ct 11 132kv pt 12 132kv la 13 132kv post insulator. 14 132kv ct & pt junction box 15 0.2 class accuracy abt energy meters ( main & check 2 nos. ) with cubicle. 16 cutting, strengthening, bending, laying 700mm.below in side ground and above ground of following size of ms flat for earthing of main and auxiliary structure, equipment structure t / f body and its material etc. including welding with main earth mat and with object to be earthed / excavation of trenches its back filling. 17 75x10mm ms flat 18 50x6mm ms flat 19 25x6mm ms flat 20 delta earthing of 120kv la consisting of fabrication of 06 nos. 40mm dia 3 mtr. long electrodes, its placing inside ground and forming of ring by 75x10mm ms flat. 21 interconnection of equipments and bus bar including cutting, bending of conductor and jumpering, clamping along with all other associated work to complete the job satisfactorily as per drawing and technical specn. 22 132kv side 1xz , 1xp ( for both bays ) 23 laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes and jb etc. in switchyard as per cable schedule. 24 2c x 2.5 sq mm. unarmoured. 25 4c x 2.5 sq mm. unarmoured. 26 6c x 2.5 sq mm. unarmoured. 27 termination of 132kv bay including cost of cable glands, ferrules and lugs complete at both end as per cable schedule. 28 preparation of cable laying schedule and cable inter connection diagram for complete operation with job satisfactory. 29 the rates qouted by the bidders should be without gst. gst to be paid extra, if applicable....

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

38144899 addition of 01 no. 132 / 33 kv, 63 mva t / f and its bay at 132 kv s / s rasara under etd, ballia. 1 bolted type tension gun fitting suitable for single acsr panther conductor . 2 bolted type suspension gun fitting suitable for acsr pantherconductor 3 p.g clamp made of aluminium alloy with 3 nos. suitable size galvanized g.i. nut, bolts & washer for panther to panther conductor. 4 p.g clamp made of aluminium alloy with 4 nos. suitable size galvanized g.i. nut, bolts & washer for moose to moose conductor. 5 p.g clamp made of aluminium alloy with 4 nos. suitable size galvanized g.i. nut, bolts & washer for moose to panther conductor. 6 bus post clamp suitable formoose 7 bus post clamp suitable forpanther 8 g.i nut. bolt with washer size 16x40 mm 9 g.i nut. bolt with washer size 16x45 mm 10 g.i nut. bolt with washer size 16x50 mm 11 70 kn disc insulator 12 40 mm ms rod for main earthmat 13 40 mmdia ms electrodeof 3 meter length 14 36kv , 1 core 630 sqmm , xlpe copper conuctor power cable 15 36kv termination kit at both end for 1x630 mm^2 mmm xlpe copper cable 16 shifting upto 20 m of main tank ofdismantled 63 mva , 132 / 33 kv transformer ( defectivem / s aditya make ) from unloading place to suitable placeincluding turning of tank , if required. all t&p and all other associated works fo completion of job satisfactory. 17 additinal shifting of 5 meter a part therof 10 meter of 63 mva132 / 33 kv transfomer@5 meter per job. 18 shifting upto 20 m of main tank of 40 mva , 132 / 33 kv transformer from unloading place to plinth including turning of tank , if required. all t&p and all other associated works fo completion of job satisfactory. 19 additinal shifting of 5 meter a part therof 50 meter of 40 mva132 / 33 kv transfomer@5 meter per job. 20 complete erection of40 mva, 132 / 33 kv transformerby erection of radiators, conservator tank, all bushing, their turrets connecting allpipe lines, cooling fans, motor drive mechanism of tap charger, rtcc panels, oil pumps and associated oil pipe lines etc to complete the job satisfactorily including first filling of oil and topping up of t / f oil ( not circulation ) in tank radiators, oil pipe lines, conservator tank etc, and attending the oil leakage, if any and all other associated works for satisfactory completion of job. crane and t&p shall be provided by the contractor 21 following testing of t / f oil if any nabl accredite lab the detail as: bdvppmdga 22 centrifuging of fresh transformer oil and filling of balance oil into the transformer with machine , operator and to provide final bdv & ppm testing results. machine and operator will be provided by the contractor. 23 jumpering of 40 mva t / f hv side 1 x panther conductor 24 lv side with 1x moose conductor 25 construction of delta earthing by piercing3.00 meter long electrodes in earth and then connecting them with each other by 75x10 mm m.s flat and connectingtoneutal bushing , the same with main earthmate at 2 places ( x&y axis of main earth mat of the substation ) as required, excluding the cost of m.s. bar and m.s. flat to be provided by the department free of cost. and all other associated work to completion the job satisfactory. 26 part c, work ( erection of63 mva t / f bay ) sortng, countingand loading and carriage of substation structure ( 20mt ) from efu naini prayagraj to 132 kv s / s ballia and after carriage unloading it at 132 kv s / s ballia.sortng, countingand loading of g.is / s structure ( 20 mt ) at efu naini . 27 carriage of s / s structure ( 20mt ) from efu naini pryagraj to 132 kv s / s ballia ( approx distance 350 km ) ( 20m.t x340km ) =6800. 28 unloadingand stacking of g.istructure ( 20 mt ) at 132 s / s ballia. 29 erection of main and auxiliary structure by shifting of structure from store to work siteas per relevant drawing and practices using nut bolt and spring washers .the material shall be supplied by department free of cost but the contractor has to managet & p and all other associated work to complete the job satisfactory. 30 stringing ofthreephase 132 kv jack bus barwith acsr single panther conductor. the workincludes cutting, bending and clamping fitting of tension clamp with all associated accessories, hoisting of insulator string after shifting of material from store to worksite and all other associated work to complete the work satisfactory. 132kv jackbus bar 31 132kv making y shape jumpers 32 erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material from store to work site includig all other associated work to complete the job satisfactory.145 kvbsi 33 145 kv ct 34 145kv post insulator 35 132kv transformer ( c&r ) panel 36 145 kv pt 37 120 kv la 38 145 kv sf6 , cb 39 junction box for 145 kv ct 40 erection of 33kv equipments 30 kv la 41 36 kv ct 42 junction box for 36 kv ct 43 36 kv vcb 44 36 kv bsi 45 132kv transformer ( c&r ) panel 46 erection of abt energy metering panel with main and check rack 47 doubel feeder control panel of 132kv chitabargaon 48 dismantiling of 132kv control panel of 132kv chitabaragaon in old control panel including disconnecting control cablethen shifting in new control panel. 49 equipment interconnection jumpering with main bus bar job includes bending of conductor in proper shape tightening with help of clamps and other associated work to complete the job.transformer bay for 132kv & 33 kv side 50 132kv transfer bay 51 laying of follwing size control cables from control & relay panels to various equipment junction boxes etcin switchyard as per cable schedule, its binding at every 1.5 mtr. distance with m.s. saddle including carriage of cable from store to work site and shiftingback to store and all associated works to complete the job satisfactorily .2c x 2.5 sq. mm 52 4cx 2.5 sq. mm 53 6cx 2.5 sq. mm 54 10cx 2.5 sq. mm 55 delta earthing of 120 kv and 30 kv la consisting of 03 nos 3 meter long electodes its placing inside the ground and connecting all three electrodes with 75x10 mm ms flat and connecting the same with laat two place required including cost of m.s stripexcluding cost of m.s round bar. 56 earthing ofmain & auxiliary structure and various type equipments ( ct, pt, cb, la, lsi, bsi etc ) by m.s strips by cutting to proper size, digging of earth from ground level to earthmat then proper welding as per drawing and leveling earth. painting of m.s strips of one coat red oxide primer and two coat with green colourand all associated work to complete the job satisfactory . m.s flat will be provided by the contractor.75 x 10 mm 57 50 x 6 mm 58 termination of above cable as per cable schedule including making necessary holes in gland plates of boxes where ever required including supply and fixing of cable glands of approxinmate size and to provide ferrules and nos. for each core of cable and its termination with all the other associated works to complete the job. 59 layingof 40 mm dia. round bar 700 mm below ground level including cutting straightening , welding painting excavation of earth in trench from back filling after completion of work with all other associated work to complete the job satisfactory , excluding cost of 40mm dia round bar. 60 fabrication of3 meter long electrode with 40 mmms round bar having 150 mm conical shape and then its piercingvertically inside the ground with top 700 mm below ground level and its welding exluding cost of 40 mm dia. round bar. 61 laying of 36kv, 1 x 630 sqmm ht power xlpecable ( 4nos. 03 no for o1 set and 01 core for spare ) & jointing of outdoor cable jointing kit ( 08 no ) and other associated work complete the job satisfactory ....

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

38026344 tender for work of carriage of various type of materials and equipments from different substation to 132 kv s / s nautanwa, maharajganjfor construction of 02 nos. 132 kv mainhiya ( nepal ) bay at 132 kv s / s nautanwa , maharajganj under etd ii , gorakhpur 1 loading , carriage and unloading of 02 nos. 145 kv sf 6 cb from 132 kv s/s maharajganj. 2 safely loading of 02 nos. 145 kv sf 6 circuit breaker in a private truck at with the help of hydra/ crane. all man power and t&p cost are included. 3 safely carriage of 02 nos. 145 kv sf 6 circuit breaker to 132 kv s/s nautanwa, maharajganj (approx. 62.00 kms.) . 4 unloading of 02 nos. 145 kv sf 6 circuit breaker from private truck at 132 kv s/s nautanwa , maharajganj on as per direction of supervisory engineer. all man power and t&p cost are included. 5 loading , carriage and unloading of 06 nos. 145 kv ct from 132 kv s/s deoria (03 nos.) and 132 kv s/s naugarh (03 nos.) . 6 safely loading of 06 nos. 145 kv ct in a private truck with the help of hydra/ crane. all man power and t&p cost are included. 7 safely carriage of 06 nos. 145 kv ct in a private truck to 132 kv s/s nautanwa, maharajganj (approx. 153.00 kms. from 132 kv s/s deoria and approx. 55.00 kms.) from 132 kv s/s naugarh). . 8 unloading of 06 nos. 145 kv ctfrom private truck at 132 kv s/s nautanwa , maharajganj on as per direction of supervisory engineer. all man power and t&p cost are included. 9 loading , carriage and unloading of 06 nos. 145 kv pt from 132 kv s/s anand nagar , maharajganj . 10 safely loading of 06 nos. 145 kv pt in a private truck with the help of hydra/ crane. all man power and t&p cost are included. 11 safely carriage of 06 nos. 145 kv pt in a private truck to 132 kv s/s nautanwa, maharajganj (approx. 46.00 kms. ) . 12 unloading of 06 nos. 145 kv ptfrom private truck at 132 kv s/s nautanwa , maharajganj on as per direction of supervisory engineer. all man power and t&p cost are included. 13 loading , carriage and unloading of 04 nos. 145 kv t.i. from substation under etd ii , gorakhpur. 14 safely loading of 04 nos. 145 kv t.i. in a private truck with the help of hydra/ crane. all man power and t&p cost are included. 15 safely carriage of 04 nos. 145 kv t.i. in a private truck to 132 kv s/s nautanwa, maharajganj (approx. 100.00 kms. ) . 16 unloading of 04 nos. 145 kv t.i.from private truck at 132 kv s/s nautanwa , maharajganj on as per direction of supervisory engineer. all man power and t&p cost are included. 17 loading , carriage and unloading of 75 nos. 145 kv p.i. from 132 kv s/s gida and 220 kv s/s gola, gorakhpur. 18 safely loading of 75 nos. 145 kv p.i. in a private truck with the help of hydra/ crane. all man power and t&p cost are included. 19 safely carriage of 75 nos. 145 kv p.i. in a private truck to 132 kv s/s nautanwa, maharajganj (approx. 96.00 kms. from 132 kv s/s gida and approx. 155 kms. from 220 kv s/s gola).. 20 unloading of 75 nos. 145 kv p.i.from private truck at 132 kv s/s nautanwa , maharajganj on as per direction of supervisory engineer. all man power and t&p cost are included. 21 loading , carriage and unloading of 01 nos. 145 kv feeder control & relay panel (sas based) from 220 kv s/s gola, lakhimpur khiri. 22 safely loading of 01 nos. 145 kv feeder control & relay panelin a private truck with the help of hydra/ crane. all man power and t&p cost are included. 23 safely carriage of 01 nos. 145 kv feeder control & relay panelin a private truck to 132 kv s/s nautanwa, maharajganj (approx. 380.00 kms. from 220 kv s/sgola , lakhimpur khiri).. 24 unloading of 01 nos. 145 kv feeder control & relay panel from private truck at 132 kv s/s nautanwa , maharajganj on as per direction of supervisory engineer. all man power and t&p cost are included. ...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

37803822 carriage of 198 kv lightening arrester, 245 kv bpi, 220 kv control & relay panel ( duplex type ) and armoured control cables from various sites to electy. 400 kv sub station dahi chowki, unnao alongwith other associated work under electy. 400 kv sub station division dahi chowki, unnao...

