Kanpur Electricity Supply Co Limited - Uttar Pradesh

40840487 supply of 11 kv and 33 kv cable boxes , electrical items : , 11 kv xlpe outdoor terminal kit 3x300 sq.mm , 11 kv xlpe outdoor terminal kit 3x240 sq.mm , 11 kv xlpe outdoor terminal kit 3x185 sq.mm , 11 kv xlpe outdoor terminal kit 3x70 sq.mm , 11 kv xlpe outdoor terminal kit 3x120 sq.mm , 11 kv xlpe st/th.terminal kit 3x70 sq.mm , 11 kv xlpe st./th. terminal kit 3x185 sq.mm , 11 kv xlpe st./th. terminal kit 3x120 sq.mm , 11 kv xlpe st./th. terminal kit 3x150 sq.mm , 11 kv xlpe st./th. terminal kit 3x240 sq.mm , 11 kv xlpe st./th. terminal kit 3x300 sq.mm , 11 kv xlpe indoor terminal kit 3x70 sq.mm , 11 kv xlpe indoor terminal kit 3x120 sq.mm , 11 kv xlpe indoor terminal kit 3x300 sq.mm , 11 kv xlpe indoor terminal kit 3x185 sq.mm , 11 kv xlpe indoor terminal kit 3x240 sq.mm , cable box i/d 33 kv 3x300 xlpe , cable box o/d 33 kv 3x300 xlpe , cable box o/d 33 kv 3x400 xlpe , cable box st.th.33 kv 3x300 xlpe , cable box st.th.33 kv 3x400 xlpe , cable box o/d 11 kv 3x185sqmm , cable box i/d 11 kv 3x185 sqmm , cable box o/d 11 kv 3x300 sqmm , cable box i/d 11 kv 3x300 sqmm...

Directorate of Training and Employment - Uttar Pradesh

40808835 bids are invited for 300amp kit kat fuse , inverter 1600va , tin head glass per sq fit , silicon , fiting charge per sq fit , cable box id 11kv 95mm 3c , 11kv pt 110v , 11kv ct , transformer oil per ltr , grease per kg , mobil oil per ltr total quantity : 766...

Modern Coach Factory - Uttar Pradesh

40759583 supply of emergency brake cable boxemergency brake cable box,emergency brake cable box npz 1 s or passanger emergency pilot valve and covering emergency brake pull box. knorr bremses drg.no. c208117 rev. 01 (icf approved) part no. ii 103643 with adapter female metric thread m14x1.5 to kbi drawing no. c59627/1 rev. 02(icf approved) and as per icf letter no.md/dss/brakes/103b dated 15.04.2021 or faiveleys drg.no. ft0051183 a00 rev a04 (rdso approved) with reduced female metric thread m14x1.5 to ftrtil part no. ft0051183 a00. packing instruction: pi042 ver 1.0 [ warranty period: 36 months after the date of delivery ]...

Kanpur Electricity Supply Co Limited - Uttar Pradesh

40738057 tender for work for replacement of various components in dada nagar division under eudc ii kesco kanpur 1 shifting of 33 kv vcb from unloading point to switchyard abd vice versa 2 shifting of 33 kv crp from unloading point to control room 3 erection of 33 kv vcb structure 4 erection of 33 kv isolator 5 erection of lightening arresstor 6 erection of 33 kv vcb in 33 / 11 kv switchyard on erected structure 7 erection of 33 kv crp in control room 8 erection of ct / pt junction box 9 shifting of 11 kv vcb from unloading site to meter room / control room. 10 shifting of 11 kv old & used indoor type vcb / ocb from control room to loading point. 11 erection and grouting of 11 kv vcb in meter room / control room. 12 wiring, testing and commissioning of newly erected 11 kv vcb and all related work. 13 laying of control cable in trench 14 dismentalling of earthing of 11 / 6.6 kv s / g panels. 15 dismentalling of connected cable box with s / g panel 16 opening of internal connection to 11 / 6.6 kv s / g panels. 17 dismentalling of old / damaged existing 11 / 6.6 kv s / g pannels. 18 connection of earthing of 11 / 6.6 s / g panels. 19 mounting of cable box on s / g panels with handing of concerning cable and its proper fixing. 20 making jumpers from cable box to line, cable support switchgear panels, section poles of each phase. 21 dismentalling of 33 kv vcb / ocb 22 dismentalling of 33 kv ct / pt unit / lightening arresstor 23 erection of 33 kv line isolator / bus isolator equipment on erected structure in proper alignment. 24 dismantling of 33 kv isolator 25 earthing work of all above mention equipment will be ms flate 50x6 mm providing contractor 26 dismentalling & erection of wti, oti & battery with charger, carriage from store to site vice versa 27 loading, carriage & unloading of all material from store to site & vice versa and its stacking...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40563280 tender for various site damage ct pt replace and other maintenance work, oil to 2 nos. 05 05 mva power transformer installed at 33 / 11 kv substation budinakala under the work area of ​​power distribution subdivision ii, iii and baghra, muzaffarnagar under executive engineer, power distribution division i, muzaffarnagar. completion of level, replacement of damaged 33 kv ct / pt unit of m / s disha industries pvt. ltd. nairana district muzaffarnagar, replacement of damaged cable box of 11 kv sikheda feeder fed from 33 / 11 kv sub station nairana, 33 kv cable box of 33 / 11 kv sub station nairana. replacement, replacement of damaged cable box of 33 kv paper mill feeder, replacement of damaged cable box of 11 kv incoming no. 2 and 11 kv industrial no. 2 feeder fed from 33 / 11 kv sub station makhiyali, m / s shree siddhabali paper mills pvt. ltd., bhopa road. replacement of damaged 33 kv ct / pt of muzaffarnagar, replacement of damaged 11 kv ct / pt unit of m / s genus paper & boards, muzaffarnagar, replacement of damaged 33 kv ct / pt 9 unit of m / s siddhashwari pvt. ltd., muzaffarnagar, area of ​​33 / 11 kv substation kinani. completion of oil level of medium distribution transformers installed under 33 / 11 kv substation bhopa, replacement of damaged 11 kv cable box of 11 kv incoming no. 3 feeder, 10 mva power transformer installed at 33 / 11 kv substation makhiyali ( incoming no. 2 ) replacement of damaged 11 kv cable box, 11 kv incoming no. 2 feeder fed from 33 / 11 kv sub station makhiyali and replacement of damaged 11 kv ct of 11 kv dhandhera feeder, of m / s ramnamah fertilizer pvt. ltd. village shernagar jolly road, muzaffarnagar. the work of replacement of damaged 11 kv ct / pt unit and installation of poles at long places in the 11 kv feeder line coming out from 33 / 11 kv sub station sikri should be done through an external agency. work for....

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

40532527 supply of various type of cable box for temporary electrification of magh mela 2024 refer to tender description , 11 kv heat shrinkable type cable termination kits xlpe cable conforming to vde 0278 / 1eee 48 1975 / is – 13573 1992 and esi std. 09 13 and all other relevant standards complete with all accessories for following type & size : , indoor size 3 x 185 sq mm. , outdoor size 3 x 185 sq mm. , straight through size 3 x 185 sq mm. , 33 kv heat shrinkable type cable termination kits xlpe cable conforming to vde 0278 / 1eee 48 1975 / is – 13573 1992 and esi std. 09 13 and all other relevant standards complete with all accessories for following type & size : , outdoorsize 3 x 300 sq mm. , straight through 3 x 300 sq mm....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40454921 to carry out various additional works under the business plan for the current summer / rainy season under the executive engineer, eudd i / ii, jhansi. 1 pg calmp for dog to dog (errection only) 2 33 kv cable jointing kit 3x300 sqmm o/d (errection only) 3 33 kv cable jointing kit 3x300 sqmm s/t (errection only) 4 supply & fixing stone pad 5 vaccum intrepter11 kv (errection only) 6 trip coil vcb (errection only) 7 tripping patti vcb (errection only) 8 tripping rod vcb (errection only) 9 tripping plate vcb (errection only) 10 trip coil plunger vcb (errection only) 11 half gear vcb (errection only) 12 charging patti(errection only) 13 pvc adhesive tape (black) (errection only) 14 d shaft 11 kv vcb (errection only) 15 shower contact (errection only) 16 male contact 11 kv vcb (errection only) 17 female contact 11 kv vcb (errection only) 18 servo motor for automatic charging(errection only) 19 charging spring (errection only) 20 supply & fixing of al lug 35 sq mm 21 supply & fixing of eye hook clamp with n & b. 22 supply & fixing of eye hook (insulated) 23 supply & fixing of suspension clamp 24 supply & fixing of piercing clamp 25 supply & fixing of dead end clamp 26 pg clamps 16 sqmm 50 sqmm (errection only) 27 angle for vertical arm with fitting as per requirement (errection only) 28 supply & fixing of al lug 400 sqmm 29 supply & fixing of nut & bolt off size if not available by store 30 supply & erection of exhaust fan in control room 31 supply & laying of ballast (gitti) in swtich yard 32 safe loading, carriage and unloading of st pole 9/11/13 mtr. long from esc hasari store to work site/je store. 33 safe loading, carriage & unloading of line material & metering cubicle (i.e. 11 kv xlpe cable, cross arm, acsr conductor, ab cable, ms material etc) from esc hasari store to work site/je store. 34 erection of st pole 9/11/13 meter long including fixing of all accessories complete with concreting & their plinth. 35 fixing of distribution boox, eye hook, suspention clamp, dead end clamps etc on existing pole for laying of ab cable and cosumer connections. 36 earthing of pole and transformer body & neutral by earthing rod, gi wire etc. complete 37 erection of stay set complete as per respo manual including their concreting. 38 painting of pole with red oxide paint & aluminium paint. 39 numbering of pole with black over yellow base. 40 chemical/pipe(water level) earthing (as per requirement of site) for power transformer, metering cubicle and cable etc. 41 laying, sagging & binding of acsr dog conductor for construction of 11 kv ht line. 42 laying & sagging of lt ab cable of size 3x50/95/120 sqmm for. lt line 43 laying & sagging of consumer connection cable of size 4x16, 2x10 sqmm 44 safe loading, carriage & unloading of 11/0.4 kv 25/63/100 kva transformer from esc hasari to work site 45 safe loading, carriage & unloading of 11/0.4 kv 250/400 kva transformer from esc hasari to work site 46 construction of plinth for plinth mounted sub station/for replacement of existing plinth if damage. 47 done the wire mesh fencing as per site requirement of standard size. 48 commissioning & energisation of 11/0.4 kv pole/plinth mounted sub station 49 giving the genuine consumer service connection through installed lt distribution box including disconnection & reconnection 50 extra pit digging in hard stiff and uneven area. 51 dismantling of st/rail/joist/pcc pole of eht/ht /lt line 52 dismantalling of line material (acsr conductor, ab cable, cross arms, various clamps etc) of eht/ht/lt line. 53 loading, carriage & unloading of existing poles & line material scrap to store. 54 petrolling of 33 kv line from transmission sub station to 33/11 kv sub station and note down the required maintenance work 55 trimming and chopping of tree brances and vines 56 re jumpering of section double pole with the use of suitable size of pg clamp 57 replacement of damage pin and disc insulator 58 resagging of overhead line as per norms forprovide vertical and horizontalclearance 59 meggaring of underground cable and reaarengement of cable if found damage, short length etc both main and alternate 60 filling/stow of hs cable box and streight through 61 repairing of 11/13 m st/rsj pole by muffing and breaking cc/hard surface of rusted and tilted st pole and digging about 4 feet to prevent, grout and muffing with the help of stones etc in well made pits 62 maintenance & repairing of 11 kv & 33 kv vcb make cg ...

Kanpur Electricity Supply Co Limited - Uttar Pradesh

40429547 supply of various size of 11 kv and 33 kv cable boxes , electrical items : , 11 kv xlpe outdoor terminal kit 3x300 sq.mm , 11 kv xlpe outdoor terminal kit 3x240 sq.mm , 11 kv xlpe outdoor terminal kit 3x185 sq.mm , 11 kv xlpe outdoor terminal kit 3x70 sq.mm , 11 kv xlpe outdoor terminal kit 3x120 sq.mm , 11 kv xlpe st / th.terminal kit 3x70 sq.mm , 11 kv xlpe st. / th. terminal kit 3x185 sq.mm , 11 kv xlpe st. / th. terminal kit 3x120 sq.mm , 11 kv xlpe st. / th. terminal kit 3x150 sq.mm , 11 kv xlpe st. / th. terminal kit 3x240 sq.mm , 11 kv xlpe st. / th. terminal kit 3x300 sq.mm , 11 kv xlpe indoor terminal kit 3x70 sq.mm , 11 kv xlpe indoor terminal kit 3x120 sq.mm , 11 kv xlpe indoor terminal kit 3x300 sq.mm , 11 kv xlpe indoor terminal kit 3x185 sq.mm , 11 kv xlpe indoor terminal kit 3x240 sq.mm , cable box i / d 33 kv 3x300 xlpe , cable box o / d 33 kv 3x300 xlpe , cable box o / d 33 kv 3x400 xlpe , cable box st.th.33 kv 3x300 xlpe , cable box st.th.33 kv 3x400 xlpe...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40416059 regarding running contract for construction of jhatpat portal, vidhayak / sansad nidhi, ht / lt lines, installation new t / f., ( line shifting ) & other works against sanctioned packages time to time in the scheme of deposite worksunder the area of edsd i parikshitgarh in the area of edd ii mawana. ; 1 cartage of the following material from central store meerut to j.e. store including loading & unloading at both ends ( maximum distance up to 50 km. ) 2 1 p.c.c. pole 8.5 mtr. long. 3 2 round pole / st pole 11 mtr. long. 4 3 line material such as 11 k.v. cross arms / 11 kv pin insulator / conductor / giwire / ms angle & ms channel / stay wire / stay rod, disc fitting etc. 5 cartage of the following material from store j.e. to site of work including loading & unloading at both ends ( maximum distance up to 10 km. ) 1 p.c.c. pole 8.5 mtr. long. 6 2 round pole / pcc pole 9.5 mtr. long. 7 3 line material such as 11 k.v. cross arms / 11 kv pin insulator / conductor / gi wire / ms angle & ms channel / stay wire / stay rod, disc fitting etc. 8 safe cartage of transformer from central store meerut to j.e. store of work including loading & unloading at both ends ( maximum distance up to 50 km. ) 1 63 kva to 100 kva 9 2 10 kva to 25 kva 10 safe cartage of transformer from j.e. store to site of work including loading & unloading at both ends ( maximum distance up to 15 km. ) 1 63 kva to 100 kva 11 2 10 kva to 25 kva 12 erection of round pole / p.c.c. pole 8.5 mtr. long including fixing all accessories and fabrication as required after digging a pit of size 1.20x0.75x1.75 mtrs. 1 pcc pole 13 2 round pole / st pole 11 mtr. long. 14 erection of d / p on pcc / round poles after digging of pits of size 1.20x0.75x1.75 mtrs including fabrication of structure as per respo norms. 15 earthing of pcc support with ms earth rod of 2.5 mtr. long including excavation of pit & driving of ms rod up to proper depth & connection the earth electrode with the help of gi wire. 16 laying lifting stringing and sagging of conductor complete in all respects as per respo norms. 1 rabbit conductor. 17 2 weasel conductor. 18 erection fixing & grouting of stay rod size 16x1800mm after digging the pit of size 0.60x0.30x0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. 19 mounting of 11 / 0.4 kv t / f on plinth & making connection of pvc cable & lead of ht / lt line. 1 63 kva to 100 kva 20 2 10 kva to 25 kva 21 providing & fixing of following clamps for pcc pole / stp, made of ms flat of size 50x6mm complete in all respect.1 lt pin clamps with nut & bolt. 22 2 shackle insulator with nut & bolt. 23 3 double pole clamps with nut & bolt. 24 providing & fixing of stay clamp for pcc pole / stp made of ms flat of size 50x6 mm complete in all respect. 25 providing & fixing of stay insulator in stay wire as per site requirement. 26 providing & fixing of f clamp for pcc pole / stp made of ms flat of size 50x6mm with nut & bolt. 27 providing & fixing of cross arm holding clamp for pcc pole / stp made ms flat of size 50x6mm with nut & bolt. 28 making section t off for 11 kv / lt line. 29 cutting & chopping of tree branches. 30 jumpering of 11 kv / lt line at different places / t points. 31 guarding of 11 kv line as per norms. 32 cartage of abc cable with junction box & other store materials related with the work of abc for each site / transformer. 33 laying lifting of abc cable complete in all respect as per instruction of j.e. / sdo. 34 fixing of junction box & making connection & other related works. 35 water level earthing ( neutral / body ) by providing & fixing 30 mtrs 30 mm dia gi pipe with ms strip 40x6 mm. lowering the same after boring of earth by 4 dia upto 30 mtr depth / water level. 36 fixing / grouting of 11 kv metering cubical at required place for releasing new connections. 37 cartage of ct / pt unit combined from central store meerut to j.e. store & from j.e. store to work site. 38 installation of ct / pt unit combined at d.p. near premises of consumers. 39 making connections of i / c & o / g. side of ct / pt unit including the work of providing and fixing of plastic pipe, aluminium lugs, pvc cable etc. to complete the work. 40 providing d type loop on each face & neutral. 41 providing & fixing of bamboo sticks of required size on lt line as per instructions of je concerned. 42 providing / supply of cable jointing kit / cable box of required size for completion of work. 43 fixing of cable jointing / termination kit. 44 laying of 11 kv xlpe cable between d.p. and metering cubical / control pannel including the work of digging of cable trench for laying the cable and filling of earth after covering the cable by bricks & sand around it. 45 fixing & errection lt distribution board & other related work as per site requirement. 46 fixing of electronic kwh meter and making connection of incoming & outgoing side and filling of sealing certificate. 47 laying / erection of 3 phase lt pvc cable between lt line / lt side of t / f. and premises of consumers ( load 5 kw to 50 kw ) . 48 making new plinth for 250 / 400 kva t / f. for installation new t / f. as per respo norms ( all the material used shall be provide by the contractor ) . 49 cartage of 11 kv xlpe cable from central store meerut to 33 / 11 kv s / s. ( distance up to 50 km approx. ) including loading & unloading at both ends ( length cable upto 50 meter each or part their off ) ....

