Department of Social Justice and Empowerment - Uttar Pradesh
37834004 bids are invited for bicycle brake wire lf12 bicycle brake wire total quantity : 30000...
37834004 bids are invited for bicycle brake wire lf12 bicycle brake wire total quantity : 30000...
37711573 auction sale of property 1st floor almirah 1, ceiling fan 8, cooler – 1, invertor with battry 1, wooden chair and table 1 split ac indoor 1, second floor double bed 1, dressing table 1, ceiling fan 1, ground floor freeze 2, sylender 1, cake counter 4, micro weve 1, ceiling fan 5, chair 7, table 4, bench 4, deep freezer 1, counter 1, bicycle 1, iron box 1, stair 1, owen 1, atta mixture 1, wall fan 2, basement ceiling fan 5, chair 10, tabel 6, bench 6, centre counter1, sweet counter old 1, water coolar 1, freeze mini 1, roof old gen set 1, chair 1, coolar1...
37687478 auction sale of lot no: 2210216/ald lot name: bicycle tp...
37687476 auction sale of lot no: 2210215/ald lot name: bicycle tp...
37661183 bids are invited for bicycle top lug and other bicycle items lb89 bicycle top lug , lb98 bicycle bottom axle assy , lb99 bicycle bottom bracket shell total quantity : 185779...
37563163 bids are invited for bicycle is 2039:1991 (q3) total quantity : 25...
37488331 installation of open air gym in prayagraj city under smart city mission , supply & installation of open air gym in prayagraj city ( u.p ) under smart city mission , earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer in charge:all kinds of soil , exacavation in foundationordinary soil ( loam caly or sand ) including lift upto 1.5m and lead upto 30mtr. including filling, watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the structures. , cement concrte with 40 mm gauge approved stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all material, labour, tools & plant etc required for proper completion of work. , r.c.c. work with cement approved coarse sand and 2 cm. gauge approved stone grit in proportion of 1 : 1.5 :3 in raft foundation & footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 b.w. g.g.i. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, t & p etc. required for proper completion of the work including cost of binding wire. , 40 mm thick fine dressed red sand stone flooring ( size of red sand stone slab should not be less than 500mm x 500mm ) over 20 mm ( average ) thick base of cement mortar 1:5 ( 1 cement : 5 coarse sand ) , including pointing with cement mortar 1:2 ( 1 cement : 2 stone dust ) with an admixture of pigment to match the shade of stone. ( flooring pattern should be as per design and as directed by engineer in charge ) , s / f of smart city branding signage made of stainless steel plate of size 750x300 mm, 2 mm gaugeincluding letters engraved 1 mm deep & painted in the sheet fixed with 2 numbers of 1 m height cp pole of 50 mm dia and fixed with cement concrete as per design and drawing complete in all respect as directed by engineer in charge. , supplying and fixing of red stone bench having thickness of top slab not less than 3 fitted with stone rectangle block of size not less than 30x30 cms at both ends. length of bench should not be less than 6 ft ( end to end support ) .width of bench 2 feet and height 1.75 feet as per design and drawing complete in all respect as directed by engineer in charge. , pull chair ( double ) providing and fixing pull chair in a pair with below specifications: with five year maintenance 1. dimensions ( lxwxh ) : 1950 x 700 x 2000 mm 2. fabricated with main post of nb100mm ( g.i. ) ‘c’ class pipe of approved make. 3. main frame of nb 50mm ( g.i. ) ‘c’ class pipe. 4. handle frame of nb 32mm ( g.i. ) ‘c’ class pipe. ( ‘nb’ stands for nominal bore i.e., internal diameter of pipe in millimeters ) 5. all pipes are powder coated with 80 120 micron thick akzo nobel or equivalent paints. 6. all joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 7. zinc primer paint is applied at all the welding points prior to finishing. 8. handle bars are provided with high end quality rubber grips. 9. base plate cover made of virgin lldpe plastic by rotational molding with 4.00mm thickness, uv resistant and colored. 10. seat to be made up from virgin lldpe manufactured by rotational molding with 4.00 mm thickness, colored, uv resistant and environmental friendly. 11. maintenance free bearings of skf or equivalent make duly oil sealed and self lubricated are used in the equipment manufactured. 12. the equipment are fitted with inbuilt limiters to prevent unwanted movements. 13. the equipment is fixed on ground with cement concreteand j shaped welded bolts of 18mm thickness. 14. once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. , chest press ( double ) providing and fixing chest press in a pair with below specifications:with five year maintenance 1. dimensions ( lxwxh ) : 1800 x 700 x 2000 mm 2. fabricated with main post of nb 100mm ( g.i. ) ‘c’ class pipe of approved make. 3. main frame of nb 50mm ( g.i. ) ‘c’ class pipe. 4. handle frame of nb 32mm ( g.i. ) ‘c’ class pipe. ( ‘nb’ stands for nominal bore size i.e., internal diameter of pipe in millimeters ) . 5. all pipes are powder coated with 80 120 micron thick akzonobel or equivalent paints. 6. all joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 7. zinc primer paint is applied at all the welding points prior to finishing. 8. handle bars are provided with high end quality rubber grips. 9. base plate cover made of virgin lldpe plastic by rotational molding with 4.00mm thickness, uv resistant and colored. 10. seat to be made up from virgin lldpe manufactured by rotational molding with 4.00 mm thickness, colored, uv resistant and environmental friendly. 11. maintenance free bearings of skf or equivalent make duly oil sealed and self lubricated are used in the equipment manufactured. 12. the equipment are fitted with inbuilt limiters to prevent unwanted movements. 13. the equipment is fixed on ground with concrete and j shaped welded bolts of 18mm thickness. 14. once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. 15. high tensile steel with galvanized nut bolts are used for assembly. 16. equipment must comply to en16630 / din79000 international standard for outdoor fitness equipment. 17. self explanatory stainless steel label fixed on equipment for ease of use. , standing waist trainer providing and fixing standing waist trainer with below dimensions:with five year maintenance 1. dimensions ( lxwxh ) : 2000 x 700 x 1700 mm 2. fabricated with main post of nb 100mm ( g.i. ) ‘c’ class pipe of approved make. 3. main frame of nb 65 mm ( g.i. ) ‘c’ class pipe 4. handle frame support of nb 32mm ( g.i. ) ‘c’ class pipe. ( ‘nb’ stands for nominal bore size i.e., internal diameter of pipe in millimeters ) . 5. foothold plate of made of cast iron of 12mm thickness. 6. all pipes are powder coated with 80 120 micron thick akzonobel or equivalent paints. 7. all joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 8. zinc primer paint is applied at all the welding points prior to finishing. 9. maintenance free bearings of skf or equivalent make duly oil sealed and self lubricated are used in the equipment manufactured. 10. the equipment is fixed on ground with cement concreteand expansion bolts. 11. once the concrete is set, the equipment is fixed on to it. 12. high tensile steel with galvanized nut bolts are used for assembly. 13. equipment must comply to en16630 / din79000 international standard for outdoor fitness equipment. 14. self explanatory stainless steel label fixed on equipment for ease of use , space walker providing and fixing space walker with below specifications:with five year maintenance 1. dimensions ( lxwxh ) : 1100 x 550 x 1480mm 2. fabricated with main post of nb 100mm ( g.i. ) ‘c’ class pipe of approved make. 3. ‘u’ shaped main frame of nb 65mm ( g.i. ) ‘c’ class pipe. 4. all other pipes of nb 32mm ( g.i. ) ‘c’ class ( ‘nb’ stands for nominal bore i.e., internal diameter of pipe in millimeters ) 5. all pipes are powder coated with 80 120 micron thick akzonobel or equivalent paints. 