Uttar Pradesh Jal Nigam - Uttar Pradesh

37729035 rehabilitation of old sewer line and construction of ips laying of rising main and alternate lying of trunk sewer line to 15 mld mps baniyapur in distt 3 zone 1 kanpur under state sector programme , schedule g1 (repair & laying of trunk sewer line works from gangpur to singhpur tiraha at baniyapur) provision for m.s. sheet of size (3.0 m x 1.8 m) barricading of roads including provision for traffic diversion/ regulation, barricading trench and working area from all sidefor traffic safety during construction period all time, including provisions confiming indian safety codes,caution boards, project boards, night light,watch & ward, 2 m tall barricading boards, reflectors, safety cones, ppe of labours i.e. safety shoes, safety jackets, safety ropes etc t&p etc. , supply of all materials, labour and t&p etc. for making temporary roka arrangement as per requirement in 1000 mm dia existingrcc pipe between mh no. 29 (shivdhampur) to mh no. 31 (gangpur) , de silting of 1000 mm diameter old trunk sewer using high pressure water jetting equipment and super sucker machines including plugging of manholes, pumping and disposal of silt at suitable place as per direction of engineer in charge including all labour , t&p equipment all complete. , repairing of old trunk sewer line by grauting including supply of all material, labour, t&p equipment all complete. , dismentaling/cutting of bituminous road, at following location including stacking properly old serviceable materials and disposal of unserviceable materials as per direction of engineering in charge. including all labour t & p etc complete. mh no. 36 to proposed ips at singhpur tiraha (narchar international school to proposed ips at singhpur tiraha) , providing and conveying to site 1000 mm pccp pipes (pre stressed concrete cylinder pipe) with internal epoxy lining confirming to is 784:2019 at following location including cost of labour, transpotation, loading, unloading , stacking etc. (excluding cost of laying, & jointing etc. mh no. 36 to proposed ips at singhpur tiraha (narchar international school to proposed ips at singhpur tiraha) , excavation of trenches for sewer in ordinary soil, loam, clay or sand by mechanical means (hydraulic excavator) including lead upto 50.0 m filling,watering, ramming excavated earth in to the trenches or spall between the trenches disposal of surplus earth up to distance of 50.0m from centre of the trenches complete work all materials, labour ,machinary , and t&p etc. complete. for repairing of existing pipe line (for depth of 4.50 to 6.0 m) , 0.00 1.50 m , 1.50 3.00 m , 3.00 4.50 m , 4.50 6.00 m , 6.00 7.5 m , supply of all materials, labour and t&p etc. for pumping out subsoil water including pumps, dg set etc. & all arrangement, equipments required for pumping , provide and fixing open(0 3.0m) and close(3.0m 10.50m) timbering in trenches for the different depth below g.l. consisting of 40 mm thick approvedapproved country wood plank for polling board, 125x125 mm form indian sal woodand 100 mm dia ballies for struts @ 1.5 m c/c including removal after laying of sewer, both side of trenches will be taken as one side for the purpose of payment, area equal to length x depth of trenches. for 3.0 to 6.0 m deep , for 6.0 to 9.0 m deep , laying & jointing of 1000 mm dia pccp pipe at following depth including all taxes and duties, transpotation upto site of works as per is 784:2001 or its latest amendment for sewer line with sliding overlap weld joint and joint ring shall be formed by one piece of steel or number of pieces of steel but welded together. the ring shall be expanded beyond their elastic limit so as to achieve accurate dimensions and shape including all setup, equipment,material, t&p, etc for pumping out of subsoil water , for proper laying & jointing, bedding,, centering, boxing of joints, including shifting & reinstatement of utilities of up irrigation dept/ kda/ up awas vikas parishad/ railways/ bsnl / gail/ cugl/ kesco/ military/ jalkal/ up jal nigam etc complete with all materials, labours, t&p etc. 4.50 6.00 m , 6.00 7.5 m , construction ofrcc manhole of, followingsizes as per unit estimate, including all material ,labour and t & p etc. size (1800 x 1800)mm of depth up to 6.00 m , size (1800 x 1800)mm of depth up to 7.50 m , reinstatement of old dismantle bituminous roads as per pwd nh specificationsand new short fallen materials for proper finishing of surface including supply of materials, labour and t&p etc. required for proper completion of work as per direction of engineer in charge. , schedule g2 ( laying of trunk sewer line works from dhanaupur to existing 15 mld mps at baniyapur) providing m.s. sheet of size (3.0 m x 1.8 m) barricading of roads including provision for traffic diversion/ regulation, barricading trench and working area from all sidefor traffic safety during construction period all time, confiming indian safety codes,caution boards, project boards, night light,watch & ward, 2 m tall barricading boards, reflectors, safety cones, ppe of labours i.e. safety shoes, safety jackets, safety ropes etc t&p etc. , dismentaling/cutting of bituminous road, at following location including stacking properly old serviceable materials and disposal of unserviceable materials as per direction of engineering in charge. including all labour t & p etc complete. from dhanaupurwa to 15 mld mps , supply and conveying to site 1000 mm pccp pipes (pre stressed concrete cylinder pipe) with internal epoxy lining confirming to is 784:2019 at following location including cost of labour, transpotation, loading, unloading , stacking etc. (excluding cost of laying, & jointing etc. from dhanaupurwa to 15 mld mps , installation of product pipe by manual pipe jacking method including making of entry and exit pits, all related civil works like excavation, shoring/strutting, etc., manual shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit after project completion as per the instructions of the engineerin charge all complete except the cost of the pipe, , excavation of trenches for sewer by mechanical means (hydraulic excavator) in ordinary soil, loam, clay or sand including lead upto 50.0 m filling,watering, ramming excavated earth in to the trenches or spall between the trenches disposal of surplus earth up to distance of 50.0m from centre of the trenches complete work all materials, labour, , and t&p etc. complete. 0.00 1.50 m , 1.50 3.00 m , 3.00 4.50 m , 4.50 6.00 m , 6.00 7.5 m , supply of all materials, labour and t&p etc. for pumping out subsoil water including pumps, dg set etc. & all equipments required for pumping , provide and fixing open(0 3.0m) and close(3.0m 10.50m) timbering in trenches for the different depth below g.l. consisting of 40 mm thick approvedapproved country wood plank for polling board, 125x125 mm form indian sal woodand 100 mm dia ballies for struts @ 1.5 m c/c including removal after laying of sewer, both side of trenches will be taken as one side for the purpose of payment, area equal to length x depth of trenches. for 3.0 to 6.0 m deep , for 6.0 to 9.0 m deep , laying & jointing of 1000 mm dia pccp pipe at following depth including all taxes and duties, transpotation upto site of works as per is 784:2001 or its latest amendment for sewer line with sliding overlap weld joint and joint ring shall be formed by one piece of steel or number of pieces of steel but welded together. the ring shall be expanded beyond their elastic limit so as to achieve accurate dimensions and shape including all setup, equipment,material, t&p, etc for pumping out of subsoil water , for proper laying & jointing, bedding,, centering, boxing of joints, including shifting & reinstatement of utilities of up irrigation dept/ kda/ up awas vikas parishad/ railways/ bsnl / gail/ cugl/ kesco/ military/ jalkal/ up jal nigam etc complete with all materials, labours, t&p etc. 4.50 6.00 m , 6.00 7.5 m , construction ofrcc manhole of, followingsizes as per unit estimate, including all material ,labour and t & p etc. size (1500 x 1500)mm of depth up to 6.00 m , size (1500 x 1500)mm of depth up to 7.50 m , size (1500 x 1500)mm of depth up to 9.00 m , reinstatement of old dismantle bituminous roads as per pwd nh specificationsand new short fallen materials for proper finishing of surface including supply of materials, labour and t&p etc. required for proper completion of work as per direction of engineer in charge. , schedule g3 ( sump well) excavation in foundation in ordinary soil (loam, clay and sand) for depth given below g.l. for effluent channel laying sewers. manholes, gully pits chambers, sumps etc. including cutting of joints pits, trimming, refilling, dressing leveling of trenches in 20cms layers, watering & ramming the same including removal of surplus earth and other dismantled materials up to 50m from the center of trenches. 0.00 m to 1.50 m , 1.50 m to 3.0 m , making well kerb shoe made of 150*150*18mm angle iron with 250*18mmflat iron brought to required form including supply of steel, bolts, nuts welding etc. complete as per drawing. , 250*12 mm flat , well sinking of 8.0 m (external dia) in ordinary soil below spring level, including supply erection and working of all plants required as well as loading and unloading of weight and bailing and pumping out water with machinery or otherwise as required and disposal of surplus earth upto 5 metre from 0 1.5 metre. , from 1.5 3.0 metre. , from 3.0 6.0 metre. , from 6.0 9.0 metre. , from 9.0 12.0 metre. , cement concrete with followinggauge approved stone ballast, coarse sand and cement in foundation including supply of all materials, labor, t & p etc; required for proper completion of the work. plug (m15) concrete with 20 mm stone ballast, coarse sand and cement 4:2:1 , plug (m15) concrete with 20 mm stone ballast, coarse sand and cement 4:2:1 , sand filling in sump well from well curb to bottom of well slab , r.c.c. 1:1:2 in cement, coarse sand & 20mm gauge stone ballast in well and floor of screening chamber excluding supply of reinforcement and its bending but including its fixing and binding with 0.50mm thick binding wire ( to be supplied by the contractor free of cost) and including necessary centering, shuttering curing and including all materials, labor, t & p etc; required for proper completion of the work. kerb shoe , in base , from kerb shoe to inlet of sewer , from inlet of sewer to top of well , top slab for sump , supply and erection of 250mm ms perforated pipe with blind flange, nut & bolt. , supply and fixing of girder of ismb250 size over the pump house including cost of cutting and wastage as per direction of engineering in charge and its painting with approved paint and also one coat of primer. , mild steel and iron work in rcc to required shape an necessary including bending for proper completion of workk including supply of steel and wastage , supply and painting with anticorrosive paint epoxy base paint inside sump up to roof slab including cost of labour, materials, t&p etc. complete. , supply and fixing of g.i.25 mm dia pipe railing in three row 1.0m.high. , pumping or bailing out of subsoil water for lowering the water table for excavation work, laying of pcd ms work, raft plaster etc. all complete as per station required up to full depth of work the help of well point equipment for 25 days@ 4 pumps , supply of all materials and fixing of aluminium ladder 100 50 channel section (medium) as including cost of 20mm pipe railing, costing of landing, fixing of angles. , provision of ms grill cover over with angle iron frame of 40*40*6mm on working platform , provision of water proofing compound for construction under sub soil water. , schdule g4 (rising main) supply of 350mm dia.pipe and specialssuitable for destination including all taxes. 350 mm dia di k 9 pipes , supply & fitting of specials @ 10% of 1(a) & 1(b) , dismantling of bitumin roads disposal of unserviceable materials within 50m from the site of work as directed by the engineer in charge including its temp reinstatement by hand ramming to make walkable. , excavation for pipe lines in ordinary soil lift upto following and lead upto 50m including filling back, watering, ramming in trenches and removal of surplus earth. 0.0 to 1.5m , laying & carting ofpipes and specials of 350mm dia. from store to the site of work, lowering them into the trenches and laying and jointing to alignment including testing of pipe. 350 mm dia di k 9 pipes , construction of thrust blocks of size 1.8m x 1.8m x 1.8m , supply & fitting of air valves of size 25mm. , reinstatement of old dismantle bituminous roads as per pwd nh specificationsand new short fallen materials for proper finishing of surface including supply of materials, labour and t&p etc. required for proper completion of work as per direction of engineer in charge. , site clearance & other unforeseen items. , schdule g5 (d.g. plate form) size of d.g. plateform size of transformer plateform concrete in 1:4:8 with cement, coarse sand and 40mm gauge stone ballast including supply of all materials labours and t&p etc. required for the proper completion of work. transformer , d.g set , reinforced cement concrete in1:1.5:3 with cement coarse sand and 20mm stone grit in foundation footing etc. excluding supply of reinforcement and its bending but including its fixing, binding the same with 0.50mm thick binding wire (to be supplied by the contractor) including of all materials, labour, and t&p etc. required for the proper completion of work transformer , d.g set , cable trench for d.g set p.c.c (1:4:8) , floor slab , vertical wall , cover , mild steel or iron work in plane work such as in r c.c work (when not included in over all rates; wrought to the required shape as necessary including bending for the completion of work and including supply of all matenals, labours, t&p etc. complete , provision for ms grill in 2.0m height all around dg set for safety against theft and tempering etc. , provision for tubular truss in mild steel or iron work in heavy section including drilling revetting and welding and also including supply of steel bolts,nuts and their fixing required for proper completion of work , supply & fix 0.63mm thick ridges,valley & gutter for gc iron roofing , schdule g6 (meter, ht & lt panel room) construction cost of lt panel room building(6.0m x 5.0m) , construction cost of meter and ht panel room building (5.5m x 8.0m) , schdule g7(boundry wall, gate and site development) excavation of earth in ordinary soil (loan, clay and sand) in manhole, gully pits, sump and chambers for depth upto 1.50m below g.l. including watering, ramming, dressing, filling back between wall and foundation and disposal of surplus earth with 50m including supply of all labours and t&p etc. required for the proper completion of work. , concrete in 1:4:8 with cement, coarse sand and 40mm gauge stone ballast including supply of all materials labours and t&p etc. required for the proper completion of work. , mild steel for raft of column of size 1000 mm x 1000 mm (12 mm dia bar of spacing 150 mm) , distribution bar for raft of column (12mm dia bar spacing 150 mm) , mild steel for column of size 230 mm x 230 mm (12 mm dia bar) , distribution bar (8 mm dia bar spacing 250 mm) , mild steel for beam of size 230 mm x 230 mm (10 mm dia bar) , distribution bar (8 mm dia bar spacing 150 mm) , mild steel for copping of size 230 mm x 150 mm(8 mm dia bar) , distribution bar (8 mm dia bar spacing 200 mm) , r.c.c. work with cement coarse sand and 20 mm gauge approved stone ballast in proportion 1:1:5:3 in columns excluding supply of reinforcement and its fixing and binding with 0.50mm thick binding wire to be supplied by the contractor and including necessary centering and shuttering supply of all material, labour t&p etc. required for proper completion of the work. r.c.c. work for column of size 230 mm x 230 mm , r.c.c. work for beam of size 230 mm x 230 mm , r.c.c. work for copping of size 230 mm x 150 mm , 1st class brick work in 1:4 cement, & coarse sand mortar in foundation and plinth including supply of all materials labour t&p etc. required for proper completion of thework. , ist class brick work in 1:4 cement, and coarse mortar in super structure including supply of all materials labour t&p etc. required for proper completion of the work , 12 mm thick 1:4 plaster with cement, and coarse sandover brick minimum thickness not be less than 10mm including supply of all materials, labour, t&p etc. required for propre completion of work. , weather proof painting of reputed company (asian, berger) two coats using approved coloring materials of buff, blue brown shades over one primary coat including supply of all materials labour t&p etc. required for proper completion of the work , earth filling in plinth including supply of necessary quantity of earth from a distance not exceeding 10 km. from the site of work and including watering, dressing etc. rate to include the cost of all materials, labour t & p etc. required for proper completion of work. , supply and fix m.s. clamps of size 50x50x6x100 mm for gates including supply of all materials labour , t&p etc . required for proper completion of the work . , supply and fixingof m.s. gate of 3.60 m wide as per type design including necessary fabrication for proper completion of work. , same as above but for wicket gate 1.2 m as per type design. , supply of all material and labour t & p etc for making drain in campous as per unit estimate , supply of all material and labour t & p etc for making internal interlocking road in campous as per unit estimate , fixing of 40 mm dia p.v.c. conduit pipe including specials & cutting etc. for clectric wiring including supply of all materials labour, t&p etc. required for propre completion of work. , painting the gate with one cost of primer and two coats of approved paint including supply of all materials, labour, t&p etc. required or proper completion of work , for wicket gate 1.2 m as per type design , supply of all material and labour t & p etc for making external cc road outsidecampous as per unit estimate , provision for other unforseen item and site development , schedule g 8 (tapping arrangement, screen channel and other appurtenant works ) excavation of earth in ordinary soil (loan, clay and sand) in manhole, gully pits, sump and chambers for depth upto 1.50m below g.l. including watering, ramming, dressing, filling back between wall and foundation and disposal of surplus earth with 50m including supply of all labours and t&p etc. required for the proper completion of work. for screen channel 0.00 – 1.50m , supply of all materials, labour and t&p etc. for pumping out subsoil water including pumps, dg set etc. & all arrangement, equipments required for pumping , concrete in 1:4:8 with cement, coarse sand and 40mm gauge stone ballast including supply of all materials labours and t&p etc. required for the proper completion of work. for screen channel , reinforced cement concrete in1:1.5:3 with cement coarse sand and 20mm stone grit in foundation footing etc. excluding supply of reinforcement and its bending but including its fixing, binding the same with 0.50mm thick binding wire (to be supplied by the contractor) including of all materials, labour,and t&p etc. required for the proper completion of work bed slab of screen channel , vertical wall of screen channel , plateform for cleaning of screen , mild steel or iron work in plane work such as in r.c.c work (when not included in over all rates) wrought to the required shape as necessary including bending for the completion of work and including supply of all materials, labours, t&p etc. complete. , supply of all material ,labour and fixing of s.s. gate for inlet channel of 12 mm thickplate of following size including frame ,spindle etc screen channel(2.0m x 1.0m) , providing and fixing mild steel ladders for entering in to sump and valve chamber made up of standard channel section, chakered plates and equipped with 32mm diameter gi pipe railing welded and finshed as per satisfaction of engineer incharge including supply of all materials labour and t&p etc forproper completion of work. , schedule of ( e&m) work ips singhpur tiraha works to be carried out by u.p.jal nigam h.t.panel( comprising with 1 i/c and 2 o/g. supply , installation, testing and comissioning of 2mm. thick factory made 11 kv, 630 a, 20ka / 3 sec, out door extensible type ip54 for panel & ip67 for main circuits ring main unit (rmu) iec 62271 200 in suitable rcc foundation with 2 no.load break switch & 1 no. vcb circuit breaker with over load, earth fault, short circuit relay, copper bus bar, bus support and insulation marerial epoxy resin,ring core protection & metering ct, auxiliary relay for wti, oti, bucholz alarm & trip along with annuciator panel, master trip relay, mechanical on / off / earth indication, voltage presence indicator, shunt trip coil, 24 v dc power pack, digital multi function meter, with bus pt panel with 3 nos single phase voltage transformers of the ratio 1kv/v3 / 110 v/v3, 25 va, class 1.0 with ht fuses in the primary and mcb on the secondary side, voltmeter with selector switch, r y b phase indication, anti reflex operating handle, right angle boots etc. every vcb panel should have 1 power pack with battery charger and charging device complete in all respect. (1 incoming and 2 outgoing) ref.e230700 (pre bsr 2021) , providing & laying xlpe insulated as per is:7098/ii/85 h.t.cable as per pwd specification for electrical works for working voltage 11 k.v.(e) in existing rcc / hume /stoneware / pvc pipe/ open duct/cable trench, on existing cable trays or on surface etc. including making necessary connection, testing etc. 3 core x 120sq.mm. armored ht cable (from ht panel to transformers) ref.e130101 (pre bsr 2021) , trench making and covering of trench in all respect. ref.e130300, e130400, e130500 and e130700 and (pre bsr 2021) , sitc of 11 kv end termination kit indoor type (3 core, 120sq.mm) ref.e131313 (pre bsr 2021) , 11 kv, 2.5 mm thick with proof voltage 22 kv / 3 min. and break down voltage 45 kv ref.e081202 (pre bsr 2021) , transformer: s i t c of oil cooled copper wound distribution transformer of 200 kva rating 11/0.433kv delta star connected, vectordyn 11,onan cooled & bis approved as per is ,losses as defined as per is 1180 part i 2014. including standard accessories like conservator, silica gel breather, radiator, fins, ht cable box & lt cable boxes, temperature rise in winding/oil 35 40 degree c, isi marked drain valve, dial type temperature gauge, first filling of transformer oil as per is :335 1953, epoxy based paint, including carrying of pre commission testing & charging of transformer complete in all respect.(as per budgatry offer attached). rating and diaphram plate,earthing terminals, lifting lugs,dial type thermometer for winding temp. indication., marshalling box, enclosure, safety interlock facility for doors, externally operated off load changing switch with lock&key, under base skid with flat roller, l.t.& h.t. terminal boxes. , l.t. panel sitc of 0.415 kv l.t. control panel for pumping plant l.t. control panel suitable to operatedon 415 ± 6 %volt , 3 phase , 50 hz, ac supply as per details given below (a) 2 nos incoming panels and 1 no. outgoing panels, 1 no. panel for dg set each consisting of following items (i) 400 amp mccb 1 no.(ii)c.ts of suitable ratio 1 no.(iii)ammeter with selector switch 1 no.(iv) voltmeter with selector switch 1 no. (v)power factor meter(0.5 lag&0.5lead) 1 no.(vi)frequency meter 1 no.(vii)kwh meter 1 no. (viii)2 pole over current relay& one pole earth fault relay and trip alarm availability 1 no.(ix) extended rotary handle 1 no. (b)bus bar chamber having 3 nos. bus bars for phase and 1 no. bus bar for neutral of suitable size – 1 no. (c) 3 nos. composite panels for 50 hp pumping plants, each consisting of following items –(i)160 a mccb 1 no.(ii)c.ts. of suitable ratio 1 no.(iii)ammeter with selector switch 1 no.(iv) automatic start / stop device according to level in the sump 1 no.(v)indicating lamps(auto/manual/low level/ reverse rotation) 1 set (vi) earth fault, under voltage and trip alarm availability 1 set (vii) extended rotary handle 1 no.(d) 2 nos. composite panels for 11 hp pumping plants, each consisting of following items –(i)40 a mccb 1 no.(ii)c.ts. of suitable ratio 1 no.(iii)ammeter with selector switch 1 no.(iv) automatic start / stop device according to level in the sump 1 no.(v)indicating lamps(auto/manual/low level/ reverse rotation) 1 set (vi) earth fault, under voltage and trip alarm availability 1 set (vii) extended rotary handle 1 no. (e) 3 nos. outgoing panels for miscellaneousworks, each consisting of following items – (i) mcb of 40 a capacity 1 no.(ii) c.ts. of suitable ratio 1 no. (iii) ammeter with selector switch 1 no.(iv) indicating lamps 1 set (f)auto power factor correction panel for total load. (g) rubber resistance sheet (ref. as per attached analysis) , lt cable laying and jointing supply, laying, testing and commissioning of lt cables for whole pumping station from power supply side which includes 300sqmmx3.5corex1run armoured aluminium cable for transformer to main lt panel with lugs jointing etc. complete and cabling work of 150sqmm.x3corex1 run un armoured aluminium from starter to motor with lugs jointing etc.complete. (ref. as per attached analysis) , earthing plate earthing as per pwd specification for electrical works as per is:3043 with copper earth plate of size 600mm x 600mm x 3.0mm by embodying 3 to 4 mtr. below the ground level with 20 mm dia. g.i. b class watering pipe ,including all accessories like nut, bolts, reducer, nipple,wire meshed funnel, and heavy duty weather proof polypropylene earth pit chamber with lockable jam free lid suitable for safe working load 5000 kg or more of size top dia. 225 to 260 mm, bottom dia 300 to 350 mm. and height 250 to 300 mm. and embodying the pipe complete with alternate layers salt and coke/ charcoal, testing of earth resistance for value of 5 ohms or less (4 for transformers and 2 for ht panel) ref.e140300 (pre bsr 2021) , pipe earthing as per pwd specification for electrical works as per is:3043 1987 with 3.0 mtr. long, 40 mm dia. b class g.i. pipe is: 1239 (part 1) 2004, equivalent to bs :1387 with perforated holes of 12 mm dia ,including all accessories like nut, bolts, reducer, nipple, wire meshed funnel, and heavy duty weather proof poly propylene earth pit chamber with lockable jam free lid suitable for safe working load 5000 kg or more of size top dia. 225 to 260 mm, bottom dia 300 to 350 mm. and height 250 to 300 mm. and embodying the pipe complete with alternate layers salt and coke/ charcoal, testing of earth resistance for value of 5 ohms (2 for lt panel and 1 for ht panel)ref.e140100 (pre bsr 2021) , supply & laying of 50mmx6mm size gi earth strip in horizontal or vertical run in ground/surface/recess including riveting,soldering, saddles, jointing shall be done by overlapping and with 2 set of gi nut bolt & spring washer spaced at 50cm making connection etc.(20meter for each earthing) ref.e140611 (pre bsr 2021) , charges of electrical safety clearance expenditure on b&l form, challan etc. , proper fencing of substation portion as per i.e. rules. (ref. ongoing amrut work aligarh sewarage) , starter panel compraising of soft starter, suitable to meet the basic requirement of motor protections and suitable to run 50 hp motor (to be fixed in composite panel of lt panel) ref. up jal nigam e&m sor, 2020 , compraising of soft starter, suitable to meet the basic requirement of motor protections and suitable to run 11 hp motor (to be fixed in composite panel of lt panel) ref. up jal nigam e&m sor, 2020 , pump 3840lpm and 29 met head 3nos. non clog submersible sewage pump suitable for handling raw sewage of specific gravity 1.03 and electric motor with digital soft starters suitable for operation on 400 ± 10% volt, 3 phase, 50 hz, ac supply system having following specification capacity 3840 lpm total head 29 meters rpm 1000 solid passable at least 100 mm accessories of each submersible pumping plant (a) pedestal with autocoupling (b) s.s. guide pipeapprox 12 m (c) s.s. chain with shacklesapprox 12 m (d) c.i.d.f, bend 200 mm dia x 350 , pump 1460lpm and 17 met head 2nos. non clog submersible sewage pump suitable for handling raw sewage of specific gravity 1.03 and electric motor with digital soft starters suitable for operation on 400 ± 10% volt, 3 phase, 50 hz, ac supply system having following specification capacity 1460 lpm total head 17 meters rpm 1450 solid passable at least 100 mm accessories of each submersible pumping plant (a) pedestal with autocoupling (b) s.s. guide pipeapprox 12 m (c) s.s. chain with shacklesapprox 12 m (d) c.i.d.f, bend 150 mm dia x 350 , installation, tesing, commissioning of above 5 pumps and starters@10% , supply of main piping & valves complete with common header alongwith all neessary nuts, bolts, rubber packing etc., as per following details. 200mm dia cidf reflux valves(ref. attached sor of ivc with ce (e./m.), up jal nigam letter) , motor operated actuator with 200mm dia cidf sluice valves(ref. attached up jal nigam sor,2020) , 150mm dia cidf reflux valves(ref. attached sor of ivc with ce (e./m.), up jal nigam letter) , motor operated actuator with 150mm dia cidf sluice valves(ref. attached up jal nigam sor,2020) , 350mm dia cidf reflux valve(ref. attached sor of ivc with ce (e./m.), up jal nigam letter) , motor operated actuator with 350mm dia cidf sluice valves(ref. attached up jal nigam sor,2020) , 200 mm dia di k9 delivery line (sor of material manager, up jal nigam attached) , 150 mm dia di k9 delivery line (sor of material manager, up jal nigam attached) , 350mm dia di k9 common header(sor of material manager, up jal nigam attached) , nut, bolt, washer, rubber & gasket etc. @ 5% of a to i , specials like tee, bend, blind flenge, d joint etc. @ 10% of a to i , installation, testing, commissioning of a to k @10% , metering apparatus and sensors gauges supply of pressure transmitter at delivery line of each pump along with fitting accessories to measure pressure for control and alarms. , electro magnetic flow meter suitable electro magnetic flow metersuitable to measure 0 to 20 mld flow to be fitted in 350 mm dia main header line.(ref. up jal nigam e&m sor, 2020) , errection, commissioning,testing charges of flow meter , level transmitter ce/ul certififed radar type level transmitter for ips (ref. up jal nigam e&m sor, 2020) , installation, testing, commissioning , e.o.t. crane sitc of e.o.t. crane of 3 tonne capacity along with gantry girders, chain pulley, block and geared trolley suitable for 10 m span 5 m clear lift complete in all respect for pump house. detailed specifications are as below confirming to i.s. 3177 and i.s.3832 chain pulley block capacity 3 ton with 15 m lift arrangement. (ref. amrut ongoing work in sewerage aligarh contract bond) , chequerred plate and guards sitc of 3mm thick m.s chequerred plate over all the run of cables trenches to cover properly and m.s. grill and m.s. guard over all pipes ducts and other point where required as per site condition (ref. up jal nigam, se aligarh rate) (3x0.75+5x0.75+8x0.6+8x0.6)x1=15.60sqmm. , painting painting of all pumps piping and valves with two coat enamel paint. (ref.up jal nigam e&m sor, 2019) , light wiring & electrification (ref. up jal nigam e&m sor, 2019) complete internal electrification of lt panel room with 2 nos. exhaust fan , complete internal electrification of ht panel room with 2 nos. exhaust fan , water works campus with solar panel and led light of 3 sets. , bar screens (20mm) provision of suitable manual bar screen having 20mm clear gap between screen bar of s.s. flat (50mmx10mm size) and angle of installation 600 with suitable size in width. , electrically operated s.s. 304 mechanical coarse bar screen with ultrasonic level sensors and transmitters, screen panel and conveyor belt system, motors capable of handling screenings complete with cable from lt panel to screen panel and hand operated trolley for lifting screenings from screen. , installation, testing, commissioning@10% , sluice gates provision of thimble mounted c.i. sluice gate having rising spindle and flush bottom system with cast iron frame, cast iron shutter, ss 410 stem, gun metal stem nut, ss 304 fasteners etc. suitable to handle smoothly, peak flow of sewage at ips. , installation, testing, commissioning , dg set supply , installation, testing and comissioning of 180 kva at 0.8 pf 415v 50hz 3 ? silent dg set (as per latest cpcb emission norms) having 1500 rpm diesel engine conform to bs:649/5514 of suitable bhp engineshall have residential silencer (isolated from main dg chamber), up to 3 m exhaust piping (with insulation & cladding ) .alternator shall be self regulated with standard alternator protection(over voltage , over speed & under voltage, under speed warning &shutdown).engine & alternator mounted on a common base frame &coupled through a flexible coupling or close coupled.standard canopy with weatherproof, powder coated accoustic enclosure for dg set for sound attenuation fabricated from 1.6 mm crca sheet steel(structure) with side wall fabricated from 1.6 mm crca sheet & filled with glass wool (96kg/m3)/ foam. as per is 8183 the doors of 28/40/50/85 mmthick as per rating and fabricated from 1.6mm crca sheet packed withaccoustic material,all doors/ opening are sealed with neoprene/epdngaskets. the enclosure has built in fuel tank, with protection and tripping of dg set against temperature of more than 50 degree centigrade.electronic / mechanical governor, manual & electric start ,batteries withbattry charger, engineinstruments panel,avm pads all controls for operation of dg set are from outside the enclosure. the enclosure should be suitable for 180 kva capacity dg sets and alternator. noise level shall be less than 75 db at a distance of 1 mtr. duly certified by authorised agency etc. complete in all respect. (ref.e231533 pre bsr 2021) , supply , installation, testing and comissioning ofplc based auto main failure (amf) panel fabricated from crca sheet steel 2 mmthick , powder coated finish , engine start & stop commands, control relays , ammeter & voltmeter with selector switches, control & 2 nos 4 pole power contactors with 2 no. of required size 4 pole mccb, timers, electronic hooter ,visual & alarm indication for faults, ups, operator interface panel complete in all respect suitable for following capacity dg sets. oem must have bis certificate and & shall have submit nabl / cpri / erda lab type test reports before execution as required complete in all respect. (ref.e231614 pre bsr 2021) , lt cable laying and jointing for dg set supply, laying, testing and commissioning of lt cables for dg set to lt panel which includes 300sqmmx3.5corex1run armoured aluminium cable from dg set to amf panel and amf panel to main lt panel with lugs jointing etc. complete.(ref. as per attached analysis) , scada system ( up jal nigam e/m sor 2020 approved rate attached) on lineups for plc supply, 3 kva with 3 nos. 12v/65 ah amf battery with dynamic isolation. , supply of auto phase reversal unit. (160 amp) , complete cabling upto 5 pumpsets in sump including cable in pumping plant room, pressure transmitter to room, flowmeter to room etc. , supply , installation, testing, interfacing & commissioning of cc tv camera with ups , ce/ul certified local control room plc/rtu with redundant cpu & power supply at lcs in ip54 encloser as specification mentioned in technical bid documents. panel with plc to control all the starters of motor and starter of actuators for pump set. the plc to accommodate analog signals from flow transmitter, level transmitter& pressure transmitter etc. , gsm/gprs based wireless communication with 5g modem for rtu/plc capable to transfer & gather data from remote sites to control station all accessories included with signal enhancer antennaa made for pumping plant internet charges as specified in tender technical specification. , full development version of required tags scada software with customisation of software for lcs as per requirement . , desktop(computer) /pc with i5/i7 processor with latest configuration mouse, keyboard etc , printer a3 size...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