North Central Railway - Uttar Pradesh

40400450 supply of overhauling kit for kbi emergency brakeoverhauling kit for kbi emergency brake, overhauling kit for kbi emergency brake cable box npz1 s to kbi part no. ii67335 consist of 7 items as per annexure v attached. make: knorr bremse. [ warranty period: 30 months after the date of delivery ] sse / cmlr / jhs / bogic uttar pradesh 500.00 set...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

40319105 repairing & replacement of shabby 33 kv, 11 kv, lt lines & its associated pcc / st poles in the area of sub divisions atrauli under jurisdiction of electricity distribution division sandila, hardoi. 1 safe carriage, loading unloading with proper stacking of following material from store centre to pit site / je dump store. 2 pcc pole of size 8.5 mtr long 3 st pole 11 mtr. long. 4 stay set complete 5 11 kv pin with net 6 33 kv pin with net 7 disc insulator with fitting ( b&s ) 70kn 8 ms earthing rod ( 2540x20 mm ) with fitting 9 acsr weasel conductor 10 gi wire 11 installation of cable box 11 kv indoor 12 installation of striaght through cable box33 / 11 kv indoor & outdoor 13 work 14 replacement of broken pcc single pole and erection of pcc pole 8.5 mtr long with grouting & with all accessories 15 replacement of broken pcc double pole and erection of pcc pole 8.5 mtr long with grouting & with all accessories 16 replacement of broken st single pole and erection of st pole 11 mtr long with grouting & with all accessories 17 replacement of broken st double pole and erection of st pole 11 mtr long with grouting & with all accessories 18 re stringing of three phase acsr weasel conductor for 11 kv line. 19 tilted of pcc pole 8.5 mtr. 20 tilted of pcc pole 9.0 mtr. 21 tilted of spt pole 11 mtr. 22 rebinding of stay set 11 kv 23 rebinding of stay 33kv 24 repairing of existing t / f double pole got damage in heavy winds & rain of 63 kva t / f on double pole with all 22 accessories all the materials except 63 kva t / f shall be provided by the contractor 25 repairing of existing t / f double pole got damage in heavy winds & rain of 25 / 16 / 10 kva t / f on double / single pole 23 with all accessories all material except 25 / 16 / 10 kva tif shall be supplied by the contractor. 26 erection of slay set complete 27 fixing of ordinary earthing by 11 kv ms earth rod 2500 mm long as per respo schedule 28 stringing of three phase acsr weasel conductor for 11 kv line 29 guarding of 11 kv line 30 jumpering of 33 kv line, 11 kv line 31 patrolling of 33 kv line, 11 kv line 32 dismanting of 11 kv line with all accessories 33 dismantling of lt line with all accessories erection & 34 erection & commissioning of lt line with all accessories 35 re fixing of distribution box three phase complete work 36 repairing of 11 kv xlpe cable ( 3x70.3x120.3x185 ) sq.mm. after removing form groud and again laying 37 installation of straight through 33 kv cable box. 38 installation of cable box 33 kv indoor & outdoor 39 looping & chopping of tree branches for clearance ofht / lt line after clearance of line throughout places of tree branches of site ( approx 3 km ) ...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40268439 supply 33 / 11 kv / straight through cable box under edd jhansi , 11 kv cable jointing kit ( 3*70 sqmm ) indoor , 11 kv cable jointing kit ( 3*70 sqmm ) outdoor , 11 kvcable jointing kit ( 3*120 sqmm ) indoor , 11 kv cable jointing kit ( 3*120 sqmm ) outdoor , 11 kv cable jointing kit ( 3*120 sqmm ) straight through , 11 kv cable jointing kit ( 3*185 sqmm ) indoor , 11 kv cable jointing kit ( 3*185 sqmm ) outdoor , 11 kv cable jointing kit ( 3*185 sqmm ) straight through , 33 kv cable jointing kit ( 3*185 sqmm ) indoor , 33 kv cable jointing kit ( 3*185 sqmm ) outdoor , 33 kv cable jointing kit ( 3*300 sqmm ) indoor , 33 kv cable jointing kit ( 3*300 sqmm ) outdoor...