6. all joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 7. zinc primer paint is applied at all the welding points prior to finishing. 8. base plate cover made of virgin lldpe plastic by rotational molding with minimum 4.00mm thickness, uv resistant and colored. 9. foothold made of nylon alloy with rounded edges to prevent impact and injury. 10. maintenance free bearings of skf or equivalent make duly oil sealed and self lubricated are used in the equipment manufactured. 11. the equipment are fitted with inbuilt limiters to prevent unwanted movements. 12. the equipment is fixed on ground with cement concrete and j shaped welded bolts of 18mm thickness. 13. once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. 14. high tensile steel with galvanized nut bolts are used for assembly. 15. equipment must comply to en16630 / din79000 international standard for outdoor fitness equipment. 16. self explanatory stainless steel label fixed on equipment for ease of use. , bicycle providing and fixing bicycle with below specifications: with five year maintenance 1. dimensions ( lxwxh ) : 1000 x 600 x 1100 mm 2. fabricated with main post of nb 100mm ( g.i. ) ‘c’ class pipe of approved make. 3. main frame of nb 65mm ( g.i. ) ‘c’ class pipe. 4. handle support frame of nb 50mm ( g.i. ) ‘c’ class pipe. ( ‘nb’ stands for nominal bore i.e internal diameter of pipe in millimeters ) 5. all pipes are powder coated with 80 120 micron thick akzonobel or equivalent paints. 6. all joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 7.zinc primer paint is applied at all the welding points prior to finishing. 8. base plate cover made of virgin lldpe plastic by rotational molding with 4.00mm thickness, uv resistant and colored. 9. foothold made of nb 25mm ( g.i. ) ‘c’ class pipe. 10. seat to be made up from virgin lldpe manufactured by rotational molding with 4.00 mm thickness, colored, uv resistant and environmental friendly. 11. maintenance free bearings of skf or equivalent make duly oil sealed and self lubricated are used in the equipment manufactured. 12. the equipment are fitted with inbuilt limiters to prevent unwanted movements. 13. the equipment is fixed on ground with cement concreteand j shaped welded bolts of 18mm thickness. 14. once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. 15. high tensile steel with galvanized nut bolts are used for assembly. 16. equipment must comply to en16630 / din79000 international standard for outdoor fitness equipment. 17. self explanatory stainless steel label fixed on equipment for ease of use....
37474123 bids are invited for bicycle rim assy rear wheel 20 hole (q3) total quantity : 16800...
37448319 bids are invited for bicycle hero ranger type front fork (q3) total quantity : 22900...
37425541 bids are invited for bicycle spoke assy lf14 , lf15 , lf55 total quantity : 49000...
37409151 bids are invited for bicycle spoke assy lk21 bicycle spoke assy , lk22 bicycle spoke assy total quantity : 1440000...
37335775 bids are invited for bicycle mudguard lc58 , lc59 , la59 , lc17 , lf67 , lf09 total quantity : 116595...
37319262 auction sale of lot no: 2210216/ald lot name: bicycle tp...
37319261 auction sale of lot no: 2210215/ald lot name: bicycle tp...
37309576 bids are invited for bicycle full half chain cover lj48 bicycle full half chain cover total quantity : 19259...
37274912 bids are invited for bicycle sprocket la67 sprocket total quantity : 58856...
37128686 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) 4 , m0 10 ( list of works attached in tender document ) daily general checking ( list of works attached in tender document ) 5 air check of all four tires 6 complete greasing of wadhan 7 tap tap by tightening dad 8 fitting new tire tube to the rim and uncoupling it from the car. 9 removing a broken spring and fitting a new one 10 dad rest cover set silvana ( 54 pieces 01 set ) ( i ) 2 dad rest cover fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest cover fitting 12 seat cover sewn ( 20 pieces 01 set ) ( i ) 2 seat cover fitting 13 engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting , steering pump replacement 17 18 , replace water pump 19 , steering box replacement 20 , change gear box 21 22 , clutch plate replacement 23 , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining changing diaphragm washers 24 p0shpat cross change 25 , p0shaft center bearing replacement 26 , chassis brake replacement 27 change bicycle bagger 28 tire repair 29 king pin repair 30 crown wheel repair 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 air governor repair unloader valve repair 35 36 , change pressure head 37 tow change 38 air compressor replacement 39 , fuel pump replacement 40 return pipe replacement 41 fix steering pipe leakage opening and repairing the radiator tank 42 43 , uj crossing 44 , greasing in p0shaft center / opposite 45 , air lock repair 46 air pressure pipe replacement 47 head gas kit replacement 48 set timing 49 50 silencer repair and installation 51 change injector center wiring rubber replacement 52 radiator hose pipe replacement 53 accelerator and shift 54 engine man oil seal replacement repair fit by dismantling cross member 55 , dd unit repair 56 , radiator rubber pad replacement 57 change knuckle ring 58 |tail pinion oil seal replacement p shaft planch replacement 59 60 brake pipe replacement 61 62 opening and repairing diesel tank 63 diesel pipe replacement 64 stop diesel leakage 65 push rod replacement 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 replace dad gasket 69 70 spring bush replacement 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates 75 disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 76 vehicle headlight replacement 77 checking / switching on / replacing the roof lights of the vehicles checking / switching on / replacing the back light bulbs of the vehicles 78 79 checking / turning on / replacing the head light bulbs of the vans 80 checking / turning on / changing the indicator lights of the extensions 81 dad rest cover repair / opening / fitting of wadhans 82 refit 83 back rest repair fit , loading unloading work in work neck / store ( full day ) 01 job 84 placing goods in the store and making use of them and depositing the old goods in the rc store and doing other work of the store as told ( job card / computer ) 85 , ( full day ) 01 job 86 repairing a broken spring ( replacing a broken belt and assembling it ) 87 88 welding work ( in various increments and rc intake ) 01 job , checking and fixing the wiring of the indicator / back light 89 after checking the wiring of the entire extension, give ok. 90 , replacing air balloons. 91 , complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / pressure plate. 95 96 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) | repair / replacement of clutch master cylinder. 97 , opening and replacing the radiator. 98 , fitting the next spring after repairing it. repair / replacement of sleb cylinder. 99 replacement of passenger cabin fan. 100 101 passenger cabin fan repair. 102 replacing head rest cover of passenger seat. 103 tire repair. 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 electric welding per inch 107 108 mourner change 109 changing injectors 110 , egr valve replacement engine dead tepid match 111 112 vehicle checking and virus removal from the device 113 wiring harness check and repair 114 change sensor ( per unit ) 115 , ecu / ecm check / change 116 common rail change 117 repairing and fitting of two and a half pressure pumps checking / fitting fly wheel sensor correcting wadhans frequent drop outs 120 electric accelerator pedal replacement 121 change turbo...