37521916 works at proposed increasing capacity of 33 / 11kv substation raghunath pur, ghaziabad from ( 2x5 ) mva to ( 5+10 ) mva 1 1. safe loading, carriage & unloading of following stock materialfrom any stores centres under pvvnl, depending upon the availability of material at stores centres, with loading & unloading at both ends respectively.a ) . 33kv vcb 1250a 2 b ) . 33kv ct 400 / 200 / 1 1 1a 3 c ) . 33kv control & relay panel with differential relay. 4 d ) . 33kv line isolator 5 e ) . 11 kv xlpe cable 3x300sq.mm 6 f ) . 11kv cable j / kit 3x185mm² 7 g ) . 33kv post insulator 8 h ) . m.s.channel / angle 9 i ) .m.s.round 32mm dia 10 2. miscellaneous works of increasing capacity of 33 / 11kv s / s raghunath pur, murad nagar ghaziabad ( 2x5 ) mva to ( 5+10 ) mva a ) . hiring of d / g set including carriage, loading, unloading & operating charges ( with fuel ) at 33 / 11kv substation under construction in case l.t. supply is not available near s / s within prescribed accessible limit.63kva, three phase, d / g set for fabrication of different structure at substation. 11 3. removal of existing 5mva transformer and other accessories equipments.a ) . disconnecting ht cable connection from 33kv side &11kv side of 5mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 12 b ) . disconnecting copper flexible / earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 13 c ) . disconnecting earthing strip from body of 05mva power transformer. 14 d ) . draining of transformer oil from conservator, radiators of existing 05 mva t / f, at 33 / 11 kv s / s raghunath pur into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided bycontractor 15 e ) . removal of conservator, radiators and other accessories from existing 5 mva power transformer. 16 f ) . safe shifting of 5 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e / s.d.o ( distribution ) . 17 g ) . re assembling of conservator, radiators and other accessories to existing 5 mva power transformer. 18 h ) . re filling the transformer oil ( old & used in existing 5mva t / f ) 19 4. installation for 33 / 11kv 10mva t / f a ) . safe shifting of 10mva, 33 / 11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 20 b ) . erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 21 5. water level earthing by boring and lowering of g.i. pipe of size 40 mm dia & thickness 2mm ( id 36mm, od 40mm ) into the ground at 50 mtr ( 160feet ) depthupto the water level. the lower end of pipe shall be provided with solid copper cone approx 225 mm long and 750 gm in weightand screwed in pipe and bringing out a continuous copper wire of 6 swg from the cone up to the power transformer neutral / l.a where it will be bolted to them.s. earth strip for transformer neutral connection. welded to the g.i. pipe and neutral earthing support. no joint in copper wire is allowed, 22 6. fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and painted with one coat of ready mixed primer and two coat of enamel aluminium paint work includes connecting neutral bushing rod of power transformer and m.s. earthing strip with the help of flexible copper bond, m.s. bolt and washer with stone pad of size ( 300x300x75mm ) . 23 7. a ) . fabrication and erection of cable support made of two pieces of m.s. channel ( 100x50x6 ) mm, 2.75 meter long, joined to each other by means of 5 nos. m.s. angle ( 50x50x6 ) mm pieces of size 0.75mtr long each by welding at equal intervals and grouting in a block of size ( 300x1000x1000 ) mm in c.c. 1:3:6 complete with one coat of ready mixed primer and two coats of al. paint. work includes providing of three nos. m.s. clamps made of ( 50x6 ) mm m.s. flat for holding the cable including nuts and bolts with stone pad of size ( 300x300x75mm ) . 24 b ) . fabrication and grouting of m.s. frames 3.60 mt. long for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the m.s. frame shall be made of m.s. channel ( 100x50 ) mm in t shape. providing 2 nos. support of m.s. angle iron ( 50x50x6 ) mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator. the m.s. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in c.c. ratio 1:3:6 in a block of size ( 300x300x700 ) mm with stone pad of size ( 300x300x75mm ) . the work also includes the fixing of 3 nos. 11 kv pin insulator with pin and binding the copper bus bar with the pin insulator by aluminium binding wire in complete. 25 8. supply & fabrication of copper bus bar of size ( 2500x50x6 ) mm in l.v. side of 10 mva 33 / 11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 26 9. h.t. power cable laying: a ) . laying 11 kv, ( 3x300 ) mm2 / ( 3x400 ) mm2 xlpe, cable from power transformer to 11 kv incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. providing 150 mm local sand for cushion beneath and 150 mm above the cable ( quality of local sand required 0.375 cum / m in length ) . the cable shall be dully protected by brick. on both side of cable by laying brick vertically and bricks would also be laid bricks along the cable ( minimum 18 nos. of bricks are to be laid top and outer side along the cable. the work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. 27 b ) . laying and dressing of 11 kv 3x300 mm2 / 3x400 mm2 power cable in air / trench. 28 10. erection of 33kv line isolator on isolator structure with proper alignment & fitting. 29 11. plinth for 33 kv v.c.b.construction of plinth for the structure of 33 kv vcb & c.t.s as per details for 01 no.: a ) . excavation of earth of size ( 2.4x1.5x1.0 ) m pits for construction of plinth. 30 b ) . brick ballast ratio ( 1:3:6 ) ( cement, sand & stone grift for foundation work ( 2.4x1.5x0.15 ) m plinth. 31 c ) . r.c.c. work in ratio 1:2:4 ( cement, coarse sand & stone grit of 20mm size ) for making plinth of size ( 2.4x1.5x1.0 ) m and grouting of foundation bolts 04 nos. for 33 kv vcb. 32 d ) . 12mm thick plaster with cement mortar in ratio 1:4 ( cement & fine sand ) of plinth of side size ( 2.4x1.5x0.4 ) m. 33 e ) .laying of g.i.earth strip of size 50x6mm for connecting the earth mat with steel structure. the work also includes cutting, bending, straigthning, over lapping and welding the earth strip with earth mat and various steel structures by using high quality arc welding in already digged trenches. 34 f ) . painting of earth strip of size ( 50x6 ) mm with one coat of ready mixed primer with two coats of isi mark synthetic oil enamal green paint. 35 12. preparation of 11 kv power cable ends:a ) . making ofcable end termination by heat shrinkable out door jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 36 b ) .making ofcable end termination by heat shrinkable indoor jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 37 13. providing & erection of g.i. strip size 50x6mm for earthing of outdoor & indoorequipment 38 14. installation of 33 kv post insulators:a ) . installation of 3 nos. pi on structure. the work includes fabrication for proper fixing, if required. 39 b ) . installation of 33 kv vcbi ) . assembling and installation of 33 kv vcb on the vcb out door structure on the plinth. adjustment of operating mechanism in proper alignment for smooth operation of the same. the work also includes fabrication of addition arrangement for proper fixing, if required. 40 ii ) . installation of 33 kv c.t.s:installation of 3 nos. c.t.s on the c.ts structure. the work includes fabrication for proper fixing, if required to complete the work. 41 iii ) . 33 kv cts junction box:providing & fixing of junction box of size ( 400x400x150 ) mm made of m.s. sheet of 16 swg in between 33 kv cts & control panel. the work also include making proper connection on the junction box and making all connection in between cts and control panel complete as per manufactures panel drawing including testing and commissioning of work etc. complete the work. 42 iv ) . installation of 33 kv vcb control panelcarefully and safely shifting of 33 kv vcb control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 43 15 a ) .providing & laying of 2x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 44 b ) . providing & laying of 4x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 45 16. earthing of outdoor equipment, details as given below: a ) . cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge and proper welding with m.s.bars. 46 b ) . digging of pits & making ofbridge on l.a. & t / f neutral earthingby laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 47 17. testing & commissioning of power t / f and all 33kv & 11kv switchgears / panels.providing required no. of technicians with proper testing equipments during commissioning & energisation. 48 18. painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.a ) . post insulator, cable support structure and neutral support structure, g.i.strip, m.s.frames....

Northern Railway - Uttar Pradesh

37481861 supply of high speed transformer auxiliary tripping relay for 2 x 25 kv control & relay panel of tss as per rdso spec no: ti / spc / psi / protct / 7100 ( 07 / 2012 ) with a & c slip no.1or latest [ warranty period: 30 months after the date of delivery ] ...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

37149847 construction of newly proposed 33 / 11 kv 1x5 mva capacity sub station upsida kauhaar, distt amethi on semi turnkey basis in the jurisdiction of eswd, ayodhya under superintending engineer electricity works circle, mvvnl, ayodhya 1 carriage of following material ( from si. no. 1.01 to 1.35 ) from store centre under eeesd ayodhya to dump store & from dump store to the site of work including loading, unloading and proper satcking at site etc. 2 33 kv line isolator 3 33 kv bus isolator 4 33 kv post insulator 5 33 kv lighting arrestor 6 33 / 11 kv 5 mva t / f 7 33 kv vcb 800a, 750 mva 8 single t / f control panel 9 c.t. o / d 33 kv ctr 200 / 100 / 1 1a 10 c.t. o / d 33 kv ctr 400 / 200 / 1 1a 11 11 kv incoming switchgear 600 / 300 / 5a , 350 mva, 630 a 12 outgoing 11 kv switch gear 200 / 100 / 5a 250 mva 13 11 kv 3 core cable 3x300 mm xlpe 14 11 kv 3x185 mm xlpe 15 11 kv cable jointing kit indoor 3x300 sq. mm xlpe 16 11 kv cable jointing kit outdoor 3x300 sq. mm xlpe 17 11 kv cable jointing kit indoor 3x185 sq .mm 18 11 kv cable jointing kit outdoor 3x185 sq .mm 19 33 kv control & relay panel feeder single feeder panel 20 63 kva 11 / 0.4 kv t / f 21 acsr dog conductor 22 stp 11 mtr long 23 construction of retaining wall around the 33kv switchyard in size ( 25x30 ) mtrx2 using first class bricks, local river sand and brick ballast which includes the following works ( including cost of 1st class brick, brick ballast sand / core sand cement etc. ) 24 excavation of earth in foundation 25 cement concrete in foundation in 1:5:10 ratio 26 1st class brick work in 1:6 ratio 27 plaster work 1:6 ratio 28 cc 1:2:4 for grouting mid angles post for fencing 29 fabrication of switchyard fencing by welded mesh with gate in size 25x30 mtr by 10 swg wire mesh , ms angle 50x50x6, ms flat 25x5mm and 40x5mm, its fitting tightining with nuts and bolt on the studs. supported by drilling the required poll along with fabrication of 1 no. gate m / o ms angle. 30 earth matlaying of earth mat in the switch yard by laying of ms round of 32mm dia in 750mm deep trenches and grounding of earth mat with ms round 32 mm dia 3mtr long earth electrode as per drawing. the work includes welding / bolting of the ms round, g.s. strip and connecting all steel structure in the switchyard with the earth mat by means of g.s. strips of size 50x6mm as per item below 31 digging of trench of size 500x750mm for laying of 32mm dia ms round including refilling of earth and ramming the same after laying of ms round / g.s. strip 32 laying and welding of lap joints of ms round of 32mm dia with minimum 150mm overlaping. the ms round shall be welded on both side so as to fill the wedges completely using high quality arc welding and goodwork manship. the joint shall be covered with black bitumen paint 33 fabrication of 32mm dia ms round 3 mtrlong earth electrodesand driving them into ground so that tip of the electrodes remains atleast 750mm below the ground level and jointing of earth electrodes 32 mm dia with the earth mat using high quality arc welding and goodworkman ship 34 jointing of ms round 32 mm dia in earth mat at cross joints using high quality arc welding . a 75mm piece of 32 mm dia ms round shall also be welded to make the joint strong for carrying fault current. the joints shall be covered with black bitumen paint 35 providing and laying of g.s. strip of size 50x6mm for connecting the earth mat with the super structure, security fencing post, including digging of trench 500x500 mm bending, cutting, straightening and welding of the earth strip with the earth mat and various street structure using high quality arc welding. the work include proper overlapping of the strip and jointing by weldiing 36 plinth of 5 mva, 33 / 11 kv t / fsconstruction of plinth of size 3.46x3.46 mtr for 5 mva to 10 mva t / f having 0.4 mtr above ground level. the work includes excavation of foundation, base concreting in c.c. 1:6:12 ratio ( cement, fine sand and brick ballast ) 1st class bricks work in cement mortar of ratio 1:4 foundation, c.c. in 1:4:8 ratio ( cement, fine sand and brick ballast ) and rcc working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge ) using ms bars of 10 mm dia ( tor ) in reinforcement including its cutting, bending and binding in required shape. the work also includes laying of 2 nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. the plinth will be made as per drawing and shall be plastered / finished on top and side of the plinth. all materials like 90 lbs rail and civil material provided by the contractor. 37 fabrication, erection & grouting of sub station structure33 kv cable standfabrication & erection of 33 kv cable stand with two leges and plinth and foundation of pits of size 1.075 x 0.9 x0.3 mtr and grouting of two legs of structure in cc ( cement, coarse sand and stone grit of 20 mm gauge ) of ratio 1:4:8 in block of 1.075 mtx 0.3 mtr including supply of all t&p complete in all respect. ( contractor shall provide all civil materials nut and bolts except steel & post insulator ) 38 bus bar gantrydigging of 2 nos pits of size 2.2mt x1.4mt x 0.75mtr providing stone pad at the bottom of the trench and grouting of the two legs of the bus bar gantry in cc ( cement, coarse sand and stone grit of 20mm gauge ) in the ratio 1:3:6 including supply of all t&p shuttering etc. in a block of size 2.2 mtx1.4 mtx0.75 mt. the work consists of dragging , shifting up to 40 mtr raising and erecting the two pre fabricated legs of bus gantry in proper allingment level and plumb. both the plinths of the termainal gantry shall be properly finished with champeringof edges. the work includes fabrication of bus bar gantry 6.23 mtrlong as per respo drawing no.38 ( set of 2 ) ( all materials like 70 kn disc insulator b & s and civil materials provided by the contractor. ) 39 bus isolator / line isolator structurefabrication of isolator structures 3.5mtr in height as per drawing no. res 39 digging of two nos. pits of size 1.075 x 0.9 x0.3 mtr providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in cc ( cement, coarse sand and stone grit of 20 mm gauge ) of ratio 1:4:8 in block of 1.075 mtx 0.3 mtr including supply of all t&p complete in all respect. the work includes dragging, shifting upto 40 mtr. raising and erecting the two legs with runner of isolator in proper allingment level and plumb. both plinths of the isolator structure shall be properly finished with champering of edges. 40 lighteningarrestor structurefabrication of lightening arrestor per drawing no. res 39 digging of two nos. pits of size 1.075 x 0.3 x0.3 mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in cc ( cement, coarse sand and stone grit of 20 mm gauge ) of ratio 1:4:8 in block of 1.075 mtr x 0.3 mtr x 0.3 mtr including supply of all t&p complete in all respect. the work includes dragging, shifting upto 40 mtr. raising and erecting the two legs with top frame above structures in properallingment level and plumb. both plinths of the structure shall be properly finished with champering of edges etc. 41 post insulator / c.t.structure / fuse setfabrication of post insulator per drawing no. res 39 digging of two nos. pits of size 1.075 x 0.3 x0.3 mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in cc ( cement, coarse sand and stone grit of 20 mm gauge ) of ratio 1:4:8 in block of 1.075 mtr x 0.3 mtr x 0.3 mtr including supply of all t&p complete in all respect. the work includes dragging, shifting upto 40 mtr. raising and erecting the two legs with top frame above structures in properallingment level and plumb. both plinths of the structure shall be properly finished with champering of edges etc. 42 plinth for 33kv vcbconstruction of plinth of size 2.0x1.5x0.9 ( mtr ) suitable for erection of super structure for 33 kvvcb including grouting of anchor bolts in proper allingment and level. scope of work includes excavation of foundation base concreting in cc 1:6:12 ( cement, fine sand and brick ballast ) 1st class brick work in cement mortor of ratio 1:4 cc in ratio 1:4:8 and rcc work in ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge ) as per drawing 43 erection and installation of 33 / 11 kv 5 mva transformererection and installation of 33 / 11 kv, 5 mva transformer in a leveled position on the plinth. the work include shifting of transformer to the site of installation with in the sub station premises, assembling, fixing and fitting of all accessories and filling of transformer oil to the desired level and ensuring that there is no leakage. 44 fabrication and grouting of m.s. channel 100x50x6 mm in l shape & in proper size and allignment to provide support for the two separate earthing strips for power transformer neutral including supply & fixing of two nos. flexible copper bonds for neutral earthing. 45 fabrication and erection of cable support made of two pieces of m.s. strip 65x65x6 mm, 3.0 mtr long joined to each other by means of 5 nos m.s. flat 50x6 mm pieces of size 150 mm long each by welding at equal intervals as per drawing and and errection of 3 no. post insulators and grouting in a block of size300x300x700 mm complete. this includes providing of four nos. m.s.clamp made of m.s. flat for holding the cable including nuts and bolts and fixing of xlpe cable. 46 special earthing by way of boring and lowering of b class g.i. pipe 50 mm dia 20mtr longfrom ground upto the water level andit will be connected to the g.s. strip for transformer neutral connection. the earth strip will be welded to the g.i. pipe. the work also includes cap & clamps for pouring water, the cost of all material with all labour & t&p etc. complete in all respect. 47 lightening arrestor 48 t / f & feeder control panel 49 p.t. of incoming s / g 50 battery charger unit 51 63 kva 11 / 0.4 kv t / f neutral 52 delta type earthing of power t / f neutral earthing of power t / f neutral by providing 03 no. of b class g.i. pipe 50 mm dia 20 feet longfrom ground upto the water level ( delta type ) and providing and laying g.s. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect. ( all the material will be supplied by the contractor ) 53 earth filling in the switchyard of size 25x30 mtr including cost of earth handling and cartage upto switcyard from outsidewith its unloading and laying in the yard, leveling, watering and ramming till its compactness 54 installation of isolatorsassembling and installation of line / bus isolator on the isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. in case of line isolator proper operation of earth links shall also be ensured. the work includes fabrication for proper fixing if required. 55 installation of lightening arrestorsassembling and installation / mounting of three nos.lightening arrestors on the l.a. structure / complete with making earth connection ( separate ) and line connections. the work includes fabrication for proper fixing if required. 56 installation of post insulator / fuse setinstallation of 3 nos post insulators on the post insulators / cts structure. the work includes fabrication for proper fixing if required 57 installation of cts installation of 3 nos cts of ratio 200 / 100 / 1a and 3 no. cts of 400 / 200 / 1 aon the cts structure. the work includes fabrication for proper fixing if required. 58 installation of 33 kv vcb, 800 amp capacitycomplete in all respect including commissioning 59 installation of switchgears in control room shifting carefully and safely 11 kv switchgear from out side of the switch gear room, including grouting the two nos. 100x50x6mm channels piceses ( each 800mm long including cutting to size ) and foundation bolts in 1:2:4 cc ( including cutting of cc of the floor and finishing of floor ) as per direction of engineer incharge, placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position and alignment, complete work with mounting of p.t. on incoming s / g etc. 60 fixing and making bus bar connection in between all switchgears after cleaning and tapping with h.t. tape, empire tape and pvc tape properly providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material ( except copper bus bars ) strictly to the satisfaction of site incharge. 61 shifting carefully and installation of 33 kvsingle / double transformer / fdr pannel in control room including grouting of above and its proper connection. 62 providing and fixing of protection board made of teak wood with white sunmica top of size 600mmx450mm duly fitted with good quality isi mark 3 nos bells, 3 nos on off switches, 3 nos indication lamps with holders, 3 nos. test button switches on wall of switchgear room duly wired with 3 / 20 swg pvc copper wire, complete job with cost of all materials 63 earthing of 11kv & 33kv switchgearlaying of earth mat for earthing of indoor equipments by means of m.s. strip 50x6mm connecting to 4 nos. earthing electrodes of 32 mm ( including fabrication of earthing electrodes ) 3 mtr long on each side ( as per respo drawing res 40 ) . this work includes driving of eath electrodes deep down into the earth so that its top remains 500 mm below ground level. the work include laying, bending, welding of m.s. earth strips 50 x 6 mm in the control room and connecting to both side squares. 64 earthing of all indoor equipment by providing and laying g.s. strip 50 x 6 mm including cutting, welding, bending etc. 65 supply and installation of 24 volt 210 ah cell type battery bank and battery charger with cabinet including its commissioning. 66 h.t. cable layinglaying & dressing of 11 kv, 3x300 sq.mm xlpe cable underground from 5 mva t / f to 11 kv incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. the cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying offine sand and bricks, refillingand rammingof the left out soil, closing the trench and leveling. spare cable shall be left and buried in the trench in the safe of rings at both ends. cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. 67 laying & dressing of 11 kv, 3x185 sq.mm ground cablein the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. the cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying offine sand and bricks, refillingand ramming of the left out soil, closing the trench and leveling. spare cable shall be left and buried in the trench in the safe of rings at both ends. for the protection of the cable 100mm dia g.i. pipe has to be worn on th cable where the cable is to be laid across pucca / main road / nallah. cable laying work includes supply of g.i. pipe, unrolling, cutting, meggring & sealing both ends of the cable. 68 33kv bus bar & stringing.stringing of 33kv bus bar by using and laying of acsr dog conductor including fixing of disc insulator. strings and tension fitting complete with sagging of bus bar etc. and making vertical / horizontal jumperconnection through pg clamps and connecting all the equipments with each other through connecting clamps. 69 construction of 11 / 0.4 kv double pole mounted sub stationerection & grouting of 2 nos 11mtr stp support for making d / p structure including fabrication, fixing of ms channel, m.s. angle, disc insulators / pin insulators etc. the work includes supply and fixing of 11 kv tpmo switch, 11 kv fuse set, necessary clamp with nut, bolts and washers. the work also includes grouting of double pole supports in cc 1:4:8 in block of size 0.45mtr into 0.45mtr into 2.0mtr earthing of double pole with m.s. earthing rod, complete in all respect. painting of one coat of red oxide primer and two coats of aluminum paint of good quality. ( contractor shall provide 03 no. pin insulator, 6 no. disc insulator with fitting, 11 kv top channel 100x50x6 01 no., bracing angle 65x65x6 2600 etc. ) 70 earthing of 11 mtr stp by providing 6 swg g.i wire and earthing rod as per norms. ( all materials will be supplied by the contractor. ) 71 nozeling and grouting of stay at sectional pole and extra stay sets at angle locations ( all the civil material and stay set, stay clamp a, 7 / 10 stay wire will be arranged by the contractor ) 72 providing and fixing of 11 kv tpmo switch with clamp at s / s d / p 73 providing and fixing of 11kv fuse setwith clamp at s / s d / p 74 providing and fixing alu connectorfor li / bi / la 75 providing and fixing copper l piece 76 erection & installation of 63 kva, 11 / 0.4 kv t / f on double pole including shifting of the same upto double pole and making of 11kv connections to the transformer. the work includes supply of material required such as clamps, nut & bolts etc. for mounting of t / f.t / f base angle 75x75x6 and all required items provided by the contractor except pole and t / f. 77 installation of 3x300 11 kv xlpe indoor and outdoor and 11 kv 3x185 xlpe indoor and outdoor jointing kit. as per norms. 78 hosting of 11 kv cable on existing / erected support with provision of ms pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of 2 no. ms angle support, 9 no. p.g. clamp and 3 no. long barral alu. lug and its clamping, and 02 nos. supporting angle 65x65x6, 2500 mm long, jumpering properly as per resspo norms. ( all material will be supplied by the contractor like p.g. clamp, lug, supporting angle 65x65x6, 2500mm. n&b etc ) . 79 station / switchyard lighting erection ofstp 9 mtr long support after excavation of earth and grouting of cc in ratio 1:4:8 ( cement, coarse sand and brick ballast ) as per respo drawing with plinth. painting of one coat of red oxide primer and two coats of aluminum paint of good quality. for making cable lt line for colony and switchyard lighting. ( all material will be supplied by the contractor like 09 mtr stp clamp etc. ) 80 providing and fixing of street light ( led, 90 watt, isi mark ) and fitting with propoer clamps and nut boltscomplete in all respect and suitable for 9.0 mtr stp support. 81 laying and spreading of 3½ core 25 sq.mm. pvc lt cable from 11 / 0.04 kv, 63kva t / f to lt distribution board in switch gear room after digging the trench, laying cable and refilling of trench including connections at both ends after providing and crimpling of lugs of proper size complete work. 82 providing and laying of 2 core 2.5 sqmm lt al.cable from s / g roomto street light supports after digging of trench, laying of cable providing a brick on top of cable, refilling of trench making connection at poles with street light fittings complete with all respects. 83 supply & laying of 6x2.5 sq.mm. sq. control cable from power t / f to controle board in the ground as per respo norm with proper connection vcb, ct & control pannel with t / f to battery and battrey charger, bucholz relay, low higher and winding temperture protection alarm etc with including all the civil material. ( all the material will be supplied by the contracto ) 84 supply & laying of 4x2.5 sq.mm. sq. control cable from power t / f to controle board in the ground as per respo norm with proper connection vcb, ct & control pannel with t / f to battery and battrey charger, bucholz relay, low higher and winding temperture protection alarm etc with including all the civil material. ( all the material will be supplied by the contracto ) 85 construction of cable trench of 200 mm wide and 300 mm deep with ms strip at a distance of 1mtr. with brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with ms strip. ( all the material will be supplied by the contractor ) 86 construction of trench cover of 600 mm long and 75 mm thick for cable trench including cost of material, labour and t&p. ( all the material will be supplied by the contractor ) 87 laying and fixing of interlocking bricks in the switchyard size 25x30 mtr and making approach path with bricks works on both side and interlocking on top and proper leveling and finishing etc. 88 water shoking chambers with covers of size ( 0.75x0.75x1.0 ) mtr in switch yard corners for rain water harvesting & for earthing. 89 painting of structurepainting of following structure with one coat of ready mixed primer and 2 coats of al.paint of good quality including cost of material, labour and t&p complete in all respect. 90 bus gantry ( complete set ) 91 bus / line isolator structure 92 lightening arrestor 93 post insulator structure 94 ct structure 95 cable stand ( 33 kv and 11 kv ) 96 neutral strand 97 scraping rubbing, cleaning of wiremesh fencing and its gate with one coat of red oxide paint as primer then painting with supirior quality of bus grean colour in two caots including cost of paint & other allied material. 98 wiremesh fencing both side 99 gate & its angle on bothside 100 supply, fixing and mounting of following equipments / items in the control room 101 sign board and other sunderyitems of substaion 102 fire extinguisher mounted type 103 fire bucket ( 4 no ) with stand complete 104 rubber matting one side chequered and other side plane size 1800x900x12mm 105 rubber hand gloves 106 office table 1 no. , 3 no chair and 1 no. bench 107 wall clock 108 single line diagram board, notice board, max / min load board complete 109 t&p of sub station 110 5000 v megger isi mark 111 rassa pulley 112 11 mtr bamboo ladderalongwith thela 113 providing m.s. channel 125x65x6 mm 114 providingm.s. channel 100x50x6 mm 115 providingr.s. joist 150x150x6 mm 116 providing round bar 32 mm 117 commissioning of 5 mva t / f and its equipments installed in switchyard and 11 kv incoming and outgoing panels complete in all respect upto energising....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