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40212074 tender for various works on semi turn basis for strengthening the electricity system in the area of ​​nipcb pratham, aligarh under nipc sashvam, aligarh. 1 st pole 11 mtr. long 2 pcc pole 8.5 mtr. long 3 stone pad ( 300x300x75 mm ) 4 top channel 125 x 65, 3200 mm with clamps 5 dropper channel ( 100x50x2028mm ) 6 v type steel x arm for 33 kv 7 cross arm holding clamp for 33 kv 8 11 kv pin insulator with pin complete 9 33 kv pin insulator with pin complete 10 11 kv disc insulator with fitting 11 disc insulator b&s type 7000 kg 12 disc fitting for dog 7000 kg 13 clamp with bolt & nut 14 m.s. angle 65x65x6x6 mm. for bracing set with 03 nos. clamps 15 m.s. angle ( 75x75x6x2028mm ) ( t / f base ) 16 m.s. t off channel with clamp b&n for support x arm 17 e bracket for 33 kv 18 f bracket 19 tpmo complete 20 3 ph. do fuse set 21 11 kv fuse set 22 holding clamp with bolt nut 23 number plate with clamp n&b 24 danger board with clamp n&b 25 stay complete 26 earthing rod complete 27 pvc cable 3.5x70 sq.mm. 28 pg clamp for conductor 29 bolt, nut & washers 30 11 / 0.4 kv 63 kva transformer 31 11 / 0.4 kv 25 kva transformer 32 5 mva 33 / 11kv power transformer with accessories 33 power transformer plinth of size 3.46x4.46 mtr.having 0.5 mtr. below ground level and 0.4 mtr. above ground level. 34 11 kv cable jointing kit 3x120 sq.mm indoor 35 11 kv cable jointing kit 3x120 sq.mm outdoor 36 11 kv cable jointing kit 3x300 sq.mm indoor & outdoor 37 33 kv cable box o / d for xlpe cable 3x300 sq.mm. 38 barbed wire 39 g.i. pipe 6 dia 40 hdpe pipe ( 160mm dia for underground cable laying of 3x120 sq.mm. 11 kv xlpe cable ( pipe to be laid by hdd method ) 41 aluminium binding wire 42 red oxide paint 43 aluminium paint 44 phase wire acsr rabbit conductor 45 phase wire acsr weasel conductor 46 phase wire acsr dog conductor 47 33 kv line isolator 48 33 kv bus isolator 49 structure for 33 kv bus isolator with plinth & foundation 50 33 kv post insulator set 51 structure for 33 kv post insulator ( 3 nos. ) with plinth & foundation 52 transformer bus complete with structure 53 33 kv ligtning arrestor 54 structure for 33 kv lightning arrester ( 3 nos. ) with plinth & foundation 55 90 lbs rail pieces ( 44.64 kg ) 56 33 kv vcb with double t / f control pannel and ct 200 / 100 / a with structure ( i ) 33 kv vcb ( ii ) control pannel i / c for 33 kv double t / f ( iii ) ct 200 / 100 / 1 1 a ( iv ) steel structure 57 plinth & foundation of vcb 58 11 kv vcb incoming ctr 400 / 200 5a, 350 mva 59 11 kv vcb incoming ctr 600 / 300 5a, 350 mva 60 11 kv vcb outgoing ctr 200 / 100 5a, 350 mva 61 bus coupler 350 mva 62 11 kv 3x120 sq.mm xlpe cable 63 11 kv 3x300 sq.mm xlpe cable 64 33 kv 3x300 sq.mm xlpe cable 65 making of 11 kv cable boxes mounted with switchgears and transformers. 66 4x2.5 sq.mm control cable 67 2x2.5 sq.mm control cable 68 earthing of indoor equipments 69 painting of indoor equipments 70 sand 71 sundries 72 24 volt battery & battery charger set 73 demounting & carriage of 11 / 0.4 kv 25 kva transformer capacity transformer due to overloaded including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. 74 concreating of pole 75 concreating of stay 76 safe cartage & erection of new 11 kv vcb’s ( i / cctr 600 / 300 / 5a 350 mva ) from store center sarsol, aligarh to respective sub station. 77 safe cartage & erection of new 11 kv vcb’s ( o / gctr 200 / 100 / 5a 350 mva ) from store center sarsol, aligarh to respective sub station. 78 dismanteling of old damaged 11 kv vcbs ( i / cctr 600 / 300 / 5a 350 mva ) after opening its 11 kv cable connection removing earthing bus bar cts and taking it out side switch yard.the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work. 79 dismanteling of old damaged 11 kv vcbs ( o / gctr 200 / 100 / 5a 350 mva ) after opening its 11 kv cable connection removing earthing bus bar cts and taking it out side switch yard.the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work. 80 laying of hdpe pipe underground minimum 3 mtr. below by hdd method trunch less alongwith laying of 11 kv 3x120 sq.mm. xlpe cable in hdpe pipe. 81 cable laying charges alongwith cost of bricks and send for cable loop and dp structor and also gi pipe....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40178889 tender for misc strengthening works 33 kv line of 33 / 11 kv sub station husen basti ( saharanpur ) . 1 1. supply of following materialg.i. angle ( 65×65×6 ) mm 2 g.i. channel ( 125×65 ) mm 3 g.i. channel ( 100×50 ) mm 4 stay sets ( 20×1800 ) mm 5 stay wire g.i 7 / 8 swg 6 g.i wire no. 6 swg 7 g.i wire no. 8 swg 8 m.s. earthing rod 9 v type cross arm 33 kv 10 cross arm holding clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 11 top channel holding clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 12 stay clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 13 guarding clamp for s.t. pole 11 m & 13m long 14 f bracket for 33 kv 15 e bracket for 33 kv 16 danger board with clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 17 number plate with clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 18 braccing clamps clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long ( upper & lower ) 19 aluminum binding wire 20 barbed wire 21 grouting of stay 22 read oxide paint 23 aluminium paint 24 m.s. bolts nuts & washers 25 earth wire clamp with nut & bolts 26 eye bolt 27 cable rout marker 28 concreting of support 29 stone pad ( 300×300×75 ) mm 30 p.g. clamp for dog to dog conductor 31 turn buckle 32 guarding angle 75×75×8 33 gi wire 16swg for binding 34 outdoor type cable jointing kit for 33 kv xlpe cable 35 g.i pipe 150mm dia 3 mtr long. 36 laying of hdpe 80 pn 150mm pipe 37 2. safe carriage of with loading & unloading at both ends respectively. ( under jurisdiction of pvvnl ) a ) steel tublar pole sp 72 13m ( bottom portiongalvanized ) 38 d ) 33 kv pin isulators ( polymer ) 39 e ) acsr dog conductor 40 f ) disc insulators b&s 7000 kg. ( polymer ) 41 g ) disc fittings b&s for dog 70 kn ( polymer ) 42 h ) 33kv, 3×300mm² xlpe cable 43 erection of following materiala erection of support after excavation of foundation pit in mix soil / normal soil / soft & hard rock and its back filling and leveling etc. the size of the pit will be ( 900×600 ) mm and having depth of 1 / 6th of the full length of the support & erection of support. the work includes carriage and handling of supports from site store to pit site. ( i ) 13 m long stp, sp 72 round pole 44 b fixing of all clamps, cross bracing sets 3.5 mtr. from m.s. angle 65×65×6mm / 50×50×6mm & other accessories on the supports as per drawing. work includes cutting of holes and providing m.s. bolts of 16×40mm size in the middle of cross bracing with 1 no. spring washer. the work also includes carriage & handling of accessories from sectional store to pit site as well as any fabrication work if required. ( i ) single pole ( a ) 13 m long stp, sp 72 round pole 45 ( ii ) double pole structures ( a ) 13 m long stp, sp 72 round pole 46 grouting of supports in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) grouting will be done in the block of size ( 450×450 ) mm ×1 / 6th of full length of the support, up to ground level, 300 mm plinth above the ground level with c.c. 1:3:6 ( cement, course sand and stone grit ) with muffing as per drawing, work includes back filling and proper ramming. ( i ) 13 m long stp, sp 72 round pole 47 grouting of stay rods ( 20×1800 ) mm including all work of excavation, cement concrete in size ( 0.60 × 0.60 × 0.30 ) m in ratio 1:4:8 cement, sand, 40mm brick ballast ) as per drg. including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. 48 earthing of supports with ms earth rod of ( 20×2500 ) mm long including excavation of pit and driving m.s. rod 3.0 m apart from support and 0.5m below the ground level and connecting below the earth electrodes with the help of g.i. wire no. 8 swg and earthing lugs. 49 guarding between two poles like single poles, double poles, four poles, etc. to guard lt, 33 kv line telephone and river crossing, road crossing etc. with g.i. wire no. 6 swg and g.i. wire no. 8 swg, including cutting with fabrication and fixing of guarding channel with clamps nut & bolts etc. as per drawing. 50 laying, spreading, lifting and final sagging of 3 phases of acsr dog conductor in accordance with profile and sag chart including binding, jumpering and fixing of p.g. clamp as per requirement in 03 nos. conductor in parallel. 51 re sagging laying, spreading, lifting and final sagging of 3 phases of acsr dog conductor in accordance with profile and sag chart including binding, jumpering and fixing of p.g. clamp as per requirement in 03 nos. conductor in parallel. 52 refitting of tilted 33 kv x arm & pin insulator. 53 providing & fixing of danger board at each location as per specification of the drawing with clamps etc. 54 chopping of branches of trees of eucalyptus, neem, keekar and other kind of trees along the route of the line and disposal of the same at suitable place. 55 making h.t. connections of the proposed line, on to the existing 33 kv bay / line from where line is eminating and another at the end of line to the terminal gantry at proposed 33 kv sub station. the work consists of fixing of tension fitting, insulators, jumpering, clamping and binding etc. at the end as per site conditions. 56 painting of following supports / structures with 2 coats of synthetic enamel paint after one coat of ready mix primer including cost of all material, as well as rubbing / cleaning of surface as required for proper completion of work. painting will be done by post office red paint from top to cross arm and remaining by aluminium paint. ( a ) 13 mtr, sp 72 poles including all channels / x arms / clamps etc ( i ) single supports 57 ( ii ) double supports 58 wrapping of barbed wire on 33 kv pcc poles / sp 55 st & sp 72 st poles as anti climbing device for a length of 0.9 mtr., wire pitch / gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75 mtr. from the ground complete with supply and fixing of lower end & upper end clamps made of m.s. flat 40×5mm complete with nuts & bolts & all other required material. 59 numbering of each supports by preparing background with dark yellow paint in the size of 150mm dia and writing support number 100mm high with black paint. 60 material required locl store. ( site to store saharanpur ) stp 11 mtr ( old & used ) 61 supply & fixing of stone pad ( 300×300×75 ) mm 62 12.h.t. power cable laying :i ) digging of trench of size 900x1050 mm for laying of 33kv cable including loops. 63 ii ) safely laying of33kv 3x300mmsq xlpe cable in cable trench by laying 2 no. cables in each trench. ( single circuit laying ) 64 iii ) safe laying of 33kv xlpe cable in air on d / p / f / p. 65 laying of 33 kv cable in hdpe pipe. 66 iv ) laying of ist class bricks along the length on both sides and stone slab 650x450x40 as a top cover over the xlpe cable in trench. ( single circuit laying ) ( as per respo norms ) 67 g ) safely laying of hdpe 80 pn 150mm pipe by trienchlessmethode in double layertunnel under railway track for laying 33 kv xlpe cable 68 v ) filling river sand in side beneath & around cable in the trench. 69 v ) back filling of excavated earth in the cable trench up to the ground level and remming properly. 70 vi ) making of 33kv outdoor type heat shrink xlpe cable box of size 3x185mmsq and crimping of proper size aluminium lugs. work includes providing insulating tapes etc. 71 vii ) fixing 150mm dia 3 mtr long g.i pipe over 33kv 3x300 mm2 xlpe cable before mounting the cable on double pole structure. this work includes supply & fixing of clamps, nut bolt, sealing of top and bottom of pipe and one end of pipe is to be buried under earth about 500mm including laying of cable in pipe....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40178885 tender for pole installation work on 33 kv line mandi sameti road ( 2 ) increasing capacity of 33 / 11 kv substation hussen basti ( saharanpur ) ( 2×5 ) to ( 10+5 ) mva. 1 1. supply of following materialg.i. angle ( 65×65×6 ) mm 2 g.i. channel ( 100×50 ) mm 3 g.i wire no. 6 swg 4 g.i wire no. 8 swg 5 m.s. earthing rod 6 v type cross arm 33 kv 7 cross arm holding clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 8 guarding clamp for s.t. pole 11 m & 13m long 9 f bracket for 33 kv 10 danger board with clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 11 number plate with clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 12 aluminum binding wire 13 barbed wire 14 read oxide paint 15 aluminium paint 16 m.s. bolts nuts & washers 17 earth wire clamp with nut & bolts 18 eye bolt 19 concreting of support 20 stone pad ( 300×300×75 ) mm 21 turn buckle 22 guarding angle 75×75×8 23 gi wire 16swg for binding 24 supply of heat shrinkable out door jointing kits suitable for 11kv, 3x300q.mm xlpe cable ( raychem / densionor pvvnl approved vender ) . 25 33 kv line isolator 26 2. safe carriage of with loading & unloading at both ends respectively. ( under jurisdiction of pvvnl ) a ) steel tublar pole sp 72 13m ( bottom portiongalvanized ) 27 2. safe carriage of with loading & unloading at both ends respectively. ( under jurisdiction of pvvnl ) a ) steel tublar pole sp 72 13m ( bottom portiongalvanized ) 28 d ) 33 kv pin isulators ( polymer ) 29 e ) acsr dog conductor 30 f ) 33 / 11 kv, 10mva transformer 31 g ) 11kv xlpe cable 3x300mm² 32 h ) 33kv, 3×300mm² xlpe cable 33 4. dismantling of existing ( 5 mva 1 nos ) transformer keptat suitable place outside switchyarda ) disconnecting ht cable connection from 33kv side &11kv side of 05mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 34 b ) disconnecting copper flexible / earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 35 c ) disconnecting earthing strip from body of 05mva power transformer 36 d ) draining of transformer oil from conservator, radiators of existing 05 mva t / f, at 33 / 11 kv s / s hussen basti ( sre ) into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided by contractor. 37 e ) removal of conservator, radiators and other accessories from existing 05 mva power transformer. 38 f ) safe shifting of 05 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e / s.d.o ( distribution ) . 39 g ) re assembling of conservator, radiators and other accessories to existing 05 mva power transformer. 40 h ) re filling the transformer oil ( old & used in existing 5mvat / f ) 41 5 miscellaneous electrical works of increasing capacity of 33 / 11 kv substation hussen basti ( saharanpur ) ( 2×5 ) to ( 10+5 ) mva.installation of 33 / 11 kv, 10 mva transformer :a ) shifting of available 10 mva 33 / 11 kv, transformer to transformer plinth in switch yard. 42 b ) erection of shifted transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. 43 6. water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 2mm into the ground at 20 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the g.i. earth strip for transformer neutral connection, the earth strip will be welded to the g.i. pipe and neutral earthing support. 44 b ) fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and painted with one coat of ready mixed primer and two coat of enamel aluminium paint work includes connecting neutral bushing rod of power transformer and m.s. earthing strip with the help of flexible copper bond, m.s. bolt and washer with stone pad of size ( 300x300x75mm ) . 45 7.ai ) fabrication and erection of cable support made of two pieces of m.s. channel ( 100x50x6 ) mm, 2.75 meter long, joined to each other by means of 5 nos. m.s. angle ( 50x50x6 ) mm pieces of size 0.75mtr long each by welding at equal intervals and grouting in a block of size ( 300x1000x1000 ) mm in c.c. 1:3:6 complete with one coat of ready mixed primer and two coats of al. paint. work includes providing of three nos. m.s. clamps made of ( 50x6 ) mm m.s. flat for holding the cable including nuts and bolts with stone pad of size ( 300x300x75mm ) . 46 b ) fixing 110mm dia 2mm thick 2m long g.i.pipe over 11kv, 3x300sq.mm xlpe cable before mounting the 2no. cable on cable support structure. work includes fixing of clamp, sealing of top and bottom end of the g.i.pipe. one end of g.i.pipe is to be buried under earth about 500mm. 47 fabrication of copper bus bar of size ( 2500×50×6 ) mm in l.v. side of 10 mva 33 / 11 kv, power transformer. work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 48 preparation of 11 kv power cable ends:making ofcable end termination by heat shrinkable out door jointing kits suitable for 11kv, 3x300q.mm xlpe cable. providing, fixing and crimping of proper size good quality lugs complete in all respect. 49 making ofcable end termination by heat shrinkable indoor jointing kits suitable for 11kv, 3x300q.mm xlpe cable.providing, fixing and crimping of proper size good quality lugs complete in all respect. 50 installation of 33 kv isolators with structure:assembling and installation of line isolator on the isolator structure. adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. in case of line isolator proper operation of earth links shall also be ensured. the work includes fabrication for proper fixing if required. 51 erection of following materiala erection of support after excavation of foundation pit in mix soil / normal soil / soft & hard rock and its back filling and leveling etc. the size of the pit will be ( 900×600 ) mm and having depth of 1 / 6th of the full length of the support & erection of support. the work includes carriage and handling of supports from site store to pit site. ( i ) 13 m long stp, sp 72 round pole 52 b fixing of all clamps, cross bracing sets 3.5 mtr. from m.s. angle 65×65×6mm / 50×50×6mm & other accessories on the supports as per drawing. work includes cutting of holes and providing m.s. bolts of 16×40mm size in the middle of cross bracing with 1 no. spring washer. the work also includes carriage & handling of accessories from sectional store to pit site as well as any fabrication work if required. ( i ) single pole ( a ) 13 m long stp, sp 72 round pole 53 grouting of supports in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) grouting will be done in the block of size ( 450×450 ) mm ×1 / 6th of full length of the support, up to ground level, 300 mm plinth above the ground level with c.c. 1:3:6 ( cement, course sand and stone grit ) with muffing as per drawing, work includes back filling and proper ramming. ( i ) 13 m long stp, sp 72 round pole 54 earthing of supports with ms earth rod of ( 20×2500 ) mm long including excavation of pit and driving m.s. rod 3.0 m apart from support and 0.5m below the ground level and connecting below the earth electrodes with the help of g.i. wire no. 8 swg and earthing lugs. 55 guarding between two poles like single poles, double poles, four poles, etc. to guard lt, 33 kv line telephone and river crossing, road crossing etc. with g.i. wire no. 6 swg and g.i. wire no. 8 swg, including cutting with fabrication and fixing of guarding channel with clamps nut & bolts etc. as per drawing. 56 laying, spreading, lifting and final sagging of 3 phases of acsr dog conductor in accordance with profile and sag chart including binding, jumpering and fixing of p.g. clamp as per requirement in 03 nos. conductor in parallel. 57 providing & fixing of danger board at each location as per specification of the drawing with clamps etc. 58 painting of following supports / structures with 2 coats of synthetic enamel paint after one coat of ready mix primer including cost of all material, as well as rubbing / cleaning of surface as required for proper completion of work. painting will be done by post office red paint from top to cross arm and remaining by aluminium paint. ( a ) 13 mtr, sp 72 poles including all channels / x arms / clamps etc ( i ) single supports 59 wrapping of barbed wire on 33 kv pcc poles / sp 55 st & sp 72 st poles as anti climbing device for a length of 0.9 mtr., wire pitch / gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75 mtr. from the ground complete with supply and fixing of lower end & upper end clamps made of m.s. flat 40×5mm complete with nuts & bolts & all other required material. 60 numbering of each supports by preparing background with dark yellow paint in the size of 150mm dia and writing support number 100mm high with black paint. 61 material required locl store. ( site to store saharanpur ) 62 supply & fixing of stone pad ( 300×300×75 ) mm 63 power t / f plinth repair...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

40177003 transformer capacity increasing, vcb installation and line related work in the area of electricity distribution division tiloi, distt. amethi under additional business plan year 2023 24. 1 loading, carriage of following item from store center. gauringaj / sultanpur to dump store inculuding unloading and proper stacking ( distance 0 70 km ) 2 pcc / st pole 3 acsr weasel conductor 4 25 / 63 / 100 kva transformer 5 11 kv cable boxindoor / outdoor 6 lt pvc cable 7 lt al lug 8 11 kv dis insulator with pin 9 11 kv pn insulator with pin 10 s / s base angle 11 top channel 12 earthing complete 13 stay set complete 14 ab cable ( 3*50+1*37+1*16 ) ( 3*95+1*70+116 ) 15 11 kv vcb i / c, o / g 16 other line materials 17 dragging of stp / pcc pole from dump store to pit site. 18 digging of pits up to the depth of 1650 / 2200 mm. as per site requriment . fabrication & erection of single pole support on pcc / st pole support inculding digging of pit respo norms ( only nuts& bolts will be provided by the contractor ) 19 digging of pits up to the depth of 1650 / 2200 mm. as per site requriment . fabrication & erectionduble pole support on p.c.c / st pole inculuding digging of pit & fixing of all accessories and clamps ( cost of elamps nuts & blots will be bron by the contractor ) as per respo norms. 20 grouting of stp / pcc pole ration 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm. above ground level as will as muffing of plinth. 21 spreading, laying & stringing of acsr weasel conductor for construction of 11 lv line as per respo morms. 22 ordinary earthing by 11 kv ms earth rod 2500 mm. long as per respo norm. 23 concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & blots other accessorise reuried form completing the work as well as its grouting by civil material viz. sand, stone ballast and contractor will provide all civil material as will as stay insulator 24 spreading, layingof ab cable 25 spreading, layingof lt pvc cable 26 installation of 25 / 63 / 100 kva transformer on newly constructed d / p making proper connection from 11kv system and proper testing as well as commissioning of transformer 27 fixing & jointing of cable box indoor / outdoor 28 dismantling / loading / unloading, carriage of old transformer from site store to store center gauriganj / sultanpur to dump store. ( distance 0 to 70 km. ) 29 25 kva 30 63 kva 31 installation and charging of incoming / outgoing vcb as per resspo norms. 32 vcb incoming / outgoing 33 handover of received materials to store center gauriganj. 34 note: if any work which has been left over in boq and is necessary to complete the work, the same will be carried outby working agency free of cost....