37128676 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) 4 , m0 10 ( list of works attached in tender document ) daily general checking ( list of works attached in tender document ) 5 air check of all four tires 6 complete greasing of wadhan 7 tap tap by tightening dad 8 fitting new tire tube to the rim and uncoupling it from the car. 9 removing a broken spring and fitting a new one 10 dad rest cover set silvana ( 54 pieces 01 set ) ( i ) 2 dad rest cover fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest cover fitting 12 seat cover sewn ( 20 pieces 01 set ) ( i ) 2 seat cover fitting 13 engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting , steering pump replacement 17 18 , replace water pump 19 , steering box replacement 20 , change gear box 21 22 , clutch plate replacement 23 , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining changing diaphragm washers 24 p0shpat cross change 25 , p0shaft center bearing replacement 26 , chassis brake replacement 27 change bicycle bagger 28 tire repair 29 king pin repair 30 crown wheel repair 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 air governor repair unloader valve repair 35 36 , change pressure head 37 tow change 38 air compressor replacement 39 , fuel pump replacement 40 return pipe replacement 41 fix steering pipe leakage opening and repairing the radiator tank 42 43 , uj crossing 44 , greasing in p0shaft center / opposite 45 , air lock repair 46 air pressure pipe replacement 47 head gas kit replacement 48 set timing 49 50 silencer repair and installation 51 change injector center wiring rubber replacement 52 radiator hose pipe replacement 53 accelerator and shift 54 engine man oil seal replacement repair fit by dismantling cross member 55 , dd unit repair 56 , radiator rubber pad replacement 57 change knuckle ring 58 |tail pinion oil seal replacement p shaft planch replacement 59 60 brake pipe replacement 61 62 opening and repairing diesel tank 63 diesel pipe replacement 64 stop diesel leakage 65 push rod replacement 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 replace dad gasket 69 70 spring bush replacement 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates 75 disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 76 vehicle headlight replacement 77 checking / switching on / replacing the roof lights of the vehicles checking / switching on / replacing the back light bulbs of the vehicles 78 79 checking / turning on / replacing the head light bulbs of the vans 80 checking / turning on / changing the indicator lights of the extensions 81 dad rest cover repair / opening / fitting of wadhans 82 refit 83 back rest repair fit , loading unloading work in work neck / store ( full day ) 01 job 84 placing goods in the store and making use of them and depositing the old goods in the rc store and doing other work of the store as told ( job card / computer ) 85 , ( full day ) 01 job 86 repairing a broken spring ( replacing a broken belt and assembling it ) 87 88 welding work ( in various increments and rc intake ) 01 job , checking and fixing the wiring of the indicator / back light 89 after checking the wiring of the entire extension, give ok. 90 , replacing air balloons. 91 , complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / pressure plate. 95 96 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) | repair / replacement of clutch master cylinder. 97 , opening and replacing the radiator. 98 , fitting the next spring after repairing it. repair / replacement of sleb cylinder. 99 replacement of passenger cabin fan. 100 101 passenger cabin fan repair. 102 replacing head rest cover of passenger seat. 103 tire repair. 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 electric welding per inch 107 108 mourner change 109 changing injectors 110 , egr valve replacement engine dead tepid match 111 112 vehicle checking and virus removal from the device 113 wiring harness check and repair 114 change sensor ( per unit ) 115 , ecu / ecm check / change 116 common rail change 117 repairing and fitting of two and a half pressure pumps checking / fitting fly wheel sensor correcting wadhans frequent drop outs 120 electric accelerator pedal replacement 121 change turbo...
37128599 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) 4 , m0 10 ( list of works attached in tender document ) daily general checking ( list of works attached in tender document ) 5 air check of all four tires 6 complete greasing of wadhan 7 tap tap by tightening dad 8 fitting new tire tube to the rim and uncoupling it from the car. 9 removing a broken spring and fitting a new one 10 dad rest cover set silvana ( 54 pieces 01 set ) ( i ) 2 dad rest cover fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest cover fitting 12 seat cover sewn ( 20 pieces 01 set ) ( i ) 2 seat cover fitting 13 engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting , steering pump replacement 17 18 , replace water pump 19 , steering box replacement 20 , change gear box 21 22 , clutch plate replacement 23 , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining changing diaphragm washers 24 p0shpat cross change 25 , p0shaft center bearing replacement 26 , chassis brake replacement 27 change bicycle bagger 28 tire repair 29 king pin repair 30 crown wheel repair 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 air governor repair unloader valve repair 35 36 , change pressure head 37 tow change 38 air compressor replacement 39 , fuel pump replacement 40 return pipe replacement 41 fix steering pipe leakage opening and repairing the radiator tank 42 43 , uj crossing 44 , greasing in p0shaft center / opposite 45 , air lock repair 46 air pressure pipe replacement 47 head gas kit replacement 48 set timing 49 50 silencer repair and installation 51 change injector center wiring rubber replacement 52 radiator hose pipe replacement 53 accelerator and shift 54 engine man oil seal replacement repair fit by dismantling cross member 55 , dd unit repair 56 , radiator rubber pad replacement 57 change knuckle ring 58 |tail pinion oil seal replacement p shaft planch replacement 59 60 brake pipe replacement 61 62 opening and repairing diesel tank 63 diesel pipe replacement 64 stop diesel leakage 65 push rod replacement 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 replace dad gasket 69 70 spring bush replacement 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates 75 disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 76 vehicle headlight replacement 77 checking / switching on / replacing the roof lights of the vehicles checking / switching on / replacing the back light bulbs of the vehicles 78 79 checking / turning on / replacing the head light bulbs of the vans 80 checking / turning on / changing the indicator lights of the extensions 81 dad rest cover repair / opening / fitting of wadhans 82 refit 83 back rest repair fit , loading unloading work in work neck / store ( full day ) 01 job 84 placing goods in the store and making use of them and depositing the old goods in the rc store and doing other work of the store as told ( job card / computer ) 85 , ( full day ) 01 job 86 repairing a broken spring ( replacing a broken belt and assembling it ) 87 88 welding work ( in various increments and rc intake ) 01 job , checking and fixing the wiring of the indicator / back light 89 after checking the wiring of the entire extension, give ok. 90 , replacing air balloons. 91 , complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / pressure plate. 95 96 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) | repair / replacement of clutch master cylinder. 97 , opening and replacing the radiator. 98 , fitting the next spring after repairing it. repair / replacement of sleb cylinder. 99 replacement of passenger cabin fan. 100 101 passenger cabin fan repair. 102 replacing head rest cover of passenger seat. 103 tire repair. 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 electric welding per inch 107 108 mourner change 109 changing injectors 110 , egr valve replacement engine dead tepid match 111 112 vehicle checking and virus removal from the device 113 wiring harness check and repair 114 change sensor ( per unit ) 115 , ecu / ecm check / change 116 common rail change 117 repairing and fitting of two and a half pressure pumps checking / fitting fly wheel sensor correcting wadhans frequent drop outs 120 electric accelerator pedal replacement 121 change turbo...