37101486 works at proposed increasing capacity of 33 / 11kv substation raghunath pur, ghaziabad from ( 2x5 ) mva to ( 5+10 ) mva 1 1. safe loading, carriage & unloading of following stock materialfrom any stores centres under pvvnl, depending upon the availability of material at stores centres, with loading & unloading at both ends respectively.a). 33kv vcb 1250a 2 b). 33kv ct 400/200/1 1 1a 3 c). 33kv control & relay panel with differential relay. 4 d). 33kv line isolator 5 e). 11 kv xlpe cable 3x300sq.mm 6 f). 11kv cable j/kit 3x185mm² 7 g). 33kv post insulator 8 h). m.s.channel/angle 9 i).m.s.round 32mm dia 10 2. miscellaneous works of increasing capacity of 33/11kv s/s raghunath pur, murad nagar ghaziabad (2x5)mva to (5+10)mva a). hiring of d/g set including carriage, loading, unloading & operating charges (with fuel) at 33/11kv substation under construction in case l.t. supply is not available near s/s within prescribed accessible limit.63kva, three phase, d/g set for fabrication of different structure at substation. 11 3. removal of existing 5mva transformer and other accessories equipments.a). disconnecting ht cable connection from 33kv side &11kv side of 5mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 12 b). disconnecting copper flexible/earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 13 c). disconnecting earthing strip from body of 05mva power transformer. 14 d). draining of transformer oil from conservator, radiators of existing 05 mva t/f, at 33/11 kv s/s raghunath pur into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided bycontractor 15 e). removal of conservator, radiators and other accessories from existing 5 mva power transformer. 16 f). safe shifting of 5 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e/s.d.o (distribution). 17 g). re assembling of conservator, radiators and other accessories to existing 5 mva power transformer. 18 h). re filling the transformer oil (old & used in existing 5mva t/f) 19 4. installation for 33/11kv 10mva t/f a). safe shifting of 10mva, 33/11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 20 b). erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 21 5. water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 2mm into the ground at 20 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the m.s. earth strip for transformer neutral connection, the earth strip will be welded to the g.i. pipe and neutral earthing support. 22 6. fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and painted with one coat of ready mixed primer and two coat of enamel aluminium paint work includes connecting neutral bushing rod of power transformer and m.s. earthing strip with the help of flexible copper bond, m.s. bolt and washer with stone pad of size (300x300x75mm). 23 7. a). fabrication and erection of cable support made of two pieces of m.s. channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 nos. m.s. angle (50x50x6) mm pieces of size 0.75mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in c.c. 1:3:6 complete with one coat of ready mixed primer and two coats of al. paint. work includes providing of three nos. m.s. clamps made of (50x6)mm m.s. flat for holding the cable including nuts and bolts with stone pad of size (300x300x75mm). 24 b). fabrication and grouting of m.s. frames 3.60 mt. long for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the m.s. frame shall be made of m.s. channel (100x50)mm in t shape. providing 2 nos. support of m.s. angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator. the m.s. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in c.c. ratio 1:3:6 in a block of size (300x300x700) mm with stone pad of size (300x300x75mm). the work also includes the fixing of 3 nos. 11 kv pin insulator with pin and binding the copper bus bar with the pin insulator by aluminium binding wire in complete. 25 8. supply & fabrication of copper bus bar of size (2500x50x6)mm in l.v. side of 10 mva 33/11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 26 9. h.t. power cable laying: a). laying 11 kv, (3x300) mm2/(3x400) mm2 xlpe, cable from power transformer to 11 kv incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). the cable shall be dully protected by brick. on both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 nos. of bricks are to be laid top and outer side along the cable. the work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. 27 b). laying and dressing of 11 kv 3x300 mm2/3x400 mm2 power cable in air/trench. 28 10. erection of 33kv line isolator on isolator structure with proper alignment & fitting. 29 11. plinth for 33 kv v.c.b.construction of plinth for the structure of 33 kv vcb & c.t.s as per details for 01 no.: a). excavation of earth of size (2.4x1.5x1.0)m pits for construction of plinth. 30 b). brick ballast ratio (1:3:6) (cement, sand & stone grift for foundation work (2.4x1.5x0.15)m plinth. 31 c). r.c.c. work in ratio 1:2:4 (cement, coarse sand & stone grit of 20mm size) for making plinth of size (2.4x1.5x1.0)m and grouting of foundation bolts 04 nos. for 33 kv vcb. 32 d). 12mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of side size (2.4x1.5x0.4)m. 33 e).laying of g.i.earth strip of size 50x6mm for connecting the earth mat with steel structure. the work also includes cutting, bending, straigthning, over lapping and welding the earth strip with earth mat and various steel structures by using high quality arc welding in already digged trenches. 34 f). painting of earth strip of size (50x6)mm with one coat of ready mixed primer with two coats of isi mark synthetic oil enamal green paint. 35 12. preparation of 11 kv power cable ends:a). making ofcable end termination by heat shrinkable out door jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 36 b).making ofcable end termination by heat shrinkable indoor jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 37 13. providing & erection of g.i. strip size 50x6mm for earthing of outdoor & indoorequipment 38 14. installation of 33 kv post insulators:a). installation of 3 nos. pi on structure. the work includes fabrication for proper fixing, if required. 39 b). installation of 33 kv vcbi). assembling and installation of 33 kv vcb on the vcb out door structure on the plinth. adjustment of operating mechanism in proper alignment for smooth operation of the same. the work also includes fabrication of addition arrangement for proper fixing, if required. 40 ii). installation of 33 kv c.t.s:installation of 3 nos. c.t.s on the c.ts structure. the work includes fabrication for proper fixing, if required to complete the work. 41 iii). 33 kv cts junction box:providing & fixing of junction box of size (400x400x150) mm made of m.s. sheet of 16 swg in between 33 kv cts & control panel. the work also include making proper connection on the junction box and making all connection in between cts and control panel complete as per manufactures panel drawing including testing and commissioning of work etc. complete the work. 42 iv). installation of 33 kv vcb control panelcarefully and safely shifting of 33 kv vcb control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 43 15 a).providing & laying of 2x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t/f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 44 b). providing & laying of 4x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t/f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 45 16. earthing of outdoor equipment, details as given below: a). cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with m.s.bars. 46 b). digging of pits for making bridge on l.a. & t/f neutral earthing by laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 47 17. testing & commissioning of power t/f and all 33kv & 11kv switchgears / panels.providing required no. of technicians with proper testing equipments during commissioning & energisation. 48 18. painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.a). post insulator, cable support structure and neutral support structure, g.i.strip, m.s.frames. ...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

37044826 work of erection of 132 kv kosi kalan upsidc air liquid line on dc tower including supply of tower parts and accessories and construction of 132 kv bay including supply of material under etd mathura 2 tower fabricationincluding ( stubs, extension, templates ) 3 nut&bolt hdg 4 tower accessories 5 number plate 6 danger plate 7 phase plate in sets of red, blue and yellow for tension towers 8 pipe type earthing material for towers 9 insulator 10 120 kn polymer insulator 11 hardwares suitable for acsr panther 12 single tension fittings 13 double tension fittings 14 conductor accessories suitable for acsr panther 15 vibration dampers 16 mid span compression joint 17 repair sleeves 18 opgw 19 24 fibre ( dwsm ) opgw fibre optic cable 20 supply & installation of hardware set for 24 fibre opgw* 21 joint box ( 48 ) fibre 22 fodp 96f 23 fibre optic approach cable for 48 f opgw 24 supply & installation of hardware setfor 48 fibre ( dwsm, g652d ) fibre optic approach cable* 25 supply of material for construction 132 kvbay : 26 supply of bolted type bus bar tension fitting suitable for moose conductor made of lm 6 alloy complete with ball eye socket and ‘d’ shackle single phase. 27 supply of bolted type bus bar tension fitting suitable for acsr panther conductor made of lm 6 alloy complete with ball eye socket and ‘d’ shackle single phase type turn buckle in all respect. 28 supply of p.g. clamp made of lm 6 alloy along with galv. nut, bolt & washer suitable for moose to panther conductor. 29 supply of p.g. clamp made of lm 6 alloy along with galv. nut, bolt & washer suitable for panther to panther conductor. 30 supply of p.g. clamp made of lm 6 alloy along with galv. nut, bolt & washer suitable for moose to moose conductor. 31 supply of 145 kv insulator bus postclamp made of lm 6 alloy along with nut, bolt & washer suitable for panther conductor. 32 supply of suspension fitting suitable for moose conductor made of lm 6 alloy complete with ball eye socket and ‘d’ shackle single phase. 33 supply of suspension fitting suitable for panther conductor made of lm 6 alloy complete with ball eye socket and ‘d’ shackle single phase. 34 supply of tinned copper bond size 15x550mm long made of 12mm multi stranded rope type 450mm long should be joined together and cramped with copper lug ( 20mm hole ) on both ends as per sample 35 supply of earthing / discharge rod of first class insulation for system voltage upto 400 kvhaving total height as 7200mm ( 24’ ) one set consisting following items. ( a ) earthing pole 6.5mtr. long in four pieces made of epoxy bonded glass fiber. ( b ) earthing cable 12mtr. long with transparent pvc insulated 12 mm2 dia flexiblity copper wire fitted with line end earthing clamp of all alloy suitable for 4” ips tubemoose / zebra conductor. ( c ) canvas carry bag for above. 36 work of erection of line: 37 survey including preparation of schedule of materials, marking of locations ( route length ) , gps survey of line with co ordinates of each tower ( the length of line shall be authenticated by gps survey ) 38 check survey 39 cost of excavation of 132 kv tower foundation pits including all earth work, backfilling, levelling etc. 40 setting of stubs including all foundation work but excludingthe cost of concerting and excavation ( rate per location ) for followingtowers : 41 132 kv dc / de 42 cost of concreting for all types of tower foundation including cost of cement, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars 43 1:2:4 concreting 44 erection of superstructure of 132kv towers and anchor towerand their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, butincluding fitting of danger number, phase plates, bird guard and fixing & punching for 132kv sc / dc lines 45 tack welding of all the boltsup to the heightof one section of the tower or5 meterfrom ground level whichever is higherwith threetacks at 1200seperatiion of minimum 10 mm thickness with 10mm / 12 mm electrode &applicationof zinc rich aluminium paint on the affectedsurfaceincludingcost of allmaterial includingtack welding of rivercrossingtower & anchor towers. 46 laying, stringing, tensioningclamping, jointing etc ofacsr ‘panther’ conductorincludinghoistingof insulators , fitting of all necessary hardware and accessories i.e.fittings armour rods, vibration dampers etc.on all three phases of 132 kv sc lines 47 laying, stringing, tensioningclamping, jointing, including fittings of all necessary hardware and accessories of opgw & ofac, termination at s / s, end to end connectivity & testing etc on 132 kv & 220 kv lines. 48 ( a ) groundingwork includingearth worketc forpipetypegroundingincludingcost of coke & salt. 49 installation of steel reinforcementbars in r.c.c. foundation includingcost of steel reinforcement bars with cutting, bending, placing, binding etc. 50 construction work of 132kv bay: 51 erection of main and auxiliary structure consisting of columns, beams, peaks, masts etc. structure required for installation of main / transfer bus, jack busbar, isolators, p.i., cts., l.as. and all other equipments. the job consists of shifting of all material i.e. conductor, fittings, structure parts, nuts, bolts, washer etc. from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt. matching of holes, cutting, matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. all material to be erected shall be supplied by upptcl free of cost but all men, material and t&p required for satisfactorily completion of work shall be arranged by the contractor at his own cost. 52 erection of following equipments as per instruction manual of various equipments and technical specifications including shifting of material / equipments from store to erection site including all other associated work to complete the job satisfactorily. 53 132 kv cb sf6 54 132 kv bi / li 55 132kv pt junction box 56 132kv pt 57 132 kv ti 58 132 kv ct 59 132 kv ctjunction box 60 132 kv la 61 132 kv pi 62 132 kv sas line feeder panel 63 abt with energy meter 64 de stringing of various main, transferbus of 132 kv with different type conductor and different length of span mention below including de fitting of tension clamp de hoisting of insulators and also shifting of all material form site to store and all other associated works required for completion of job satisfactorily as per technical specification. 65 132 kv over head jack bus with 3x panther ( approx 36mtr section ) 66 stringing of various main, transferbus of 132 kv with different type conductor and different length of span mention below including fitting of tension clamp hoisting of insulators cutting of conductor and also shifting of all material form store to work site and all other associated works required for completion of job satisfactorily as per technical specification. 67 132 kv over head jack bus with 3x panther ( approx 36mtr section ) 68 132 kv main bus 3x moose ( approx 15 mtr section ) 69 132 kv transfer bus with 3x panther ( approx 12 mtr section ) 70 dismantling of exisiting jumpers of 132 kvc.b. c.t. isolator and la made of single moose / zebra / panther conductor with bending and shaping of conductor along with shifting of material from site to store. 71 making of new jumpers of 132 kvc.b., c.t., , isolator and la by the single moose / zebra / panther conductor with cutting bending and shaping of conductor along with shifting of material from site store to work place. 72 providing inter connection diagram and cable schedule as per drawing to complete job including c.b., c.t., pt., isolator, panel etc for proper wiring and commisioning of bay. 73 laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes / junction box etc. in switchyard as per cable schedule, their saddling at every 750mm distance with m.s. saddles of size 25x3mm size including carriage of cable drums from store to laying site and shifting back the remaining material to store and all other associated work to complete the job satisfactorily as per technical specification. 74 6x2.5 sq. mm. 75 4x2.5 sq. mm. 76 2x2.5 sq. mm. 77 termination of following sizes of cable as laid above as per cable schedule including making necessary holes in glands plates or box wherever required. supply and fixing of cable glands of appropriate size, supply and providing ferrules and nos. for each core. ( the rates of termination of control cable include the all cores of cable at one end with lug ) 78 6x2.5 sq. mm. 79 4x2.5 sq. mm. 80 2x2.5 sq. mm. 81 cutting, straightening bending & laying 800mm below inside ground and above ground of following size m.s. flat for earthing of main and auxiliary structure, equipment structure etc. including welding with main earthmat and with object to be earthed excavation of trenches, its back filling, painting and all other associated work as required to complete the work satisfactorily excluding the cost of m.s. flat. 82 75x10mm 83 50x6mm 84 25x6mm 85 to make earthing for l.a. with 06 nos. electrode of 03 meter long m.s. round including cutting, welding and making electrode and making a rectangle with 75x10mm m.s. flat inside earth below 0.8mtr. deep including excavation and refilling of soil with t&p and labour etc for completion satisfactorily. 86 132 kv l.a. 87 laying of 40 / 36 mm size m.s. round bar 600 mm below ground level including cutting, straightening welding, painting of joints with bitumen black japan paint, excavation of trench, its back filling and all other associated work to complete the work satisfactorily as per drawing and technical specification ( excluding the cost of ms bar ) work includes providing and fixing of 100 mm long, 50x50x6 mm ms angle ( 4 pcs ) at each cross joint of earth mat as per direction of supervising engineer to complete the job satisfactorily. 88 fabrication of 3 meter long electrodes with the 40 mm / 36mm ms rod having 150 mm long conical shape and then its piercing vertically inside the ground with top 600 mm below ground level and its welding with main earthmat excluding the cost of ms bar, providing anf fixing 50x50x6 angle 100 mm pieces for each joints as per direction of supervising engineer to complete the job satisfactory. 89 sorting / counting / stacking erection mark wise and proper loading ofgisubstation structure ( alp, abl, bct, axm, btm, atm, bbl, bti, ) etc. in trucks / trailor at efu nainy allahabad and safe carriage of loaded structure from efu nainy allahabad to 132 kv s / s kosikalan upsidc under etd mathura. app. 600 km and unloading of carriage structure from the trucks / trailor at132 kv s / s kosikalan upsidc under etd mathura.its sorting, counting and proper stacking at the s / s premises as per direction of supervisory engineer to complete the job satisfactorily ( appr. weight of 13 mt ) 90 providing and fixing of retro reflective sign board of size 3ftx2ft made out of 2mm thick aluminum sheet, face to fully covered with 3m dg cube retro reflective sheet of green colour. the letters and symbols shall be computer cut and in white colour. board is to be supplied along with the back support from of size 35x35x5mm & two legs for grouting. backside of aluminum sheet shall be painted with stove enamel black paint. language for writing will be provided by the department ( upptcl ) . 91 fabrication of hut type fire bucket stand made of ms angle of size 40x40x6 mm and isi mark ms roofing sheet, having arrangment for hanging 10 buckets. all the metal surfaces should be painted with one coat of red oxide and two coats of first quality post office red synthetic enamel paint of asian paints / nerolac / berger. fire in 25 cm should be written in white color on the top of the both side of roof after painting in red colour. all the material including ms angle shall be provided by the contractor at his own cost. 92 providing fire buckets of 9 ltr capacity as per is 2546, buckets should be painted inside by white and outside by post office red colour; ear and handle by black color with two coats of first quality synthetic enamel paint afterone coat of red oxide, from asian paints / nerolac / berger. fire and agni ( hindi ) in 10 cm font in white color should be written on opposite sides of buckets. all the material shall be provided by the contractor at his own cost. 93 work of strengthening of lighting arrangement: 94 supply & fixing of round pole of ms pipe b class 9 meter long ( 114.3 mm x4.5mm x5meter 88.9 mm.x3 65mm x2.0 meter, 76.1mm x3.2mm x2meter ) with base plate work induded duly bainted with synthetic aluminium enamel paint completely as outer surface of ms round pole and grouting with plinth size 300mm duly earth with ms electrode and all other associated work to complete the job satisfactory as per direction of supervising engineer. 95 supply & fixing of pole bracet of 2 dia ms pipe of b class ( id 50mm od 60mm. ) 1 2 meter long filled at angle of 30 degree suitable at 100 w led luminaries and all other associated work to complete the job satisfactory as per direction of supervising engineer. 96 supply & fixing of 100 watt led lamp crompton greaves / bajai / syska / philips make fiting including lamp and all fixtures etc. for fixing of round pole including cost of all meterial labour and t&p for completion of work. and all other associated work to complete the job satisactory as per direction of supervising engineer. 97 supply of fixing of junction box on lighting poles of sive 200x200x150 mm of ms sheet 16 swg duly painted with synthetic enamel paint box should be fixed with 01 no 6amp mcb and backlite terminal surip of 4 nos terminal both should be fixed on sunmica sheet and half round m.s. clamp with gl pipe for fixing the junction box on the pole and all other associated work to complete the job satisfactory as per direction of supervising engineer. 98 laying of 4x2.5 / 6x2.5 sqmm pvc cable 50cm. blow the ground level in pvc conduct pipe afler exavation and back fitling including all labor pvc pipe etc and all other associated work to complete the job satisfaclory as per direction of supervising engineer. 99 laying of 2x2.5 sqmm pvc cable from fitting to junction box inside the pole and all other associated work to complete the job satisfactory as per direction of supervising engineer....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