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40176969 schedule of work / technical specification for misc construction work of underground cable from 33 / 11 kv sub station avas vikas ( saharanpur ) . 2 m.s. earthing rod 3 top channel holding clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 4 e bracket for 33 kv 5 danger board with clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 6 number plate with clamp for pcc pole 9 m + s.t. pole 11 m long & 13m long 7 aluminum binding wire 8 barbed wire 9 read oxide paint 10 aluminium paint 11 m.s. bolts nuts & washers 12 earth wire clamp with nut & bolts 13 concreting of support 14 stone pad ( 300×300×75 ) mm 15 p.g. clamp for dog to dog conductor 16 outdoor type cable jointing kit for 33 kv xlpe cable 17 g.i pipe 150mm dia 3 mtr long. 18 laying of hdpe 80 pn 150mm pipe 19 route marker 20 2. safe carriage of with loading & unloading at both ends respectively. ( under jurisdiction of pvvnl ) a ) steel tublar pole sp 55 11m ( bottom portiongalvanized ) 21 d ) 33 kv pin isulators ( polymer ) 22 h ) 33kv, 3×300mm² xlpe cable 23 erection of following materiala erection of support after excavation of foundation pit in mix soil / normal soil / soft & hard rock and its back filling and leveling etc. the size of the pit will be ( 900×600 ) mm and having depth of 1 / 6th of the full length of the support & erection of support. the work includes carriage and handling of supports from site store to pit site. ( i ) 11 m long stp, sp 55 round pole 24 b fixing of all clamps, cross bracing sets 3.5 mtr. from m.s. angle 65×65×6mm / 50×50×6mm & other accessories on the supports as per drawing. work includes cutting of holes and providing m.s. bolts of 16×40mm size in the middle of cross bracing with 1 no. spring washer. the work also includes carriage & handling of accessories from sectional store to pit site as well as any fabrication work if required. ( i ) ouble pole structures ( a ) 11 m long stp, sp 55 round pole 25 grouting of supports in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) grouting will be done in the block of size ( 450×450 ) mm ×1 / 6th of full length of the support, up to ground level, 300 mm plinth above the ground level with c.c. 1:3:6 ( cement, course sand and stone grit ) with muffing as per drawing, work includes back filling and proper ramming. ( i ) 13 m long stp, sp 72 round pole 26 earthing of supports with ms earth rod of ( 20×2500 ) mm long including excavation of pit and driving m.s. rod 3.0 m apart from support and 0.5m below the ground level and connecting below the earth electrodes with the help of g.i. wire no. 8 swg and earthing lugs. 27 providing & fixing of danger board at each location as per specification of the drawing with clamps etc. 28 making h.t. connections of the proposed line, on to the existing 33 kv bay / line from where line is eminating and another at the end of line to the terminal gantry at proposed 33 kv sub station. the work consists of fixing of tension fitting, insulators, jumpering, clamping and binding etc. at the end as per site conditions. 29 painting of following supports / structures with 2 coats of synthetic enamel paint after one coat of ready mix primer including cost of all material, as well as rubbing / cleaning of surface as required for proper completion of work. painting will be done by post office red paint from top to cross arm and remaining by aluminium paint. ( a ) 13 mtr, sp 72 poles including all channels / x arms / clamps etc ( i ) double supports 30 wrapping of barbed wire on 33 kv pcc poles / sp 55 st & sp 72 st poles as anti climbing device for a length of 0.9 mtr., wire pitch / gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75 mtr. from the ground complete with supply and fixing of lower end & upper end clamps made of m.s. flat 40×5mm complete with nuts & bolts & all other required material. 31 numbering of each supports by preparing background with dark yellow paint in the size of 150mm dia and writing support number 100mm high with black paint. 32 supply & fixing of stone pad ( 300×300×75 ) mm 33 12.h.t. power cable laying :i ) digging of trench of size 900x1050 mm for laying of 33kv cable including loops. 34 ii ) safely laying of33kv 3x300mmsq xlpe cable in cable trench by laying 2 no. cables in each trench. ( single circuit laying ) 35 iii ) safe laying of 33kv xlpe cable in air on d / p / f / p. 36 iv ) laying of ist class bricks along the length on both sides and stone slab 650x450x40 as a top cover over the xlpe cable in trench. ( single circuit laying ) ( as per respo norms ) 37 g ) safely laying of hdpe 80 pn 150mm pipe by trienchlessmethode in double layertunnel under railway track for laying 33 kv xlpe cable 38 laying of 33 kv 3x300 sqmm al cable in hdpe pipe 39 v ) filling river sand in side beneath & around cable in the trench. 40 v ) back filling of excavated earth in the cable trench up to the ground level and remming properly. 41 vi ) making of 33kv outdoor type heat shrink xlpe cable box of size 3x185mmsq and crimping of proper size aluminium lugs. work includes providing insulating tapes etc. 42 vii ) fixing 150mm dia 3 mtr long g.i pipe over 33kv 3x300 mm2 xlpe cable before mounting the cable on double pole structure. this work includes supply & fixing of clamps, nut bolt, sealing of top and bottom of pipe and one end of pipe is to be buried under earth about 500mm including laying of cable in pipe. 43 fixing cable route marker...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40176959 replacing of 33 kv cable of work hospital chcok. ( 2 ) ( a ) guarding work of33 / 11 kv substation railway line. ( b ) guarding work of33 / 11 kv substation hakikatnagar line. ( c ) guarding work of33 / 11 kv substation avas vikas line. ( d ) guarding work of33 / 11 kv substation mankmau line. ( e ) guarding work of33 / 11 kv substation ambala road line. ( saharanpur ) 2 p.p. & clamp / guarding channel clamp 3 eye bolt 12×100mm2 4 g.i. wire no. 6 swg 5 g.i. wire no. 8 swg 6 turn buckle 7 gi wire 16swg for binding 8 outdoor type cable jointing kit for 33 kv xlpe cable 9 g.i pipe 150mm dia 3 mtr long. 10 laying of hdpe 80 pn 150mm pipe 11 cable rout marker 12 2. safe carriage of with loading & unloading at both ends respectively. ( under jurisdiction of pvvnl ) 33kv, 3×300mm² xlpe cable 13 12.h.t. power cable laying :i ) digging of trench of size 900x1050 mm for laying of 33kv cable including loops. 14 ii ) safely laying of33kv 3x300mmsq xlpe cable in cable trench by laying 2 no. cables in each trench. ( single circuit laying ) 15 iii ) safe laying of 33kv xlpe cable in air on d / p / f / p. 16 iv ) laying of ist class bricks along the length on both sides and stone slab 650x450x40 as a top cover over the xlpe cable in trench. ( single circuit laying ) ( as per respo norms ) 17 g ) safely laying of hdpe 80 pn 150mm pipe by trienchlessmethode in double layertunnel under railway track for laying 33 kv xlpe cable 18 safe laying in hdpe pipe 19 v ) filling river sand in side beneath & around cable in the trench. 20 v ) back filling of excavated earth in the cable trench up to the ground level and remming properly. 21 vi ) making of 33kv outdoor type heat shrink xlpe cable box of size 3x185mmsq and crimping of proper size aluminium lugs. work includes providing insulating tapes etc. 22 vii ) fixing 150mm dia 3 mtr long g.i pipe over 33kv 3x300 mm2 xlpe cable before mounting the cable on double pole structure. this work includes supply & fixing of clamps, nut bolt, sealing of top and bottom of pipe and one end of pipe is to be buried under earth about 500mm including laying of cable in pipe. 23 fixing of cable route marker...

Department Of Technical Education - Uttar Pradesh

40138869 bids are invited for computer lab workstation table , curvi linear workstation , student chair , high back revolving chair , executive table , visitor chair , steel almirah , open racks , desktop , 20 kva online ups , 48 port l2 smart managed network switch , 2 ton split ac with stabilizer , 75 inch interactive panel with ops , 4mp ip dome camer , 8 channel nvr with 2tb hdd , 8 port poe switch , cat6 utp cable box 305 mtr , cat6 utp 48 port patch panel , cat6 information outlet box with base and face plate , cat6 1 mtr patch cord , cat6 2 mtr patch cord , 15u rack with accessories , pvc conduit pipe 32 mm , supply of flexible pvc pipe 38mm , electrical wiring and networking total quantity : 1229...

Department Of Technical Education - Uttar Pradesh

40138713 bids are invited for computer lab workstation table , chair , high back revolving chair , executive table , visitor chair , steel almirah , open racks , desktop , 20kva online ups , 48 port l2 smart managed network switch , 2 ton split ac , intreactive panel , 4mp ip dome camera , 8 channel nvr , 8 port poe switch , cat6 utp cable box , cat6 utp 48 port patch panel , cat6 information outlet box with base and face plate , cat6 1 mtr patch cord , cat6 2 mtr patch cord , 15u rack with accessories , pvc conduit pipe , flexible pvc pipe , installation of all equipment electrical wiring and networking with 82 io box and sockets total quantity : 1229...

Indian Oil Corporation Limited - Uttar Pradesh

40137922 bids are invited for supply of utp cables liu and rj45 connectors utp cat6 cable box of 305 meters , utp cat 6 patch cord 01 mt , utp cat 6 patch cord 03 mt , utp cat 6 patch cord 05 mt , utp cat 6 patch cord 10 mt , connector rj45 , 24 port rack mounted liu fully loaded total quantity : 1740...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40122614 work of installation of 11 kv line underground cabling at various site under business plan scheme 2023 24 ( system strengthening work in muncipal area ) on semi turnkey basis in the area of ee, eudd i and eudd ix ghaziabad. under the jurisdiction of se, eudc i, ghaziabad. 1 carriage of 11 kv 3x120 sqmm xlpe cable from store centerto various work site loading and unloading both side. distance 1 km to 50 km. 2 carriage of 11 kv 3x70 sqmm xlpe cable from store centerto various work site loading and unloading both side. distance 1 km to 50 km. 3 carriage of 11 kv 3x185 sqmm xlpe cable from store centerto various work site loading and unloading both side. distance 1 km to 50 km. 4 carriage of st pole 11 mtr from store centerto various work site loading and unloading both side. distance 1 km to 50 km. 5 carriage of 11 kv polymeric pin insulator from store centerto various work site loading and unloading both side. distance 1 km to 50 km. 6 dismantling of st pole 11 mtr scrap old and used and safley carriage from work site to store center / je store loading and unloading both side. 7 dismantling of old & used conductor acsr weasel / dog..etc and safley carriage from work site to store center / je store loading and unloading both side. 8 dismantling of scrap old & used conductor acsr weasel / dog..etc and safley carriage from work site to store center / je store loading and unloading both side. 9 erection of st pole 11 mtr long at various site with all accessories complete in all respect as per respo norm. 10 providing and grouting / concreating of st pole at various site complete in all respect as per respo norm. 11 laying / lifting / sagging of 11 kv 3x120 sqmm xlpe cable at various site with all accessories complete in all respect as per respo norm. 12 laying / lifting / sagging of 11 kv 3x70 sqmm xlpe cable at various site with all accessories complete in all respect as per respo norm. 13 laying / lifting / sagging of 11 kv 3x185 sqmm xlpe cable at various site with all accessories complete in all respect as per respo norm. 14 laying / lifting / sagging of lt pvc cable 1x240 sqmm at various site with all accessories complete in all respect as per respo norm. 15 laying of 3x185 sqmm xlpe cable in double circuit in open cut with sand & bricks complete in all respect as per respo norm. 16 road restoration pakka & kaccha after cable laying complete in all respect of work as per respo norm. 17 fixing of polymeric pin insulator at various site complete in all respect as per respo norm. 18 supply & fixing of gi pipe 6 inch dia for hosting of cable at various site complete in all respect as per respo norm. 19 supply & fixing of barberd wire at various site complete in all respect as per respo norm. 20 supply & fixing of 11 kv cable hosting on dp with ms pipe at various site complete in all respect as per respo norm. 21 supply & fixing of 11kv cable box j / kit o / d 3x185 xlpe cable at various site complete in all respect as per respo norm. 22 supply & fixing of 11kv cable box j / kit o / d 120sqmm xlpe cable at various site complete in all respect as per respo norm. 23 supply & fixing of 11kv cable box j / kit o / d 70sqmm xlpe cable at various site complete in all respect as per respo norm. 24 supply & fixing of 11kv straight through for 3x185 xlpe cable at various site complete in all respect as per respo norm. 25 supply & fixing of danger board with clamp at various site complete in all respect as per respo norm. 26 supply & fixing of number plate with clamp at various site complete in all respect as per respo norm. 27 supply & fixing of clamp for top & droper channel, tpmo fuse set at various site complete in all respect as per respo norm. 28 supply & fixing of m.s channel at various site complete in all respect as per respo norm. 29 supply & fixing of m.s angle at various site complete in all respect as per respo norm. 30 supply & fixing of nut bolt of size at various site complete in all respect as per respo norm. 31 supply & fixing of stone pad at various site complete in all respect as per respo norm. 32 providing earthing of st pole with help ofm.s earthing rod 2540x20 mm at various site complete in all respect as per respo norm. 33 making of all ht / lt connections required to energize the line and restoring of electricity supply to consumer properly complete in all respect....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40104412 tender for computer work, maintenance of lt line, replacement of battery and charger, damage cable box, repair of oil/ vacuum circuit breaker, purchase and installation of battery and charger, repair of ct/pt unit, replacement of meter....

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

40083405 tender for capacity enhancement of 33 / 11 kv sub station 1 supply of following materials as per resspo / puvvnl norms at the work site. 2 33 / 11 kv 10 mva transformer 3 33 / 11 kv 05 mva transformer 4 33 kv vcb with single t / f control pannel 5 current transformer 200 / 100 / 1 a 6 33 kv single transformer control pannel 7 33 kv bus isolator 400 a 8 33 kv line isolator 800 a 9 33 kv fuse set 10 33 kv post insulator 11 33 kv lighting arresters 12 33 kv pt, 33 / 110v ip 13 acsr dog conductor 14 11 kv vcb i / c ctr 600 / 300 / 5a, 350 mva 24 bolt, 1250 amp. with differential 15 11 kv 3x300 sq.mm xlpe cable for i / c 16 11 kv 3x120 sq.mm xlpe cable for o / g 17 11 kv og fdr ctr 200 / 100 / 5a, 350 mva 18 supply of de centralized materials ( provided by contactor ) 19 laying of 11 kvcable including cost of sand and briks 20 making of 11 kv cable box mounted with swich gear and t / f 21 90 lbs rail pieces for t / f ( 44.64kg mtr. ) 22 11 kv 3x300 sq.mmcable jointing kit indoor / outdoor 23 11 kv 3x120 sq.mmcable jointing kit indoor / outdoor 24 control cable size 4x2.5 mm2 25 control cable size 2x2.5 mm2 26 plinth for power t / f 27 structor for 33 kv vcb with single t / f & 28 structor for ct 200 / 100 / 1 a 29 structor for fuse set 30 11 kv pt structor 31 structor for 33 kv bus isolator 400 a, 33 kv post insulator & 33 kv lighting arresters 32 clamp and connector for la ct, vcb, pt and isolator 33 earthing of power transformer 34 earthing of indoor equipments 35 sundries 36 work of following materials as per resspo / puvvnl norms at the work site. 37 shifting, loading, carriage of materials & making of plinth, carriage and resetting on new plinth including complete work for establishmentof5 mva t / f . 38 shifting, loading, carriage of materialsand resetting on existing plinth including complete work for establishmentof10 mva t / f . 39 shifting, loading, carriage & erection andinstallation of 33 kv vcb and its control panel for single transformer, construction of steel structure for the33 kv vcb and digging of pit, grouting of steel structure and making connection to earthing mat. 40 shifting, loading, carriage & erection andinstallation of current transformer 200 / 100 / 1 afor single transformer. 41 shifting, loading, carriage& erection andinstallation of 600 / 300 / 5a, 350mva i / c 11kv vcb panel. 42 shifting, loading, carriage& erection andinstallation of 200 / 100 / 5a outgoing 11kv vcb panel. 43 laying &terminationfrom t / f to 11 kv incoming pannel by 11 kv xlpe cable 300 sq.mm.digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth. 44 laying &termination from 11 kv outgoing control pannel to double pole by 11 kv xlpe cable 120 sq.mm. digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth. 45 shifting, loading, carriage & laying, spreading, lifting and final sagging of 3 phases of acsr dog conductor for makinng bus bar. 46 installation of bus isolator for 33 kv voltage and construction of steel structure for the same and digging of pit, grouting of steel structure and making connection to earthing mat. 47 installation of 33 kv line isolator 800 a and construction of steel structure for the same and digging of pit, grouting of steel structure and making connection to earthing mat. 48 installation of 33 kv fues set and construction of steel structure for the same and digging of pit, grouting of steel structure and making connection to earthing mat. 49 installation of post isolator for 33 kv voltage and construction of steel structure for the same and digging of pit, grouting of steel structure, and making connection to earthing mat. 50 installation of33 kv pt 33 / 110 volt 1p and construction of steel structure for the same and digging of pit, grouting of steel structure, and making connection to earthing mat. 51 installation oflightning arrestor for 33 kv voltage and construction of steel structure for the same and digging of pit, grouting of steel structure and making connection to earthing mat and one individual earthing connection from lightning arrestor 52 installation of 200 / 100 / 1 amp ct and construction of steel structure for the same and digging of pit, grouting of steel structure and making connection to earthing mat. 53 making joint by 11kv cable jointing kit outdoor 120 sqmm 54 making of 11 kv cable boxes ( 300sqmm ) mounted with sweatchgears &transformer 55 laying &termination control cable 4x2.5 sqmm. 56 laying &termination control cable2x2.5 sqmm. 57 taking off the old 5 mva transformer currently in use from the plinth and receive back it to the esc sonbhadra. 58 taking off the old 8 mva transformer currently in use from the plinth and receive back it to the esc sonbhadra....