37128154 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) 4 , m0 10 ( list of works attached in tender document ) daily general checking ( list of works attached in tender document ) 5 air check of all four tires 6 complete greasing of wadhan 7 tap tap by tightening dad 8 fitting new tire tube to the rim and uncoupling it from the car. 9 removing a broken spring and fitting a new one 10 dad rest cover set silvana ( 54 pieces 01 set ) ( i ) 2 dad rest cover fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest cover fitting 12 seat cover sewn ( 20 pieces 01 set ) ( i ) 2 seat cover fitting 13 engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting , steering pump replacement 17 18 , replace water pump 19 , steering box replacement 20 , change gear box 21 22 , clutch plate replacement 23 , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining changing diaphragm washers 24 p0shpat cross change 25 , p0shaft center bearing replacement 26 , chassis brake replacement 27 change bicycle bagger 28 tire repair 29 king pin repair 30 crown wheel repair 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 air governor repair unloader valve repair 35 36 , change pressure head 37 tow change 38 air compressor replacement 39 , fuel pump replacement 40 return pipe replacement 41 fix steering pipe leakage opening and repairing the radiator tank 42 43 , uj crossing 44 , greasing in p0shaft center / opposite 45 , air lock repair 46 air pressure pipe replacement 47 head gas kit replacement 48 set timing 49 50 silencer repair and installation 51 change injector center wiring rubber replacement 52 radiator hose pipe replacement 53 accelerator and shift 54 engine man oil seal replacement repair fit by dismantling cross member 55 , dd unit repair 56 , radiator rubber pad replacement 57 change knuckle ring 58 |tail pinion oil seal replacement p shaft planch replacement 59 60 brake pipe replacement 61 62 opening and repairing diesel tank 63 diesel pipe replacement 64 stop diesel leakage 65 push rod replacement 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 replace dad gasket 69 70 spring bush replacement 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates 75 disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 76 vehicle headlight replacement 77 checking / switching on / replacing the roof lights of the vehicles checking / switching on / replacing the back light bulbs of the vehicles 78 79 checking / turning on / replacing the head light bulbs of the vans 80 checking / turning on / changing the indicator lights of the extensions 81 dad rest cover repair / opening / fitting of wadhans 82 refit 83 back rest repair fit , loading unloading work in work neck / store ( full day ) 01 job 84 placing goods in the store and making use of them and depositing the old goods in the rc store and doing other work of the store as told ( job card / computer ) 85 , ( full day ) 01 job 86 repairing a broken spring ( replacing a broken belt and assembling it ) 87 88 welding work ( in various increments and rc intake ) 01 job , checking and fixing the wiring of the indicator / back light 89 after checking the wiring of the entire extension, give ok. 90 , replacing air balloons. 91 , complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / pressure plate. 95 96 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) | repair / replacement of clutch master cylinder. 97 , opening and replacing the radiator. 98 , fitting the next spring after repairing it. repair / replacement of sleb cylinder. 99 replacement of passenger cabin fan. 100 101 passenger cabin fan repair. 102 replacing head rest cover of passenger seat. 103 tire repair. 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 electric welding per inch 107 108 mourner change 109 changing injectors 110 , egr valve replacement engine dead tepid match 111 112 vehicle checking and virus removal from the device 113 wiring harness check and repair 114 change sensor ( per unit ) 115 , ecu / ecm check / change 116 common rail change 117 repairing and fitting of two and a half pressure pumps checking / fitting fly wheel sensor correcting wadhans frequent drop outs 120 electric accelerator pedal replacement 121 change turbo...