36802642 works at proposed increasing capacity of 33 / 11kv substation raghunath pur, ghaziabad from ( 2x5 ) mva to ( 5+10 ) mva 1 1. safe loading, carriage & unloading of following stock materialfrom any stores centres under pvvnl, depending upon the availability of material at stores centres, with loading & unloading at both ends respectively.a ) . 33kv vcb 1250a 2 b ) . 33kv ct 400 / 200 / 1 1 1a 3 c ) . 33kv control & relay panel with differential relay. 4 d ) . 33kv line isolator 5 e ) . 11 kv xlpe cable 3x300sq.mm 6 f ) . 11kv cable j / kit 3x185mm² 7 g ) . 33kv post insulator 8 h ) . m.s.channel / angle 9 i ) .m.s.round 32mm dia 10 2. miscellaneous works of increasing capacity of 33 / 11kv s / s raghunath pur, murad nagar ghaziabad ( 2x5 ) mva to ( 5+10 ) mva a ) . hiring of d / g set including carriage, loading, unloading & operating charges ( with fuel ) at 33 / 11kv substation under construction in case l.t. supply is not available near s / s within prescribed accessible limit.63kva, three phase, d / g set for fabrication of different structure at substation. 11 3. removal of existing 5mva transformer and other accessories equipments.a ) . disconnecting ht cable connection from 33kv side &11kv side of 5mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 12 b ) . disconnecting copper flexible / earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 13 c ) . disconnecting earthing strip from body of 05mva power transformer. 14 d ) . draining of transformer oil from conservator, radiators of existing 05 mva t / f, at 33 / 11 kv s / s raghunath pur into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided bycontractor 15 e ) . removal of conservator, radiators and other accessories from existing 5 mva power transformer. 16 f ) . safe shifting of 5 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e / s.d.o ( distribution ) . 17 g ) . re assembling of conservator, radiators and other accessories to existing 5 mva power transformer. 18 h ) . re filling the transformer oil ( old & used in existing 5mva t / f ) 19 4. installation for 33 / 11kv 10mva t / f a ) . safe shifting of 10mva, 33 / 11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 20 b ) . erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 21 5. water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 2mm into the ground at 20 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the m.s. earth strip for transformer neutral connection, the earth strip will be welded to the g.i. pipe and neutral earthing support. 22 6. fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and painted with one coat of ready mixed primer and two coat of enamel aluminium paint work includes connecting neutral bushing rod of power transformer and m.s. earthing strip with the help of flexible copper bond, m.s. bolt and washer with stone pad of size ( 300x300x75mm ) . 23 7. a ) . fabrication and erection of cable support made of two pieces of m.s. channel ( 100x50x6 ) mm, 2.75 meter long, joined to each other by means of 5 nos. m.s. angle ( 50x50x6 ) mm pieces of size 0.75mtr long each by welding at equal intervals and grouting in a block of size ( 300x1000x1000 ) mm in c.c. 1:3:6 complete with one coat of ready mixed primer and two coats of al. paint. work includes providing of three nos. m.s. clamps made of ( 50x6 ) mm m.s. flat for holding the cable including nuts and bolts with stone pad of size ( 300x300x75mm ) . 24 b ) . fabrication and grouting of m.s. frames 3.60 mt. long for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the m.s. frame shall be made of m.s. channel ( 100x50 ) mm in t shape. providing 2 nos. support of m.s. angle iron ( 50x50x6 ) mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator. the m.s. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in c.c. ratio 1:3:6 in a block of size ( 300x300x700 ) mm with stone pad of size ( 300x300x75mm ) . the work also includes the fixing of 3 nos. 11 kv pin insulator with pin and binding the copper bus bar with the pin insulator by aluminium binding wire in complete. 25 8. supply & fabrication of copper bus bar of size ( 2500x50x6 ) mm in l.v. side of 10 mva 33 / 11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 26 9. h.t. power cable laying: a ) . laying 11 kv, ( 3x300 ) mm2 / ( 3x400 ) mm2 xlpe, cable from power transformer to 11 kv incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. providing 150 mm local sand for cushion beneath and 150 mm above the cable ( quality of local sand required 0.375 cum / m in length ) . the cable shall be dully protected by brick. on both side of cable by laying brick vertically and bricks would also be laid bricks along the cable ( minimum 18 nos. of bricks are to be laid top and outer side along the cable. the work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. 27 b ) . laying and dressing of 11 kv 3x300 mm2 / 3x400 mm2 power cable in air / trench. 28 10. erection of 33kv line isolator on isolator structure with proper alignment & fitting. 29 11. plinth for 33 kv v.c.b.construction of plinth for the structure of 33 kv vcb & c.t.s as per details for 01 no.: a ) . excavation of earth of size ( 2.4x1.5x1.0 ) m pits for construction of plinth. 30 b ) . brick ballast ratio ( 1:3:6 ) ( cement, sand & stone grift for foundation work ( 2.4x1.5x0.15 ) m plinth. 31 c ) . r.c.c. work in ratio 1:2:4 ( cement, coarse sand & stone grit of 20mm size ) for making plinth of size ( 2.4x1.5x1.0 ) m and grouting of foundation bolts 04 nos. for 33 kv vcb. 32 d ) . 12mm thick plaster with cement mortar in ratio 1:4 ( cement & fine sand ) of plinth of side size ( 2.4x1.5x0.4 ) m. 33 e ) .laying of g.i.earth strip of size 50x6mm for connecting the earth mat with steel structure. the work also includes cutting, bending, straigthning, over lapping and welding the earth strip with earth mat and various steel structures by using high quality arc welding in already digged trenches. 34 f ) . painting of earth strip of size ( 50x6 ) mm with one coat of ready mixed primer with two coats of isi mark synthetic oil enamal green paint. 35 12. preparation of 11 kv power cable ends:a ) . making ofcable end termination by heat shrinkable out door jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 36 b ) .making ofcable end termination by heat shrinkable indoor jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 37 13. providing & erection of g.i. strip size 50x6mm for earthing of outdoor & indoorequipment 38 14. installation of 33 kv post insulators:a ) . installation of 3 nos. pi on structure. the work includes fabrication for proper fixing, if required. 39 b ) . installation of 33 kv vcbi ) . assembling and installation of 33 kv vcb on the vcb out door structure on the plinth. adjustment of operating mechanism in proper alignment for smooth operation of the same. the work also includes fabrication of addition arrangement for proper fixing, if required. 40 ii ) . installation of 33 kv c.t.s:installation of 3 nos. c.t.s on the c.ts structure. the work includes fabrication for proper fixing, if required to complete the work. 41 iii ) . 33 kv cts junction box:providing & fixing of junction box of size ( 400x400x150 ) mm made of m.s. sheet of 16 swg in between 33 kv cts & control panel. the work also include making proper connection on the junction box and making all connection in between cts and control panel complete as per manufactures panel drawing including testing and commissioning of work etc. complete the work. 42 iv ) . installation of 33 kv vcb control panelcarefully and safely shifting of 33 kv vcb control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 43 15 a ) .providing & laying of 2x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 44 b ) . providing & laying of 4x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 45 16. earthing of outdoor equipment, details as given below: a ) . cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with m.s.bars. 46 b ) . digging of pits for making bridge on l.a. & t / f neutral earthing by laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 47 17. testing & commissioning of power t / f and all 33kv & 11kv switchgears / panels.providing required no. of technicians with proper testing equipments during commissioning & energisation. 48 18. painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.a ) . post insulator, cable support structure and neutral support structure, g.i.strip, m.s.frames....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

36793199 works at proposed increasing capacity of 33 / 11kv substation noorpur, murad nagar ghaziabad from ( 5+10 ) mva to ( 2x10 ) mva 2 b ) . 33kv ct 400 / 200 / 1 1 1a 3 c ) . 33kv control & relay panel with differential relay. 4 d ) . 11kv vcb, i / c ctr 600 / 300 / 5a, 350mva 5 e ) . 11kv vcb, o / g ctr 200 / 100 / 5a, 350mva 6 f ) . 33kv lightening arrester 7 g ) . 11 kv xlpe cable 3x300sq.mm 8 h ) . 11kv cable j / kit 3x185mm² 9 i ) . 33kv post insulator 10 j ) . m.s.channel / angle 11 k ) .m.s.round 32mm dia 12 l ) . 90 lbs rail pieces for t / f ( 44.64kg / mtrs. ) 13 2. miscellaneous works of increasing capacity of 33 / 11kv s / s noorpur pur, murad nagar ghaziabad ( 5+10 ) mva to ( 2x10 ) mva a ) . hiring of d / g set including carriage, loading, unloading & operating charges ( with fuel ) at 33 / 11kv substation under construction in case l.t. supply is not available near s / s within prescribed accessible limit.63kva, three phase, d / g set for fabrication of different structure at substation. 14 3. removal of existing 5mva transformer and other accessories equipments.a ) . disconnecting ht cable connection from 33kv side &11kv side of 5mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 15 b ) . disconnecting copper flexible / earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 16 c ) . disconnecting earthing strip from body of 05mva power transformer. 17 d ) . draining of transformer oil from conservator, radiators of existing 05 mva t / f, at 33 / 11 kv s / s noorpur, murad nagar, ghaziabad into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided bycontractor 18 e ) . removal of conservator, radiators and other accessories from existing 5 mva power transformer. 19 f ) . safe shifting of 5 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e / s.d.o ( distribution ) . 20 g ) . re assembling of conservator, radiators and other accessories to existing 5 mva power transformer. 21 h ) . re filling the transformer oil ( old & used in existing 5mva t / f ) 22 4. construction & renovation of old transformer plinth. 23 5 ) . installation for 33 / 11kv 10mva t / f a ) . safe shifting of 10mva, 33 / 11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 24 b ) . erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 25 6. water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 2mm into the ground at 20 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the m.s. earth strip for transformer neutral connection, the earth strip will be welded to the g.i. pipe and neutral earthing support. 26 7. fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and painted with one coat of ready mixed primer and two coat of enamel aluminium paint work includes connecting neutral bushing rod of power transformer and m.s. earthing strip with the help of flexible copper bond, m.s. bolt and washer with stone pad of size ( 300x300x75mm ) . 27 8. a ) . fabrication and erection of cable support made of two pieces of m.s. channel ( 100x50x6 ) mm, 2.75 meter long, joined to each other by means of 5 nos. m.s. angle ( 50x50x6 ) mm pieces of size 0.75mtr long each by welding at equal intervals and grouting in a block of size ( 300x1000x1000 ) mm in c.c. 1:3:6 complete with one coat of ready mixed primer and two coats of al. paint. work includes providing of three nos. m.s. clamps made of ( 50x6 ) mm m.s. flat for holding the cable including nuts and bolts with stone pad of size ( 300x300x75mm ) . 28 b ) . fabrication and grouting of m.s. frames 3.60 mt. long for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the m.s. frame shall be made of m.s. channel ( 100x50 ) mm in t shape. providing 2 nos. support of m.s. angle iron ( 50x50x6 ) mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator. the m.s. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in c.c. ratio 1:3:6 in a block of size ( 300x300x700 ) mm with stone pad of size ( 300x300x75mm ) . the work also includes the fixing of 3 nos. 11 kv pin insulator with pin and binding the copper bus bar with the pin insulator by aluminium binding wire in complete. 29 9. supply & fabrication of copper bus bar of size ( 2500x50x6 ) mm in l.v. side of 10 mva 33 / 11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 30 10. installation of 11 kv switch gears in control rooma ) . carefully & safely shifting of 11 kv switch gears from outside to inside the switch gear room grouting foundation of bolts in c.c. ratio of 1:2:4 ( including cutting of rcc floor and finishing of rcc floor ) as per requirement placing, aligning and fixing of 11 kv anchor gi bolts and nuts of proper size for completion of work. 31 b ) . proper fixing and making bus bar connection in between two switch gears after proper cleaning. work also include proper insulation, taping by empire, pvc and h.t. tape etc. 32 11. h.t. power cable laying: a ) . laying 11 kv, ( 3x300 ) mm2 / ( 3x400 ) mm2 xlpe, cable from power transformer to 11 kv incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. providing 150 mm local sand for cushion beneath and 150 mm above the cable ( quality of local sand required 0.375 cum / m in length ) . the cable shall be dully protected by brick. on both side of cable by laying brick vertically and bricks would also be laid bricks along the cable ( minimum 18 nos. of bricks are to be laid top and outer side along the cable. the work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. 33 b ) . laying and dressing of 11 kv 3x300 mm2 / 3x400 mm2 power cable in air / trench. 34 12. erection of 33kv line isolator on isolator structure with proper alignment & fitting. 35 13. plinth for 33 kv v.c.b.construction of plinth for the structure of 33 kv vcb & c.t.s as per details for 01 no.: a ) . excavation of earth of size ( 2.4x1.5x1.0 ) m pits for construction of plinth. 36 b ) . brick ballast ratio ( 1:3:6 ) ( cement, sand & stone grift for foundation work ( 2.4x1.5x0.15 ) m plinth. 37 c ) . r.c.c. work in ratio 1:2:4 ( cement, coarse sand & stone grit of 20mm size ) for making plinth of size ( 2.4x1.5x1.0 ) m and grouting of foundation bolts 04 nos. for 33 kv vcb. 38 d ) . 12mm thick plaster with cement mortar in ratio 1:4 ( cement & fine sand ) of plinth of side size ( 2.4x1.5x0.4 ) m. 39 e ) . laying of g.i.earth strip of size 50x6mm for connecting the earth mat with steel structure. the work also includes cutting, bending, straigthning, over lapping and welding the earth strip with earth mat and various steel structures by using high quality arc welding in already digged trenches. 40 f ) . painting of earth strip of size ( 50x6 ) mm with one coat of ready mixed primer with two coats of isi mark synthetic oil enamal green paint. 41 14. preparation of 11 kv power cable ends:a ) . making ofcable end termination by heat shrinkable out door jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 42 b ) . making ofcable end termination by heat shrinkable indoor jointing kits suitable for 11kv, 3x300sq.mm xlpe cable. suitable size cable jointing kit will be provided by department free of cost execution of work. providing, fixing and crimping of proper size good quality lugs complete in all respect. 43 15. providing & erection of g.i. strip size 50x6mm for earthing of outdoor & indoorequipment 44 16. installation of 33 kv post insulators:a ) . installation of 3 nos. pi on structure. the work includes fabrication for proper fixing, if required. 45 b ) . installation of 33 kv lightning arrestors:i ) . installation of 33 kv lightning arrestors: assembling and installation / mounting of 3 nos. lighting arrestors on the l.a.s structure / terminal gentry, complete with earthing and line connections. the work includes fabrication for proper fixing, if required. 46 c ) . installation of 33 kv vcbi ) . assembling and installation of 33 kv vcb on the vcb out door structure on the plinth. adjustment of operating mechanism in proper alignment for smooth operation of the same. the work also includes fabrication of addition arrangement for proper fixing, if required. 47 ii ) . installation of 33 kv c.t.s:installation of 3 nos. c.t.s on the c.ts structure. the work includes fabrication for proper fixing, if required to complete the work. 48 iii ) . 33 kv cts junction box:providing & fixing of junction box of size ( 400x400x150 ) mm made of m.s. sheet of 16 swg in between 33 kv cts & control panel. the work also include making proper connection on the junction box and making all connection in between cts and control panel complete as per manufactures panel drawing including testing and commissioning of work etc. complete the work. 49 iv ) . installation of 33 kv vcb control panelcarefully and safely shifting of 33 kv vcb control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 50 17 a ) . providing & laying of 2x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 51 b ) . providing & laying of 4x2.5mm2control cables i.s marki.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv cts to cts junction box, ct 33 kv, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 52 18. earthing of outdoor equipment, details as given below: a ) . cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with m.s.bars. 53 b ) . digging of pits for making bridge on l.a. & t / f neutral earthing by laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 54 19. testing & commissioning of power t / f and all 33kv & 11kv switchgears / panels.providing required no. of technicians with proper testing equipments during commissioning & energisation. 55 20. painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.a ) . post insulator, cable support structure and neutral support structure, g.i.strip, m.s.frames....

Indian Institute Of Technology - Uttar Pradesh

36640007 tender for replacement of electrical items 1 ms conduit (isi marked) bec/akg/nic/steel craft/ m key, sk (e.r.w) 2 pvc conduit and accessories polycab/akg/asian 3 pvc/xlpe insulated aluminium/copper conductor armoured/unarmoured mv cable upto 1100 v havells/finolex/kei/grandlay/ gloster 4 frls pvc insulated copper conductor stranded flexible wire i/c control cables havells/finolex/kei/grandlay/rr kabel/ gloster 5 cable raceway floor/wall mounted and accessories schenider/legrand/cooper 6 modular switch & socket legrand (myrus)/m.k. (element)/schneider (zencelo india)/havells/ abb 7 metal clad industrial socket legrand/siemens/schneider/c&s/abb 8 cat 6 cable beldon/siemon/legrand/penduit (pannet) 9 cable glands dowells/commet/gripwell/raychem 10 crimp patch cord beldon/siemon/legrand/penuit (pannet) 11 protection device (mcb/rccb/db/elcb) siemens (betagard),/hager/schneider / legrand / c&s / abb 12 mccbs siemens (3va)/l&t /schneider/ legrand / c&s / abb 13 power contactor siemens /l&t / schneider / legrand / abb / c&s 14 surge protection devices siemens/l&t/schneider / legrand 15 panel accessories siemens /l&t/schneider / legrand/tecnic / abb/ c&s/neptune 16 selector switch salzer/seimens /bch/ kacee 17 auxiliary relays siemens/l&t/schneider/legrand/abb 18 led/metal halide/fluorescent internal lighting fixture philips/ vipro/havells/crompton/decon 19 external lighting fixture philips/ wipro/havells/crompton 20 emergency lighting/ exit sign boards philips/havells/lighting technologies/trilux/prolite 21 ceiling fan (isi marked & bee rated 5 star) havells/almonard/orient/usha/bajaj 22 paint nerolac/asian/berger 23 advance lighting protection system (early streamer emission type) lpi (australia) by allied power/sgi (duval messien/satellite (france) by sgi/bradlay (usa) by jmv/erico (usa) by security shoppe/abb 24 gi pipe tata/jindal/sail 25 main lt panels/ mcc panel (main lt panel / mcc panel board should be iec 61439 part 1 and ii manufacturer has to produces the relevant test certificate as per iec code for the same failing which panel shall be rejected). tricolite, delhi /siemens / schneider/ milestone/ neptune 26 air circuit breaker siemens / schneider /l&t /legrand/ c&s/abb 27 surge voltage protection siemens /schneider/l&t/legrand/abb 28 earth fault module siemens/schneider/l&t/legrand 29 protection relays siemens/areva/l&t/legrand 30 c.ts and pts kappa/ae/matrix 31 digital meters siemens (pac)/ schneider/ (conzerv) / secure enersol / l&t/ neptune 32 change over switch l&t/havells /socomec/abb/c&s 33 indicating lamps esbee/schneider/siemens/vaishno/neptune 34 power capacitors epcos/ neptune / legrand /abb/ l&t 35 automatic power factor correction relay/controller epcos/siemens (pac) /schneider (conzerv)/l&t/neptune 36 sealed maintenance free batteries exide/panasonic/hitachi/shinkobe 37 battery charger caldyne/chhabi electricals/statcon/max power 38 cable trays (factory fabricated/overhead & floor raceways legrand/mem/obo/ milestone/ neptune 39 hdpe underground cable duct rex polyextrusion/tirpura/plasomatics/duraline 40 insulation mats dl miller & co. ltd.?premier polyfilm ltd./rmg polyvinyl india ltd/jyoti 41 smoke/heat detectors apollo/ system sensor/ agni 42 manual call point prd/system tek/ simplex/ system sensor/agni 43 response indicators prd/system tek/ simplex/ system sensor/agni 44 fire exit signs system tek/ simplex/ agni 45 fire control panel system tek/ morley /agni 46 speaker / hooter system tek/ philips /agni 47 occupancy sensors/ movement sensor legrand/ philips/ wipro 48 flush type switch /socket anchor/ kinjal/ ssk/ havells reo 49 fuse switches unit / switch fuse unit /hrc fuse l&t / siemens/ havells/ c&s 50 exhaust fan almonard/ alstom/ crompton/ havells 51 xlpe insulated ht cables gloster /kei/havells 52 cable lug ascon (heavy gauge) jainson dowells 53 lamp holder (brass) kay/ssk/kinjal 54 telephone wires/telephone cable / jelly filled telephone cables finolex /delton/havell’s /r.r. kabel 55 telephone tag blocks krone/ pouyet 56 telephone outlet mk electric /legrand (mosaic)/crabtree (piccadilly) 57 gi raceways milestone engineering /legrand/mds/neptune systems pvt. ltd./mk 58 pvc raceways legrand/ mk 59 electronic ballast philips /wipro/bajaj/decon/crompton/havells 60 dlp plastic trunking legrand/mk 61 geysers recold /venus /usha lexus /sphere hot 62 tower light ligman/simes/bega 63 ht/lt transformers abb/schneider /cgl (crompton greaves ltd.) 64 ht sf 6 circuit breakers/vcb siemens /abb/cgl/schneider 65 programmable logic controller(plc) siemens/allen bradley/schneider 66 earthing (chemical earthing) plate earthing jmv/as per cpwd norms 67 octagonal pole bajaj / crompton / phillips 68 11 kv ht panel i/c relay cgl/schneider/abb/ siemens 69 control relay panel cgl/schneider/abb 70 lightning arrestor abb/alltec/jmv 71 temp. gauge guru 72 gate valve leader/sant 73 electrical backup spare hot/ racold 74 pvc tank syntex/ polycon 75 thermostat isi marked 76 flat collector plate solocrome/ tata bp/ racold 77 s.s sheet jindal / national 78 ht/lt cable joints (straight through/outdoor/indoor) 3m/ denson/ m seal/raychem/ cabseal 79 alternator stamford/crompton greaves 80 dg set sterling & wilson /caterpillar/commins power / eneration/ kirlosker 81 makes of accessories of ht / lt panel / transformers as per standard practice of manufacturer. 82 bus trunking c&s / l&t/ schneider as per standard practice of oem manufacturer / channel partner 83 ht panel 11 kv abb/schneider /cgl (crompton greaves ltd.) 84 bus duct neptune/ milestone/tricolite...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