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

40080608 works to be done for system strengthening in business plan scheme on semi turnkey basis including loading and unloading of material. 2 holding clamp for pcc pole cross arm 3 t / f clamp with 4 no washer n&b 4 11 kv stay clamp 8.5 mtr 5 f bracket 6 stay insulator 7 cable box i / d 3x185 sqmm 11 kv 8 cable box o / d 3x185 sqmm 11 kv 9 24 volt battery charger 10 24 volt battery set 11 supply of clamp meter 0 2000a 12 supply of clamp meter 0 100 mili ampire 13 supply of digital megger rating 5kv 14 supply of earth resistance tester 15 supply of multimeter 16 supply of primary current injection test kit for 600a, 5 kva with copper connection lead 185mm square 17 supply of digital megger rating 10 kv 18 supply of secondry relay test kit 02 set 19 top channel clamp 20 errection work...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40079917 works at proposed ( i ) increasing capacity of 33 / 11kv sub station palara, khurja bulandshahr from ( 5+10 ) mva to ( 2x10 ) mva ( ii ) increasing capacity of 33 / 11kv s / s jhangirabad town bulandshahr from ( 5+5 ) mva to ( 5+10 ) mva 1 (i) increasing capacity of 33/11kv s/s palara, khurja bulandshahr from (5+10)mva to (2x10)mvasupply of following material supply for neutral link l type galvanised structurei) galvanised channel (100x50x6)mm 2 ii) galvanised angle (50x50x6)mm 3 supply for cable support galvanised structurei) galvanised channel (100x50x6)mm 4 ii) galvanised angle (50x50x6)mm 5 iii) g.i.pipe 110mm dia 2mm thickness 2mtr long with g.i.clamp (size 50x6mm) 6 supply for copper bus bar support t type galvanised structurei) galvanised channel (100x50x6)mm 7 ii) galvanised angle (50x50x6)mm 8 iii) al. binding wire 9 supply of copper bus bar of size (2500x50x6)mm 10 supply of heat shrinkable indoor jointing kits suitable for 11kv, 3x300q.mm xlpe cable (raychem / densionor pvvnl approved vender). 11 supply of heat shrinkable outdoor jointing kits suitable for 11kv, 3x300q.mm xlpe cable (raychem / densionor pvvnl approved vender). 12 supply of 33 kv lightning arrestors as per pvvnl approved vendor. 13 supply of 90 lbs rail pieces for t/f (44.64kg/mtrs.) 14 supply of m.s.round 32mm dia for earthing. 15 supply of g.i. strip size 50x6mm for earthing of outdoor & indoorequipment 16 supply for water level earthing i) g.i. pipe size 40 mm inner dia & thickness 2mm 17 ii) solid copper cone approx 225 mm long and 750 gm in weight 18 iii) copper wire 6 swg 19 iv) copper flexible earthing strip of size 50x6mm for neutral 20 supply of ready mixed primer & isi mark aluminium paint & isi mark synthetic enaimel green paint for painting of installed all m.s.structure / g.i.strip (old & new). 21 safe carriage of following stock material from any stores centres under pvvnl, depending upon the availability of material at stores centres, with loading & unloading at both ends respectively.11kv xlpe cable 3x300sq.mm 22 miscellaneous works of increasing capacity of 33/11kv s/s, palara, khurja bulandshahr from (5+10)mva to (2x10)mva hiring of d/g set including carriage, loading, unloading & operating charges (with fuel) at 33/11kv substation under construction in case l.t. supply is not available near s/s within prescribed accessible limit.63kva, three phase, d/g set for fabrication of different structure at substation. 23 removal of existing 5mva transformer and other accessories equipments.disconnecting ht cable connection from 33kv side &11kv side of 05mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 24 disconnecting copper flexible/earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 25 disconnecting earthing strip from body of 05mva power transformer. 26 draining of transformer oil from conservator, radiators of existing 05 mva t/f, at 33/11 kv s/s palra khurja, bulandshahr into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided by contractor 27 removal of conservator, radiators and other accessories from existing 05 mva power transformer. 28 safe shifting of 05 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e/s.d.o (distribution). 29 re assembling of conservator, radiators and other accessories to existing 05 mva power transformer. 30 re filling the transformer oil (old & used in existing 5mva t/f) 31 plinth for 10 mva transformerconstruction of plinth for 10 mva, 33/11 kv transformer of (4.00x3.00x1.0)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached (all required matrials provided/supply by the contractor own his cost): excavation of earth in foundation. 32 cement concrete in foundation in ratio 1:6:12, cement, sand & brick ballast. all civil material supply by the contractor. 33 first class brick work in ratio 1:4 with cement & coarse sand mortar. all civil material supply by the contractor. 34 cement concreting inner side of plinth in ratio 1:4:8, cement, coarse sand and stone shingle. all civil material supply by the contractor. 35 m.s.work for re inforcement 12mm. tor at a distance of 15cms. apart, including cutting, bending & binding by wire to each other for making jal in two layer, 12 to 15cms. apart. m.s.12mm tor bar provided by the contractor his own cost. 36 fixing of 4mtr.long, 2no. rail pices, 90lbs, on top of plinth at proper distance in alignment by c.c. 37 cement concrete in ratio 1:2:4, cement, coarse sand & stone shingle, on top of the plinth, including fixing of m.s.tor jal. all civil material supply by the contractor. 38 12mm.thick cement plaster in ratio 1:4, cement & sand mortar, on all side of plinth. all civil material supply by the contractor. 39 neat cement coating 3mm.thick on top surface of plinth. all civil material supply by the contractor. 40 installation for 33/11kv 10mva t/f safe shifting of 10mva, 33/11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 41 erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 42 water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 2mm into the ground at minimum 50 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the g.i. earth strip for transformer neutral connection, the earth strip will be welded to the g.i. pipe and neutral earthing support. 43 earthing of outdoor equipment, details as given below: cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge and proper welding with m.s.bars. 44 digging of pits & making ofbridge on l.a. & t/f neutral earthingby laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 45 laying of g.i.earth strip of size 50x6mm for connecting the earth mat with steel structure. the work also includes cutting, bending, straigthning, over lapping and welding the earth strip with earth mat and various steel structures by using high quality arc welding in already digged trenches. 46 fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and work includes connecting neutral bushing rod of power transformer and g.i. earthing strip with the help of flexible copper bond, g.i. bolt and washer with stone pad of size (300x300x75mm). 47 fabrication and erection of cable support made of two pieces of g.i.channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 01 nos. g.i.channel (100x50x6)mm & 03 nos. g.i.angle (50x50x6) mm pieces of size 1.0mtr long each by welding at equal intervals and grouting in a block of size (300x1500x1000)mm in c.c. 1:3:6. work includes providing of three nos. g.i. clamps made of (50x6)mm g.i. flat for holding the cable including nuts and bolts with stone pad of size (300x300x75mm). 48 fixing 110mm dia 2mm thick 2m long g.i.pipe over 11kv, 3x300sq.mm xlpe cable before mounting the 2no. cable on cable support structure. work includes fixing of clamp, sealing of top and bottom end of the g.i.pipe. one end of g.i.pipe is to be buried under earth about 500mm. 49 fabrication and grouting of g.i. frames 3.60 mt. long & 1.8mtr wide on top for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the g.i. frame shall be made of g.i. channel (100x50)mm in t shape. providing 2 nos. support of g.i. angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator/post insulator. and grouting the frame in c.c. ratio 1:3:6 in a block of size (300x300x1000) mm with stone pad of size (300x300x75mm). the work also includes the fixing of 3 nos. post insulator with g.i. nut bolt & washers and binding the copper bus bar with the post insulator by aluminium binding wire in complete. 50 fabrication of copper bus bar of size (2500x50x6)mm in l.v. side of 10 mva 33/11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 51 h.t. power cable laying: laying 11 kv, (3x300) mm2 xlpe, cable from power transformer to 11 kv incoming switch gear in the cable trench 0.50 m wide, 0.90m depth. providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). the cable shall be dully protected by brick. on both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 nos. of bricks are to be laid top and outer side along the cable. the work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. 52 laying and dressing of 11 kv 3x300 mm2 power cable in air/trench. 53 preparation of 11 kv power cable ends:making ofcable end termination by heat shrinkable indoor jointing kits suitable for 11kv, 3x300q.mm xlpe cable. providing, fixing and crimping of proper size good quality lugs complete in all respect. 54 making ofcable end termination by heat shrinkable out door jointing kits suitable for 11kv, 3x300q.mm xlpe cable. providing, fixing and crimping of proper size good quality lugs complete in all respect. 55 installation of 33 kv lightning arrestorsinstallation of 33 kv lightning arrestors: assembling and installation/mounting of 3 nos. lighting arrestors on the l.a.’s structure/terminal gentry, complete with earthing and line connections. the work includes fabrication for proper fixing, if required. 56 testing & commissioning of power t/f and all 33kv & 11kv switchgears / panels.providing required no. of technicians with proper testing equipments during commissioning & energisation. 57 painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.all installed (old & new) m.s. structures in switchyard. 58 painting of g.i.earth strip (old & new) of size (50x6) mm with two coats of isi mark synthetic enaimel green paint. 59 safe carriage of old received back material from site to store including loading & unloading at both end. 60 (ii)increasing capacity of 33/11kv s/s jhangirabad bulandshahr from (2x5)mva to (5+10)mva supply of following items : supply for neutral link l type galvanised structurei) galvanised channel (100x50x6)mm 61 ii) galvanised angle (50x50x6)mm 62 supply for cable support galvanised structurei) galvanised channel (100x50x6)mm 63 ii) galvanised angle (50x50x6)mm 64 iii) g.i.pipe 110mm dia 2mm thickness 2mtr long with g.i.clamp (size 50x6mm) 65 supply for copper bus bar support t type galvanised structurei) galvanised channel (100x50x6)mm 66 ii) galvanised angle (50x50x6)mm 67 iii) al. binding wire 68 supply of copper bus bar of size (2500x50x6)mm 69 supply of 33 kv lightning arrestors as per pvvnl approved vendor. 70 supply of m.s.round 32mm dia for earthing. 71 supply of g.i. strip size 50x6mm for earthing of outdoor & indoorequipment 72 24 volt battery set as per pvvnl approved vender 73 battery charger 24 voltas per pvvnl approved vender 74 supply for water level earthing (01 nos)i) g.i. pipe size 40 mm inner dia & thickness 2mm 75 ii) solid copper cone approx 225 mm long and 750 gm in weight 76 iii) copper wire 6 swg 77 iv) copper flexible earthing strip of size 50x6mm for neutral 78 supply of ready mixed primer & isi mark aluminium paint & isi mark synthetic enaimel green paint for painting of installed all m.s.structure / g.i.strip (old & new). 79 miscellaneous works of increasing capacity of 33/11kv s/s, jhangirabad bulandshahr from (2x5)mva to (5+10)mva hiring of d/g set including carriage, loading, unloading & operating charges (with fuel) at 33/11kv substation under construction in case l.t. supply is not available near s/s within prescribed accessible limit.63kva, three phase, d/g set for fabrication of different structure at substation. 80 removal of existing 5mva transformer and other accessories equipments.disconnecting ht cable connection from 33kv side &11kv side of 05mva power transformer for removing power transformer from plinth after proper shutdown. dismantling of 11kv cable support structure, copper bus bar structure, m.s.frame etc. 81 disconnecting copper flexible/earthing strip from power transformer neutral & dismantling neutral earthing systemto facilitate removal of power transformer from plinth. 82 disconnecting earthing strip from body of 05mva power transformer. 83 draining of transformer oil from conservator, radiators of existing 05 mva t/f, at 33/11 kv s/s jahangirabad, bulandshahr into the dry & clean drums and stacking at the safe place in substation outside of switchyard. empty drums shall be provided by contractor 84 removal of conservator, radiators and other accessories from existing 05 mva power transformer. 85 safe shifting of 05 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e/s.d.o (distribution). 86 re assembling of conservator, radiators and other accessories to existing 05 mva power transformer. 87 re filling the transformer oil (old & used in existing 5mva t/f) 88 installation for 33/11kv 10mva t/f safe shifting of 10mva, 33/11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 89 erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 90 water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 2mm into the ground at minimum 50 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the g.i. earth strip for transformer neutral connection, the earth strip will be welded to the g.i. pipe and neutral earthing support. 91 earthing of outdoor equipment, details as given below: cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge and proper welding with m.s.bars. 92 digging of pits & making ofbridge on l.a. & t/f neutral earthingby laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 93 laying of g.i.earth strip of size 50x6mm for connecting the earth mat with steel structure. the work also includes cutting, bending, straigthning, over lapping and welding the earth strip with earth mat and various steel structures by using high quality arc welding in already digged trenches. 94 fabrication and erection of neutral earthing l type support made of m.s. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms and 0.75mtr bracing. structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and work includes connecting neutral bushing rod of power transformer and g.i. earthing strip with the help of flexible copper bond, g.i. bolt and washer with stone pad of size (300x300x75mm). 95 fabrication and erection of cable support made of two pieces of g.i.channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 01 nos. g.i.channel (100x50x6)mm & 03 nos. g.i.angle (50x50x6) mm pieces of size 1.0mtr long each by welding at equal intervals and grouting in a block of size (300x1500x1000)mm in c.c. 1:3:6. work includes providing of three nos. g.i. clamps made of (50x6)mm g.i. flat for holding the cable including nuts and bolts with stone pad of size (300x300x75mm). 96 fixing 110mm dia 2mm thick 2m long g.i.pipe over 11kv, 3x300sq.mm xlpe cable before mounting the 2no. cable on cable support structure. work includes fixing of clamp, sealing of top and bottom end of the g.i.pipe. one end of g.i.pipe is to be buried under earth about 500mm. 97 fabrication and grouting of g.i. frames 3.60 mt. long & 1.8mtr wide on top for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the g.i. frame shall be made of g.i. channel (100x50)mm in t shape. providing 2 nos. support of g.i. angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator/post insulator. and grouting the frame in c.c. ratio 1:3:6 in a block of size (300x300x1000) mm with stone pad of size (300x300x75mm). the work also includes the fixing of 3 nos. post insulator with g.i. nut bolt & washers and binding the copper bus bar with the post insulator by aluminium binding wire in complete. 98 fabrication of copper bus bar of size (2500x50x6)mm in l.v. side of 10 mva 33/11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 99 installation of 33 kv lightning arrestorsinstallation of 33 kv lightning arrestors: assembling and installation/mounting of 3 nos. lighting arrestors on the l.a.’s structure/terminal gentry, complete with earthing and line connections. the work includes fabrication for proper fixing, if required. 100 testing & commissioning of power t/f and all 33kv & 11kv switchgears / panels.providing required no. of technicians with proper testing equipments during commissioning & energisation. 101 installation of 24v battery and battery charger:assembling and installation of the cabinet of 24v battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. the electrical connection between battery and battery charge with flexible copper lead of size 7/20 swg shall be done properly. the work includes installation, wiring upto control panel, testing and commissioning complete in all respect. 102 painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.all installed (old & new) m.s. structures in switchyard. 103 painting of g.i.earth strip (old & new) of size (50x6) mm with two coats of isi mark synthetic enaimel green paint. 104 safe carriage of old received back material from site to store including loading & unloading at both end. ...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40079852 tender for increasing capacity of 33 / 11kv s / s nandgram 2, ghaziabad ( 1x10 ) mva to ( 2x10 ) mva; 1 supply of following material bus isolator 800a, 33kv as per pvvnl approved vendor. 