37128098 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) 4 , m0 10 ( list of works attached in tender document ) daily general checking ( list of works attached in tender document ) 5 air check of all four tires 6 complete greasing of wadhan 7 tap tap by tightening dad 8 fitting new tire tube to the rim and uncoupling it from the car. 9 removing a broken spring and fitting a new one 10 dad rest cover set silvana ( 54 pieces 01 set ) ( i ) 2 dad rest cover fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest cover fitting 12 seat cover sewn ( 20 pieces 01 set ) ( i ) 2 seat cover fitting 13 engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting , steering pump replacement 17 18 , replace water pump 19 , steering box replacement 20 , change gear box 21 22 , clutch plate replacement 23 , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining changing diaphragm washers 24 p0shpat cross change 25 , p0shaft center bearing replacement 26 , chassis brake replacement 27 change bicycle bagger 28 tire repair 29 king pin repair 30 crown wheel repair 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 air governor repair unloader valve repair 35 36 , change pressure head 37 tow change 38 air compressor replacement 39 , fuel pump replacement 40 return pipe replacement 41 fix steering pipe leakage opening and repairing the radiator tank 42 43 , uj crossing 44 , greasing in p0shaft center / opposite 45 , air lock repair 46 air pressure pipe replacement 47 head gas kit replacement 48 set timing 49 50 silencer repair and installation 51 change injector center wiring rubber replacement 52 radiator hose pipe replacement 53 accelerator and shift 54 engine man oil seal replacement repair fit by dismantling cross member 55 , dd unit repair 56 , radiator rubber pad replacement 57 change knuckle ring 58 |tail pinion oil seal replacement p shaft planch replacement 59 60 brake pipe replacement 61 62 opening and repairing diesel tank 63 diesel pipe replacement 64 stop diesel leakage 65 push rod replacement 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 replace dad gasket 69 70 spring bush replacement 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates 75 disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 76 vehicle headlight replacement 77 checking / switching on / replacing the roof lights of the vehicles checking / switching on / replacing the back light bulbs of the vehicles 78 79 checking / turning on / replacing the head light bulbs of the vans 80 checking / turning on / changing the indicator lights of the extensions 81 dad rest cover repair / opening / fitting of wadhans 82 refit 83 back rest repair fit , loading unloading work in work neck / store ( full day ) 01 job 84 placing goods in the store and making use of them and depositing the old goods in the rc store and doing other work of the store as told ( job card / computer ) 85 , ( full day ) 01 job 86 repairing a broken spring ( replacing a broken belt and assembling it ) 87 88 welding work ( in various increments and rc intake ) 01 job , checking and fixing the wiring of the indicator / back light 89 after checking the wiring of the entire extension, give ok. 90 , replacing air balloons. 91 , complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / pressure plate. 95 96 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) | repair / replacement of clutch master cylinder. 97 , opening and replacing the radiator. 98 , fitting the next spring after repairing it. repair / replacement of sleb cylinder. 99 replacement of passenger cabin fan. 100 101 passenger cabin fan repair. 102 replacing head rest cover of passenger seat. 103 tire repair. 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 electric welding per inch 107 108 mourner change 109 changing injectors 110 , egr valve replacement engine dead tepid match 111 112 vehicle checking and virus removal from the device 113 wiring harness check and repair 114 change sensor ( per unit ) 115 , ecu / ecm check / change 116 common rail change 117 repairing and fitting of two and a half pressure pumps checking / fitting fly wheel sensor correcting wadhans frequent drop outs 120 electric accelerator pedal replacement 121 change turbo...
37025171 auction sale of scrap items steel chair computer chair leveling machine with stand cooler cooler stand kettle ceilingfan lock revolving chair room heater rack pedestal fan almira exhaust fan box table type writer geyser computertable umbrella bicycle bench door fire extinguisher tasla etc.,...
36891714 bids are invited for bicycle is 2039:1991 total quantity : 250...
36889087 tender for request for proposal of implementation of public bicycle sharing project with 5 years comprehensive operation and maintenance in jhansi city...
36876732 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36876661 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36876627 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36876077 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36875824 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36875706 bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36875626 tender for bus maintenance job work 1 , m0 40 ( list of works attached in tender document ) 2 3 , m0 20 ( list of works attached in tender document ) . m0 10 ( list of works attached in tender document ) , daily general checking ( list of works attached in tender document ) 4 5 complete greasing of all four tires 6 7 bad tight and tap tap 8 , fitting new tire tube to the rim and uncoupling it from the vehicle. removing a broken spring and fitting a new one 9 10 , dad rest cover set sewed ( 54 pieces 01 set ) ( 1 ) 2 dad rest cover fitting fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest covers | seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 , engine ring work 14 engine replacement 15 fip pump replacement 16 radiator cleaning and fitting 17 , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 clutch plate replacement 22 23 changing diaphragm washers 24 p0shpat cross change , repairing of pads ( a ) wearing / greasing ( b ) replacing brake lining 25 , p0shaft center bearing replacement 26 27 chassis brake replacement change bicycle bagger tire repair 28 king pin repair 29 crown wheel repair 30 31 tire change 32 , tire puncture 33 brake hose repair and replacement 34 , air governor repair unloader valve repair 35 36 , change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement return pipe replacement 40 41 , fix steering pipe leakage 42 opening and repairing the radiator tank , uj crossing 43 44 , p0 shaft center / opposite greasing 45 air lock repair air pressure pipe replacement 46 47 head gas kit replacement 48 set timing 49 silencer repair and installation 50 change injector 51 center wiring rubber replacement radiator hose pipe replacement 52 accelerator and shift 53 engine man oil seal replacement repair and fit by opening cross member 54 55 , dd unit repair 56 , radiator rubber pad replacement 57 cly bdle ring replacement 58 59 , tail pinion oil seal replacement , p0 shaft flange replacement 60 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement stop diesel leakage 64 65 pura road change 66 wheel alignment 67 , diesel water separator replacement valve seal replacement 68 69 head gasket replacement spring bush replacement 70 71 speedometer chain replacement 72 turbo pipe replacement 73 74 electrical self opening / closing of gates disconnection / connection of alternators checking and completing the water by cleaning the terminals of the battery of wadhano 75 76 , checking / turning on / changing the roof lights of vehicles 77 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles checking / turning on / changing the indicator lights of vehicles 80 head rest cover repair / opening / fitting of extensions 81 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 placing goods in store and doing e u and depositing old goods in rc store and doing other work of store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing a broken spring ( replacing a broken belt and assembling it ) 87 welding work ( in various increments and rc intake ) 01 job 88 checking and fixing the wiring of the indicator / back light 89 , after checking the wiring of the entire extension, give ok. 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 inserting rings into the engine. 94 replacement of clutch plate / presser plate. 95 , checking and repairing the complete wiring of the extensions. ( of passenger cabin ) 96 97 , repair / replacement of clutch master cylinder. 98 replacing the radiator by opening it. , to remove and fit the next spring after repair. 99 repair / replacement of sleb cylinder. 100 replacement of passenger cabin fan. passenger cabin fan repair. replacing head rest cover of passenger seat. tire repair. 101 102 103 104 overhauling read 04 of wadhan. 105 , repair by opening the p.p. 106 sliding yoke repair 107 electric welding per inch 108 , mourner change 109 changing injectors 110 egr valve replacement 111 engine block tapid matching 112 vehicle checking and virus removal from the device wiring harness check and repair 113 114 change sensor ( per unit ) 115 , ecu / ecm check / change common rail change 116 117 repairing and fitting of two and a half pressure pumps 118 checking / fitting fly wheel sensor , correcting wadhans frequent drop outs electric accelerator pedal replacement change turbo...
36859654 tender for implementation of public bicycle sharing project with 5 year comprehensive operation and maintenance in jhansi city....
36857556 tender for implementation of public bicycle sharing project with operation and maintenance 5 year comprehensive in jhansi city...