36388953 tender for 01 no 132 kv mauranipur bay construction at 132kv ss gursarai under etd jhansi 1 erection of following different type main and auxiliary structure, columns, beams, peaks, masts ets. suitable for placing of 132kv equipments. 2 main structure & auxiliary structure 3 erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material / equipments from store to erection site including all other associated work to complete the job satisfactorily. 4 132kv c.b. 5 132kv bi ( motorised ) 6 132kv li 7 132kv ti 8 132kv control and relay panel ( simplex type ) 9 132kv ct 10 132kv pt 11 132kv la 12 132kv post insulator. 13 132kv ct & pt junction box 14 0.2 class accuracy abt energy meters ( main & check 2 nos. ) with cubicle. 15 cutting, strengthening, bending, laying 700mm.below in side ground and above ground of following size of ms flat for earthing of main and auxiliary structure, equipment structure t / f body and its material etc. including welding with main earth mat and with object to be earthed / excavation of trenches its back filling. 16 75x10mm ms flat 17 50x6mm ms flat 18 25x6mm ms flat 19 delta earthing of 120kv la consisting of fabrication of 06 nos. 40mm dia 3 mtr. long electrodes, its placing inside ground and forming of ring by 75x10mm ms flat. 20 interconnection of equipments and bus bar including cutting, bending of conductor and jumpering, clamping along with all other associated work to complete the job satisfactorily as per drawing and technical specn. 21 132kv side 1xp 22 laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes and jb etc. in switchyard as per cable schedule. 23 2c x 2.5 sq mm. unarmoured. 24 4c x 2.5 sq mm. unarmoured. 25 6c x 2.5 sq mm. unarmoured. 26 termination of 132kv bay including cost of cable glands, ferrules and lugs complete at both end as per cable schedule. 27 preparation of cable laying schedule and cable inter connection diagram for complete operation with job satisfactory. 28 stringing of single moose 12 mtr. ( all 3 ph ) main bus of 132kv including fitting of tension clamps, hoisting of isolators, cutting of conductor and shifting of all material from store to site and all other associated works required for completion of job satisfactorily as per technical specification. 29 stringing of single panther approx. 36 mtr. jack bus ( all 3 ph ) of 132kv including fitting of tension clamps, hoisting of isolators, cutting of conductor and shifting of all material from store to site and all other associated works required for completion of job satisfactorily as per technical specification. 30 stringing of single panther 12 mtr. auxiliary bus ( all 3 ph ) of 132kv including fitting of tension clamps, hoisting of isolators, cutting of conductor and shifting of all material from store to site and all other associated works required for completion of job satisfactorily as per technical specification. 31 the rates qouted by the bidders should be without taxes. taxes to be paid extra, if applicable....