2 33kv post insulator as per pvvnl approved vendor. 3 galvanized structure for 33 kv post insulator with plinth & foundation as per specification 4 33kv lightening arrester as per pvvnl approved vendor. 5 galvanized structure for 33 kv lightening arrester with plinth & foundation as per specification 6 33kv fuse set as per pvvnl approved vendor. 7 copper bus bar 2500x50x6mm 8 galvanized structure for cu bus bar 9 power transformer neutral g.i. l type stand of size 100x50x6mm channel with copper bound as per specification 10 g.i. cable support structure of size 65x65x6mm angle as per specification 11 90 lbs rail pieces for t / f ( 44.64kg / mtrs. ) 12 11kv cable j / kit outdoor type for 3x300mm xlpe cable. as per pvvnl approved vendor. 13 11kv cable j / kit indoor type for 3x300mm xlpe cable. as per pvvnl approved vendor. 14 providing of armoured control cable. as per pvvnl approved vendor.4x2.5 mm sq. armoured control cable. as per pvvnl approved vendor. 15 2x2.5 mm sq. armoured control cable 16 m.s.round 32mm dia for earthing of outdoor equipment earthing. 17 heat shrinkable outdoor type end termination cable jointing kit suitable for 11kv xlpe 3x185sq.mm. cable. as per pvvnl approved vendor. 18 heat shrinkable indoor type end termination cable jointing kit suitable for 11kv xlpe 3x185sq.mm. cable. as per pvvnl approved vendor. 19 carriage of following material from pvvnl store 33kv vcb with double t / f control panel and ct 400 / 200 / 1a with structure.i ) 33kv vcbii ) control panel i / c for 33kv double t / fiii ) ct 400 / 200 / 1 1aiv ) steel structure 20 11kv switchgear600 / 300 / 5a, 350mva, i / c 21 outgoing 200 / 100 / 5a 350mva 22 11kv xlpe cable 3x300mm² 23 acsr dog conductor for bay & jumpering. 24 11kv xlpe cable 3x185mm2 25 erection of following material & miscellaneous electrical works.l.a. / post insulator structures ( 1+1 ) :fabrication of structure, including cutting, straightening & drilling of holes in channel / angle / joists. m.s.plate to be fixed on structure of required size. 26 excavation of earth in size 2x ( 0.45x0.45x1.00 ) x2 27 erection of above structure in proper alignment. 28 grouting by c.c. in ratio 1:4:8, 2x ( 0.45x0.45x1.00 ) x2 all civil material supply by the contractor 29 making plinth by c.c. ratio 1:3:6, in size 2x ( 0.45x0.45x0.30 ) x2 all civil material supply by the contractor 30 12mm thick plastering on plinth in ratio 1:4 of size 4x ( 0.45x0.30 ) x2+4x ( 0.45x0.30 ) x2+2x ( 0.45x0.45 ) x2 all civil material supply by the contractor. 31 supply & fixing of stone pad. 32 plinth for 10 mva transformerconstruction of plinth for 10 mva, 33 / 11 kv transformer of ( 4.00x3.00x1.0 ) m ( 0.50m below ground level and 0.5 m above ground level ) as per details & drawing attached ( all required matrials provided / supply by the contractor own his cost ) : excavation of earth in foundation. 33 cement concrete in foundation in ratio 1:6:12, cement, sand & brick ballast. all civil material supply by the contractor. 34 first class brick work in ratio 1:4 with cement & coarse sand mortar. all civil material supply by the contractor. 35 cement concreting inner side of plinth in ratio 1:4:8, cement, coarse sand and stone shingle. all civil material supply by the contractor. 36 m.s.work for re inforcement 12mm. tor at a distance of 15cms. apart, including cutting, bending & binding by wire to each other for making jal in two layer, 12 to 15cms. apart. m.s.12mm tor bar provided by the contractor his own cost. 37 fixing of 4mtr.long, 2no. rail pices, 90lbs, on top of plinth at proper distance in alignment by c.c. 38 cement concrete in ratio 1:2:4, cement, coarse sand & stone shingle, on top of the plinth, including fixing of m.s.tor jal. all civil material supply by the contractor. 39 12mm.thick cement plaster in ratio 1:4, cement & sand mortar, on all side of plinth. all civil material supply by the contractor. 40 neat cement coating 3mm.thick on top surface of plinth. all civil material supply by the contractor. 41 plinth for 33 kv v.c.b.construction of plinth for the structure of 33 kv vcb & c.t.’s as per details for 01 no. ( all required materials provided / supply by the contractor own his cost ) : excavation of earth of size ( 2.0x2.0x1.0 ) m pits for construction of plinth. 42 brick ballast ratio ( 1:4:8 ) ( cement, sand & brick ballast ) for foundation work ( 2.0x2.0x0.5 ) m plinth. all civil material supply by the contractor. 43 r.c.c. work in ratio 1:2:4 ( cement, coarse sand & stone grit ) of 20m size for making plinth of size ( 2.0x2.0x1.0 ) m and grouting of foundation bolts 04 nos. for 33 kv vcb. all civil material supply by the contractor. 44 12mm thick plaster with cement mortar in ratio 1:4 ( cement & fine sand ) of plinth of 0.4m upper side all civil material supply by the contractor. 45 earthing of outdoor equipment details as given below: cutting of 32mm.dia m.s. bar 3mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge and delta proper welding with m.s.bars. 46 digging of pits triangular making ofbridge on l.a. & t / f neutral earthingby laying 32mm. dia m.s.round in rectangular shape. electric welding on cross joints by providing “u” clamp in size 25x6mm. of m.s.flat and inter connecting both by m.s.round 32mm.diawith over lap joint by providing m.s.round 12mm dia, on both sides of over lap joints of m.s.round, by electric welding. all joints shall be painted with black bituminious paint. 47 providing & laying of g.i.strip of size 50x6mm for connecting the earthmat with each equipment ( bus isolators, 33kv c.t., 33kv v.c.b., l.as., fuse set, post insulators, t / f body & its neutral and m.s.frame of cable supporting structure ) , various steel structures. the work also includes cutting, bendidng, straightening, over laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches. 48 painting of earth strip of size ( 50x6 ) mm with one coat of ready mixed primer with two coats of isi mark synthetic enamel green paint. 49 water level earthing by boring and lowering of g.i. pipe size 40 mm dia & thickness 3mm into the ground at 50 mtr depth or upto the water level with the lower end of solid copper cone approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 swg from the cone up to the ground surface where it will be bolted to the g.i. earth strip for transformer neutral connection, the g.i.earth strip size 50x6mm will be welded to the g.i. pipe and neutral earthing support & other installed equipment in switchyard. all required material provided / supply by the contractor his own cost. 50 construction of control cable trench in switchyard, as per details ( length 100mtr. ) :excavation of earth in size 0.750x0.40m. 51 c.c.work in foundation in ratio 1:4:8 ( cement, sand & brick ballast ) with proper ramming in size 0.750x0.15m. all civil material supply by the contractor. 52 ist class brick work in cement mortar in ratio 1:4 in size 0.23x0.35m. all civil material supply by the contractor. 53 25mm thick c.c. in floor of cable trench in ratio 1:2:4 ( cement, coursend and stone grift ) 20mm guage in size 0.3m width. all civil material supply by the contractor. 54 providing & grouting of m.s.strip of size 450x25x6mm in cable trench 100mm above floor level and at equal space distance 300mm 55 providing & grouting of m.s.angle iron of size 50x50x6mm in upper edge of trench. 56 c.c.work on the top in the ratio 1:2:4 in the grouting of edge of the trenches. 2x ( 100x0.23x0.06 ) all civil material supply by the contractor. 57 plastering of trench in cement, mortar in ratio 1:4, 12mm thick in cable trench. all civil material supply by the contractor. 58 fabrication and fixing cable trench cover of m.s.angle iron size 50x50x6mm of size 0.3m wide 0.5 to 1.0 mtr length with proper welding of 8mm size of bar 2nos. in length and 6nos. in width. work will be include providing of all required civil material & all fabrication material ( m.s.angle 50x50x6mm ) 0.5 mtr long 59 1.00 mtr long 60 removal of existing 3mva transformer and other accessories equipments.safe shifting of 03 mva power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern j.e / s.d.o ( distribution ) . 61 installation for 33 / 11kv 10mva t / f safe shifting of 10mva, 33 / 11 kv, power transformer from out side of switchyard to near power transformer plinth in switchyard. 62 erection & installation of 10mva power transformer on power transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. reconnecting 2 nos. earthing strip to transformer body. 63 fabrication and erection of neutral earthing l type support made of g.i. channel size 100x50mm. structure shall be 4 mtr. long with 1 mtr. arms.structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted of welding joint with one coat of ready mixed primer and two coat of enamel aluminium paint work includes connecting neutral bushing rod of power transformer and g.i. earthing strip with the help of flexible copper bond, g.i. bolt and washer. 64 fabrication and erection of cable support made of two pieces of g.i. angle ( 65x65x6 ) mm, 2.75 meter long, joined to each other by means of 5 nos. g.i. flat ( 50x6 ) mm pieces of size 750 mm long each by welding at equal intervals and grouting in a block of size ( 300x300x700 ) mm in c.c. 1:3:6 ( cement, coarse sand and stone ballast ) complete and painted of welding joint with one coat of ready mixed primer and two coat of enamel aluminium paint. work includes providing of three nos. g.i. clamps made of ( 50x6 ) mm g.i. flat for holding the cable including nuts and bolts. 65 fabrication and grouting of g.i. frames 3.60 mt. long for support of copper bus bar. bus bar will be provided in l.v. side of power transformer. the g.i. frame shall be made of g.i. channel ( 100x50 ) mm in ‘t’ shape. providing 2 nos. support of g.i. angle iron ( 50x50x6 ) mm, 0.60mt. long below the top channel, drilling of 3 nos. hole on the top channel for fixing of 11 kv pin insulator and painted of welding joint with one coat of ready mixed primer and two coat of enamel aluminium paint and grouting the frame in c.c. ratio 1:3:6 ( cement, coarse sand and stone ballast ) in a block of size ( 300x300x700 ) mm. the work also includes the fixing of 3 nos. 11 kv pin insulator with pin and binding the copper bus bar with the pin insulator by aluminium binding wire in complete. 66 fabrication of copper bus bar of size ( 2500x50x6 ) mm in l.v. side of 10mva 33 / 11 kv, power transformer, work includes connection of outside bus bar in l.v. side busing rod of power transformer and other side with outdoor 11 kv cable box as well as providing empire tape and h.t. tape etc. for proper insulation work. 67 installation of 11 kv switchgears in control room carefully & safely shifting of 11 kv switchgear panels from outside to inside the switch gear room grouting foundation of bolts in c.c. ratio of 1:2:4 ( including cutting of rcc floor and finishing of rcc floor ) as per requirement placing, aligning and fixing of 11 kv anchor gi bolts and nuts of proper size for completion of work in all respect. 68 safely mounting of 11 kv pt on 11 kv incoming switch gear filling of oil ( if required ) making all electrical connections and testing & commissioning of work. 69 proper fixing and making bus bar connection in between two switch gears after proper cleaning. work also include proper insulation, taping by empire, pvc and h.t. tape etc. 70 earthing of 11 kv switch gears:earthing of 11kv switchgears by means of g.i. earth strips ( 50x6 ) mm connecting to 4 nos. earthing electrodes of 32 mm dia. ( including fabrications of earthing electrodes ) 3m long on either side ( as per respo drg. res 40 ) .welding of g.i.earth strips ( 50x6 ) mm and also laying of the m.s.round 32mm dia in trench of control room and connecting to both sides squares including cost of g.i. earth strip ( 50x6 ) mm approx. 40m length and earthing of all indoor equipment by laying and providing g.i.earth strip ( 50x6 ) mm including cutting & welding etc. 71 h.t. power cable laying: laying 11 kv, ( 3x300 ) mm2 xlpe, cable from power transformer to 11 kv incoming switch gear in the cable trench 0.50 m wide, 0.90m depth. providing 150 mm local sand for cushion beneath and 150 mm above the cable ( quality of local sand required 0.375 cum / m in length ) . the cable shall be dully protected by brick. on both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable ( minimum 18 nos. of bricks are to be laid top and outer side along the single cable. the work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. 72 laying and dressing of 11 kv 3x300 mm2 power cable in air / trench. 73 laying and dressing of 11kv 3x185mm² power cable in puccka trench. 74 preparation of 11 kv power cable ends:making of 11 kv xlpe heat shrinkable outdoor jointing kits 3x185sq.mm / 3x300sq.mm after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs 75 making of 11 kv xlpe heat shrinkable indoor jointing kits 3x185sq.mm / 3x300sq.mm in switch gears after carefully removing the insulation of cable, providing and crimping of proper size of lugs, plumbing and taping of cable with good quality available insulation tape with j / kit boxes, fixing and insulating of lugs on cable with switch gear complete in all respect. 76 laying of different size of ( 2x2.5 ) mm2 / ( 4x2.5 ) mm2control cables i.e. from buchholz realy to marshalling box marshalling box to indication protection board in switch gear room, 33 kv ct’s to ct’s junction box, 33 kv ct, 33 kv pt, v.c.b. control panel junction box to 33 kv vcb control panel and control panel to 33 kv vcb outdoor operating mechanism panel from t / f etc. in the cable trench including making proper connection at buchholz relay, marshalling box and indication board as per required for installed equipment. 77 painting of structurespainting of the following structure with one coat of ready mixed primer and two coats of isi mark aluminium paint after rubbing with sand paper to the surface of the structure including labour and t&p complete in all respect.painting of substation structures 78 painting of substation structures 79 installation of 33 kv isolators:assembling and installation of line / bus isolator on the isolator structure. adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. in case of line isolator proper operation of earth links shall also be ensured. the work includes fabrication for proper fixing if required. 80 installation of 33 kv lightning arrestors: assembling and installation / mounting of 3 nos. lighting arrestors on the l.a.’s structure / terminal gentry, complete with earthing and line connections. the work includes fabrication for proper fixing, if required. 81 installation of 33 kv post insulators:installation of 3 nos. pi on structure. the work includes fabrication for proper fixing, if required. 82 installation of 33 kv fuse set:assembling and installation of fuse set on the fuse set structure. the work includes fabrication for proper fixing, if required. 83 installation of 33 kv vcbassembling and installation of 33 kv vcb on the vcb out door structure on the plinth. adjustment of operating mechanism in proper alignment for smooth operation of the same. the work also includes fabrication of addition arrangement for proper fixing, if required. 84 installation of 33 kv vcb control panel for double t / f carefully and safely shifting of 33 kv vcb control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 85 installation of 33 kv c.t.’s:installation of 3 nos. c.t.’s on the c.t’s structure. the work includes fabrication for proper fixing, if required to complete the work. 86 33 kv ct’s junction box:providing & fixing of junction box of size ( 400x400x150 ) mm made of g.i. sheet of 16 swg in between 33 kv ct’s & control panel. the work also include making proper connection on the junction box and making all connection in between ct’s and control panel complete as per manufacture’s panel drawing including testing and commissioning of work etc. complete the work. 87 33 kv bus bar jumpering:jumpering, including clamping / binding with acsr panther conductor / 33kv 3x300mm2 xlpe cable with providing p.g.clamp & other accessories.33kv bus bar to 33kv p.i 88 33kv p.i. to 33kv bus isolator 89 33 kv bus isolator to 33 kv vcb 90 33 kv vcb to 33 kv c.t 91 33 kv c.t to 33 kv fuse set. 92 33kv fuse set to 33kv l.a 93 33kv la to 33 / 11kv 10mva t / f 94 to provide required no. of technicians to work on power t / f, ht / lt panels & 33kv line during testing as assisting technical hands of test team during commissioning & energisation. 95 construction of sso’s approached road 1.2 mt wide in switch yard by laying dry brick ballast in 15 cm layer, 115 mm thick brick work 1:4 in both side of edge, providing 10 cm thick cc in ratio 1:2:4. the work include proper plastering top & side of road and making groove, leveling & dressing of earth beneath the brick work on edge. all required materials provived / supply by the contractor own his cost. 96 construction of fire protection wall size 5mtrx4.5mtr above ground level ( as per approved drawing ) . providing required civil material by the contractor. 97 dismantling of existing neutral link structure and transportation to pvvnl store. 98 hiring of d / g set including carriage, loading, unloading & operating charges ( with fuel ) at 33 / 11kv substation under construction in case l.t. supply is not available near s / s within prescribed accessible limit.63kva, three phase, d / g set for fabrication of different structure at substation....

Dakshinanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40077186 work of various electricity related works under business plan 2023 24 under electricity distribution division, firozabad and shikohabad area under electricity distribution circle, firozabad. 1 33 kv vcb with double t / f control panel and ct 200 / 100 / 1 1a ( 1 ) 33 kv vcb ( 2 ) control pannel i / c for 33 kv double t / f ( 3 ) ct 200 / 100 / 1 1a ( 4 ) street structure 2 control cable 4x2.5 sqmm 3 plinth & foundation of vcb ( provided by contractor ) 4 33 kv bus side esolator 5 structure of bus side isolator 6 33 kv xlpe cable box outdoor 7 33 kv xlpe cable alluminium 3x300 sqmm 8 pvc pipe 40 mm 9 acsr rabbit conductor 10 t off channel 11 m.s. t off channel 12 earthing 13 stay set complete ( with all related work ) 14 pcc pole 8.5 mtr long 15 11 kv v type cross arm 16 f clamp 17 11 kv cross arm holding clamp 18 11 kv pin insulator with pin 19 11 kv t.p.m.o. 20 11 kv disc insulator with fitting 21 stone pad ( 300x300x75 mm ) 22 clamp with nut & bolt with washers all size 23 m.s. angle 75x75x6x2028 mm 24 dropper channel 25 11 kv fuse set 26 top channel 27 received back old wiasel conductor...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40076567 work of bifurcation at various site under business plan scheme 2023 24 on semi turnkey basis in the area of ee, eudd v and eudd ix ghaziabad. under the jurisdiction of se, eudc i, ghaziabad. 1 carriage of st pole 11 mtr long from store center to various work site loading and unloading both side. distance 1 km to 50 km. 2 carriage of st pole 13 mtr long from store center to various work site loading and unloading both side. distance 1 km to 50 km. 3 carriage of xlpe cable 3x185 sqmm from store center to various work site loading and unloading both side. distance 1 km to 50 km. 4 carriage of acsr dog conductor from store center to various work site loading and unloading both side. distance 1 km to 50 km. 5 carriage of acsr raccon conductor from store center to various work site loading and unloading both side. distance 1 km to 50 km. 6 carriage of 11kv vcb outgoingfrom store center to work site loading and unloading both side. distance 1 km to 50 km. 7 carriage of line material as 11 kv polymeric pin insulator 143, polymeric pin insulator with pin 124, 11kv disc insulator 45kn 39 ….etc. from store center to various work site loading and unloading both side. distance 1 km to 50 km. 8 laying of xlpe cable 3x185 sqmm in overhead at various site with all accessories complete in all respect as per respo norms. 9 laying, lifting and sagging of acsr dog conductor at various site with all accessories complete in all respect as per respo norms. 10 laying, lifting and sagging of acsr raccon conductor at various site with all accessories complete in all respect as per respo norms. 11 safely placing of 11kv vcb outgoing at related substationsite with all accessories complete in all respect as per respo norms. 12 eraction of st pole 11 mtr at various site with all accessories complete in all respect as per respo norms. 13 eraction of st pole 13 mtr at various site with all accessories complete in all respect as per respo norms. 14 fixing of line material as 11 kv polymeric pin insulator 143, polymeric pin insulator with pin 124, 11kv disc insulator 45kn 39 at various site complete in all respect as per respo norms. 15 providing and concreting of stp 11 mtr & 13 mtr at various site complete in all respect as per respo norms. 16 supply & fixing m.s channel 125x65x1300 mm ( t off ) at various site with all accessories complete in all respect as per respo norms. 17 supply & fixing m.s nut and bolt with washer at various site with all accessories complete in all respect as per respo norms. 18 supply & fixing 11 kv i / d j / kit 3x185 sqmm at various site with all accessories complete in all respect as per respo norms. 19 supply & fixing 11 kv o / d j / kit 3x185 sqmm at various site with all accessories complete in all respect as per respo norms. 20 supply & fixing11 kv v type steel cross arm at various site with all accessories complete in all respect as per respo norms. 21 supply & fixing cross arm holding clamp with nut and bolt at various site with all accessories complete in all respect as per respo norms. 22 supply & fixing clamp with nut and bolt at various site with all accessories complete in all respect as per respo norms. 23 supply & fixing stone pad 300x300x75 at various site with all accessories complete in all respect as per respo norms. 24 supply & fixing m.s angle 65x65x6 mm at various site with all accessories complete in all respect as per respo norms. 25 supply & fixing m.s angle at various site with all accessories complete in all respect as per respo norms. 26 supply & fixing 11kv straight through cable box 3x185sqmm at various site with all accessories complete in all respect as per respo norms. 27 supply & fixing f clamp at various site with all accessories complete in all respect as per respo norms. 28 supply & fixing f bracket for fitting top inulator at various site with all accessories complete in all respect as per respo norms. 29 supply & fixing of earthing of st pole with earthing rod 2540x20 mm at various site with all accessories complete in all respect as per respo norms. 30 making of all ht / lt connections required to energize the line and restoring of electricity supply to consumer properly complete in all respect....

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

40076489 procurement of various de centralized materials under jurisdiction of edc fatehpur , lkexzh vkiwfrz dk fooj.k& , aluminium lug 400 mm2 , aluminium lug 240 mm2 , aluminium lug 120 mm2 , aluminium lug 70 mm2 , h.t. tape , l.t. tape , empire tape , fuse wire (10, 16 kva t/f) 28 swg , fuse wire (25 kva t/f) 26 swg , fuse wire (63, 100 kva t/f) 24 swg , fuse wire (250, 400 kva t/f) 22 swg , fuse wire (05 mva) 10 swg , fuse wire (08 and 10 mva) 8 swg , m seal (100gm) , nut bolt (off size) , p.g. clamps,(dog to dog) , terminal connector (c.t.&p.t and isolator jaw) , 11 kv cross arm clamp with nuts & bolts , 11 kv top channal clamp with nuts & bolts , t/f base channal clamp with nuts & bolts , z clamp for power t/f , f clamp for for 8.5 meter pcc pole with nuts & bolts , l.t. clamp with nuts & bolts , 33 kv isolator blade (round pole, flate pole) , 33 kv isolator jaw (round pole, flate pole) , tripping coil (24 volt dc) for (stelmake. toshiba, crompton greaves, pascal) , tripping coil (230 volt ac) for (stelmake. toshiba, crompton greaves, pascal) , closing coil (24 volt dc) for (stelmake. toshiba, crompton greaves, pascal) , closing coil (230 volt ac) for (stelmake. toshiba, crompton greaves, pascal) , silica gel , 11 kv cable jointig kit 3x185mm2 state through , 11 kv cable jointig kit 3x300mm2 state through , 11 kv cable jointig kit 3x185mm2 outdoor , 11 kv cable jointig kit 3x300mm2 outdoor , 11 kv incoming cable box (3x300 sqmm/3x185sqmm) , 11 kv outgoing cable box (3x185 sqmm/3x120sqmm) , megar 5 kv ...

Paschimanchal Vidyut Vitran Nigam Limited - Uttar Pradesh

40067442 tender for work of bifurcation tronica city 5 / 6, feeder no. 4 and installation of transformer in malik palace under edd i loni. 1 cartage of st pole 11 mtr. sp 55long, from central store gzb / shahibabad je store ( dist. ) to site of work including loading unloading of both ends. ( 0 50 km ) 2 cartage of transformer 11 kv / 0.4250 kva t / ffrom central store gzb / shahibabad to site of work including loading unloading at both ends. ( 0 50 km ) 3 cartage ofst pole clamps, acsr dog conductor., 1 kv pin insultor.11 kv disc insultor, ms top channel 100x50x2240mm, top channel 100x50x6 mm, ms dropper channel 100x50x2000, dropper channel 100x50x6 mm, 11 kv ht xlpe cable 3x185 sqmm, 11 ht cable box 3x185 xlpe sqmm o / d, 1x240 sqmm. al. cable xlpe, al. crimping lug 240 sqmm, aluminium lugs. , stay set complete. clamp nut & bolt, t off channel 100x50x6 mm, 11 kv cross arm, gi pipe 4 inch. dia, 11 kv vcb for o / g ctr 400 / 200 / 5a, 350 mva 24 volt.etc.from central store gzb / shahibabad je ( dist. ) to site of work including loading unloading at both ends. ( 0 50 km ) 4 erection of st pole 11 mtr long single pole with all accessories complete in all respect as per resspo norms 5 concreting / grouting of st pole 11mtr. long ( with material ) ofsupport up to ground level including back filling and rammingas per resspo specification. 6 fixing of st pole clamps complete in all respect with nut & bolts. 7 laying and stringing of acsr dog conductor complete in all respect. 8 fixing of 11 kv pin insultor. 9 fixing of 11 kv disc insultor. 10 fixing of ms top channel 100x50x2240mm 11 fixing of top channel 100x50x6 mm 12 fixing of ms dropper channel 100x50x2000 13 fixing of dropper channel 100x50x6 mm 14 mounting and fixing of 250 kv t / f with all accesries as per resspo norms. 15 laying of 11 kv ht xlpe cable 3x185 sqmm. 16 laying of 11 ht cable box 3x185 xlpe sqmm o / d. 17 laying of 1x240 sqmm. al. cable xlpe 18 fixing of al. crimping lug 240 sqmm. 19 fixing of aluminium lugs. 20 providing & fixing of t / f earthing ( nutral & body ) 21 providing & fixing of plinth & fencing of t / f in all respect. 22 fixing of stay set complete. 23 fixing of 11 kv fuse set. 24 fixing of 11 kv cross arm. 25 fixing of gi pipe 4 inch dia. 26 fixing of earthing complete. 27 fixing of clamp nut & bolt. 28 fixing of t off channel 100x50x6 mm. 29 laying of cable charge double ckt ( 2x270 ) 30 fixing of road restoration charges for cable crossing. 31 mounting & fixing of 11 kv vcb for o / g ctr 400 / 200 / 5a, 350 mva 24 volt. 32 providing & fixing of chemichal earthingfor v.c.b....