36848135 tender for bus maintenance job work 1 m0 40 ( list of works attached in tender document ) 2 3 m0 20 ( list of works attached in tender document ) , m0 10 ( list of works attached in tender document ) 4 , daily general checking ( list of works attached in tender document ) 5 air checking of all four tires 6 complete greasing of the vehicle 7 tappet 8 fitting new tire tube to the rim and uncoupling it from the vehicle. 9 removing a broken spring and fitting a new one 10 head rest cover set silvana ( 54 pieces 01 set ) ( i ) 2 head rest cover fitting 11 back rest set sewn ( 20 pieces = 01 set ) ( i ) 2 back rest cover fitting seat cover sewed ( 20 pcs 01 set ) ( i ) 2 seat cover fitting 12 13 engine ring work 14 15 engine replacement fip pump replacement 16 radiator cleaning and fitting 17 steering pump replacement 18 replace water pump steering box replacement 19 20 change gear box 21 clutch plate replacement 22 , repairing wheel ( a ) wearing / greasing ( b ) changing brake lining 23 , changing diaphragm washers 24 p0shaft cross replacement 25 , p0shaft center bearing replacement 26 chassis brake replacement 27 bicycle hanger replacement 28 tire repair 29 king pin repair 30 crown wheel repair 31 32 , tire change 33 tire puncture brake hose repair and replacement 34 air governor repair 35 unloader valve repair 36 change pressure head 37 turbo replacement 38 air compressor replacement 39 fuel pump replacement 40 return pipe replacement 41 fix steering pipe leakage 42 opening and repairing the radiator tank 43 uj crossing 44 , greasing in p0shaft center / opposite 45 air lock repair 46 air pressure pipe replacement 47 head gas kit replacement 48 set timing 49 silencer repair and installation change injector 50 51 center wiring rubber replacement 52 radiator hose pipe replacement 53 accelerator and shift engine man oil seal replacement 54 repair and fit by opening cross member 55 dd unit repair 56 radiator rubber pad replacement 57 cly wheel ring replacement 58 tail pinion oil seal replacement 59 60 , p0 shaft flange replacement 61 brake pipe replacement 62 opening and repairing diesel tank 63 diesel pipe replacement 64 stop diesel leakage 65 push rod replacement 66 67 wheel alignment diesel water separator replacement 68 valve seal replacement 69 head gasket replacement 70 spring bush replacement speedometer chain replacement 71 72 turbo pipe replacement 73 electrical self unlocking / locking of vehicles 74 disconnection / connection of alternator of vehicles 75 checking and completing the water by cleaning the terminals of the battery of vehicles. 76 vehicle headlight replacement 77 checking / turning on / changing the roof lights of vehicles 78 checking / turning on / changing the back light bulb of vehicles 79 checking / turning on / changing the head light bulbs of vehicles 80 checking / turning on / changing the indicator lights of vehicles 81 head rest cover repair / opening / fitting of vehicles 82 refit 83 back rest repair fit loading unloading work in office / store ( full day ) 01 job 84 , placing and e u the goods in the store and depositing the old goods in the rc store. , putting goods in the store and eu and depositing old goods in rc store and doing other work of the store as told ( job card / computer ) 85 , ( full day ) 01 job 86 , repairing of broken spring ( reassembling broken plate ) welding work ( in various vehicles and rc section ) 01 job 87 checking and fixing the wiring of the indicator / back light 88 give ok after checking the wiring of the entire vehicle 89 90 replacing air balloons. 91 complete overhaul of air suspension. 92 unmounting and mounting the engine. 93 putting ring in engine. 94 , replacement of clutch plate / pressure plate. 95 checking and repairing the complete wiring of vehicles. ( of passenger cabin ) 96 repair / replacement of clutch master cylinder. 97 replacing the radiator by opening it. 98 fitting the next spring after repairing it. 99 sleb cylinder repair / replacement. 100 replacement of passenger cabin fan. 101 passenger cabin fan repair. replacing head rest cover of passenger seat. 102 tire repair. 103 overhauling of 04 wheels of the vehicle. 104 repair by opening the p0 gift. 105 106 , sliding yoke repair 107 electric welding per inch 108 mourner change changing injectors 109 110 egr valve replacement 111 engine head tapid matching 112 vehicle checking and virus removal from the device 113 wiring harness check and repair 114 change sensor ( per unit ) 115 ecu / ecm check / change 116 common rail change 117 repair and fitting of high pressure pump 118 checking / fitting fly wheel sensor 119 , correcting the fault of frequent leaving of the vehicle 120 electric accelerator pedal replacement 121 change turbo...
36785219 auction sale of lot no: 2210216/ald lot name: bicycle tp...
36785218 auction sale of lot no: 2210215/ald lot name: bicycle tp...
36754009 bids are invited for 1 diy kit 3d pen kit to explore the basic concepts of 3d modelling and design thinking. 3 2 diy kit a paper circuit is a low voltage electronic circuit that is created on paper using conductive copper tape , leds , buzzer , switches and a power source such as coincell battery. it’s a friendly way to learn, design and create your own electronics. 3 3 diy kit this diy 4 wheel drive robot chassis is the perfect mechanical platform for your robotics projects. this kit includes all the hardware and mechanical components required to build your robot, including motors, wheels, chassis, nut and bolts, etc. just add your electronics – arduino / raspberry pi and motor driver and you can start programming your robot. it offers a large space with predrilled holes for mounting sensors and electronics as per your requirement. 3 4 diy kit the arduino starter kit will help you get started in the world of electronics and embedded system programming.this kit is aimed at beginners and intermediates and can be used to junmp start your growth and learning towards diy electronics and embedded system. 3 5 diy kit teaches about art of designing and quick construction. creativity: unleash students’ creativity with more imaginative models. 3 6 diy kit gears and wheels with teeth. they are simple machines that harness force. bicycles, non digital clocks, wind up toys, and many other machines work with gears. machines typically use two or more gears of different sizes; one gear is often larger than the other. understand gears and builds your own motorized gear changing cars. can easily and quickly construct the models and dismantle too. 3 7 diy kit the kit contains more than 50 diy ( do it yourself ) projects with more than 40 interactive simulations and 10 real world model templates and a colorful user manual with its easy to follow instructions, smart electronics kit gives a hands on education in how electrical circuits work to run the everyday devices that theyre familiar with. theyll also gain valuable lessons in building circuit design. 2 8 diy kit with rechargable battery 1 9 diy kit the kit comes with 100+ pieces and an instruction manual for 25 activities. experiment by implementing the linkages mechanism concept in straw bot to imitate the movement pattern of various creatures. 2 10 engineer services 35 days engineer visit for the training of teachers and students 35...