Uttar Pradesh Jal Nigam - Uttar Pradesh

35970374 supply of material at dr. bhimrao amebedkar smarak kendra aishbagh lucknow , fire alarm & detection system supplying, installation, testing & commissioning sector panel suitable for following zones, complete with visual indications for short circuit fault, open circuit fault, fire condition and all other standard facilities as per is:2189 with mimic diagram for all area / zone covered, complete with all connections, interconnections as required. ( for sub station ) 4 zone , supplying, installation, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the following loop modules and capable of supporting not less than 240 devices ( including detectors ) and minimum 120 detectors per loop and loop length up to 2 km, network communication card, minimum 320 character graphics / lcd display with touch screen or other keypad and minimum 4000 events history log in the non volatile memory ( eprom ) , power supply unit ( 230 ± 5% v, 50 hz ) , 48 hrs back up with 24 volt sealed maintenance free batteries with automatic charger. the panel shall have facility to connect printer to printout log and facility to have seamless integration with analog / digital voice evacuation system ( which is part of the schedule of work under sh: pa system ) and shall be complete with all accessories . the panel shall be compatible for ibms system with open protocol bacnet / modbus over ip complete as per specifications. two loop , supplying, installation, testing & commissioning of central graphical fire alarm management system to centrally monitor and operate the fire alarm system complete as required. , supplying, installation, testing & commissioning of repeater panel wih 320 character / touch screen lcd display with inbuilt reset, acknowledge and silence switches complete as required. , supplying, installation, testing & commissioning of intelligent analog addressable smoke detector complete with mounting base complete as required. , supplying, installation, testing & commissioning of response indicator on surface / recessed ms box having two led, metallic cover complete with all connections etc as required. , supplying, installation, testing & commissioning of fault isolator complete with base as required. , supplying, installation, testing & commissioning of intelligent addressable thermal detector with rate of rise cum fixed tempreature thermistor complete with base as required. , supplying, installation, testing & commissioning of addressable fire control module complete as required. , supplying, installation, testing & commissioning of addressable phone control module complete as required. , supplying, installation, testing & commissioning of intelligent addressable duct detector including suitable photo detector complete with base as required. , supplying, installation, testing & commissioning of addressable manual call point complete as required. , supplying, installation, testing & commissioning of addressable horn cum strobe complete as required. , supplying, installation, testing & commissioning of fire fighter telephone hand set complete as required. , supplying, installation, testing & commissioning of fire fighter phone jack complete as required. , supplying, installation, testing & commissioning of 6 zone, voice alarm controller with usb, mp3 player ( including 6 zone button paging station ) with seamless integration facility with main fire alarm panel for voice evacuation complete as required. , supplying, installation, testing & commissioning of ceiling / wall mounted loud speaker, 3 / 1.5 watt in abs enclosure complete as required. , supplying, installation, testing & commissioning of digital audio amplifier 75 watt, 25v rms operating at 240 volt ac supply complete as required. , supplying, installation, testing & commissioning of voice command keypad 6 zone, with microphone assembly complete as required. , supplying & laying of 2x1.5 sqmtm fire survival armoured cable, 600 / 1000v rated with annealed copper conductor having glass mica fire barrier tape covered by an extruded layer of cross linkable ethylene propylene rubber ( epr ) insulation and lszh inner bedding, steel wire armouring & lszh outer sheath complete as required. , supplying and drawing of cable fire retardant pvc insulated copper conductor cable in the existing surface / recessed steel conduit of following pairs, cores and size including connections and interconnections etc. as required. speaker cable two pair, 2 core, 1.5 sqmtm , supplying and drawing of cable fire retardant pvc insulated copper conductor cable in the existing surface / recessed steel conduit of following pairs, cores and size including connections and interconnections etc. as required. speaker cable four pair, 2 core, 1.5 sqmtm , supplying and fixing 25 mm dia ms flexible pipe with pvc coating along with all ancillaries and accessories like coupler etc. as required. , supplying and installing following size of perforated hot dipped galvanised iron cable tray ( galvanisation thickness not less than 50 microns ) with perforation not more than 17.5%, inconvenient sections, joined with connectors, suspended from the ceiling with g.i. suspenders including g.i. bolts & nuts, etc. as required. 100mm widthx50mmdepthx1.6mm thickness , supply of addressable monitor module. the module should be able to monitor dry contacts. it should have a led indicator. any junction box used with the call point should have minimum ip 44 rating.the device should be vds / ul approved , supply of addressable relay module. the relay should be form c with no, c and nc contacts. the contacts should work with minimum 2.0 amp resistive or 1.0 amp inductive current. it should have a led indicator .any junction box used with the module should have minimum ip 44 rating. the device should be vds / ul approved , supply, installation, testing and commissioning of workstation pc: intel ( r ) core ( tm ) i3 10th gen processor ( 8m cache, up to 3.90 ghz ) ; ram: 8gb ( 1x8gb ) non ecc ddr5 1600mhz ; keyboard: 12 function keys; chassis: tower / workstation; dvd: 8x slimline dvd+ / rw, data only; dual graphics card; network interface card: integrated intel ( r ) 82579lm gigabit1 ethernet lan 10 / 100 / 1000; ssd: 256gb; operating system: windows 10professional 64 bit or latest.approved makes: hp / dell / asus / lenovo , fire fighting and sprinklersystem providing, fixing, jointing, testing and commissioning of heavy duty ( class c ) ms pipe conforming to is : 1239 ( part i ) pipes up to 150 trim dia with all necessary fittings like tees, elbows, flanges, reducers. gasket, nuts and bolts etc. welded or screwed joints as required including fixing the pipe with necessary structural supports including painting of two coats of synthetic enamel paint over two coats of red oxide primer including all civil breakages and making good the same, . make: jindal. a ) 50mm , 80mm , 25mm , gml double headed csi marked oblique pattern hydrant landing valves with 80mm dia flanged inlet & 63 mm dia female outlet complete with pvc / rubber cap and gi chain twist release type plug and all accessories as per is 5290 type a including fixing with anchor fasteners and flanged tapping from wet riser complete as uired. make newage / safe gaurd / geetech , providing and fixing of non percolating flexible rrl hose pipe isi marked ( is:636 ) 63 mm diax 15 m long complete with instantaneous type 63 mm dia. marked male and female gm couplings ( is:903 ) bound and riveted to hose pipe. ( type 1 ) make newage / safeguard / getech , gm branch pipe with nozzle of 20 mm nominal bore outlet as per is:903 suitable to fit with standard instantaneous type 63mm dia coupling isi marked ( 1s:903 ) complete. make newage / safegaurd / geetech , wall mounting swinging type first aid fire hose reel with drum, hanging bracket, 30.0 mir. length x 20 mm dia high pressure hose reel tubing as per is: 444 with gun metal ( gm ) shut off nozzle having 6.5 mm dia orifice. the hose reel shall be conforming to is : 884 1985. rate shall include 25 mm dia m.s. pipe ( heavy class ) connection from riser to hose reel, sockets, nipples, elbows and ball valve ( 25 mm dia ) . drum shall be fixed on adjoining wall by means of 120 mm x 100 mm long fasteners, bolts and nuts including painting. ( for internal hydrant system ) . make newage / safegaurd / geetec , providing & fixing of 1.6 mm thick m.s / door frame, door capable of accommodating fire hose reel, landing valve, hose pipes, fittings & accessories. the door shall have a front glass with lock and key arrangement & shall be painted with post office red colour ( approval shall be taken on the basis of submitted sample before ordering ) cost of fire extinguishers not included in item rate. ( liasioing with civil contractor for making recessed type mansuary box ( by civil contractor ) . make localy fabricated 900 mm x2100mm , supplying. installing, testing and commissioning 0 to 12 kg / cm2 on / off pressure switch in delivery line of pump along with control wiring for auto starting and auto stopping make danfos , electric driven terrace pump supplying.installing, testing & commissioning of fire authority approved electrically driven terrace pump suitable for automatic / manual operation consisting of the following: squirrel cage, tefc induction motor suitable for 415 ± 10%v, 3phase, 50 hz a.c. supply of suitable h.p. 900 lpm @ 35 mtr head 2900 rpm make: kirloskar / crompton cireaves. , providing and fixing air vessel made of 200 mm dia , 8 mm thick 1200 mm in height with air release valve on top and flanged connection to riser , drain arrangement with 25 mm dia ball valve with required accessories , pressure gauge complet in all respect make fabricated , providing, fixing, testing & commissioning of c.i. butterfly valve conforming to is : 13095 with flanges, nuts, bolts and washers complete for following sizes : [ pn 16 rating ( 16 kg / cm2 pressure rating ) ] . make: kartar 150mm , providing, fixing. testing & commissioning of c.i. dual plate non return valve [ pn 1.6 rating ( 16 kg / cm2 pressure raring ) complete with 2 nos, matching flanges, rubber insertion, with nuts, bolts and washers etc of following sizes . make: kartar 150mm , providing & fixing dial type pressure gauge with isolation ball valve suitable for working pressure of 250 psi cost shall be of inclusive of providing any short pieces, nipples, elbows etc as required. having calibration of 0 15 kg / cm2. make h guru , supplying and laying of aluminium conductor pvc insulated armoured served sheathed cable 1100 volts grade on surface the cable run shall he fixed on ms clamps etc.of suitable size or as directed by the engineer lncharge , complete in all respect. the armouring of the cable shall be properly connected with the earth conductor by clamps etc. following size make haveels / rr / polycab 16 x3.5 core , supplying, installation, testing and commissioning of electrical control panel of cubicle construction, floor / wall mounted type, fabricated out of 2 mm thick crca sheet, compartmentalised with hinged locakable doors, dust and vermin proof, powder coated fabricated out of 2 mm thick crca sheet, compartmentalised with hinged locakable doors, dust and vermin proof, powder coated including sutaible contector relay , ct , auto manual switch complet in all respects, for terrace pump , external fire hydrant system providing laying, testing & commissioning of c class heavy duty ms pipe conforming to is 1239 / 3589 ( all pipes shall be is1 marked and of makes specified in the specifications ) lic fittings like elbows, tees flanges, tapers, nuts bolts, gaskets etc. in ground including excavation & providing cement concrete blocks as supports and anti corrosive treatment to burned pipes by wrapping & coating wih anticorrosion tape along with two coat of black japan primer for under ground pipe including digging and backfilling upto 1.0 mu. below from g.l.for external work . make jindal ( under g round ) a ) 150mm , 80mm , gml single headed csi marked oblique pattern hydrant landing valves with 80mm dia flanged inlet & 63 mm dia female outlet complete with pvc / rubber cap and gi chain twist release type plug and all accessories as per is 5290 type a including fixing with anchor fasteners and flanged tapping from wet riser complete as uired. make newage / lifeguard / geetec , providing and fixing of non percolating flexible rrl hose pipe isi marked ( is:636 ) 63 mm diax 15 m long complete with instantaneous type 63 mm dia. marked male and female couplings ( is:903 ) bound and riveted to hose pipe. ( type a ) make new age / lifeguard / geetech , standard gml branch pipe with nozzle of 20 mm nominal bore outlet as per is:903 suitable to fit with standard instantaneous type 63mm dia coupling isi marked ( 1s:903 ) complete. make life guard / newage / geetec , providing & fixing of 1.6 mm thick m.s / fire hose cabinet box 750 x600 x300 capable of landing valve, hose pipes, , branch pipe , accessories. the door shall have a front glass with lock and key arrangement & shall be painted with post office red colour ( approval shall be taken on the basis of submitted sample before ordering ) for externel yard hydrant , complet in all respect make fabricated , providing and fixing of fire brigade inlet 4 way connection of cast iron body with ss male instantaneous inlet coupling complet with cap and chain as reqd for suitable dia ms pipe connection complet with suitable size ms box complet in all respect newage / lifeguard / geetech , providing, fixing, testing & commissioning of c.i. butterfly valve conforming to is : 13095 with flanges, nuts, bolts and washers complete for a ) following sizes : [ pn 16 rating ( 16 kg / cm2 pressure rating ) ] . make: kartar 150mm , make: kartar 80mm , providing, fixing. testing & commissioning of c.i. dual plate non return valve [ pn 1.6 rating ( 16 kg / cm2 pressure raring ) complete with 2 nos, matching flanges, rubber insertion, with nuts, bolts and washers etc of following sizes . make: zoloto / sant / kartar 150mm , supply, and constructing of masonary valve chamber 900x900x1000 cm inside 75 class designation brick work in cement , mortar 1:5 ( 1 cement, 5 find send ) for sluice valve / butter fly valve with ci surface box 100 mm top dia 180 mm bottom dia, and rcc top slab complet as per standard , fire sprinkler system ( first ) providing, fixing, jointing, testing and commissioning of heavy duty ( class c ) ms pipe conforming to is : 1239 ( part i ) pipes up to 150 trim dia with all necessary fittings like tees, elbows, flanges, reducers. gasket, nuts and bolts etc. welded or screwed joints as required including fixing the pipe with necessary structural supports including painting of two coats of synthetic enamel paint over two coats of red oxide primer including all civil breakages and making good the same, . make: jindal. ( above ground ) 150mm , 100mm , 80mm , 65mm , 50mm , 40mm , 25mm , providing laying, testing & commissioning of c class heavy duty ms pipe conforming to is 1239 / 3589 ( all pipes shall be is1 marked and of makes specified in the specifications ) lic fittings like elbows, tees, flanges, tapers, nuts bolts, gaskets etc. in ground including excavation & providing cement concrete blocks as supports and anti corrosive treatment to burned pipes by wrapping & coating wih anticorrosion tape along with two coat of black japan primer for under ground pipe including digging and backfilling upto 1.0 mu. below from g.l.for external work as per is 909 make jindal ( under ground ) 150mm , providing and fixing 25 mm dia flexible stainless steel ( ss 304 ) pipe for making final connection of sprinkler head with sprinkler system piping network including 2 nos. 25 mm diameter g.i. connector, g.e. nipple, reducer, elbow and threaded jointing complete as per detail. make: newage / tyco a ) 1000mm , 1500mm , providing and fixing and commissioning of sprinkler rosette plate 560.00 no supply, installation, testing and commissioning of required size zonal control valve inclusive of 1 nos required size butterfly valve, required size non return valve, flow switch, water pressure gauges & 25 mm dia. auxiliary drain valve with sight glass with necessary gi c class piping with threaded fittings of required sizes complete. 150mm , providing, fixing, testing & commissioning of c.i. butterfly valve conforming to is : 13095 with flanges, nuts, bolts and washers complete for following sizes : [ pn 16 rating ( 16 kg / cm2 pressure rating ) ] . make: sant / zoloto a ) 150mm , 50mm , providing, fixing, testing and commissioning of 15 mm dia quartzoid bulb type stainless steel sprinkler head suitable to operate at 68 deg c ( ul / fm listed / approved ) make tyco / hd / newage note al! sprinklers shall be chrome finish / powder coated except for conceled., the sprinkler shall be either pendent or upright type / side wall and shall not be universal style. a ) side wall sprinkler 680c ( with extended coverage ) , b ) pendent sprinkler 680c ( stadard response ) , upright sprinkler 680c ( standard response ) , providing and fixing air vessel made of 200 mm dia , 8 mm thick 1200 mm in height with air release valve on top and flanged connection to riser , drain arrangement with 25 mm dia ball valve with required accessories , pressure gauge complet in all respect make fabricated , fire pumps and valve electric motor driven main hydrant / sprinkler / ( location plant room ) supplying, installing, testing and commissioning of fire authority approved electrical driven fire pump suitable for automatic / manual operation consisting or the following: horizontal split casing, high pressure single / multistage centrifugal type fire pump running at 2900 rpm complete with gland packing, proper connection to suction and delivery line, and including bypass arrangement for testing of pumps, having a name plate indicating suction, delivery, head, discharge, stages, rpm and direction of rotation.pump shall be capable of furnishing not less than 150% of rated capacity at a head not less than 65% of rated head. the shut off head shall not exceed 120% of rated head. squirrel cage, induction motor, tefc type, efficiency class. eff 1, suitable for 415 + 10%v, 3 phase, 50 hz, ac supply, of suitable hp rating for the above pump with asynchronous speed of 2900 rpm conforming to ip 55 protection & class f insulation.the motor shall conform to is 12615 : 2004 and is 325 : 1978 ( up to date ) with flexible coupling and coupling guard.common base plate for mounting pump and motor fabricated of mild steel channel as per manufacturers recommendation with heavy duty anti vibration pads ( 6 nos., heavy duty ) . suitable reinforced cement concrete pump foundation as per manufacturers design including foundation bolts, washers as required.flexible coupling and coupling guard for direct coupling of pump and motor. rate should include interconnection cables and foundation bolts, grouting of foundation bolts and other accessories required.main fire electric driven moter with pump : suitable hp 2900 rpm, 2280 lpm, 70 mtr head ( horizontal split casing ( 02 stage ) or as per manufacturer ecommendation. , diesel engine driven fire pump supplying, installing, testing & commissioning of fire authority approved diesel engine driven tire pump suitable for automatic / manual operations consisiing of the following: horizontal split casing, high pressure single centrifugal type tire pump running at 1500 rpm complete with gland packing , proper connection to suction and elivery line, and including 80 mm bypass arrangement for testing of pumps, having a name plate indicating suction a delivery head, discharge, stages. rpm and direction of .rotation.pump shall he capable of furnishing not less than 150, 1 ) of rated capacity at a head not less than 65% of the rated head. the shut off head shall not exceed 120% of rated head water cooled eith radiator , diesel engine of required blip or as per manufacturer recommendation at 1500 rpm for the above pump complete with standard accessories & suitable cooling system as described in specifications common base plate for mounting pump & engine of required strength manufactured out of m, s. channels as per manufactures recommendation with heavy duly anti vibration pads. ( cushy foot ) ( 8 nos., heavy duty ) . flexible coupling & coupling guard for direct coupling of engine & pump suitable reinforced cement concrete pump foundations as per manufacturer design including foundation bolts, washer as required. 1 no. 8 hours capacity day oil storage tank fabricated from 3 mm thick m.s. plates. tank shall be provided with inlet, outlet.overflow, air vent, drain connections, filling connection & magnetic level indicator. tank shall be mounted on a suitable steel structure ( painted with 2 coats of red oxide paint ) . tank shall be provided with epoxy coat from inside & two or more coats of synthetic enamel paint outside over two coats of red oxide primer. diesel storage tank shall be double skin. 24 volts 180 ah lead acid battery ( 12 volts 2 nos ) with boost / trickle charger for starting the engine automatically complete as required. make: kirloskar / crompton ( ireaves ) fire diesel engine with pumps : suitable bhp 1500 rpm, 12 volt, 2280 lpm, 70 mtr head ( horizontal split casing ( 02 stage ) or as per manufacturer recommendation. , electric motor driven jockey pump supplying, installing, testing & commissioning of fire authority approved electrically driven jockey pump suitable for automatic / manual operation consisting of the following: horizontal / vertical type fire pump running at 2900 r.p.m. including bypass arrangement ( 25 mm dia gm stop valve & 5m pipe ) . gland arrangement shall be included. squirrel cage induction motor suitable for 415 ± 10%v, 3 phase, 50 1.1z„ac supply of suitable hp rating for the above pump with asynchronous speed o 2900 rpm t.e.f.0 type having efficiency class eff 1 as per is 12615 : 2004, connected to pump with flexible coupling and coupling guard. 4 nos. anti vibrat ion ( cushy foot ) heavy duty mounting pads. coupling and coupling guard for direct coupling of motor and pump. make: kirloskar / crompton cireaves. 7.5 h.p. 2900 rpm, 180 lpm, 70 mtr head ( horizontal / vertical multi stage ) ( 1 stage ) or as per manufacturer recommendation. , design, manufacturing and supply of 400a fire fighting panel fabricated out of 2.0mm thick crca sheet steel, painted with powder coated paint of shade as per the direction of engineer in charge after proper sheet treatment process of sheet steel. the bus bar of panel shall be of electrical grade high conductive aluminum alloy of appropriate cross section as per rating. the calculation of continuous rating of bus bar shall he submitted. the bus bar shall be supported by non hygroscopic smc / dmc bus bar supports which shall be mounted on proper interval to ensure the bear the jerks of short circuit as fault level require. all indicating lights shall be led type and all wiring shall be done from pvc insulated copper flexible wire. the panel shall be completed in all respect and shall consist of following, material. incoming 400a fp, 35ka mccb with oil & s / c release, extended rhom & with metering along with. phase indicating lights, ct, cf etc. outgoing 75 h.p. star / delta starter with suitable mpcb, 35ka. 3 nos. 80a tp ac duty contactor, star / delta timer, ammeter with ct, single phase preventer, on / off indicating lights, on / off push button, auto / manual push button including all associated accessories ( driven pump 1 for internal hydrant, i for external hydrant, 1 for sprinkler system ) 2 set 7.5 h.p. dol starter with suitable mpcb, 35ka, 1 no. 32a tp ac duty contactor, direct type ammeter with single phase preventer, on / off indicating lights, on / off push button, auto / manual push button including all associated accessories ( electrical driven jockey pump ) sprinkler system ) diesel driven pump control suitable for auto / manual operation with suitable timer, aux. relays, 230vac 24vdc battery charger with dc ammeter & voltmeter, emergency stop pb, on! off, llop, fiwt, os indicating lights with audio visual alarm, on / off push button, auto / manual push button and also including all associated accessories. 1 set , providing, fixing, testing & commissioning of heavy duty ms pipe ( galvanised ) class c, is : 3589 marked with all necessary fittings like tees, eibows, flanges.reducers, gaskets, nuts and bolts etc. welded or screwed joints as required including fixing the pipe with necessary structural supports ( for delivery / suction manifold related to the pumps ) including painting of two coats of synthetic enamel paint over two coats of red oxide zince chromate primer including all civil breakages and making good the same [ location : plant room ] . make: jindal 250mm , 200mm , 150mm , 100mm , 80mm , 25mm , providing, fixing, testing & commissioning of m.s. class c diesel pump exhaust pipe including all fittings like bends, tee.clamps / structural steel support of suitable dia for the engine.the insulation of the exhaust pipe shall be carried our with rock wool with aladded with 22 gauge aluminium sheet complete with all fittings & accessories. make: jindal. 100mm , providing, fixing, testing & commissioning of butter fly valve conforming to is : 13095 with flanges, nuts, bolts and washers complete for following sizes : [ pn 16 rating ( 16 kg / cm2 pressure rating ) ] . make: kartar 200mm , 150mm , 100mm , 80mm , providing, fixing. testing & commissioning of dual plate non return valve [ pn 1.6 rating ( 16 kg / cm2 pressure raring ) complete with 2 nos, matching flanges, rubber insertion, with nuts, bolts and washers etc of following sizes . make: kaipatia / kartar / firejeet. make kartar 150mm , 80mm , providing, fixing, testing & commissioning of flanged end basket strainer made from ms body with bottom and top removable flanges with nuts, bolts etc having filteration area at least 6 times the cross sectional area of the pipe. make:kartar 200mm , providing and fixing air vessel made of 250 mm dia , 8 mm thick 1200 mm in height with air release valve on top and flanged connection to riser , drain arrangement with 25 mm dia ball valve with required accessories , pressure gauge complet in all respect make fabricated , supplying. installing, testing and commissioning 0 to 12 kg / cm2 on / off pressure switch in delivery line of pump along with control wiring for auto starting and auto stopping danfos , providing & fixing dial type ( 150 mm dia ) pressure gauge with isolation ball valve suitable for working pressure of 250 psi cost shall be of inclusive of providing any short pieces, nipples, elbows etc as required. having calibration of 0 15 kg / cm2. make h guru / fiebig , 150 mm dia gun metal fire brigade suction hose coupling of ( ss ) draw off connection ) with 150 mm dia m.s. c class suction pipe with 150 mm dia c.i. foot valve.cost shall include a wall mounted box of m.s. construction ( 16 swg ) with glass door ( 4.0 mm thick ) to house the above mentioned component to be connected to static water tank. make newage / life guard , providing, fixing, testing & commissioning of resilient rubber lined single arc vibration eliminators suitable for raw water up to 45oc temperature, working pressure 8.8 kg / cm2 and test pressure 20 kg / cm2 for : kanwal / dunlop / easyflex 150mm , 80mm , supplying and laying of aluminium conductor pvc insulated armoured served sheathed cable 1100 volts grade on surface the cable run shall he fixed on ms clamps etc.of suitable size or as directed by the engineer lncharge , complete in all respect. the armouring of the cable shall be properly connected with the earth conductor by clamps etc. following size make hevells / kei / polycapsize 10 sq mm x 2 core , size 70 sq mm x 3 1 / 2 core , size 2x 1.5 sq mm for ( control wiring ) copper , signage board providing and fixing of self illuminated / auto glow exit signs printed on photo luminescent sheet containing self illuminated base chemical, of appropriate size not less than 400x150mm, suspended from ceilling or fixed to the walls with accessories as riquired and as directed at site. , hand appliances ( fire extinguisher _ ) internal / substation providing and fixing carbon di oxide fire extinguishers made from brand new seamless cylinder as per is: 7285 and cce approval fitted with discharge, bend and horn and squeeze grip / wheel type valve with initial charge as per is:15683:2006 specification, bearing 1st mark & eil approved. make safe guard / safex 4.5 kg capacity , 6 kg. capacity , 9 kg capacity , providing and fixing dcp fire extinguishers trolley mounted with all accessories internal discharge tube, high pressure discharge hose, discharge nozzle, suspension bracket, marked as per is:2878 finished externally with red enamel paint and fixed to wall with brackets complete with internal charge. make safe guard / safex capacity50 kg. , providing and fixing abc stored pressure type mono ammonium phosphate powder magnetic pressure gauage having the faclity to check at site , discharge time 9 sec , controllable discharge mechanisum range 4 meters applicable on class pressure fire extinguisher bearing isi mark for fighting abc and electrically started fire complet in all respect . safe guard / safex 4.5 kg. capacity , 6 kg. capacity , providing and fixing of clean agent ceeling mounted type fe odp fabricated edd cr sheet fitted with brass forged sprinkler assembly incorporated with pressure gauge intial 10 kg hfc pressurized with nitrogen gas at 14 kg / cm2 complet in all respect . make safe guard / safex , sub station transformer ( 11kv / 0.433 kv ) supply, testing & commissioning of outdoor mounted type 11 kv / 433 volt transfomer ( as per is : 2026, p1 to p5 ) , 3 phase, 6.25% impedance, dyn 11 vector group, 50 cycles, ( onan ) oil immersed naturally cooled, step down, copper wound, continuous duty, temperature rise above 50oc in oil by thermometer 40oc, in winding by resistance 45oc and other standard accessories as required including followings : the transformer losses should confirm to is : 1180 ( level 2 ) with latest amendments at the time of instalation. a ) cable termination box with disconnecting facility for 11 kv 3c 150 sq mm xlpe cable at 11 kv side b ) lv side box suitable for suitable amp bus duct termination. c ) off load tap changer +10% to 10% @ 1.25% in 16 equal steps with consisting offollowings high torque, electric motor suitable for 415v 3 ph. 50 hz., ac supply motor drive and energy accumulator. monitor isolating device with overload protection. contactors for forward & reverse operations of motor oil surge relay “raise / lower” control for local operation. “local / remote” control selector switch. “raise / lower” limit switches. stepping relay. auxiliary transformer. d ) bidirectional rollers. e ) oil conservator with filter cap, drain plug & oil level gauge f ) earthing terminals 2 nos for body earthing. g ) 0.415 kv neutral seperately bought out on a bushing for neutral earthing. h ) neutral ct as required. i ) pressure release device. double diaphragm explosion vent. ent. j ) radiators detachable type with top & bottom shut off valve. k ) first filling of filtered dehydrated oil as per is : 335 including make up fill during installation & 10% extra l ) silica gel breather with connecting pipe & oil seal. m ) rating, diagram & terminal marking plate of ss. n ) sampling valves for filteration, drainage and filling with plugs. o ) air release plugs. p ) thermometer pocket with plug. q ) lifting lugs. r ) double float buchholz relay with gas release cock, alarm & shut off valve on either side with separate set of contacts for trip and alarm. s ) 150 mm winding temperature indicator ( wti ) with alarm. ( for 800 kva & above ) t ) 150 mm oil temperature indicator ( oti ) with alarm u ) marshalling box v ) clamping device w ) jacking pads x ) ladder with safety device for access to the top of transformer tank. the work shall be complete in all respects up to the satisfaction of engg in charge make: kirloskar, transtron, schnider, crompton, 630 kva , ht pannel supply, installation, testing & commissioning of indoor type floor mounting, dust & vermin proof, front operated construction, enclosure class ip 42, powder coated after proper treatment with 9 tank process, 11 kv vcb ht panel 01 with 4 nos vcb breakers ( 1 incomer and 3 out goings ) , totally enclosed & fully interlocked, horizontal drawout, horizontal isolation type breaker, having capacities as mentioned below, single break, trip free mechanism, motorised charged and auto closing breaker suitable for use on 11 kv, 3 phase, 50 hz a. c. supply with short circuit fault level of 26.3 ka, complete with self contained, fully interlocked, rack in and rack out mechanism, air insulated but encapsulated copper alloy bus bars of suitable fault level having conductivity of 97 to 99 % , al. earth bar, earth bar, breaker featured with mechanical on / off indicator with hand trip device, spring release coil, shunt trip coil, controlvoltage of 24 volt dc, tnc, led type indicating lamps for phases and trip conditions and auxiliary switch of 6 no + 6 nc and equipped with following switchgears and accessories. the panel should be suitable for connections for up to 3 x 120 sq.mm xlpe 11 kv cable ( cable entry from bottom / top / side ) , end termination with heat shrinkable jointing material etc. as required. ( the cost of end termination not included in this item ) electrical estimate substation equipment power pack ( 1 working & 1 standby ) with 220 volt ac input & 24 volt dc continuousoutput suitable for indicating lights & closing / tripping / indication of 4 nos. ht panel boards with 2 nos. 12 volts each maintenance free batteries of suitable ah ( min 4 hrsback up for each relays & indication ) each, charging unit, capacitor bank for emergencydelivering for trip system complete with suitable capacity of ammeter & voltmeter i / cconnections with 2.5 sq.mm frls insulated copper conductor cable etc. including dc db consisting of required mcbs for dc supply distribution to panels as required. makes : 11 kv breaker abb / siemens / schneider / l & t ( bus bar : hindalco / jindal ) incoming 1 nos. 630 amp. vcb breakers with followings in each breaker ( a ) 1 set ( 3 nos ) 11 kv / v3 / 110 / v3 volts drawout type pt class 0.5 accuracy and 100 va burden with 1 no. voltmeter ( 0 36 kv ) , digital type, selector switch for voltmeter and protection fuses / mcb for ht metering. ( b ) 3 nos. dual core dual ratio cts of ratio 200 / 100 / 5 / 5a of 15 va burden and accuracy class 0.5 for metering and class 5p10 for protection. ( c ) 1 no. ( 0 200a ) ammeter, digital type with selector switches ( d ) master trip relay ( e ) trip circuit supervision relay ( f ) microprocessor based numerical relay with idmt setting for o / l, e / f and s / c protection. g ) energy analyser ( digital type ) consisting of i, v, kw, kwh, kva, kvah, kvarh, pf, hz & mdi with rs 485 port ( h ) over and under voltage relay ( i ) timer and tnc switch outgoing 3 nos. 630a vcb breakers with followings in each breaker note provide all type of protection, auxillary relays, release for the transformer protection as the outgoing feeders shall feeds the power to transformer. there is a provision in out going vcb that should be trip off after ref relay activated in downstream panel after transformer. ( a ) 3 nos. dual core dual ratio cts of ratio 50 / 5 / 5a of 15 va burden and accuracy class 1 for protection. ( b ) ( 0 50a ) ammeters, dual scale digital type & selector switches for ammeters. ( c ) microprocessor based numerical relay with idmt & instantaneous element for o / l, e / f and s / c protection. ( the relay having auto doubling feature to prevent nuisance triping during inrush current cycle of transformer ) ( d ) 12 window annunciation panel with necessary relays, audio and visual indicators and push buttons. ( e ) auxilliary relay for buchholtz / oti / wti / mog / oltc surge with alarm & trip ( f ) tnc switch g ) master trip relay ( h ) trip circuit supervision relay ( i ) energy analyser ( digital type ) consisting of i, v, kw, kwh, kva, kvah, kvarh, pf, hz & mdi with rs485 port. ht panel 04 as described above metering and class 5p10 for protection. , sub head main lt pannel design, manufacture, supply , installation, inspection, handling, assembling, affecting proper connections, testing and commissioning of main l.t. panel ( with 275gsm gi / crca ) plc based load manager, floor mounting, dust & vermin proof, front operated construction, enclosure class ip54 / 42. the bubsbar shall be of aluminium. the panel should be double door design for safety of operator.the panel has to a bolted design and no welding shall be allowed.the main parts like upright ( frame ) 9 fold design, busbar support & corner pieces 3 way of panel should be supplied by oem to system integrator and copy of inoices ( without price ) to be submit by system integrator during drawing approval & inspection for authenticity purpose. no changes in the iec or models / makes of panels as specified in this particular boq itself shall not be allowed to ensure high quality of products for hospital and this boq shall supercedes all previous / amedmend / sld issued / list of makes for any make / model / rating during tendering. the main lt panel shall be as per iec61439 ( tta ) . make : system integrator of abb ( artu k ) , schneider ( okken ) siemens ( sivakon ) / l&t ( terra ) authorized certificate and agreement copy with oem to be submit while drawing approvals through contractor. tender based authorization or any other certifications shall not be valid.further, only oems system integrator for tta panels as per iec61439 ( models as specified above ) shall only be allowed to manufacturer & supply non tta panels also like hvac, sub panels, ahu panels, control panel, fire fighting panel to maintain the high quality vendor for complete lt panels.no other manufacturer shall supply non tta panels even if it is specified in make list and this boq shall supercedes all previous / amedmend / sld / list of makes issued. all acbs shall have inbuilt microprocesor based over load protection ( l ) , short circuit protection ( s ) , instantaneous short circuit protection ( i ) , earth fault protection ( g ) , shunt trip releases. all acb should have ics=icu=icw=50 ka for 1 sec.all acb shall be supplied with all standard accessories i.e. auxillary switch with 4no + 4nc contacts, cradle, handle, safety shutter in confirmity with is:60947. all acb incomer shall be 4p, edo, lsig , with display and communication module for real data assessment like events, fault and all current parameters all mccb above 250a, shall be microprocessor based with inbuilt ol, sc, ef protections.mccb 250a & below shall be thermal based ol, sc all mccbs shall be ics = 100% icu, with rotary handle, phase barriers, spreader terminals & pad locking arrangement, with per load requirement. all tp mccb shall be with heavy duty solid isolable neutral link. the instrument chamber shall be separate and shall comprise of flush type ammeter, voltmeter, selector switches, cast resin type cts & pts, etc. separate cts shall be provided for protective and measuring system and for apfcr of capacitor bank with suitable va each section of panel shall have door opearted light of sufficent lux to illumunate that section & each section of capacitor, buscoupler, all acbs sections shall have exhaust fans for ventilation purpose. each section of panel shall be provided with space heater alonwiththermostate and suitable arrangment for automatic operation. all energy analyser / tvm shall have rs 485 modbus rtu on board communication protocolfor scada communication. the fault withstanding capacity of panel & its control gear shall be min. 35 ka rms for 1 sec the maximum height of the panel should not exceed 2100 mm unless specifically approved. ga drawings shall be got approved from consultants before fabrication.the panel has to be specifically fabricated as per the space available at basement level. the existing column positions will also be considered.acb make and model : abb e max, schneider ( nw ) , siemens 3wl ( etu 76b ) , l & t u power mccb make and model : abb t max, schneider nsx, siemens 3vl, l&t dsine dn2 incomers from 2 nos.630 kva transformers 2nos acb 1000a 4p edo ol, sc, ef with display ( 4 line display ) with 20 trip history and 60 events and release should be compatible with bluetooth for extracting data wirelessly andcommunication module for real data assessment like events, fault and all current parameters acb and release make / model : abb e max ( pr122 ) , schneider nw 6e, siemens 3wl ( etu 76b ) ( etu45b ) , l & t u power the acb shall be electrically and mechanically interlocked with the bus coupler, dg incomersand other transformer incomers. 2 nos. 250 kvar capacitor bank with 400 amp tp mccb ( 50 ka ) for each transformer incomer. 1 nos. 32 amp tp mccb ( 35 ka ) for oltc ( for each transformer incomer ) protection releases / relays, metering & accessories for each transformer incomers over voltage / under voltage relay / release with timer.restricted earth fault relay. master trip relay trip circuit supervison relay. tnc switch. auto manual selector switch. 1 nos. 0 500 volt range digital type voltmeter with selector switch 1 set of 3 cts of ratio 1000 / 5a, class 1.0 accuracy 15 va burden for metering. 1 set of 3 cts of ratio 1000 / 5a, class 1.0 accuracy 15 va burden for apfcr 1 set 415 / v3 / 110 / v3 class 1.0 accuracy 100 va burden pt along with primary and secondary fuse. 1 set of 4 cts of ratio 1000 / 1a, class ps for protection 1 no. 0 1000 amp range digital type ammeter with selector switch. energy analyser ( digital type ) consisting of i, v, kw, kwh, kva, pf, hz, mdi ( em 6400 ofconzerve or equi. ) with rs 485 communication port for communication / report generation. ( or dual meter ) power factor meter frequency meter 3 nos. led type phase indicating lamps, each lamp shall be with bakup mcb along with hooter, auxillary relay, 2 sets of push buttons. 5 nos. led type indicating lamp for indicating the status of feeder on / off / trip / trip circuit healthy / dc supply healthy. each lamp shall be with bakup mcb. incomers from 1 nos 500 kva d g sets 1 nos acb 800a 4p edo ol, sc, ef with display ( 4 line display ) with 20 trip history and 60 events and release should be compatible with bluetooth for extracting data wirelessly and communication module for real data assessment like events, fault and all current parameters incomers from 1 nos 250 kva d g sets 1 nos mccb 400a 4p ol, sc, ef with display ( 4 line display ) with 20 trip history and 60 events and release should be compatible with bluetooth for extracting data wirelessly and communication module for real data assessment like events, fault and all current parameters protection releases / relays, metering & accessories for each d g set incomers over voltage / under voltage relay / release with timer idmt earth fault relay master trip relay trip circuit supervison relay. reverse power relay main lt pannel as described above , automatic power factor correction panel ( capacitor pannel ) design, manufacture, supply, installation, inspection, handling, assembling, affecting proper connections, testing and commissioning of 16 swg crca sheet steel fabricated cubical type 250 kvar a p f c panel 01 / 02 / 03 consisting of1 / 2 / 5 / 10 / 15 / 20 / 25 / 50 / 60 kvar capacitor units in tier formation, housed in an integrated cubicle type automatic switching on and off control panel, floor mounting, dust & vermin proof, front operated construction, enclosure class ip 52, powder coated after proper treatment with 9 tank process with top / bottom removable gland plates, as required, double compression type cable glands, earth bus, hinged and lockable doors to achieve dust and vermin proof complete with all inter connections small wiring by min. 2.5 sq. mm. copper wires, ckt labels etc. the aluminium bus bar shall be of suitable length, 500 volts, 3 phase 50 hz tpn, electrolytic aluminium as per is 8623 all mccbs shall be ics = 100% icu, with rotary handle & pad locking arrangement, with adjustable o / l & s / c trip setting as per load requirement. all tp mccb shall be with heavy duty solid isolable neutral link. the breaking capacity specified is ics value. the instrument chamber shall be separate and shall comprise of flush type ammeter, voltmeter, selector switches, cts, pts, etc. ac3 duty contactors should be used for switching individual capacitor banks. the fault withstanding capacity of panel & its control gear shall be min. 35 ka rms for 1 sec. each section of capacitor panel shall have verticle hood & exhaust fans for ventilation purpose. the maximum height of the panel should not exceed 2100 mm unless specifically approved. incoming incomer circuit breaker has been included in the main panel. 1 set 3 cts , ratio 250 / 5a class 1.0 accuracy 15 va burden for metering. 1nos ( 0 1000a ) digital ammeter with selector switchmicro processor based automatic power factor control relay ( 3 phase ) ( including power factor meter ) in 16 steps for automatic cut off or add on capacitor units to keep the power factor at 0.95 with variation of loads. all associated auxiliary contactors / relays shall be provided with in the scope of work. phase indicating lamps with hrc fuses, and indicating in each capacitor chamber unit to indicate on / off status of capacitor unit. bus bars 320 amp, 500 volts, 3 phase 50 hz tpn high conductivity electrolytic aluminium bus bar of suitable length, smc / dmc supports, with colour coding and insulated by heat shrinkable sleeves and clips on shrouds for joints. the current density of bus bar shall be minimum 1.3 sq mm / amp. the maximum allowable temperature for the bus bar to be restricted to 85 deg c. the temperature rise should be restricted to 35 deg c above ambientte mperature. outgoings 4 nos. of 100 amps tpn 35 ka mccb and 60 amps ac3 duty contactor with 30 kvar, mpp resin filled, super heavy duty , 480 v capacitor bank, with copper coil 7% detuned filters, auto manual selector switch, start stop push button for manual operation including on / off indicating lamps and delay timer complete. 5 nos. of 63 amps tpn 35 ka mccb and 63 amps ac3 duty contactor with 20 kvar, mpp resin filled, super heavy duty , 480 v capacitor bank, with copper coil 7% detuned filters, auto manual selector switch, start stop push button for manual operation including on / off indicating lamps and delay timer complete. 3 nos. of 40 amps tpn 35 ka mccb and 40 amps ac3 duty contactor with 10 kvar, mpp resin filled, super heavy duty , 480 v capacitor bank, with copper coil 7% detuned filters, auto manual selector switch, start stop push button for manual operation including on / off indicating lamps and delay timer complete. , section h : d.g. sets supply, testing and commissioning of silent type diesel generating set at 0.8 pf, 415 volts, 50 cycles per second, 1500 rpm, 3 phase, suitable for parallel operation, 0.85 load factor, sound proof acoustic and weather proof enclosure, residential type silencer ( as per cpcb norms 2 ) fabricated out of crca sheet of 14 / 16 swg thickness with 9 tank pretreated before powder coating with ventillation system complete in all respects comprising of the following. diesel engine suitable for driving alternator of above rating, compression ignition, 4 stroke cycle, radiator cooled, turbo charged, battery starting, 1500 rpm, suitable for above output of alternator at 40o c, 50% rh & at 210 m msl and confirming to bs 5514, bs 649, is 10000, capable of taking 10% overloading for one hour after 12 hrs of prime continuous loading, complete with all the accessories i.e. tachometer with hour meter, flexible coupling with guard, crank case of steel, crank shaft, conncting rods, electronic governing system, dynamically balanced flywheel, air intake manifold, air cleaner, anti vibration pads, starter motor, including all other accessories required to complete the system. instrument panel engine mounted instrument panel fitted with and having digital display for followings : start stop switch with key, water temperature indication, lubrication oil pressure indication., lubrication oil temperature indication., battery charging indication, rpm indication over speed indication, low lube oil trip indication, engine hours indication, alternator synchronous alternator of above capacity at 0.8 pf, 3 phase, 415 volts, 50 cycles, 4 wire, 1500 rpm, suitable for operation at 40 deg c, 50% rh & at 210 meter above msl, capable of taking 10% overlioading for one hour after 12 hrs of prime continuous loading, brushless, self excited, self regulated through avr, continuous duty confirming to is 4722, bs 2613 suitable for tropical conditions, class h insulation, including terminal box suitable for bus duct termination as required. note : alternator should have with all other accessories as per specified in technical specfications. base frame both the engine and alternator shall be mounted on suitable base frame made of ms channel which shall be installed on cement concrete foundation and vibration isolating arrangement as per recommendations of manufacturer. power controller for dg synchronization microprocessor based power command controller ( p.c. 3.3 jakson or equivalent ) suitable for auto / manual synchronization & auto load sharing. daily service fuel tank of 990 liters capacity fabricated out of 2 mm thick ms sheet complete with inlet and outlet connections, oil indication gauge, drain plug, air breather, provision for fuel transfer system, level indicators and all standard accessories etc. as required. exhaust silencer exhaust manifold with residential silencer. the d g set should be supplied with required hardware for external plc based auto synchronization, auto load sharing, auto load management system. starting system 24 volt dc starting system comprising of starter motors : voltage regulator and arrangement for initial excitation complete with 12 / 24 volts suitable nos. lead acid type batteries of suitable ah. ventillation system arrangement for fresh air intake for cooling of the engine & alternator, extraction, discharging hot air into the atmosphere as per standard specifications. 500 kva , supply of outdoor unit 16 hp heat pump type three phase sigma , 20 hp heat pump type three phase sigma , 24 hp heat pump type three phase sigma , vrf indoor unit supply of indoor units address setting and capacity as mentioned below. multispeed motor, coil section with dx coil, outer cabinet, drain pan mechanism insulation, pipe connections and fresh air intake connector as per hitachi specifications vrf indoor unit in the ceiling / ducted : 12.0 hp , in the ceiling / ducted : 10.0 hp , in the ceiling / ducted : 8.0 hp , in the ceiling : 3.0 hp low static , in the ceiling : 2.5 hp , in the ceiling : 2.0 hp , in the ceiling : 1.5 hp , hi wall 2.5 hp , hi wall 1.3 hp , 4 way cassette : 6.0 hp , 4 way cassette : 5.0 hp , 4 way cassette : 4.0 hp , 4 way cassette : 3.0 hp , drain pump for conceled split , supply of multikit joints indoors average for all required size of refnut joints ( above quantities shall vary after copper pipe designe finalize ) , supply of multikit joints outdoors average for all required size of refnut joints , supply of cordless remotes for hi wall split , supply of corded remotes for ( all ) , installation of vrf air conditioning system hp heat pump type ( cooling & heating ) vacuumising the system upto 500 micron level which ensures the zero moisture content level in piping which results in better cooling efficiency and long life of system. pressure testing of system with nitrogen gas with 1.5 times of working pressure of r410a refrigerant gas to ensure leakproof system. to flush the system with food grade nitrogen gas to remove carbon contents , dirt particles to make sure that there is no chance of mixing of any impurity with refrigerant gas , lifting and shifting & positioning charges of outdoor unit , chouki type ms stand for outdoor unit , indoor units 1.vrf hi wall , 1 way / 2 way / 4 way cassette , in the ceiling 12 / 10 / 8 hp , in the ceiling 1.5 / 2.0 / 2.5 / 3 / 4 / 5 hp , commissioning of system commisssion of vrf system including topping r410a gas per site requirments ( r410a make : dupont , honeywell ) , refrigerant piping supply installation testing and commissioning of interconnecting refrigerant pipe work with ( 19mm / 13 mm thick ) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per hitachi std. & specifications, all piping inside the room shall be properly supported with ms hanger. , make: mandev, maxflow or equivalent ( copper pipe ) , make: superlon, accoflex, a flex or equivalent ( insulation ) , make: harris / mexflow ( brazing rod ) 41.2 mm dia 19 mm thk. insulation , 38.1 mm dia 19 mm thk. insulation , 34.9 mm dia 19 mm thk. insulation , 31.2 mm dia 19 mm thk. insulation , 28.6 mm día 19 mm thk. insulation , 25.4 mm día 19 mm thk. insulation , 22.2 mm dia 19 mm thk. insulation , 19.04 mm dia 19 mm thk. insulation , 15.9 mm dia 19 mm thk. insulation , 12.7 mm dia 13 mm thk. insulation , 9.5 mm dia 13 mm thk. insulation , 6.4 mm dia 13 mm thk. insulation , drain piping providing and fixing rigid pvc piping complete with fittings, supports as per hitachi std.& specifications. in client scope make: supreme, kissan , astral, or equivalent a ) 25 mm dia , 32 mm dia , 40 mm dia , drain hose connector if required , control cabling supply & fixing of control cum transmission wiring ( sheilded ) of copper conductor cable alongwith conduite for looping between indoor & outdoor vrf system & to main central remote controller system make: polycab or equivalent 2 c x 0.75sq. mm , sheet metal work fabrication, supply, installation, testing & commissioning of following gauges complete with, supports and turning vanes make: sail , jindal , or equivalent a ) uninsulted gi ducting 24 g ( 0.63 mm ) , uninsulted gi ducting 22 g ( 0.80 mm ) , canvas connection double layer , thermal insulation work supply, installation & testing of thermal duct insulation. make: kflex, accoflex, a flex , supreme or equivalentsupply & installation of thermal insulation over the duct with xlpe sheet for the ducts with 9 mm thick sqmt one laver externally on the duct. , acoustic lining ( ducts ) work supply, installation & testing of acoustic lining with fiber glass wool. make: up twiga, or equivalent supply & installation of acoustic lining of duct with 12.5 mm thick fiber glass covered with tissue paper, gi screws and washers. 25 mm thick with 24 kg density , grilles and diffusers supply & return air grille supply, installation, testing and balancing of powder coated extruded aluminum supply & return air grilles / diffuser with approved shop drawings and specifications. , supply & installation of ms painted supply air vcd coller dampers. , minor civil work / wall cutting / breaking of wall , lift make otias, schindler ( details & specification attached in tender document ) ...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