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

40066073 supply of material maintenance work in edd ii, edd phaphamau and edd handia under edc ii prayagraj. , item details , 400 sqmm allumi. lug long barrel of standard specification / weight. , 240 sqmm allumi. lug long barrel of standard specification / weight. , 120 sqmm allumi. lug long barrel of standard specification / weight. , 70 sqmm allumi. lug long barrel of standard specification / weight. , fuse wire 40 swg , fuse wire 38 swg , fuse wire 24 swg , fuse wire 22 swg , fuse wire 16 swg , fuse wire 14 swg , p.g. clamps, ( dog to dog ) aluminium , terminal connector ( c.t.&p.t and isolator jaw ) , ms flat 11 kv cross arm clamp 50x6 ms , 11 kv top channal clamp 50x6 ms , t / f base channal clamp , z clamp copper 10 mva, 5 mva power t / f , l.t. clamp 50x6 ms , 33 kv isolator blade ( round pole ) , 33 kv isolator jaw ( round pole ) , tripping coil ( 24 volt dc ) for ( stelmake. toshiba, cromptan greaves, pascal ) copper wound. , tripping coil ( 230 volt ac ) for ( stelmake. toshiba, cromptan greaves, pascal ) copper wound. , closing coil ( 24 volt dc ) for ( stelmake. toshiba, cromptan greaves, pascal ) copper wound. , closing coil ( 230 volt ac ) for ( stelmake. toshiba, cromptan greaves, pascal ) copper wound. , silica gel unit size 5 kg 1 / 2 connection , 11kvct resintype current current ratio 600 / 400 / 5 amp burden 15 va suitable for 11 kv ct resin type burden 15 va is 2070, 2705 , 11kvct resin type current current ratio 400 / 200 / 5 amp burden 15 va suitable for 11 kv ct resin type burden 15 va is 2070, 2705 , rubber matt 2x1 10 mm thick , 11 kv outgoing cable box ( 3x185 sqmm / 3x120sqmm ) , vaccum interpptor metalized ceremic for 11 kv crompton vcb current relay 1250 a 80 hz 11000 volt , vaccum interpptor metalized ceremic for 11 kv steelmake vcb current relay 1250 a 80 hz 11000 volt , vaccum interpptor metalized ceremic for 11 kv greavs vcb current relay 1250 a 80 hz 11000 volt , vaccum interpptor metalized ceremic for 11 kv pascal vcb current relay 1250 a 80 hz 11000 volt , vaccum interpptor metalized ceremic for 11 kv toshiba vcb current relay 1250 a 80 hz 11000 volt , magnetic oil guge wti / oti with...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

40065161 work of 33 kv / 11 kv / lt line shifting due to road widening of pilibhit bareilly mathura bharatpur road ( highway no. 33 ) from by pas tiraha ( ujhani ) to ambedker square ( ujhani ) in deposit scheme under edd iv ( ujhani ) , budaun.= 1 safe carriage including loading / unloading & proper stacking of following store materials from store centre, nawada, badaun / je store to site of work ( approx. distance 0 15 km. ) 2 s.t pole 11 mtr long 3 11 kv xlpe cable 3x185 mm 4 33 kv xlpe cable 3x300 mm 5 stay rod 6 stay wire 7 / 10 swg 7 11 kv disc insulator 8 11 kv disc fitting 9 earthing rod 10 g.i wire 6 / 8 swg 11 11 kv cable box 3x185 mm 12 33 kv cable box 3x300 mm 13 33 kv disc insulator 14 33 kv disc fitting 15 top channel 11 kv 16 dropper chanel 11 kv 17 dropper chanel 33 kv 18 stay clamp 19 top channel for 33 kv 20 x bracing 33 kv 21 clamp for hoisting 22 11 kv x bracing 23 fabrication, erection of 33 & 11 kv double pole structure for end terminations on 11 m long st pole with fixing of necessary clamps & other accessories like 1 no. top channel 100x50 mm – 2.24 mtr, bracing. its grouting in ratio 1:4:8, plinthing 300 mm above ground level, painting of pole with one coat of red oxide & two coats of enamel paint ( isi mark ) , earthing of support as per resspo norms & one side cable expose for road crossing ( all grouting material shall be provided by the contractor. ) 24 erection / fixing for stay set with stay wire and clamp as per resspo drawing including binding. climbing, clamping, tightening and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 before back filling of the pits as per resspo, cement, brick, concrete ballast, sand and etc would be provided by the contractor for 33 / 11 kv single support, double pole and four pole structure. 25 laying of 33 kv xlpe cable 3x300 sq.mm. in g.i. pipe 6” dia by trench less technology method by horizontal drilling system for road xing. ( single circuit ) the job includes the cost of excavation of earth, supply of g.i. pipe 6” dia laying of cable inside it. the work is to be carried out as per govt. approved drg. ( length of road crossing approx 80 mtr. including road ) . ( g.i. pipe will be provided by the contractor ) . 26 laying of 11 kv xlpe cable 3x185 sq.mm. by trench less technology method by deep drilling system. the job includes the cost of g.i. pipe 06” dia, excavation of earth, laying of cable inside it. the work is to be carried out as per govt. approved drg. ( g.i. pipe will be provided by the contractor ) . 27 hoisting of 3x300 mm2 33 kv xlpe cable on four pole / tri pole / double pole with gi pipe of size 6” dia including its jumpering complete with clamps nut and bolts. ( g.i pipe shall be provided by the contractor ) . ( for single circuit ) . 28 hoisting of 3x185 mm2 11 kv xlpe cable on double pole with gi pipe of size 6” dia including its jumpering complete with clamps nut and bolts ( g.i pipe shall be provided by the contractor ) . ( for single circuit ) . 29 fixing of 33 kv 3x300 sq.mm xlpe cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. 30 fixing of 11 kv 3x185 sq.mm xlpe cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. 31 back cartage of following used / scrap ( received by dismantling ) from site to store centre, nawada, budaun including / unloading etc. 32 s.t. pole 11 mtr. long. ( old & used ) 33 garter iron pole ( old & used ) 34 rail pole ( old & used ) 8 nos 35 top chanel 36 acsr weasel conductor ( old & used ) 37 metalik scrap...

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

39967957 tender for the supply of 11 kv and 33 kv cable jointing kit outdoor and st / thru. for maintenance of damage ht cable and cable box of 11 kv feederand underground cable ( railway crossing etc ) inthe juridiction of ee edd ii gopiganj 1 the supply of 11 kv and 33 kv cable jointing kit outdoor and st/thru 2 11 kv cable jointing kit outdoor 3x120 sqr.mm 3 11 kv cable jointing kit st/thru. 3x120 sqr.mm 4 11 kv cable jointing kit outdoor 3x185 sqr.mm 5 11 kv cable jointing kit st/thru 3x185 sqr.mm 6 11 kv cable jointing kit outdoor 3x300 sqr.mm 7 11 kv cable jointing kit st/thru 3x300 sqr.mm 8 33 kv cable jointing kit outdoor 3x185 sqr.mm 9 33 kv cable jointing kit st/thru. 3x185 sqr.mm 10 33 kv cable jointing kit outdoor 3x300 sqr.mm 11 33 kv cable jointing kit st/thru 3x300 sqr.mm ...

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

39965609 the supply of 11 kv and 33 kv cable jointing kit outdoor and st/thru. for maintaince of damage ht cable and cable box of 11 kv feeder and underground cable (railway crossing etc) in the juridiction of ee edd i bhadohi. , the supply of 11 kv and 33 kv cable jointing kit outdoor and st/thru , 11 kv cable jointing kit outdoor 3x120 sqr.mm , 11 kv cable jointing kit st/thru. 3x120 sqr.mm , 11 kv cable jointing kit outdoor 3x185 sqr.mm , 11 kv cable jointing kit st/thru 3x185 sqr.mm , 11 kv cable jointing kit outdoor 3x300 sqr.mm , 11 kv cable jointing kit st/thru 3x300 sqr.mm , 33 kv cable jointing kit outdoor 3x185 sqr.mm , 33 kv cable jointing kit st/thru. 3x185 sqr.mm , 33 kv cable jointing kit outdoor 3x300 sqr.mm , 33 kv cable jointing kit st/thru 3x300 sqr.mm...

Purvanchal Vidyut Vitaran Nigam Limited - Uttar Pradesh

39941152 for the work for erection of line for new connection on jhatpat portal, nives mitra and shifting under ee, uedd vii, varanasi. ; 2 decentralized item 3 lt copper z clamp for 25 / 63 / 100 4 lt copper z clamp for 250 5 alu. lug. 70 / 95 / 120 sqmm 6 lt cable s / c 1x35 sq mm 7 lt distribution box 8 danger board 9 dead end clamp with eye hook 10 dead end clamp with eye hook 11 suspension clamp with eye hook 12 stay clamp for stp / pcc 13 x arm clamp for stp / pcc 14 cross arm clamp for eye hook 15 lt insulated piercing clamp for enagiging d / b 16 m.s. nut & bolts off size 17 mid span jointing abc of different size 18 barbed wire 19 shackle insulator 20 loop / stay insulator 21 gi pipe 6 dia 22 stone pad 23 11 kv 3x70 sqmm o / d cable jointing kit 24 11 kv 3x70 sqmm i / d cable jointing kit 25 11 kv 3x70 sqmm s / t cable jointing kit 26 11 kv 3x120 sqmm o / d cable jointing kit 27 11 kv 3x120 sqmm i / d cable jointing kit 28 11 kv 3x120 sqmm s / t cable jointing kit 29 hdpe pipe 140 mm od pn 4 pe 80 grade as per is 4984 in 06 meter. 30 labour & cartage charges 31 erection & commissioning of ( 3x120 ) and 3x95 sq mm xlpe abc with all accessories dead end clamps, suspension clamps, lt cable s / c, connector such as clamp for pole and eye hook etc 32 sp. earthing of 25 / 63 / 100 / 250 / 400 kva t / f netural & body sepertaly with 40 mm g.i. pipe & 60 fit deep and connection with g.i. strip off size 30x5 mm including cost of material 33 loading unloading & carriage of condusctor, ms channel, angle, disc, pin, earthing & decentralised materials from raja talab central store to site 34 erection of d.p including grouting and plinthing of pole fitting fixing of s / s base of m.s. angle / channel, fixing of all accessories 35 errection & mounting of 25 / 63 / 100 / 250 / 400 kva t / f on d / p and making connection and jumpring. 36 loading unloading & carriage of 25 / 63 / 100 / 250 / 400 kva t / f from raja talab central store to site 37 loading unloading & carriage of conductor, abc size ( 3x120+1x95+1x16 ) sq mm , ms channel, angle, disc, pin, earthing & decentralised materials from raja talab central store to site 38 a ) abc size ( 3x120+1x95+1x16 ) & ( 3x95+1x70+1x16 ) sqmm and other material as per estimate 39 errecion of single pole spport of 9 / 11 mtr stp pole then grouting and plinthing of pole.fixing of fitting for lt line 40 laying and sagging of weasel for 11kv line 41 laying and sagging of dog for 11kv line 42 grouting & nozzling of stay with suitable pole clamp 43 painting of stp 9 / 11 mtr & fitting with one coat of red oxide post man colour & two coat al. paints including cost of materials 44 loading unloading & carriage of 11 mtr st pole / pcc pole from raja talab central store to site 45 fixing of dist. boxes on lt pole including all clamps and material for mounting, connection & sealing 46 fabrication and fixing of fitting on errected pole 47 connection of consumer service cable hrough distribution boxes after commissioning of abc line. 48 errection of earthing rod 49 erection & commissioning of ( 3x120+1x95+1x16 ) sq mm xlpe abc with all accessories dead end clamps, fixing of dist. boxes suspension clamps, such as clamp for pole and eye hook etc. 50 guarding of 11 kv line with gi wire along with lacing. 51 dismantling of old & use 9 / 11 mtr st pole with fitting 52 dismantling of old & used dog / weasel conductor 53 dismantling of diffirent capacity 11 / 0.4 kv t / f 54 cartage of dismantling material from site to store including loading and unloading. 55 cartage of cable and other materials 56 jointing of 11 kv i / d cable box for 3x70 / 3x120 sqmm. cable. 57 jointing and hoisting of 11 kv o / d cable box for 3x70 / 3x120 sqmm. cable. 58 jointingof 11 kv s / t cable box for 3x70 / 3x120 sqmm. cable. 59 making of cable trench for double ckt. cable & laying of cable in trench with soil filling in cable trence brick and sand will be supply by contractor / drilling...

Madhyanchal Vidut Vitran Nigam Limited - Uttar Pradesh

39916197 different types of work against system strengthening works in municipal area including noida / mau ( aiib ) scheme 2023 24 ( package no. 937, 938 and 939 / ce / si / aiib. / 2023 24 ) in the area of vrindavan under jurisdiction of e.e., eudd vrindavan, lesa, lucknow 1 safe loading, carriage & unloading of following materials from centre store to pit site/j.e. dump store. 2 (a) line material 3 (b) tf 250 kva 4 (c) 11 kv 3x70/3x120/3x185 sqmm xlpe cable 5 (d) abc 3x50/3x120 sq.mm. 6 (e) 11 kv pin insulator with gi pin 7 (f) 11 kv o d cable box 3x120 sqmm xlpe 8 (g) earthing complete for pole 9 (h) lt pvc 3.5x240 sq.mm. 10 (i) lt pvc 1x400 sq.mm. 11 (j) st pole 11 mtr long 12 (k) g.i. wire 8 swg 13 dragging of st pole digging of pit erection of sub station type double pole structure on st pole with fixing of necessary item such as top channel, along with grouting (as per respo norms) dropper channel, 11 pin insulator with pin & 11 kv disc insulator with fitting, do fuse set its ramming, as per respo specification. only pole and insulator will be provided by the department. 14 cable hosting of 11 kv 3x70/3x120/3x185/ sq. mm xlpe cable at the following including jumpering etc complete with help of gi pipe as perrespo norms. gi pipe and other required material shall be supplied by contractor. 15 high pressure testing of 11 kv 3x70/3x120/3x185 xlpe cable along with arrangement of high pressure equipment. 16 well type earthing of with 60 fit deep borring and providing gi pipe 1.5 dia (b class) and earthing must be joint by g.i. strip of 32x5 mm thick long attached with nut & bolts and gi pipe cap. all material and labour shall be supplied the contractor. 17 construction of t/f plinth of size 2x2x1.2 mtr with the help first class brick & masonry in the ratio 1:4 cement & sand coarse. filling the structure completely per norms with rcc to 1:2:2 cement & stone grit with ms bar and ms channel for resting transformer. all material and labour shall be supplied the contractor. 18 wiremess fencing of 11/0.4 kv s/s shall be made of rectangular of size as per site requirement not exceeding 3 meter fabrication 45x45x5 mm angel the frame is also have 1 no. horizontal runner of ms flat 40x5 welded in middle to support of wire mesh. rectangular welded type wire mess of size 50x25 made of 12 s.w.g. wire mess shall be welded all along the periphery of the frame as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. diagonal bracing of all the frame panel will be welded with ms flat of size 25x3mm to support as per respo specification & direction of e/i. 19 construction ofmasonry/metalic type distribution pillar of size 1x1.5x2.5 mtr. with supply & fixing of fabricated 4 nos. doors (2ft.x4ft.) made of bp sheet of 18 swg with locking arrangement, 2 nos. straight ms angle 50x50x6mm (1800 mm olng) 2 nos. 500 amp, 3 nos. 300 amp henely type tailess funse unit, 3 nos coper bus bar of size 1000x50x6 mm and one no. alum busbar 1000x50x6 mm including all civil material required for work. all material shall be supplied by contractor. 20 laying oflt cable 3.5x400 sq mm (double circuit) by drill method as per respo norms. only lt cable supplied by department. 21 cable hosting of ltxlpe cable at the following including jumpering etc complete with help of gi pipe as perrespo norms. gi pipe and other required material shall be supplied by contractor. 22 proper laying & commissioning of (3x50/3x120 sq.mm) xlpe aerial bunched conductor. only abc provided by deptt. 23 fixing and laying of lt pvc cable 1x400 sq.mm as per respo norms only pvc cable provided by department. 24 laying of3x70/3x120/3x185 sq.mm 11 kv xlpe cable by drill method as per respo norms. only 11 kv xlpe cable supplied by department. 25 supply and fixing of copper l piece for 250 kva tf (62x225x12 mm) as per respo norms 26 supply and fixing of copper alluminium lug for 250 kva tf (240/400 sqmm) as per respo norms 27 supply and fixing of 11 kv do fuse set as per respo norms 28 supply and fixing of lt tailless fuse unit 500 amp as per respo norms 29 supply and fixing of gi pipe 6 dia with clamp and nut bolt as per respo norms 30 fabrication, errection & commissioning of 250kvat/f on plinth with all accessories. all material except 250 kva t/f shall be supplied by the contractor. 31 other mislenious material. 32 g.s.t.extra as per rules. ...