36742713 tender for outsource mechanical work sitapur depot wrokshop 1 m0 40 ( list of works attached ) 2 3 4 m0 20 ( list of works attached ) engine reconditioning ( complete engine assembling ) gear box reconditioning ( complete repair ) 5 slack adjuster reconditioning 6 , power steering pump reconditioning bad tight and tap tap 7 8 , self repair ( reconditioning ) repair by opening completely. alternator repair ( reconditioning ) 9 10 removing broken spring and fitting new spring 11 bed rest cover saint silna ( 54 piece 1 set ) ( ) 2 dad rest cover fitting 12 13 back rest set sewn ( 20 pcs 01 set ) ( ) 2 back rest cover fitting seat cover fitting ( 20 pcs 01 set ) ( ) 2 seat cover fitting 14 engine ring work 15 engine replacement fip pump replacement 16 17 , steering pump replacement 18 replace water pump 19 20 change gear box , clutch plate replacement , steering box replacement fan type clutch plate repair , p0shaft center bearing replacement , repairing ( a ) wearing / greasing ( b ) replacing brake linings 25 chassis brake replacement 26 27 change bicycle bagger 28 tire repair king pin repair 29 crown wheel repair 30 , tire change 31 , tire puncture 32 , air governor repair 33 unloader valve repair 34 change pressure head 35 turbo replacement 36 , air compressor replacement 37 , fuel pump replacement 8 38 uj crossing 8 39 dad gas kit replacement 8 40 silencer repair and installation and 41 change injector £ 42 center wiring rubber replacement 43 engine man oil seal replacement 44 repair and fit by opening cross member 45 dd unit repair 46 radiator rubber pad replacement 47 cly bdle ring replacement 48 opening and repairing diesel tank 49 pura road change 50 51 wheel alignment 52 valve seal replacement replace dad gasket 53 , electrical self opening / closing of gates 54 , disconnection / connection of alternators 55 repair / opening / fitting of the dead rest cover of the seats. opening and refitting the seat cushion 56 57 back rest repair fit 58 repair of broken spring ( replacing and assembling broken belt ) loading unloading rate per person per day 59 60 , personnel rate per person per day for painter work 61 personnel rate per person per day for welding work 62 , personnel rate per person for carpenter / tin smith work 63 fixing by repairing cylinder dead. engine reconditioning. daily 64 65 , injector replacement ( per injector ) of bs04 / bs05 vehicles 66 change of fip of bs04 / bs06 vehicles. ring work of bs04 / bs06 vehicles 67 68 , engine overhaul of bs04 / bs06 vehicles 69 , opening / fastening radiator of bs04 / bs06 wadhans 70 cleaning and applying inter color of bs04 / bs06 vehicles 71 , bs 06 wadhan cleaning / cleaning and tying of yaria tank 72 73 change of urea filter of bs06 vadhans ac unit / fan belt replacement of bs04 / bs vadhans...
36742633 tender for outsource mechanical work kannouj depot wrokshop 1 2 3 m0 40 ( list of works attached ) 4 m0 20 ( list of works attached ) engine reconditioning ( complete engine assembling ) , gear box reconditioning ( complete repair ) 5 slack adjuster reconditioning 6 , power steering pump reconditioning 7 tappet 8 9 10 , self repair ( reconditioning ) repair by opening completely. alternator repair ( reconditioning ) removing a broken spring and fitting a new one dad rest cover set sewn ( 54 pieces 1 set ) ( ) 2 brad rest cover fitting back rest set sewed ( 20 pcs 01 set ) ( ) 2 back rest cover fitting seat cover sewn ( 20 pieces 1 set ) ( ) 2 seat cover fitting , engine ring work engine replacement fip pump replacement , steering pump replacement replace water pump 19 steering box replacement change gear box clutch plate replacement fan type clutch plate repair 24 p0shaft center bearing replacement repairing ( a ) wearing / greasing ( b ) replacing brake linings 25 chassis brake replacement 26 27 change bicycle bagger 28 tire repair 29 king pin repair crown wheel repair 30 tire change 31 , tire puncture 32 air governor repair 33 unloader valve repair 34 , change pressure dad 35 turbo replacement 36 air compressor replacement 37 fuel pump replacement 38 uj cross change dad gas kit change 39 40 silencer repair and installation 41 change injector 42 center wiring rubber replacement 43 engine man oil seal replacement 44 repair and fit by opening cross member 45 46 dd unit repair 47 , radiator rubber pad replacement 48 cly bdle ring replacement opening and repairing diesel tank 49 pura road change 50 51 wheel alignment 52 valve seal replacement replace dad gasket 53 electrical self opening of weirs / dams 54 disconnection / connection of alternators 55 repair / opening / fitting of the dead rest cover of the seats. opening and refitting the seat cushion 56 57 back rest repair fit 58 repair of broken spring ( replacing and assembling broken belt ) loading unloading rate per person per day 59 60 , personnel rate per person per day for painter work 61 personnel rate per person per day for welding work 62 63 , carpenter / tin smith work per person rate per person for repair of cylinder head. daily engine reconditioning. 64 65 , injector replacement ( per injector ) of bs04 / bs06 vehicles 66 , change of fip of bs04 / bs06 vehicles ring work of bs04 / bs06 vehicles 67 68 engine overhaul of bs04 / bs06 vehicles 69 , opening / tying radiator of bs04 / bs05 vehicles 70 , cleaning and applying inter color of bs04 / bs06 vehicles bs 06 wadhan cleaning / cleaning and tying of yaria tank 71 72 change of urea filter of bs06 vadhans 73 ac unit / fan belt replacement of bs04 / bs06 vehicles...
36740756 tender for bicycle / cycle stand fee recovery motor in front of the eastern gate of the district magistrates office...