35726047 erection of 01nos. 132kv transformer bay for 40mva transformer at 132kv s / s lalitpur, under etd, jhansi 2 erection of following different type main and auxiliary structure, columns, beams, peaks, masts ets. suitable for placing of 132 / 33 kv equipments. 3 erection of main structure 4 erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material / equipments from store to erection site including all other associated work to complete the job satisfactorily. 5 erection of 145kv cb 6 erection of 36kv vcb 7 erection of 145kv bus isolator. 8 erection of 145kv tandem isolator. 9 erection of substation automation system panel. 10 erection of 145kv current transformer. 11 erection of 120kv lightning arrester 12 erection of 145kv post insulator 13 erection of junction box for 145kv current transformer. 14 erection of abt energy metering panel with main and check rack. 15 erection of 36kv current transformer. 16 repair / replacement work of 120 kv lighting arrestor. 17 erection of 36kv bus iso 18 erection of junction box for 33kv current transformer. 19 connection of the control & power cables as per new cable schedule of new 40 mva t / f & its oltc / rtcc panels at both ends control & relay panel, cooling fans & pumps, marshalling box etc. using existing cable, including laying dressing & binding of additional control cables, if required as per site requirement and termination alongwith making necessary holes in the glands plates or box wherever required providing and fixing of cable glands of appropriate size, providing of ferrules and cable termination lugs as per standard & all other associated work as per technical specification includingpreparation of cable schedule drawing. 20 termination 2cx2.5sqmm unarm ctrl cable both end. ( 1500 mtr. ) 21 termination 4cx2.5sqmm unarm ctrl cable both end. ( 2000 mtr. ) 22 termination 6cx2.5sqmm unarm ctrl cable both end. ( 2500 mtr. ) 23 delta earthing, fab of 3x3m electrode 40mm 24 cutting, strengthening, bending, laying 1500mm.below in side ground and above ground of following size of ms flat for earthing of main and auxiliary structure, equipment structure t / f body and its material etc. including welding with main earth mat and with object to be earthed / excavation of trenches its back filling. 25 fresh earthing, connected with earthmat 75x10mm 26 fresh earthing, connected with earthmat 50x6mm 27 fresh earthing, connected with earthmat 25x6mm 28 interconnection of following equipments and bus bar including cutting, bending of conductor and jumpering, clamping along with all other associated work to complete the job satisfactorily as per drawing and technical specn. 29 eqpt jumper repl 1xpanther, <10m, 132kv 30 eqpt jumper repl 1xmoose, <10m, 33kv 31 laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes and jb etc. in switchyard as per cable schedule. 32 laying 2cx2.5sqmm unarm ctrl cable 33 laying 4cx2.5sqmm unarm ctrl cable 34 laying 6cx2.5sqmm unarm ctrl cable 35 preparation of cable schedule and case interconnection diagram in between relevant panels, breakers. ct, pt, cvt, etc. 36 stringing of single moose 36 mtr. ofmain bus of 132kv ( all 3 phases ) including fitting of tension clamps, hoisting of isolators, cutting of conductor and shifting of all material from store to site and all other associated works required for completion of job satisfactorily as per technical specification. 37 stringing of single moose 24 mtr. ofmain bus of 33kv ( all 3 phases ) including fitting of tension clamps, hoisting of isolators, cutting of conductor and shifting of all material from store to site and all other associated works required for completion of job satisfactorily as per technical specification....

Northern Coalfields Limited - Uttar Pradesh

35605928 bids are invited for spares for sait teknik make starter main copper busbar with ht sleeving 25 x , busbar and pt fuse support , on off isolator , vacuum contactor savac4 , vacuum interrupter bottle 3.3kv 400a , closing coil of vac contactor , limit switch 3no and 3nc, 10a , dc pack for closing coil, 220v dc , p t fuse , ammeter selector switch 10a 3p 440vac , 3ph ptntl trnsfrmr 6.6kv 220v 110v 500va , voltmeter 0 to 8kv, ptr 6.6kv 110v , voltmeter selector switch 10a 3p 440vac , core balance current transformer , motor protection relay 110vac , timer elctrnc ,0 to 60s, 2no and 2nc,110vac , control circuit breaker 3p 6a 10ka , lamp with holder 3w 220vac , aux control relay kai, 3co , ht hrc fuse 150a 6.6kv , auto transformer w tpng 1000kw 6.6 kv , ct 2crw mtrng and prtcn 150 5 5volt cl1 , ammeter 0 150 , 900 , crt 150 5 total quantity : 63...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

35466642 tender for erection of structure & equipment’s required for construction of 01 no.33 kv feeder bay for m / s gayatri project ltd., ( deposit ) at 132 kv sub station khekra under etd baraut. erection of main & auxiliary structure by shifting of structures from store to site of erection and erection of structures as per drawing ( nut bolts & washer and structures will be provided by dupartment free of cost ) 3 main & auxiliary structures 4 erection of following equipments as per instruction manual ofequipments including shifting of equipments from store to erection site with all other associated works to complete the job satisfactorily: 5 33 kv triple feeder panel 6 33 kv circuit breaker 7 33 kv bus isolator 8 33 kv line isolator 9 33 kv ct 10 33 kv c.t. junction box 11 interconnection of jumper of equipments from bus bar to bi, bi to ct, ct to cb, cb to li with help of twin acsr panther conductor, the work includes cutting, bending of conductor and jumpering, clamping including all other associated work to complete the job satisfactorily. 12 loading / unloading and carriage of miscellanceous material and equipments from various s / s under etc meerut to 132 kv s / s khekra, under etd baraut. 13 sorting and stacking of s / s galvanized steel structures ( as per bill material ) and to make ready the same structure wise for loadinginto truck. 14 safe carriage of s / s steel structures into truck to be arranged by the contractor at his own cost from efu naini ( prayagraj up ) or any substation according availability in transmission west zone to 132 kv s / s khekra. 15 unloading of structures and stacking the all above structure in store at 132 kv s / s khekra. 16 providing & fixing of phase plate ( r, y, b phase ) of2 mm thick aluminum sheet of size 5 dia. covering of 3m hip / mdf retro reflected sheet in single piece along mounting with gi nuts, bolts & washer 01 set comprise. 17 laying of following size of control cables in the cable trench from control relay panels to various equipments, marshaling boxes, junction boxes in the switchyard as per cable schedule its saddling at every 75 cm distance with ms saddles of size 25x3mm size including carriage of cable drums from stores to laying site and shifting back to store and all other associated works to complete the job satisfactorily: 18 2cx2.5 sq. mm cable unarmored 19 4cx2.5 sq. mm cable unarmored 20 6cx2.5 sq. mm cable unarmored 21 termination of following sizes of control cables as laid above as per cables schedule ( prepared by contructor ) including making necessary holes in gland plates or box wherever required, supply and fixing of letter marked ferrules and no marked for each core of cable and its termination as per drawing on equipments cable termination blocks. 22 2cx2.5 sq. mm cable unarmored 23 4cx2.5 sq. mm cable unarmored 24 6cx2.5 sq. mm cable unarmored 25 cutting, straightening , bending & laying of 75x10 / 50x6 mmms flat ( provided by the department ) 700 mm below ground level and above ground level & connecting with existing earthmat of substation and proper earthing at different structure and equipments ( as per drawing ) . 26 part b supply 27 33 kv isolator clamp for twin panther conductor made of aluminum alloy lm 6. 28 33 kv ct clamp for twin panther conductor made of aluminum alloy lm 6. 29 4 bolted type pg clamp made of aluminum alloy lm 6 with gi nuts, bolts & washer suitable for zebra to panther. 30 4 bolted type pg clamp made of aluminum alloy lm 6 with gi nuts, bolts & washer suitable for panther to panther. 31 01 bolt 60 mm spacing spacer for twin panther conductor. 32 120 watt led light fitting complete....

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

35461812 tender for miscellaneous work in splitting the 132kv main bus bar at 132kv s / s saidpur under etd ghazipur dismantling of 132 kv main bus bar of acsr moose conductor of all three phases having length 36 mtr each phase between gantry to gantry of main bus by the opening from fitting and insulator & other associated work to complete job satisfactorily. 3 stringing of 132 kv main bus of acsr moose conductor of all three phases having length 24 mtr. each phase between gantry to gantry section isolator by the cutting, bending and clamping fitting of tension clamp with all associated accessories, hoisting of insulator string after shifting of material from store to switchyard at site and all other associated work to complete the job satisfactorily. 4 stringing of 132 kv main bus of acsr moose conductor of all three phases having length 12mtr. each phase between gantry to gantry section isolator by the cutting, bending and clamping fitting of tension clamp with all associated accessories, hoisting of insulator string after shifting of material from store to switchyard at site and all other associated work to complete the job satisfactorily. 5 dismantling of existing feeder / equipment jumper. 6 jumpering ofequipment jumper by clamping with moose to panther jumpers including cutting, bending and clamping and all associated work to complete the job. 7 erection of 145kv section isolator as per instruction manual of equipments and technical specification including shifting of material / equipment on store to erection site including all other associated work to complete the job satisfactorily. 8 laying of 4cx2.5 mm2 control cable in the cable trench from control relay panel to various type equipments, junction box as per cable schedule and drawing, including carriage of cable drum from store laying site and shifting back to store and all other associated work. 9 termination of 4cx2.5 mm2 control cables as laid above as per cables schedule including making necessary holes in gland plates or box wherever required, supply and fixing of letter marked and number marked ferrules for each core of cable and its termination as per drawing on equipments cable termination blocks. 10 erection of main structure consisting of columns, beams, and auxiliary structure required for installation of pts. the job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt matching of holes. cutting, matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. all material to be erected shall be supplied by upptcl free of cost but all men, material and t&p required for satisfactorily completion of work shall be arranged by the contractor at his own cost. 11 part b supply 12 gun type single tension fitting made of lm 6 al. alloy with d shakle, u bolt and g.i. nut & bolts complete suitable for acsr moose conductor. 13 t clamp made of lm 6 al. alloy with 6 nos. of gi. nut & bolts suitable for panther to moose conductor. 14 p.g. clamp made of 1m 6 al. alloy with 4 nos. g.i. nut & bolts suitable for panther to moose conductor. 15 p.g. clamp made of lm 6 al. alloy with 4 nos. g.i. nut & bolts suitable for panther to panther conductor....

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

34841706 work of dismantling and erection of acdb & dcdb at 220 kv s / s banda under etd banda. 2 loading, carriage & unloading of dcdb from 132 kv s / s banda to 220 kv s / s banda 3 disconnection ( at both end ) & reomving of 2c*2.5 sqmm dc control cablesof all control & protection panel installed at 220 kv s / s banda control room 4 dismentlling of existing dcdb ( very old condition expo fun make ) 5 erection of new dcdbin place of dismental dcdb 6 laying of2c*2.5 sqmm dc control cables from dcdb to control & relay panel including termination at both end with proper lugs and fureling. 7 dismentlling of existing acdb ( very old condition ) with disconnecting its from different power cables. 8 erection of new acdb ( asian switchgear make ) in place of dismental acdb including termintion of all power cables. 9 laying of 95 sq mm power cable in trench with proper opening & closing of trench cover including termination at both end for second source to acdb. 10 dismentlling of old relay & control panel of 220 kv banda fatehpur line 11 erection of new relay & control panel ( nulumbo make ) 12 laying of different size cables. 13 termination of different size of cables. 14 preparing of cable schedule of above all works. 15 rates qouted by the bidders shall be without taxes. taxes applicable if any to paid extra...

Uttar Pradesh Power Transmission Corporation Limited - Uttar Pradesh

34109162 maintenance of 220kv, 132kv and 33kv equipments for three month at 220kv substation naubasta kanpur under etd ii kanpur 1 cleaning of following control & relay panel etc. with collin spray out side weekly and with blower & duster from inside for removing spider net, dust and other durt etc. once every month. 2 220kv control & relay panel ( 10nos. ) 3 132kv control & relay panel ( 20nos. ) 4 33kv control & relay panel ( 10nos. ) 5 dismantling of following rating old & damaged jumpers and fixing of new jumpers by acsrpanther / zebra conductor from bus bar to equipment and equipment to equipment. 6 220kv jumper 7 132kv jumper 8 33kv jumper 9 replacement and repairing of damaged / burnt terminal connector of following rating equipments by new terminal connector. 10 220kv terminal connector 11 132kv terminal connector 12 33kv terminal connector 13 replacement and repairing of damaged / burnt jaw / blade assembly of the following rating isolator and replacement by new one. 14 220kvisolator 15 132kv isolator 16 33kv isolator 17 adjustment of mechanism, overhauling and greasing of following rating isolators including petty repair of any. 18 220kvisolator 19 132kv isolator 20 33kv isolator 21 replacement / reacharging of silica jel granules offollowing rating of the transformers including dismantling of silica jel breather and cleaning of the breather pots & its refiting 22 220 / 132kv, 160mva t / fs 23 132 / 33kv, 63 / 40mva t / fs 24 33 / 0.4kv, 250kva t / fs...