36731025 tender for outsource mechanical work hardoi depot wrokshop 1 m0 40 ( list of works attached ) 2 3 4 m0 20 ( list of works attached ) engine reconditioning ( complete engine assembling ) gear box reconditioning ( complete repair ) 5 clack adjuster reconditioning 6 , power steering pump reconditioning 7 tappet 8 , self repair ( reconditioning ) open repair alternator repair ( reconditioning ) open repair 9 10 removing a broken spring and fitting a new one 11 bed rest cover set sewn ( 54 pieces 1 set ) ( ) 2 dad rest cover fitting 12 back rest set sewn ( 20 piece 01 set ) ( ) 2 back rest cover fitting | seat cover sewn ( 20 pieces 1 set ) ( ) 2 seat cover fitting 13 14 engine ring work 15 engine replacement 16 , fip pump replacement 17 , steering pump replacement 18 19 replace water pump , steering box replacement 20 change gear box clutch plate replacement fan type clutch plate repair p0shaft center bearing replacement , repairing ( a ) wearing / greasing ( b ) replacing brake linings 25 chassis brake replacement 26 27 change bicycle bagger 28 tire repair king pin repair 29 crown wheel repair 30 tire change 31 , tire puncture 32 air governor repair 33 unloader valve repair 34 change pressure head 35 turbo replacement 36 air compressor replacement 37 fuel pump replacement 38 uj crossing 39 40 replacing dead gas kit, repairing and installing silencer 41 change injector 42 center wiring rubber replacement 43 engine man oil seal replacement 44 repair and fit by opening cross member dd unit repair 45 46 radiator rubber pad replacement 47 cly bdle ring replacement 48 opening and repairing diesel tank 49 pura road change 50 51 wheel alignment 52 valve seal replacement replace dad gasket 53 electrical self opening / closing of gates 54 disconnection / connection of alternators 55 repair / opening / fitting of the dead rest cover of the seats. opening and refitting the seat cushion 56 57 back rest repair fit 58 repair of broken spring ( replacing and assembling broken belt ) loading unloading rate per person per day 59 60 , personnel rate per person per day for painter work 61 personnel rate per person per day for welding work 62 63 personnel rate for carpenter / tin smith work per person per day repairing cylinder dead. engine reconditioning. 64 65 , injector replacement ( per injector ) of bs04 / bs06 vehicles 66 , change of f.i.p. of bs04 / bs06 vehicles. ring work of bs04 / bs06 vehicles 67 68 engine overhaul of bs04 / bs06 vehicles 69 , opening / tying radiator of bs04 / bs05 vehicles 70 cleaning and applying inter color of bs04 / bs06 vehicles 71 , bs 06 vehicles cleaning / cleaning and bonding of yaria tank 72 73 change of urea filter of bs06 vadhans ac unit / fan belt replacement of bs04 / bs05 vehicles 73 , ac unit / fan belt replacement of bs04 / bs06 units...
36730914 outsource mechanical work rws depot wrokshop 2 , m0 20 ( list of works attached ) 3 4 engine reconditioning ( complete engine assembling ) 5 gear box reconditioning slack adjuster reconditioning 6 , power steering pump reconditioning 7 bad tight and tap tap 8 , self repair ( reconditioning ) open repair alternator repair ( reconditioning ) open repair 9 10 removing a broken spring and fitting a new one 11 dad rest cover set sewed ( 54 pieces 1 set ) ( ) 2 braid rest cover fitting back rest cover set sewed ( 20 pieces 01 set ) ( ) 2 back rest cover fittings 12 13 seat cover sewn ( 20 pieces 1 set ) ( ) 2 seat cover fitting 14 engine ring work 15 16 17 engine replacement fip pump replacement , steering pump replacement 18 replace water pump 19 , steering box replacement 20 change gear box 21 22 23 , clutch plate replacement fan type clutch plate repair 24 , p0shaft center bearing replacement om , chassis brake replacement , repairing ( a ) wearing / greasing ( b ) replacing brake linings 25 chassis brake replacement 26 27 change bicycle bagger 28 tire repair king pin repair 29 crown wheel repair 30 , tire change 31 , tire puncture 32 , air governor repair 33 unloader valve repair 34 change pressure head 35 turbo replacement 36 air compressor replacement 37 fuel pump replacement 38 uj crossing 39 , dad gas kit replacement 40 silencer repair and installation 41 change injector 42 center wiring rubber replacement 43 engine man oil seal replacement 44 repair and fit by opening cross member 45 dd unit repair 46 , radiator rubber pad replacement 47 change knuckle ring 48 opening and repairing diesel tank 49 push rod replacement 50 51 wheel alignment 52 valve seal replacement replace dad gasket 53 electrical self unlocking / locking of vehicles 54 , disconnection / connection of alternators 55 dad rest cover repair / opening / fitting of wadhans 56 seat cushion replacement 57 back rest repair fit 58 repairing a broken spring ( replacing a broken belt and assembling it ) 59 loading unloading rate per person per day 60 , personnel rate per person per day for painter work 61 personnel rate per person per day for welding work 62 63 , personnel rate per person for carpenter / tin smith work per day by repairing cylinder head. engine reconditioning. 64 , injector replacement ( per injector ) of bs04 / bs05 vehicles fip replacement of bs04 / bs06 vehicles ring work of bs04 / bs06 extensions engine overhaul of b.s.04 / b.s.06 vehicles , opening / tying radiator of bs04 / bs06 vehicles cleaning and applying inter color of bs04 / bs06 vehicles , bs 05 vehicles rebar tank cleaning / welding and bonding 72 change of urea filter of bs06 vadhans 73 ac unit / fan belt replacement of bs04 / bs06 vehicles...
36708083 bids are invited for bicycle is 2039:1991 ( q3 ) total quantity : 345...
36675424 bids are invited for bicycle is 2039:1991 (q3) total quantity : 250...
36647769 bids are invited for bicycle is 2039:1991 (q3) total quantity : 224...
36633681 bids are invited for bicycle is 2039:1991 (q3) total quantity : 5...
36616261 bids are invited for burn unit semi fowler bed with saline stand with mattress epoxy , bed side locker with epoxy coating , bed side attendant bench with epoxy coating , bed side stool , foot step epoxy coating , dressing trolley epoxy coating , examination couch epoxy coating , stretcher trolley epoxy coating , emergency drug cabinet trolley , bed side screen 3 folds , instruments trolley , suction machine with 2 jar electrical and foot operated , skin graph mesher , shoulder wheel , over head pully , static bicycle , quadriceps table , hubbys knife , ladder wall , muscular stimulator , ultrasound machine therapeutic 1 and 3 , paraffin wax bath , doctor chair , office almirah , bed sheet white , hospital blanket , ot towel , 3 seater visitor chair , hand gripper , shadowless lamp , vertical laminar flow , air curtain , air purification tower , iccu bed 4 fold with mattress epoxy coating , bed side attendant bench with epoxy coating , bed side monitor multi 5 channel function modular , multi parameter , pulse oxymeter , ecg machine digital 12 channel , central oxygen system 6 points , central suction system 6 points total quantity : 244...
36609589 auction sale of lot no: 14.0 lot name: old & scraped bicycle...
36595688 bids are invited for bicycle is 2039:1991 (q3) total quantity : 1240...
36525307 bids are invited for bicycle is 2039:1991 (q3) total quantity : 224...